RFT Site Construction Package 6A RFT Site Construction Package 6A 27.mar.2017

The document provides a weekly report on the construction of an RFT site. It includes progress updates on engineering, procurement, submittals and approvals for various materials and method statements. Overall progress on the construction package is reported at 49.36% complete.

Uploaded by

anwar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
68 views4 pages

RFT Site Construction Package 6A RFT Site Construction Package 6A 27.mar.2017

The document provides a weekly report on the construction of an RFT site. It includes progress updates on engineering, procurement, submittals and approvals for various materials and method statements. Overall progress on the construction package is reported at 49.36% complete.

Uploaded by

anwar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

RFT Site Construction weekly report 28-Mar-17 12:35

Activity ID Activity Name Orig erformance


Dur. %
Complete
Total 481 49.36%

RFT Site Construction Package 6A 27.Mar.2017 481 49.36%

Project Initiation & Startup 14 100%


Mobilization 14 100%
PRE1020 Baseline Schedule Submission 14 100%
Engineering 330 0%
Material Submittal & Approval 195 0%
Civil Bulk Materials 5 0%
Submittals 5 0%
MATCVL1293 Submittal of Bondek Composite Roof Deck 5 100%
MEP Bulk Materials 46 0%
Submittals 46 0%
MAT MEP1137 Submittal of Electric Water Heater 5 100%
MAT MEP1146 Submittal of uPVC Pipes and Sanitaryware 5 100%
Approvals 12 0%
MAT MEP1179 Approval of Electric Water Heater 12 100%
MAT MEP1188 Approval of uPVC Pipes and Sanitaryware 12 100%
Long Lead Items 177 0%
Material Submittal 12 0%
MAT LL1526 Submittal of PA materials 12 100%
MAT LL1528 Submittal of CCTV materials 12 100%
MAT LL1530 Submittal of Security System materials 12 100%
Approval 177 0%
MAT LL1536 Approval of CCTV materials 12 0%
MAT LL1308 Approval of Light Fittings. 12 100%
MAT LL1534 Approval of PA materials 12 100%
MAT LL1538 Approval of Security System materials 12 100%
Ballistic Materials 17 0%
Submittals 14 0%
MAT LL1338 Lamell Rubber Curtain 6 100%
MAT LL1329 Sacon Walls 7 100%
MAT LL1347 Skid & Bisplate 5 100%
MAT LL1356 Poly Urethane Coating 5 100%
Approvals 17 0%
MAT LL1354 Lamell Rubber Curtain 12 50%
MAT LL1360 10mm/12mm Thick Ballistics Steel Plate 12 100%
Shop Drawing Submittal & Approval 26 0%
Drawing Submittal 14 0%
ENG SD 1322 Submittal of Superstructure Drawings. 14 100%
Drawing approval 12 0%
ENG SD 1294 Approval of Superstructure Drawings. 12 100%
Method Statement Submittal 63 0%
Civil 5 0%
ENG MS1264 Hollow Metal Doors and Frames Installation 5 100%
Electrical 5 0%
ENG MS1354 Installation of Earthing and Lighting Protection System 5 100%
HVAC 10 0%
ENG MS1180 Chillers Installation 5 100%
ENG MS1210 FCU's Installation 5 100%
Ballastic 5 0%
ENG MS1159 Sacon Installation 5 100%
Method Statement Approval 59 0%
Civil 16 0%
ENG MS1120 Approval for False Ceiling Method Statements. 12 50%
ENG MS1306 Hollow Metal Doors and Frames Installation 12 50%
Electrical 12 0%
ENG MS1387 Installation of Earthing and Lighting Protection System 12 50%
HVAC 12 0%
ENG MS1231 Chillers Installation 12 50%
ENG MS1258 FCU's Installation 12 50%
Ballastic 12 0%
ENG MS1204 Sacon Installation 12 50%
Procurement 60 0%
Ballistic Items 60 0%
Sacon Concrete. 28 0%
Sacon Samples 28 0%
MAT BAL1009 Drying & Density Settelment 28 100%
Rubber / Sand / Bullet Trab 60 0%
Rubber Block Samples 30 0%
MAT BAL1018 Fabrication of Rubber Sample 30 10%
General 60 0%

Page 1 of 4 TASK filter: update.


