Course Content

Unit 1 Work Planning Overview


Unit 2 Work Orders
Unit 3 Creating a Work Order
Unit 4 Changing Work Orders
Unit 5 PM Materials
Unit 6 Work Order List Displays

Work Order Processing - PM_WO_300 (v1.2) 2

PM_WO_300_Work Order Processing (v1.2) 1


Prerequisites and Roles

Prerequisites
PM UK_100 IRIS/SAP Awareness & Navigation
PM_200 Plant Maintenance Overview

Roles
All Plant Maintenance managers, supervisors, and
workers who will process work orders will take this class
Each PM class taken will allow different access roles for
different users, based on each users job and the IRIS
functionality needed to perform that job

Work Order Processing - PM_WO_300 (v1.2) 3

Plant Maintenance IRIS Project Goals

Integrate Plant Maintenance with Finance, Human


Resources, and Materials
Allow enhanced scheduling and planning for work
assignments
Provide work scheduling as well as management
reporting tools
Improve automated updates to customers about the
status of work
Implement a Preventive Maintenance system for
buildings, areas, and equipment
Use standard SAP functionality to collect utility use and
cost information for recharge calculations

Work Order Processing - PM_WO_300 (v1.2) 4

PM_WO_300_Work Order Processing (v1.2) 2


Unit 1

Work Planning
Overview
Work Order Processing - PM_WO_300 (v1.2) 5

The Plant Maintenance Process

Identify the Work Plan the Work Do the Work

Web Request Priority / Dates Parts Issued


Phone Call Labor Required Purchase Reqs
Parts

Preventive Maintenance
Procedures Record What was Done
History/Analysis
Schedules
Technical History Hours Worked

Breakdowns Comments

Costs Codes

Work Order Processing - PM_WO_300 (v1.2) 6

PM_WO_300_Work Order Processing (v1.2) 3


The Plant Maintenance Process in IRIS

Identify the Work Plan the Work Do the Work

Notification Goods Issue


Work Order
Purchase Order

Preventive Maintenance
Record What was Done
History/Analysis Task List
Maintenance Plan Order Confirmation
UK Business
Warehouse

Work Order Processing - PM_WO_300 (v1.2) 7

The Plants in Plant Maintenance

The Maintenance Plant


Represents the physical facility
The entire UK campus: buildings and grounds
Represents the place where maintenance materials are kept
Always UK10

The Planning Plant


Organizational in nature
There are 3 main Planning Plants:
- Main Campus PPD (CPPD),
- Medical Center PPD (MPPD), and
- Housing (HOUS)
Work groups are grouped by plant

Work Order Processing - PM_WO_300 (v1.2) 8

PM_WO_300_Work Order Processing (v1.2) 4


Functional Locations

The Functional Location Structure


The first level would be the campus (LX-)
The next level is the building
The next level is the floor
The next level is the room
There is a separate structure for Grounds (exterior space)

Work Order Processing - PM_WO_300 (v1.2) 9

Functional Location Structure - Buildings

The Building: LX-0082


College of Pharmacy
The Floor: LX-0082-01
College of Pharmacy, 1st floor
The Room: LX-0082-01-116A
College of Pharmacy, 1st floor, room 116A
LX-0082-ST
College of Pharmacy Stairway
LX-0082-EL
College of Pharmacy Elevator

Work Order Processing - PM_WO_300 (v1.2) 10

PM_WO_300_Work Order Processing (v1.2) 5


Functional Locations

How are Functional Locations used?


Maintenance repairs and work requests are written
referencing the functional locations.
Work orders may be listed by functional location or rolled
up to the organizational area (CPPD, MPPD, HOUS).
Accounting information for chargeback is automatically
assigned to the work order from the functional location.
(This may be overridden if required.)
Statistical reporting will provide summary work order
counts and costs at the functional location or the
organizational level(s) above it.
Equipment may be assigned to a functional location.

Work Order Processing - PM_WO_300 (v1.2) 11

Unit 2

Work Orders
Work Order Processing - PM_WO_300 (v1.2) 12

PM_WO_300_Work Order Processing (v1.2) 6


What is a Work Order?

A financial and work management transaction used to


plan and charge labor, stock materials, non-stock
purchases, and services
It is integrated with Financials, Materials Management,
and Human Resources in the IRIS system
It may be created from a Notification or without an
existing Notification
Multiple Notifications can be turned into ONE Work
Order

Plan the Work

Work Order Processing - PM_WO_300 (v1.2) 13

Why are Work Orders used?

