Job Number Sheet
1
Job Title
alain farm
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
Calcs by Checked by Date
E-Mail : mail@prokon.com Eng Anwar 9/15/2020
Continuous Beam: beam (Code of Practice : BS8110 - 1997)
9/15/2020 11:21:25 AM C01
Input Tables
Fcu (MPa) 30
Fy (MPa) 450
Fyv (MPa) 250
% Redistribution 0
Downward/Optimized redistr. D
Cover to centre top steel(mm) 40
Cover to centre bot.steel(mm) 40
Dead Load Factor 1.4
Live Load Factor 1.6
Density of concrete (kN/m3) 24
% Live load permanent 25
Ø (Creep coefficient) 2
Ecs (Free shrinkage strain) 300E-6
Sec Bw D Bf-top Hf-top Bf-bot Hf-bot Y-offset Web Flange
No. (mm) (mm) (mm) (mm) (mm) (mm) (mm) offset offset
1 200 650
Span Section Sec No Sec No
No Length(m) Left Right
1 3.3 1
2 4.35 1
Sup Code Column Below Code Column above Code
No. C,F F,P F,P
D(mm) B(mm) H(m) D(mm) B(mm) H(m)
Case Span Wleft Wright a b P a M a
D,L (kN/m) (kN/m) (m) (m) (kN) (m) (kNm) (m)
D 1 4
L 1 4
D 2 3
L 2 3
Span M left M right
(kNm) (kNm)
Job Number Sheet
2
Job Title
alain farm
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
Calcs by Checked by Date
E-Mail : mail@prokon.com Eng Anwar 9/15/2020
Deflection, Shear, Moment and Steel diagrams. Spans 1,2
Elastic Deflections (Alternate spans loaded) Def max = .1958mm @ 5.72m
.500
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
.050
.100
.150
Long-term Deflections (All spans loaded - using entered reinforcement) Def max = .3371mm @ 5.72m
.500
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
.050
.100
.150
.200
.250
.300
SHEAR: X-X V max = 35.42kN @ 3.30m
30.0
20.0
10.0
.500
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
-10.0
-20.0
-30.0
MOMENTS: X-X M max = -27.59kNm @ 3.30m
-20.0
-10.0
.500
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
10.0
20.0
Shear Steel: X-X Asv max = .3680mm²/mm @ 0.00m
.350
.300
.250
.200
.150
.100
.050
.500
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
Bending Steel: X-X As max = -121.7mm2 @ 3.30m
-100
-50.0
.500
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
50.0
Job Number Sheet
3
Job Title
alain farm
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
Calcs by Checked by Date
E-Mail : mail@prokon.com Eng Anwar 9/15/2020
COLUMN REACTIONS
Support Dead Load(kN) Live Load(kN) Dead + Live(kN) Ultimate(kN)
1 7.99 4.67 12.65 21.60
2 31.67 16.53 48.20 70.79
3 10.46 5.06 15.52 23.98
---------------------------------------------------------------------
COLUMN MOMENTS (Ultimate limit state)
Columns below
Support Bending Moment(kNm) Shear Force (kN)
No. Min. Max. Min. Max.
1 0.00 0.00 0.00 0.00
2 0.00 0.00 0.00 0.00
3 0.00 0.00 0.00 0.00
Columns above
Support Bending Moment(kNm) Shear Force (kN)
No. Min. Max. Min. Max.
1 0.00 0.00 0.00 0.00
2 0.00 0.00 0.00 0.00
3 0.00 0.00 0.00 0.00
---------------------------------------------------------------------
Job Number Sheet
4
Job Title
alain farm
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
Calcs by Checked by Date
E-Mail : mail@prokon.com Eng Anwar 9/15/2020
Reinforcing Tables
Beam type (1-5) 1
Maximum bar length (m) 13
TOP: Minimum bar diameter (mm) 12
Maximum bar diameter (mm) 40
BOTTOM: Minimum bar diameter (mm) 12
Maximum bar diameter (mm) 40
STIRRUP: Minimum diameter (mm) 8
Maximum diameter (mm) 16
Stirrup shape code 72
First bar mark - top A
First bar mark - mid.[optional]
First bar mark - bot.[optional]
Cover to stirrups - top (mm) 30
Cover to stirrups - bot (mm) 30
Cover to stirrups - sides (mm) 25
Minimum stirrups as % of nominal 100
Loose method of detailing (Y/N) N
Exploded elevation (Y/N) Y
Bending schedule scale 1: Auto
Number bars from left to right (Y/N) Y
Middle bar diameter (mm) Auto
Target Padds
Bars Mark SC Span Offset Length Hook Layer
2Y16 A 35 1 0.025 7.600 R T
2Y16 B 35 1 0.025 7.600 R B
Stirrup Section Bar Type + Shape Top Top Bottom
Number Number Diameter Mark Code Offset Flange Flange
1 1 R8 SA1 72
R8 SA2 35
Stirrup Length
Number Spacing Span Offset (m)
1 250 1 0.20 2.75
1 250 2 0.20 3.75
Section positions
Label Span Offset(m)
A 1 1.8
B 2 0.3
C 2 2.4
Job Number Sheet
5
Job Title
alain farm
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
Calcs by Checked by Date
E-Mail : mail@prokon.com Eng Anwar 9/15/2020
File name CB.PAD
First span 1
Last span 2
Draw grid lines?(Y/N) Y
Draw columns?(Y/N) Y
Number/Letter of first grid A
Number (U)p or (D)own U
Drawing size?(A4 or A5) A5
Height (normal text) mm 2
Height (title text) mm 2.5
Height (sec. bar mark) mm 1.8