Oracle Corporation
RFT Site Construction weekly report 28-Mar-17 12:35
mance % ty Activity % Schedule % Nonlabor Units % BL Project BL Project Start Finish Total
Complete Complete Complete Complete Start Finish
% Float
49.36% 42.79% 37.56% 29-Dec-15 11-Jul-17 23-Feb-16 A 12-Jul-17 -83

49.36% 42.79% 37.56% 29-Dec-15 11-Jul-17 23-Feb-16 A 12-Jul-17 -83


100% 100% 100% 29-Dec-15 17-Jan-16 20-Apr-16 A 13-Mar-17 A
100% 100% 100% 29-Dec-15 17-Jan-16 20-Apr-16 A 13-Mar-17 A
100% 100% 100% 100% 29-Dec-15 17-Jan-16 20-Apr-16 A 13-Mar-17 A
0% 0% 0% 22-Feb-16 08-Jun-17 23-Feb-16 A 31-May-17 -56
0% 0% 0% 21-Aug-16 29-May-17 15-Oct-16 A 23-Apr-17 -56
0% 0% 0% 13-Mar-17 20-Mar-17 13-Mar-17 A 20-Mar-17 A
0% 0% 0% 13-Mar-17 20-Mar-17 13-Mar-17 A 20-Mar-17 A
100% 100% 100% 0% 13-Mar-17 20-Mar-17 13-Mar-17 A 20-Mar-17 A
0% 0% 0% 26-Mar-17 29-May-17 01-Feb-17 A 26-Mar-17 A
0% 0% 0% 26-Mar-17 29-May-17 01-Feb-17 A 19-Mar-17 A
100% 100% 12% 0% 26-Mar-17 02-Apr-17 14-Mar-17 A 19-Mar-17 A
100% 100% 0% 0% 22-May-17 29-May-17 01-Feb-17 A 19-Mar-17 A
0% 0% 0% 30-Mar-17 16-Apr-17 20-Mar-17 A 26-Mar-17 A
100% 100% 0% 0% 30-Mar-17 16-Apr-17 20-Mar-17 A 23-Mar-17 A
100% 100% 0% 0% 30-Mar-17 16-Apr-17 20-Mar-17 A 26-Mar-17 A
0% 0% 0% 21-Aug-16 02-May-17 15-Oct-16 A 23-Apr-17 -78
0% 0% 0% 30-Mar-17 16-Apr-17 20-Mar-17 A 26-Mar-17 A
100% 100% 0% 0% 30-Mar-17 16-Apr-17 20-Mar-17 A 26-Mar-17 A
100% 100% 0% 0% 30-Mar-17 16-Apr-17 20-Mar-17 A 26-Mar-17 A
100% 100% 0% 0% 30-Mar-17 16-Apr-17 20-Mar-17 A 26-Mar-17 A
0% 0% 0% 21-Aug-16 02-May-17 15-Oct-16 A 23-Apr-17 -78
0% 0% 0% 0% 17-Apr-17 02-May-17 26-Mar-17 A 23-Apr-17 -112
100% 100% 100% 0% 21-Aug-16 05-Sep-16 15-Oct-16 A 26-Mar-17 A
100% 100% 0% 0% 17-Apr-17 02-May-17 26-Mar-17 A 26-Mar-17 A
100% 100% 0% 0% 17-Apr-17 02-May-17 26-Mar-17 A 26-Mar-17 A
0% 0% 0% 15-Mar-17 06-Apr-17 18-Feb-17 A 05-Apr-17 -56
0% 0% 0% 15-Mar-17 04-Apr-17 18-Feb-17 A 19-Mar-17 A
100% 100% 0% 0% 27-Mar-17 04-Apr-17 14-Mar-17 A 19-Mar-17 A
100% 100% 100% 0% 15-Mar-17 26-Mar-17 18-Feb-17 A 14-Mar-17 A
100% 100% 100% 0% 15-Mar-17 22-Mar-17 19-Feb-17 A 13-Mar-17 A
100% 100% 100% 0% 15-Mar-17 22-Mar-17 27-Feb-17 A 14-Mar-17 A
0% 0% 0% 15-Mar-17 06-Apr-17 19-Feb-17 A 05-Apr-17 -56