Work Orders are used:


To plan and schedule work
To accumulate charges for work that will be recharged
to others
To document the costs of an event
For Preventive Maintenance work

Work Order Processing - PM_WO_300 (v1.2) 14

PM_WO_300_Work Order Processing (v1.2) 7


Who Creates Work Orders?

This function will be used primarily by the Dispatch


area (Work
Work Control Centers)
Centers to create orders to initiate
work to be done.
Authorized users responsible for creating orders for
their area will also have access to create work orders in
IRIS.

Work Order Processing - PM_WO_300 (v1.2) 15

Information on a Work Order


Order Type - A four-character code used to distinguish the
different work order types.
Examples: REPR = Corrective Repair; RENV = Renovation

Priority - An indicator of when this work should be


scheduled.
Examples: Daily Operations; Emergency

Object to be maintained Functional Location or Equipment


Functional Location - Place where the work is to be performed;
i.e., a building, floor, room, or exterior (Grounds)
Example: LX-0030-01-104 = 104 Student Center
(0030=Student Center, 01=First Floor, 104=Room 104)
Equipment Can be located at a Functional Location
Example: H-222 Ice Maker

Work Order Processing - PM_WO_300 (v1.2) 16

PM_WO_300_Work Order Processing (v1.2) 8


Optional Information on a Work Order

Description Text describing the work that is to be done;


this can include long text of unlimited length
Examples: Repair thermostat; Fix broken window

Work Duration Number of hours of planned labor


Example: 2 H (2 hours)

Main Work Center = 2 fields


Field 1 - initially created Unassigned - The work group responsible for
maintaining the order, equipment, etc. -
Field 2 - The responsible planning plant - based on the Functional
Location.

Work Order Processing - PM_WO_300 (v1.2) 17

Other Work Order Information

Person Assigned could be someone with a specialty in a


certain area

Materials parts and supplies needed to perform the work


Planned labor and materials
Actual labor and materials costs
Special Conditions Examples: may have to wait to do work
when patient leaves Hospital room or when students leave
residence hall, or may be hazardous materials in the area

Many of these items are added later as additional planning is


performed for more complex orders.

Work Order Processing - PM_WO_300 (v1.2) 18

PM_WO_300_Work Order Processing (v1.2) 9


Unit 2 Work Orders

Exercise 1

Display a
Work Order
IW33

Work Order Processing - PM_WO_300 (v1.2) 19

Unit 3

Creating a
Work Order
Work Order Processing - PM_WO_300 (v1.2) 20

PM_WO_300_Work Order Processing (v1.2) 10


Create a Work Order - IW31

There
There are
are 33 required
required fields
fields
on
on the
the first
first screen:
screen:

Order
Order Type
Type
Priority
Priority
Functional
Functional Location
Location
or
or Equipment
Equipment

Work Order Processing - PM_WO_300 (v1.2) 21

Work Order Types

Click
Click on
on the
the Possible
Possible
Entries
Entries icon
icon to
to see
see the
the list
list
of
of Order
Order Types.
Types.

Double-click
Double-click on
on the
the one
one
you
you want
want to
to use.
use.

Work Order Processing - PM_WO_300 (v1.2) 22

PM_WO_300_Work Order Processing (v1.2) 11


Work Order Types

Type Name
Cash Chargeout Order
CASH
Example: Fraternity Work
Special Event
EVNT
Example: Commencement
Preventive Maintenance
PREV
Example: Oil HVAC regularly
Renovation (Charged Out)
RENV
Example: Install new bathroom
Corrective (Repair)
REPR
Example: Repair hinge on door

Work Order Processing - PM_WO_300 (v1.2) 23

Priority

Click
Click on
on the
the drop-down
drop-down iconicon
in
in the Priority field
the Priority field to
to see
see the
the
choices.
choices.

Each
Each priority
priority has
has aa specified
specified time
time
span
span for the work. This
for the work. This time
time span
span is
is
incorporated in the Order.
incorporated in the Order.

