Engineering & Projects EHV Engineering and Projects Sector Sala gSht Aya yaudl AS pA) Department Manager of EHV Projects - West & South Saudl Electricity Company P.O. Box 9299 Jeddah 21413 Kingdom Of Saudi Arabia Tel, + 966-2-653 7320 Fax. + 966-2-6500 179 Email: EVPRWMG@se.com.sa Letter No, [1202300//1618 [1S ee eee ee Date (Hijra) ‘Attachments | To ALL Contractors: Please be advised that as per civil defense department and various excerpts from internet heavy rainstorm will be expected to hit KSA on or before Tuesday (17 November 2015}. Excerpts from ARAB NEWS: RIVADH: Presidency of Meteorology and Environmental Protection (MEP) announced on Saturday that various areas of the Kingdom will experience low temperatures in the coming days. ‘On Monday, a medium to heavy thunderstorm is expected in Tabuk and in coastal areas, and is likely to extend to Al Jouf. These weather conditions may continue until Wednesday morning, he said. Rainfall is expected in Madinah, Yanbu and Makkah, and in the provinces of Rabigh and Jeddah as well as areas of Qassim, Hail and northern parts of the Riyadh region. With this everyone is advice to take safety of themselves and others. All contractors should ensure the safety of their employee and the safety of their project area (S/S, OHTL and U/G). With this please consider the Following checkpoints specifically for U/G and OHTL projects and ensure your compliance # Check that all excavation (Auger drill hole, Pad and Chimney, Underground trenches) in all location of your projects is properly isolated with concrete barriers and orange mesh. © Check that sign boards indicating deep excavation, men at work, slow speed, directions, ete. are sufficiently installed. © Check that sufficient warning lights such as beacon lights and LED strip lights are provided. ‘© Check that trench / Excavation are properly shored to prevent cave in(s). ‘+ Check that sufficient nos, of temporary pedestrian crossing bridges is provided ‘© Check that temporary panels/generators are properly enclosed and all electrical connections and cables are Insulated (No unsafe connection). «Check that all existing electrical cables laying on grounds shall be elevated or secure it with rope and shoring pipe. «Check that heavy equipments are positioned away from the trench after completing the duty or after the end of each shift. ‘© Check that all auxiliary earthing of equipments near live lines are properly grounded. «Check that Proper site housekeeping is maintained; ensure that all trenches and Excavations are clean. FOR YOUR STRICT COMPLIANCE. Engr. Saleh M. Al Kurdi Oe Department Manager, EHV Projects-WOA &SOA OAT / CAB

You might also like