50% 50% 26.67% 0% 21-Mar-17 06-Apr-17 21-Mar-17 A 05-Apr-17 -69
100% 100% 65% 0% 15-Mar-17 02-Apr-17 19-Feb-17 A 14-Mar-17 A
0% 0% 0% 22-Feb-16 28-Mar-16 23-Feb-16 A 15-Mar-17 A
0% 0% 0% 22-Feb-16 10-Mar-16 23-Feb-16 A 14-Mar-17 A
100% 100% 100% 0% 22-Feb-16 10-Mar-16 23-Feb-16 A 14-Mar-17 A
0% 0% 0% 13-Mar-16 28-Mar-16 19-Apr-16 A 15-Mar-17 A
100% 100% 100% 0% 13-Mar-16 28-Mar-16 19-Apr-16 A 15-Mar-17 A
0% 0% 0% 26-Feb-17 23-May-17 26-Feb-17 A 26-Mar-17 A
0% 0% 0% 26-Feb-17 02-Mar-17 26-Feb-17 A 14-Mar-17 A
100% 100% 100% 0% 26-Feb-17 02-Mar-17 26-Feb-17 A 14-Mar-17 A
0% 0% 0% 16-May-17 23-May-17 20-Mar-17 A 26-Mar-17 A
100% 100% 0% 0% 16-May-17 23-May-17 20-Mar-17 A 26-Mar-17 A
0% 0% 0% 10-Apr-17 23-Apr-17 19-Mar-17 A 20-Mar-17 A
100% 100% 0% 0% 10-Apr-17 16-Apr-17 19-Mar-17 A 19-Mar-17 A
100% 100% 0% 0% 17-Apr-17 23-Apr-17 19-Mar-17 A 20-Mar-17 A
0% 0% 0% 20-Mar-17 26-Mar-17 20-Mar-17 A 26-Mar-17 A
100% 100% 100% 0% 20-Mar-17 26-Mar-17 20-Mar-17 A 26-Mar-17 A
0% 0% 0% 20-Mar-17 08-Jun-17 20-Mar-17 A 31-May-17 -56
0% 0% 0% 20-Mar-17 10-Apr-17 20-Mar-17 A 17-Apr-17 -30
50% 50% 8.33% 0% 26-Mar-17 10-Apr-17 26-Mar-17 A 17-Apr-17 -50
50% 50% 41.67% 0% 20-Mar-17 04-Apr-17 20-Mar-17 A 03-Apr-17 -20
0% 0% 0% 23-May-17 08-Jun-17 23-Mar-17 A 31-May-17 -56
50% 50% 0% 0% 23-May-17 08-Jun-17 23-Mar-17 A 31-May-17 -56
0% 0% 0% 10-Apr-17 25-Apr-17 20-Mar-17 A 24-Apr-17 -36
50% 50% 0% 0% 10-Apr-17 25-Apr-17 20-Mar-17 A 24-Apr-17 -36
50% 50% 0% 0% 10-Apr-17 25-Apr-17 21-Mar-17 A 24-Apr-17 -43
0% 0% 0% 20-Mar-17 04-Apr-17 20-Mar-17 A 03-Apr-17 -28
50% 50% 41.67% 0% 20-Mar-17 04-Apr-17 20-Mar-17 A 03-Apr-17 -28
0% 0% 0% 21-Mar-17 30-May-17 25-Feb-17 A 06-Jun-17 -51
0% 0% 0% 21-Mar-17 30-May-17 25-Feb-17 A 06-Jun-17 -51
0% 0% 0% 03-Apr-17 07-May-17 25-Feb-17 A 25-Mar-17 A
0% 0% 0% 03-Apr-17 07-May-17 25-Feb-17 A 25-Mar-17 A
100% 100% 0% 0% 03-Apr-17 07-May-17 25-Feb-17 A 25-Mar-17 A
0% 0% 0% 21-Mar-17 30-May-17 21-Mar-17 A 06-Jun-17 -52
0% 0% 0% 21-Mar-17 25-Apr-17 21-Mar-17 A 02-May-17 -110
10% 10% 13.58% 0% 21-Mar-17 25-Apr-17 21-Mar-17 A 02-May-17 -110
0% 0% 0% 21-Mar-17 30-May-17 21-Mar-17 A 06-Jun-17 -52

Page 2 of 4 TASK filter: update.