Work Order Processing - PM_WO_300 (v1.2) 24

PM_WO_300_Work Order Processing (v1.2) 12


Priority

Description Start End Area(s)


Emergency 10 Min 24 Hours MPPD
Emergency 30 Min 24 Hours CPPD, Housing
General Maint. 7 Days 30 Days MPPD
Scheduleable Maint. 7 Days 30 Days CPPD, Housing
Daily Operations 1 Day 2 Days All
Research Fac. Res. 1 Hour 4 Hours CPPD
Priority Maintenance 1 Hour 4 Hours Housing
Patient Care 1 Hour 4 Hours MPPD
Elect. Improv. 3 Days 10 Days MPPD
Elect. Improv. CPPD, Housing
Renovations CPPD, MPPD
Renovations/AptChk Housing

Work Order Processing - PM_WO_300 (v1.2) 25

Functional Location

If
If you
you do
do not
not know
know the
the
Functional
Functional Location
Location code,
code,
you
you can
can click
click on
on the
the
Possible
Possible Entries
Entries
icon
icon to
to search
search for
for it.
it.

To
To see
see the
the complete
complete
Functional
Functional Location
Location
structure, enter LX first
structure,
and
and then
then click
click the
the
Structure
Structure List
List icon.
icon
icon.

Work Order Processing - PM_WO_300 (v1.2) 26

PM_WO_300_Work Order Processing (v1.2) 13


Functional Location

The
The Functional
Functional Location
Location search
search box
box will
will
appear.
appear.

Navigate
Navigate to
to the
the Text
Text (=
(= Description)
Description) tab.
tab.

Work Order Processing - PM_WO_300 (v1.2) 27

Functional Location

Enter
Enter your
your search
search text
text in the Description field.
The
The asterisk
asterisk is
is the
the wildcard
wildcard character.

Example: *mcvey* for


Example: for McVey
McVey Hall.
Hall.

Then
Then press
press the
the Enter
Enter key.
key.

Work Order Processing - PM_WO_300 (v1.2) 28

PM_WO_300_Work Order Processing (v1.2) 14


Functional Location

The
The Functional
Functional Location
Location
matches
matches will
will be
be displayed.
displayed.

Double-click
Double-click onon the
the
appropriate
appropriate location
location to
to
populate
populate the
the Functional
Functional
Location
Location field
field on
on the
the Work
Work
Order.
Order. Then
Then press
press enter.
enter.

Work Order Processing - PM_WO_300 (v1.2) 29

Create a Work Order IW31

The
The required
required fields
fields
are
are complete.
complete.

Press
Press Enter
Enter

Work Order Processing - PM_WO_300 (v1.2) 30

PM_WO_300_Work Order Processing (v1.2) 15


Create a Work Order IW31

If
If there
there have
have been
been 3 or more
work
work orders
orders for
for this
this functional
functional
location
location during
during the
the previous
previous 12
12
months,
months, the
the Object
Object Information
Information
box
box appears.
appears.

Press
Press Enter
Enter to
to proceed.
proceed.

Work Order Processing - PM_WO_300 (v1.2) 31

Create a Work Order IW31

The
The work
work order
order will
will appear.
appear.

Enter
Enter aa description
description of
of the
the work.
work.

To
To add
add more
more detail,
detail, click
click
on
on the
the Create
Create Text
Text icon.
icon.

Work Order Processing - PM_WO_300 (v1.2) 32

PM_WO_300_Work Order Processing (v1.2) 16


Create a Work Order IW31

For
For planning
planning purposes
purposes you
you may
may
want
want to
to enter
enter an
an estimate
estimate of
of the
the
labor
labor time
time required.
required.

Click
Click on
on the
the Save
Save icon
icon
to
to save
save the
the order.
order.

Work Order Processing - PM_WO_300 (v1.2) 33

Work Order Number

The
The Work
Work Order
Order number
number is
is displayed
displayed
in
in the
the lower-left
lower-left corner
corner of
of the
the screen
screen

Only
Only REPR
REPR (Corrective
(Corrective Repair)
Repair) Work
Work Orders
Orders
are
are saved with a notification number.
saved with a notification number.

All
All other
other Work
Work Orders
Orders are
are saved
saved
without
without a notification number.
a notification number.

Work Order Processing - PM_WO_300 (v1.2) 34

PM_WO_300_Work Order Processing (v1.2) 17


Unit 3 Work Orders

Exercise 2

Create a
Work Order
IW31

Work Order Processing - PM_WO_300 (v1.2) 35

Notifications and Work Orders

A Notification is a non-financial transaction that is


used to report a problem, request work, or record an
event or activity. It is purely informational in nature.

A Work Order is a financial and work management


transaction that is used to plan and charge labor, stock
materials, non-stock purchases, and services.

