TECHNICAL MANUAL
POWERTRANSFORMERMAINTENANCE
ANDACCEPTANCETESTING
16 NOVEMBER1998
REPRODUCTION AUTHORIZATION/RESTRICTIONS
This manual has been prepared by or for the Government and, except to the
extent indicated below, is public property and not subject to copyright.
HEADQUARTERS
DEPARTMENT OF THE ARMY
WASHINGTON,DC, 16 November 1998
PaSe
cmAFTEn 1. INTRODCTKlNlSAFETY
Purpose.. ....................................................................... l-l
scope .......................................................................... l-l
References ...................................................................... l-l
Maintenanceandtesdng ........................................................... l-2
safety .......................................................................... l-2
Nameplatedata .................................................................. 13
CHAPTER
2. CONSTRUCTIONlTHEORY
Tn3nsfomwapplications .......................................................... 2-l
Magnetic flux .................................................................... 2-2
Widhg,cumetandoltageratios .................................................. 2-2
Corecos4mction ................................................................ 23
Corefo~construction ............................................................ 24
Shell*omlcomtNctia" ............................................................ 2-4
cHArTEn
3. TRANSFORMER CONNECTIONS AND TAPS
Tapped P,imariesmdsecandties ................................................... %1
Palaity ......................................................................... 3-l
*tatiansfomers ................................................................. L&2
Singleandmulti-phaserelati~nslups ................................................. s2
Delta-wyeandwye-deltadisplacements ............................................... %I3
CUFTER
4. COOIJNWCONSTRUCTION ClASSIFlCATIONS
C,assifications ................................................................... Pl
Dly-typetransfomers ............................................................. Pl
Liquid-tilledtransformers .......................................................... Pl
TarkconstNction ................................................................ 4-2
Freebreakhingtanks .............................................................. 4-2
Consemtortanh ................................................................ 4-2
Gas-ailsealedtan~ ............................................................... 44
Autamaticineti@ssealedtm!e .................................................... 44
Sealedtanktype .................................................................. 44
CmmER
5. INSLILATING FLUIDS
Oil ............................................................................. f-1
Oil testing....................................................................... &l
Dissolvedgashoilanalysis ........................................................ F-2
lbmskrmeroilsamplii .......................................................... 64
Syntheticsa.ndotl,erhwtitiqtItids ................................................ 6-5
i
Page
Movingandstorage ............................................................... 62
Internalinspection ................................................................ 63
Testingforle* .................................................................. 04
acrnflllinS .................................................................... 64
TRANSFORMER TESTING
Testdata.. ...................................................................... 7-l 7-1
Directcurrenttes~ .............................................................. 7-Z 7-l
Alternatingcunxnttesting ......................................................... 73 14
List of Figures
P@le
TypicalpowertrarLsfomIer ......................................................... ........... l-l
Distributionsystemschematic ...................................................... ........... 2-l
nansformeruxlines ............................................................. ........... 2-2
winsfomwequaltumsratio ....................................................... ........... 2-3
Ttan&ormer lo:1 turns ratio ........................................................ ........... 23
ltansformer 1:1otumsratio ........................................................ ........... 23
Ransformercorecon~ction ...................................................... ........... 24
Transformershellconstruction ...................................................... ........... 25
nan8fomlertaps ................................................................. ........... 3-l
Single Phase transformer second;uy winding arrangements .............................. ........... ?-2
Physicaltransformerpolarity ....................................................... %2
Dia~ammatictransformerpolarity .................................................. %3
Transformer subtractive polarity test ................................................. %3
ltansformeradditivepolaritytest ................................................... ........... %4
Autotransformer.. ................................................................ ........... 34
Sine wave ....................................................................... ........... 3-5
Tbreephasesinewaes.. .......................................................... ........... %5
3phasephasormagram ............................................................ ........... %5
Delta-delta and wye-wye transformer configurations .................................... ........... %E
Wye-delta and delta-wye transformer configurations .................................... ........... %6
ltanaformerleadmarkings ......................................................... ........... >7
Wye delta tmnsfonner nameplate .................................................... ........... 3-7
conservator tad transformers ...................................................... ........... 43
Gasoilsealedtmnsfonnen ......................................................... ........... p3
Automatic inert gas sealed transformers .............................................. ........... 43
Sealedtanktransfa~ers ........................................................... ........... 44
~~sformertankvacuumf~ing ..................................................... ........... 65
Transformer maintenance test diagram ............................................... ........... 7-3
list of Figures (CO&W@
ntJ.e
nnrwf0me*acceptancetestdiagram
.............................................................
wiiding
losses
inBtransf0mer
with
unCOtaminated dielechic .......................................
wiiding losses in a tIansfm.mer with contaminated dielechic .........................................
oltmeter-ammeter.wanmeter method of measuring insulation power factor .............................