Oracle Corporation
RFT Site Construction weekly report 28-Mar-17 12:35
Activity ID Activity Name Orig erformance
Dur. %
Complete
MAT LL1372 Procurement of Rubber Ballistics protection 60 10%
MAT LL1396 Procurement of 10mm/12mm Thick Ballistics Steel Plat 60 10%
Construction 227 48.04%
P7 (100M OLR) 227 52.02%
Canopy (Zone 2) 7 50%
Sub structure 7 50%
Concrete Works 7 50%
OLR SUB1302 Back Filling & Compaction Under SOG With Testing & A 7 50%
Buffle Walls (Zone 4) 2 50%
Sub structure 2 50%
Slab on Grade 2 50%
OLR SUB1380 Blinding for SOG 2 50%
Firing Range shelter (Zone 5) 155 56.84%
MEP Works 155 56.84%
Electrical Works 155 56.84%
General 155 56.84%
OLR ELE 347 Cable Trays Truncking 6 50%
OLR ELE 353 GI Boxes Installation 4 100%
Control Room & Workshop Building ((Zone 6) 8 50%
MEP works 8 50%
Electrical Works 8 50%
General 8 50%
OLR MEP 1088 Cable Trays Truncking 8 50%
P6 (100M IFMR) 59 47.97%
100 m IFMR P-6 Zone 1 Area A-B-C-D 14 20%
Super Structure (Area B) 14 20%
Superstructure P-6 Zone 1 Area B 14 20%
Concrete Work 14 20%
Vertical Elements 14 20%
IFMR SPR1436 Installation of Precast Panels 14 20%
Tunnel (Zone 3) Area A-B-C 18 66.07%
Substructure P-6 Zone 3 Area A 12 68.82%
Concrete Work 12 68.82%
IFMR UGT1235 Steel Reinforcement for Tunnel Roof Slab 3 20%
IFMR UGT1229 Protection for Water Proofing 3 100%
IFMR UGT1232 Shuttering Plus Scaffolding for Tunnel Roof Slab 4 100%
Substructure P-6 Zone 3 Area B 6 38.78%
Concrete Work 6 38.78%
IFMR UGT1286 Shuttering Plus Scaffolding for Tunnel Roof Slab 4 20%
IFMR UGT1283 Protection for Water Proofing 2 72%
Substructure P-6 Zone 3 Area C 11 70.5%
Concrete Work 11 70.5%
IFMR UGT1334 Water Proofing for Retaining Wall 2 60%
IFMR UGT1331 Casting of Retaining Walls 2 65%
IFMR UGT1325 Shuttering for Retaining Wall 3 80%
Amenities Buildings (Zone 4) 54 55.86%
Substructure P-6 Zone 4 15 100%
Slab on Grade 15 100%
IFMR SUB1333 Slab on Grade Concreting 6 100%
IFMR SUB1299 Steel Reinf. for Beams & Slab 10 100%
IFMR SUB1301 Beams Concreting 6 100%
Superstructure P-6 Zone 4 30 30.78%
Concrete Work 30 30.78%
Vertical Elements 30 30.78%
IFMR SPR1259 Steel Reinf. for Columns / Walls 10 5%
IFMR SPR1433 Installation of Precast External Walls 10 33%
MEP works 8 70%
Mechanical Works 8 70%
Drainage 8 70%
IFMR DRG 1160 Drainage Piping and Fixtures 8 70%
Targetary Area (Zone 2) 16 79.56%
Sub-structure P-6 Zone 2 16 79.56%
Area above Ground Surface Level
Leve +98.25 16 79.56%
Concrete 16 79.56%
IFMR SUB1209 Shuterring, Reinforcement, and Casting of beam above 8 50%
IFMR SUB1212 Water Proofing for walls 3 75%
IFMR SUB1215 Protection for Water Proofing 2 75%
IFMR SUB1218 Backfilling up to blinding of Ground Slab levels +99.65 & 3 75%
IFMR SUB1203 Shuttering for Retaining Walls & Columns 4 100%
IFMR SUB1206 Casting of Concrete for Retaining Walls & Columns 2 100%
IFMR SUB1200 Steel Reinforcement for Retaining Walls & Columns 5 100%

Page 3 of 4 TASK filter: update.