Work Order Processing - PM_WO_300 (v1.2) 36

PM_WO_300_Work Order Processing (v1.2) 18


Create Work Order from Notification IW34

A Work Order can be created from an existing


Notification by using transaction code IW34.
This function can be used after looking at a list of
Notifications to create an order to do the work.
One Work Order can be created for multiple
Notifications. For example, if 10 Notifications are
received for the same power outage, only one Work
Order is really needed.

Work Order Processing - PM_WO_300 (v1.2) 37

Create Work Order from Notification IW34

Information for this function:


Order Type A four-character code used to describe an
order type
Priority Indicates when the work should be scheduled
Notification (number) The number assigned to the
notification by the system when the notification was
created

Work Order Processing - PM_WO_300 (v1.2) 38

PM_WO_300_Work Order Processing (v1.2) 19


Create Work Order from Notification IW34

Fields
Fields on
on the
the first
first screen:
screen:

Order
Order Type
Type
Priority
Priority
Notification
Notification

Work Order Processing - PM_WO_300 (v1.2) 39

Notification Display

A
A notification
notification is
is typically
typically what,
what,
where
where and
and contact
contact info
info

Work Order Processing - PM_WO_300 (v1.2) 40

PM_WO_300_Work Order Processing (v1.2) 20


Create Work Order from Notification IW34

Click
Click on
on the
the Possible
Possible
Entries
Entries icon
icon to
to see
see the
the list
list
of
of Order
Order Types.
Types.

Double-click
Double-click on
on the
the one
one
you
you want
want to
to use.
use.

Work Order Processing - PM_WO_300 (v1.2) 41

Create Work Order from Notification IW34

Click
Click the
the drop-down
drop-down iconicon in
in
the
the Priority
Priority field
field to
to see
see the
the
choices,
choices, and
and then
then click
click on
on the
the
one
one you
you want.
want.

Work Order Processing - PM_WO_300 (v1.2) 42

PM_WO_300_Work Order Processing (v1.2) 21


Create Work Order from Notification IW34

Type
Type the
the Notification
Notification number
number in
in the
the
Notification
Notification field.
field.

If
If you
you dodo not
not know
know the
the number,
number, click
click
on
on the
the Possible
Possible Entries
Entries icon
icon to
to search
search
for
for it.
it.

Work Order Processing - PM_WO_300 (v1.2) 43

Create Work Order from Notification IW34

Press
Press the
the Enter
Enter key
key or
or
click
click on the Enter icon.
on the Enter icon.

Work Order Processing - PM_WO_300 (v1.2) 44

PM_WO_300_Work Order Processing (v1.2) 22


Create Work Order from Notification IW34
The
The Create:
Create: Central
Central Header
Header screen
screen is
is displayed.
displayed.

Work Order Processing - PM_WO_300 (v1.2) 45

Create Work Order from Notification IW34

Scroll
Scroll down
down to
to the
the First
First operation
operation section.
section.
Enter
Enter the
the work
work duration
duration in
in the
the Work
Work durtn
durtn
field.
field.

Example:
Example: 2
2 (for
(for 2
2 hours)
hours)

Work Order Processing - PM_WO_300 (v1.2) 46

PM_WO_300_Work Order Processing (v1.2) 23


Create Work Order from Notification IW34

When
When you
you Save
Save the
the Work
Work Order,
Order, all
all Costs
Costs are
are calculated.
calculated.

To
To see
see the
the calculated
calculated cost
cost now
now

Click
Click on
on the
the Determine
Determine Costs
Costs
icon
icon on the Application toolbar.
on the Application toolbar.

Work Order Processing - PM_WO_300 (v1.2) 47

Create Work Order from Notification IW34

This
This system
system message
message will appear in
the
the lower-left
lower-left corner
corner of
of the
the screen.
screen.

Click
Click on
on the
the Costs
Costs tab
tab to
to display
display the
the costs.
costs.

Work Order Processing - PM_WO_300 (v1.2) 48

PM_WO_300_Work Order Processing (v1.2) 24


Create Work Order from Notification IW34

The
The Cost
Cost Overview
Overview will
will be
be displayed.
displayed.

Work Order Processing - PM_WO_300 (v1.2) 49

Create Work Order from Notification IW34

Click
Click the
the Save
Save icon
icon
to
to save
save your
your Work
Work Order.
Order.