Hotcollarbushingpowerfactortest .............................................................
Itansfo~erporcelainandailfiedbushin* .......................................................
Mechanicalpressure-rellefdevlee ................................................................
Suddenpressurerelay ..........................................................................
Tempe*ture*uge ............................................................................
Dialtypetemperaturegauge .....................................................................
Sehematic~oftransonnertapchanger .....................................................
~~~earresters .............................................................................
Typical failure distribution for substation transformers ...............................................
List of Tables
iii
TM 5-686
CHAPTER 1
INTRODUCTION/SAFETY
l-1
TM 5-686
14. Maintenance and testing a. Although inspections and sampling can usuahy be
performed while the transformer is in service, all other
Heat and contamination are the two greatest enemies to
service and testing functions will require that the trans-
the transformers operation. Heat will break down the
former is de-energized and locked out. This means that a
solid insulation and accelerate the chemical reactions
thorough understanding of the transformers circuit and
that take place when the oil is contamllated. All trarw
the disconnecting methods should be reviewed before
farmers require a cooling method and it is important to
any work is performed.
ensure that the transformer has proper cooling. Proper
b. A properly installed transformer will usually have a
cooling usually involves cleaning the cooling surfaces,
maximizing ventilation, and monitoring loads to ensure means for disconnecting both the primary and the sec-
the transformer is not producing excess heat. ondary sides; ensure that they are opened before any
a. Contamination is detrimental to the transformer, work is performed. Both disconnects should be opened
both inside and out. The importance of basic cleanliness because it is possible for generator or induced power to
and general housekeeping becomes evident when long- backfeed into the secondary and step up into the prhna-
term service life is considered. Dirt build up and grease ry. After verifying that the circuit is de-energized at the
deposits severely limit the cooling abilities of radiators source, the area where the work is to be performed
and tank surfaces. Terminal and insulation surfaces are should be checked for voltage with a hot stick or some
especially susceptible to dii and grease build up. Such other voltage indicating device.
buildup will usually affect test results. The transformers c. It is also important to ensure that the circuit stays de-
general condition should be noted during any activity, energized until the work is completed. This is especially
and every effort should be made to maintain its integrity important when the work area is not in plain view of the
during all operations. disconnect. Red or orange lock-out tags should be applied
b. The oil in the transformer should be kept as pure as to all breakers and disconnects that will be opened ~foora
possible. Dirt and moisture will start chemical reactions service procedure. The tags should be highly visible, and
in the oil that lower both its electrical strength and its as many people as possible should be made aware of their
cooling capability. Contamination should be the primary presence before the work begins.
concern any time the transformer must be opened. Most d. Some switches are equipped with physical locking
transformer oil is contaminated to some degree before it devices (a hasp or latch). This is the best method for
leaves the refmery. It is important to determine how con- locking out a switch. The person performing the work
taminated the oil is and how fast it is degenerating. should keep the key at all times, and tags should still be
Determining the degree of contamination is accom- applied in case other keys exist.
plished by sampling and analyzing the oil on a regular e. After verifying that all circuits are de-enetgized,
basis.
grounds should be connected between all items that
c. Although maintenance and work practices are
could have a different potential. This means that all con-
designed to extend the transformers life, it is inevitable
ductors, hoses, ladders and other equipment shoukl be
that the transformer will eventually deteriorate to the
grounded to the tank, and that the tanks connection to
point that it fails or must be replaced. Transformer test-
ground should be v&tied before beginning any wor~k on
ing allows this aging process to be quantified and
the transformer. Static charges can be created by many
tracked, to help predict replacement intervals and avoid
failures. Historical test data is valuable for determinll maintenance activities, including cleaning and filtezing.
damage to the transformer after a fault or failure has The transformers inherent ability to step up voltages and
occurred elsewhere in the circuit. By comparing test data currents can create lethal quantities of electricity.
taken after the fault to previous test data, damage to the J The inductive capabilities of the transformer should
transformer can be determined. also be considered when working on a de-energized unit
that is close to other conductors or devices that are ener-
1-5. Safety gized. A de-energized transformer can be affected by
Safetyis of primary concern when working around a these energized items, and dangerous currents or volt-
transformer. The substation transformer is usually the ages can be induced in the achacent windings.