Oracle Corporation
RFT Site Construction weekly report 28-Mar-17 12:35
mance % ty Activity % Schedule % Nonlabor Units % BL Project BL Project Start Finish Total
Complete Complete Complete Complete Start Finish
% Float
10% 10% 6.79% 0% 21-Mar-17 30-May-17 21-Mar-17 A 06-Jun-17 -52
10% 10% 6.79% 0% 21-Mar-17 30-May-17 21-Mar-17 A 06-Jun-17 -60
48.04% 41.31% 35.94% 21-Aug-16 11-Jul-17 02-Jan-17 A 12-Jul-17 -76
52.02% 32.65% 15.78% 21-Aug-16 11-Jul-17 02-Jan-17 A 12-Jul-17 -76
50% 0% 0% 03-Jul-17 11-Jul-17 14-Mar-17 A 12-Jul-17 -76
50% 0% 0% 03-Jul-17 11-Jul-17 14-Mar-17 A 12-Jul-17 -76
50% 0% 0% 03-Jul-17 11-Jul-17 14-Mar-17 A 12-Jul-17 -76
50% 50% 0% 0% 03-Jul-17 11-Jul-17 14-Mar-17 A 12-Jul-17 -76
50% 100% 0% 20-Mar-17 21-Mar-17 20-Mar-17 A 28-Mar-17 -33
50% 100% 0% 20-Mar-17 21-Mar-17 20-Mar-17 A 28-Mar-17 -33
50% 100% 0% 20-Mar-17 21-Mar-17 20-Mar-17 A 28-Mar-17 -33
50% 50% 100% 0% 20-Mar-17 21-Mar-17 20-Mar-17 A 28-Mar-17 -33
56.84% 33.82% 13.68% 21-Aug-16 02-Apr-17 02-Jan-17 A 03-Apr-17 -71
56.84% 33.82% 13.68% 21-Aug-16 02-Apr-17 02-Jan-17 A 03-Apr-17 -71
56.84% 33.82% 13.68% 21-Aug-16 02-Apr-17 02-Jan-17 A 03-Apr-17 -71
56.84% 33.82% 13.68% 21-Aug-16 02-Apr-17 02-Jan-17 A 03-Apr-17 -71
50% 50% 23.33% 0% 23-Mar-17 02-Apr-17 23-Mar-17 A 03-Apr-17 -71
100% 100% 100% 100% 21-Aug-16 24-Aug-16 02-Jan-17 A 23-Mar-17 A
50% 0% 37.5% 29-Mar-17 10-Apr-17 20-Mar-17 A 12-Apr-17 -66
50% 0% 37.5% 29-Mar-17 10-Apr-17 20-Mar-17 A 12-Apr-17 -66
50% 0% 37.5% 29-Mar-17 10-Apr-17 20-Mar-17 A 12-Apr-17 -66
50% 0% 37.5% 29-Mar-17 10-Apr-17 20-Mar-17 A 12-Apr-17 -66
50% 50% 0% 37.5% 29-Mar-17 10-Apr-17 20-Mar-17 A 12-Apr-17 -66
47.97% 41.46% 36.31% 12-Mar-17 01-Jun-17 23-Feb-17 A 14-Jun-17 -97
20% 67.43% 50% 13-Mar-17 02-Apr-17 13-Mar-17 A 04-Apr-17 -99
20% 67.43% 50% 13-Mar-17 02-Apr-17 13-Mar-17 A 04-Apr-17 -99
20% 67.43% 50% 13-Mar-17 02-Apr-17 13-Mar-17 A 04-Apr-17 -99
20% 67.43% 50% 13-Mar-17 02-Apr-17 13-Mar-17 A 04-Apr-17 -99
20% 67.43% 50% 13-Mar-17 02-Apr-17 13-Mar-17 A 04-Apr-17 -99
20% 20% 67.43% 50% 13-Mar-17 02-Apr-17 13-Mar-17 A 04-Apr-17 -99
66.07% 43.33% 12.85% 12-Mar-17 05-Apr-17 06-Mar-17 A 12-Apr-17 -52
68.82% 74.01% 61.02% 12-Mar-17 28-Mar-17 06-Mar-17 A 29-Mar-17 -54
68.82% 74.01% 61.02% 12-Mar-17 28-Mar-17 06-Mar-17 A 29-Mar-17 -54
20% 20% 33.33% 0% 26-Mar-17 28-Mar-17 26-Mar-17 A 29-Mar-17 -54