The
The system
system will
will assign
assign aa number
number toto the
the
order
order and
and display
display it
it in
in the
the lower-left
lower-left
corner
corner of
of the
the screen.
screen.

Work Order Processing - PM_WO_300 (v1.2) 50

PM_WO_300_Work Order Processing (v1.2) 25


Creating a Sub-order IW36

A sub-order is a work order that has a link to a


superior order
The actual costs of sub-orders my be viewed from the
superior order
These are typically used to break a project into units by
craft or shop. Each shop can estimate its costs on a
sub-order and these can be tracked at the sub-order
and superior order level.
The costs of the sub-orders may either settle to the
superior order or directly to another cost object.
Sub-orders may have sub-orders.

Work Order Processing - PM_WO_300 (v1.2) 51

Create Sub-order IW36

Fields
Fields on
on the
the first
first screen:
screen:

Order
Order Type
Type
Priority
Priority
Superior
Superior Order
Order

Work Order Processing - PM_WO_300 (v1.2) 52

PM_WO_300_Work Order Processing (v1.2) 26


Create Sub-order IW36

From
From this
this point
point on
on the
the process
process
is
is the
the same
same asas aa regular
regular work
work
order.
order.

Work Order Processing - PM_WO_300 (v1.2) 53

Display Superior and Sub-order

Superior
Superior Order
Order

List
List of
of Subs
Subs

Sub-Order
Sub-Order

Work Order Processing - PM_WO_300 (v1.2) 54

PM_WO_300_Work Order Processing (v1.2) 27


Unit 4

Changing
Work Orders
Work Order Processing - PM_WO_300 (v1.2) 55

Change a Work Order IW32

You may need to modify an existing work


order to change the following:
Description of the Work
Functional Location
Work Duration
Components
Person or Work Group Assigned
And other information

Work Order Processing - PM_WO_300 (v1.2) 56

PM_WO_300_Work Order Processing (v1.2) 28


Change a Work Order IW32

Type
Type the
the Order
Order number
number in
in the
the
Order
Order field
field and
and press
press Enter.
Enter.

If
If you
you do
do not
not know
know the
the Order
Order
number,
number, click
click on
on the
the Possible
Possible
Entries
Entries icon
icon to
to search
search for
for it.
it.

Work Order Processing - PM_WO_300 (v1.2) 57

Change a Work Order IW32

The
The Work
Work Order
Order is
is displayed.
displayed.

Work Order Processing - PM_WO_300 (v1.2) 58

PM_WO_300_Work Order Processing (v1.2) 29


Change a Work Order IW32

We needed to add chairs, podium to


the work description and increase the
work duration from 2 hours to 3 hours.
Remember you can also change:
Functional Location
Work Duration
Components
Person or Work Group Assigned
And other information

Work Order Processing - PM_WO_300 (v1.2) 59

Saving a Change to a Work Order

The
The Work
Work Order
Order is
is saved
saved with
with its
its
original
original number,
number, which
number which isis displayed
displayed in
in
the
the lower-left
lower-left corner
corner of
of the
the screen.
screen.

Work Order Processing - PM_WO_300 (v1.2) 60

PM_WO_300_Work Order Processing (v1.2) 30


Unit 5

PM Materials
Work Order Processing - PM_WO_300 (v1.2) 61

Materials and Inventory

Materials Management Inventory will be replacing Stores


Inventory Systems
On-shelf inventory will be minimized
We are moving toward just-in-time inventory (parts will be
requisitioned daily)
We are moving away from ProCard being used for materials;
instead, contracts will be set up
There will be stock, non-stock, and non-file materials
Materials may be planned (used on a routine basis) and
unplanned
Stock and non-stock materials will be identified by numbers
in IRIS

Work Order Processing - PM_WO_300 (v1.2) 62

PM_WO_300_Work Order Processing (v1.2) 31


Types of Components

Stock materials: Parts that have IRIS material numbers and


are kept on hand
Non-
Non-stock materials: Parts which are used less frequently
that do have IRIS material numbers.
They are ordered as needed from suppliers
Non-
Non-file materials: Parts ordered as needed and do not have
IRIS material numbers
Services: Services provided by external companies and are
requested as needed
Text Items: Text Items are instructions or comments about
materials required for a work order, such as a note to bring
a ladder or supplies like electrical tape.

Work Order Processing - PM_WO_300 (v1.2) 63

Planned Materials on a Work Order

Planning a stock material results in a Reservation being created in


the Storeroom.
The Storeroom can then pick, stage, and deliver the materials
as required.
Planning a non-stock material results in a Reservation being
created in the Storeroom and in the automatic creation of a
Purchase Requisition.
The requisition is processed by Purchasing and materials are
delivered to Central Stores. The Storeroom can then pick,
stage, and deliver the materials as required.

Planning a non-file material results in a Reservation being created


in the Storeroom and in the manual creation of a Purchase
Requisition.
The requisition is processed by Purchasing and materials are
delivered to Central Stores. The Storeroom can then pick,
stage, and deliver the materials as required

Work Order Processing - PM_WO_300 (v1.2) 64

PM_WO_300_Work Order Processing (v1.2) 32


Unplanned Materials on a Work Order

Unplanned stock materials may be issued directly to a


work order.
Storeroom personnel will issue the material and charge it
to the work order number.
The name of the person receiving the material is also
recorded.

Work Order Processing - PM_WO_300 (v1.2) 65

How to plan stock materials


There are several ways to select the materials:
Enter the component number, if known
A Possible Entries search may be performed to find the part
number or description.
Asterisks can be used as wildcards in a search, to let you search
using partial information.
Examples: *bearing* will find all materials with bearing in the
description; *filter*16* will find all materials with filter and 16 in
the description (such as Filter, Air, 16x20x1)

Future Enhancements
A Bill of Material (BOM) for the building, room, or equipment to be
maintained. The BOM may be used to suggest part numbers.
A Task List - if you include the Task List on an order this will also
include any materials on that Task List.

Work Order Processing - PM_WO_300 (v1.2) 66

PM_WO_300_Work Order Processing (v1.2) 33


Planning Materials on an Order

We
We want
want to
to add
add materials
materials to
to an
an
order. Click on the Components
order. Click on the Components
tab.
tab.

Work Order Processing - PM_WO_300 (v1.2) 67

Planning stock materials


The Components tab of a Work Order is displayed

Work Order Processing - PM_WO_300 (v1.2) 68

PM_WO_300_Work Order Processing (v1.2) 34


Columns on the Components Tab

Item Sequential number on the list


Component The component number in IRIS
Description Text describing the component
Reqmnt Qty Quantity required for the work
UM Unit of Measure, such as EA for each
IC Item Category; Stock, Non-stock, etc.
SLoc Storage Location
Plnt Plant; always UK10

Work Order Processing - PM_WO_300 (v1.2) 69

Planning Materials on an Order

We
We will
will search
search for
for the
the Components
Components
(materials)
(materials) needed by
needed by clicking
clicking on
on the
the
Possible Entries icon in the
Possible Entries icon in the
Component
Component field.
field.

Work Order Processing - PM_WO_300 (v1.2) 70

PM_WO_300_Work Order Processing (v1.2) 35


Planning Materials Search by Description

When
When the
the search
search box
box appears
appears choose
choose
the
the Plant
Plant Material
Material by
by Description
Description tab.
tab.

Work Order Processing - PM_WO_300 (v1.2) 71

Planning Materials Search by Description

We
We need
need aa hinge,
hinge, so
so we
we will
will search
search for
for
all materials with hinge in the
all materials with hinge in the
description
description by
by using
using the
the wildcard
wildcard
characteri.e. *hinge*
characteri.e. *hinge*

Work Order Processing - PM_WO_300 (v1.2) 72

PM_WO_300_Work Order Processing (v1.2) 36


Planning Materials Search by Description

The
The search
search results
results appear.
appear.

Double-click
Double-click on
on the
the desired
desired material
material
to
to populate
populate the
the Component
Component field.
field.

Work Order Processing - PM_WO_300 (v1.2) 73

Planning Materials on an Order

Enter
Enter the
the quantity
quantity required.
required.

The
The unit
unit of
of measure
measure and
and item
item category
category
fields
fields will
will populate
populate automatically.
automatically.

Repeat
Repeat for
for each
each component.
component.

Work Order Processing - PM_WO_300 (v1.2) 74

PM_WO_300_Work Order Processing (v1.2) 37


Component Item Category

Work Order Processing - PM_WO_300 (v1.2) 75

Automatic Purchasing Requisition Information

For
For non-
non-stock materials,
non-stock materials, an
materials an automatic
automatic
purchase
purchase requisition
requisition is
is created
created in
in the
the
background.
background.