100% 100% 100% 100% 12-Mar-17 15-Mar-17 06-Mar-17 A 16-Mar-17 A
100% 100% 100% 100% 16-Mar-17 22-Mar-17 16-Mar-17 A 23-Mar-17 A
38.78% 0% 0% 29-Mar-17 05-Apr-17 20-Mar-17 A 12-Apr-17 -65
38.78% 0% 0% 29-Mar-17 05-Apr-17 20-Mar-17 A 12-Apr-17 -65
20% 20% 0% 0% 02-Apr-17 05-Apr-17 20-Mar-17 A 12-Apr-17 -65
72% 72% 0% 0% 29-Mar-17 30-Mar-17 20-Mar-17 A 06-Apr-17 -65
70.5% 41.98% 0% 16-Mar-17 02-Apr-17 16-Mar-17 A 09-Apr-17 -49
70.5% 41.98% 0% 16-Mar-17 02-Apr-17 16-Mar-17 A 09-Apr-17 -49
60% 60% 0% 0% 30-Mar-17 02-Apr-17 22-Mar-17 A 09-Apr-17 -49
65% 65% 0% 0% 28-Mar-17 29-Mar-17 21-Mar-17 A 05-Apr-17 -49
80% 80% 100% 0% 16-Mar-17 21-Mar-17 16-Mar-17 A 03-Apr-17 -49
55.86% 28.82% 33.35% 20-Mar-17 01-Jun-17 23-Feb-17 A 14-Jun-17 -112
100% 1.47% 100% 26-Mar-17 16-Apr-17 23-Feb-17 A 12-Mar-17 A
100% 1.47% 100% 26-Mar-17 16-Apr-17 23-Feb-17 A 12-Mar-17 A
100% 100% 0% 100% 06-Apr-17 16-Apr-17 06-Mar-17 A 12-Mar-17 A
100% 100% 4.4% 100% 26-Mar-17 09-Apr-17 23-Feb-17 A 08-Mar-17 A
100% 100% 0% 100% 02-Apr-17 10-Apr-17 23-Feb-17 A 11-Mar-17 A
30.78% 46.03% 0% 20-Mar-17 30-Apr-17 20-Mar-17 A 07-May-17 -112
30.78% 46.03% 0% 20-Mar-17 30-Apr-17 20-Mar-17 A 07-May-17 -112
30.78% 46.03% 0% 20-Mar-17 30-Apr-17 20-Mar-17 A 07-May-17 -112
5% 5% 0% 0% 17-Apr-17 30-Apr-17 22-Mar-17 A 07-May-17 -112
33% 33% 50% 0% 20-Mar-17 02-Apr-17 20-Mar-17 A 09-Apr-17 -112
70% 0% 0% 22-May-17 01-Jun-17 14-Mar-17 A 14-Jun-17 -112
70% 0% 0% 22-May-17 01-Jun-17 14-Mar-17 A 14-Jun-17 -112
70% 0% 0% 22-May-17 01-Jun-17 14-Mar-17 A 14-Jun-17 -112
70% 70% 0% 0% 22-May-17 01-Jun-17 14-Mar-17 A 14-Jun-17 -112
79.56% 25.34% 22.22% 13-Mar-17 04-Apr-17 23-Feb-17 A 17-Apr-17 -120
79.56% 25.34% 22.22% 13-Mar-17 04-Apr-17 23-Feb-17 A 17-Apr-17 -120
79.56% 25.34% 22.22% 13-Mar-17 04-Apr-17 23-Feb-17 A 17-Apr-17 -120
79.56% 25.34% 22.22% 13-Mar-17 04-Apr-17 23-Feb-17 A 17-Apr-17 -120
50% 50% 100% 0% 13-Mar-17 23-Mar-17 13-Mar-17 A 05-Apr-17 -120
75% 75% 47.99% 0% 23-Mar-17 28-Mar-17 14-Mar-17 A 10-Apr-17 -120
75% 75% 0% 0% 28-Mar-17 30-Mar-17 15-Mar-17 A 12-Apr-17 -120
75% 75% 0% 0% 30-Mar-17 04-Apr-17 15-Mar-17 A 17-Apr-17 -120
100% 100% 0% 100% 28-Mar-17 03-Apr-17 23-Feb-17 A 07-Mar-17 A
100% 100% 100% 100% 20-Mar-17 22-Mar-17 09-Mar-17 A 11-Mar-17 A
100% 100% 68.79% 100% 21-Mar-17 28-Mar-17 23-Feb-17 A 09-Mar-17 A