You
You do
do not
not see
see this
this dialog
dialog box.
box.

Work Order Processing - PM_WO_300 (v1.2) 76

PM_WO_300_Work Order Processing (v1.2) 38


Text Component Item Category

The
The Item
Item Category
Category field
field will
will
populate
populate automatically
automatically based
based
on
on the
the component
component specified
specified --
BUT
BUT if
if you
you enter
enter aa text
text note,
note,
you
you must
must select
select T
T for
for Text
Text
item.
item.

Work Order Processing - PM_WO_300 (v1.2) 77

Component Item Category

Work Order Processing - PM_WO_300 (v1.2) 78

PM_WO_300_Work Order Processing (v1.2) 39


Stock Materials - Availability

Future
Future Enhancement
Enhancement

You
You will
will be
be able
able to
to check
check
materials
materials available using
available using
the
the Material
Material Availability
Availability
icon
icon

Work Order Processing - PM_WO_300 (v1.2) 79

Non-file Materials

For
For aa non-
non-file component,
non-file component, enter
component enter aa
description,
description, quantity,
quantity, and
and unit
unit of
of measure.
measure.

Press
Press the
the Enter
Enter key
key to
to proceed.
proceed.

Work Order Processing - PM_WO_300 (v1.2) 80

PM_WO_300_Work Order Processing (v1.2) 40


Non-file Materials

This
This box
box will
will appear,
appear, asking
asking for
for the
the
information
information required
required by
by Purchasing.
Purchasing.

Work Order Processing - PM_WO_300 (v1.2) 81

Purchasing Information Reference Only Slide

Information required to order non-


non-stock materials:
Requirement Quantity How many are needed? (defaults
from what was entered on the Components tab)
Price - Cost of material (defaults from Components tab)
Material Group PM000001 for PM Non-Material Master
Material, PM000002 for PM Non-Material Master Service
Purchasing Group Defaults to 000 / UK00
000 = Work Order / UK00 = Purchasing
Goods Recipient Who should receive the material?
Requisitioner Who is requisitioning the material?
Unloading Point Where should material be delivered?
Vendor Material Number Description of the material
Work Order Processing - PM_WO_300 (v1.2) 82

PM_WO_300_Work Order Processing (v1.2) 41


Calculating Planned Components Cost
When
When you
you Save
Save the
the Work
Work Order,
Order, all
all Costs
Costs are
are calculated.
calculated.

To
To see
see the
the calculated
calculated cost
cost now
now

After
After entering
entering the
the components,
components, click
click
on
on the Determine Costs icon.
the Determine Costs icon.

Work Order Processing - PM_WO_300 (v1.2) 83

Planned Cost Display

Note
Note that
that all
all planned
planned costs
costs are
are displayed
displayed on
on
the
the Costs
Costs Overview
Overview tab.
tab.
Services
Services are
are handled
handled the
the same
same way
way as
as aa
non-stock
non-stock material
material purchase.
purchase.

Work Order Processing - PM_WO_300 (v1.2) 84

PM_WO_300_Work Order Processing (v1.2) 42


Planning Materials on an Order

When
When you
you have
have finished
finished adding
adding
Components,
Components, click the
click the Save
Save icon.
icon.

Work Order Processing - PM_WO_300 (v1.2) 85

Unit 5 PM Materials

Exercise 3

Add
Components
to a Work Order
IW32

Work Order Processing - PM_WO_300 (v1.2) 86

PM_WO_300_Work Order Processing (v1.2) 43


Unit 6

Work Order
List Displays
Work Order Processing - PM_WO_300 (v1.2) 87

Work Order List Displays in IRIS

List Displays can help manage work. You can specify


criteria and produce lists of work orders for planning
and analysis.
Selection screens and variants can narrow your
requests for information.
Drill-down functionality can provide detail.

Work Order Processing - PM_WO_300 (v1.2) 88

PM_WO_300_Work Order Processing (v1.2) 44


Multi-Level Order List Display IW40

A multi-level order list allows more detailed


information.
Use this function to view an order from a list to see
more detail, such as any sub-orders or labor costs
associated with the order.

Work Order Processing - PM_WO_300 (v1.2) 89

Multi-Level Order List Display IW40

To
To display
display specific
specific work orders, you can
set
set criteria
criteria such
such as
as Order
Order number,
number, Type,
Type,
and/or
and/or Functional
Functional Location,
Location, etc.
etc.
To
To search
search on
on any
any field,
field, click
click on
on the
the
Possible
Possible Entries
Entries icon
icon for
for that
that field.
field.

Work Order Processing - PM_WO_300 (v1.2) 90

PM_WO_300_Work Order Processing (v1.2) 45


Multi-Level Order List Display IW40

After
After filling
filling in
in the
the criteria,
criteria,
click
click the
the Execute
Execute icon.
icon.

Work Order Processing - PM_WO_300 (v1.2) 91

Multi-Level Order List Display IW40

Order
Order information
information is
is displayed.
displayed.
The
The legend is shown here.
legend is shown here.

Work Order Processing - PM_WO_300 (v1.2) 92

PM_WO_300_Work Order Processing (v1.2) 46


Unit 6 Work Order List Displays

Exercise 4

Multi-Level
Order List
Display
IW40

Work Order Processing - PM_WO_300 (v1.2) 93

List Display Orders IW39

To
To display
display certain
certain work
work orders,
orders, you
you
first
first specify
specify your
your criteria,
criteria, such
such as
as
Order
Order Status,
Status, Type,
Type, and
and Functional
Functional
Location.
Location.

Work Order Processing - PM_WO_300 (v1.2) 94

PM_WO_300_Work Order Processing (v1.2) 47


List Display Orders IW39

Our
Our criteria
criteria will
will display
display aa list
list of
of REPR
REPR
(Repair)
(Repair) Work
Work Orders
Orders that
that are
are
Outstanding
Outstanding (Not
(Not Released)
Released) or or
In
In process
process (Released).
(Released).

Click
Click on
on the
the Execute
Execute icon.
icon.

Work Order Processing - PM_WO_300 (v1.2) 95

Display the List

The
The results
results display
display as
as aa list
list
of
of orders that match the
orders that match the
criteria
criteria specified.
specified.

Work Order Processing - PM_WO_300 (v1.2) 96

PM_WO_300_Work Order Processing (v1.2) 48


Change the Layout

Click
Click the
the Change
Change
Layout
Layout icon
icon
to
to add
add or
or
remove
remove columns.
columns.

Work Order Processing - PM_WO_300 (v1.2) 97

Change the Layout

You
You can
can add
add fields
fields and
and rearrange
rearrange the
the
order
order of
of the
the columns.
columns. Click
Click the
the Save
Save
icon
icon to
to save
save the
the layout,
layout, or
or press
press Enter
Enter to
to
simply
simply display
display it
it once.
once.

Work Order Processing - PM_WO_300 (v1.2) 98

PM_WO_300_Work Order Processing (v1.2) 49


Change the Layout

The
The new
new layout
layout appears.
appears.

Work Order Processing - PM_WO_300 (v1.2) 99

Download Data to Spreadsheet

When the list is displayed,


click on the Spreadsheet icon.
You will be prompted to Enter number of key
columns. You can leave that unchanged (at 1).
You will be prompted to choose Table or Pivot
Table. Choose Table and click on the Continue
icon.
You will be prompted to save to
MS Excel. Click on the Continue icon.
Be patient. The data will appear in an Excel
spreadsheet and you can format, save, and use it
as you wish.

Work Order Processing - PM_WO_300 (v1.2) 100

PM_WO_300_Work Order Processing (v1.2) 50


Unit 6 Work Order List Displays

Exercise 5

Change Layout
of Order List
Display
IW39

Work Order Processing - PM_WO_300 (v1.2) 101

Course Summary

You should now have an understanding of:


Creating Work Orders
Creating Sub-orders
Changing Work Orders
Adding Components to Work Orders
Materials
Work Order List Displays

Work Order Processing - PM_WO_300 (v1.2) 102

PM_WO_300_Work Order Processing (v1.2) 51


Contact Information

First point of contact for any problems should be the


IRIS-PM Power User in your area
Nick Arnold Nick@uky.edu 559-7605
Kevin Jones Kevin.Jones@uky.edu 7-3421
Skip Van Hook bevanh2@email.uky.edu 7-5397

IRIS Plant Maintenance Team


Kevin Cheser kchese@email.uky.edu
Ben Crutcher ben@email.uky.edu

For more information visit the IRIS PM web site:


www.uky.edu/IRIS/PM
Work Order Processing - PM_WO_300 (v1.2) 103

PM_WO_300_Work Order Processing (v1.2) 52

You might also like