highest voltage item in a facilitys electrical distribution 9. Most electrical measurements require the applica-
system. The higher voltages found at the transformer tion of a potential, and these potentials can be stored,
deserve the respect and complete attention of anyone multiplied, and discharged at the wrong time if the prop-
working in the area. A 13.8 kV system will arc to ground er precautions are not taken. Care should be taken during
over 2 to 3 in. However, to extinguish that same arc will the tests to ensure that no one comes in contact with the
require a separation of 18 in. Therefore, working around transformer while it is being tested. Set up safety barr-
energized conductors is not recommended for anyone but ers, or appoint safety personnel to secure remote test
the qualified professional. The best way to ensure safety areas. After a test is completed, grounds should be left on
when working around high voltage apparatus is to make the tested item for twice the duration of the test, prefer-
absolutely certain that it is deenergized. ably longer.
l-2
TM 5-686
h. Once the operation of the transformer is under- angular displacement (rotation) between the primary
stood, especially its inherent ability to multiply volt- and secondary
ages and currents, then safety practices can be applied h. Comection diagram. The connection diagram
and modified for the type of operation or test that is will indicate the connections of the various windings,
being performed. It is also recommended that anyone and the winding connections necessary for the various
working on transformers receive regular training in tap voltages.
basic first aid, CPR, and resuscitation, i. Percent impedance. The impedance percent is the
vector sum of the transformers resistance and reac-
l-6. Nameplate data tance expressed in percent. It is the ratio of the voltage
Thetransformer nameplate contains most of the impor- required to circulate rated current in the corresponding
tant information that will be needed in the field. The winding, to the rated voltage of that winding. With the
nameplate should never be removed from the trans- secondary terminals shorted, a very small voltage is
former and should always be kept clean and legible. required on the primary to circulate rated current on
Although other information can be provided, industry the secondary. The impedance is defined by the ratio of
standards require that the following information be dis- the applied voltage to the rated voltage of the winding.
played on the nameplate of all power transformers: If, with the secondary terminals shorted, 138 volts are
a. Serial number The serial number is required any required on the primary to produce rated current flow
time the manufacturer must be contacted for informa- ln the secondary, and if the primary is rated at 13,800
tion or parts. It should be recorded on all transformer volts, then the impedance is 1 percent. The impedance
inspections and tests. affects the amount of current flowing through the
b. Class. The class, as discussed in paragraph 4-1, transformer during short circuit or fault conditions.
will indicate the transformers cooling requirements j. Impulse level (BIL). The impulse level is the crest
and increased load capability. value of the impulse voltage the transformer is required
c. The kVA rating. The kVA rating, as opposed to the to withstand without failure. The impulse level is
power output, is a true indication of the current carry designed to simulate a lightning strike or voltage surge
ing capacity of the transformer. kVA ratings for the va- condition. The impulse level is a withstand rating for
ious cooling classes should be displayed. For three- extremely short duration surge voltages. Liquill-filled
phase transformers, the kVA rating is the sum of the transformers have an inherently higher BIL rating than
power in all three legs. dry-type transformers of the same kVA rating.
d. Voltage rating. The voltage rating should be given k. Weight. The weight should be expressed for the
for the primary and secondary, and for all tap positions. various parts and the total. Knowledge of the weight is
e. Temperature rise. The temperature rise is the important when moving or untanking the transformer.
allowable temperature change from ambient that the 1. Insulating fluid. The type of insulating fl.uid is
transformer can undergo without incurring damage. nnportant when additional fluid must be added or
J Polarity (single phase). The polarity is important when unserviceable fluid must be disposed of.
when the transformer is to be paralleled or used in con- Different insulatiig fluids should never be mixed. The
junction with other transformers. number of gallons, both for the main tank, and for the
g. Phasor diagrams. Phasor diagrams will be pro- various compartments should also be noted.
vided for both the primary and the secondary coils. m. Instruction reference. This reference will indi-
Phasor diagrams indicate the order in which the three cate the manufacturers publication number for the
phases will reach their peak voltages, and also the transformer instruction manual.
1-3
TM S-666
CHAPTER 2
CONSTRUCTION/THEORY
PRIMARY SECONDARI
a. Voltages must be stepped-up for transmission. mitted at 1,000 volts (P=lxE, 10 amps X 1,000 volts =
Every conductor, no matter how large, will lose an 10,000 watts) the same 10,000 watts will be applied to
appreciable amount of power (watts) to its resistance the beginning of the transmission line.
(R) when a current (T) passes through it. This loss is b. If the transmission distance is long enough to pro-
expressed as a function of the applied current duce 0.1 ohm of resistance acrooss the transmission
(P=I%R). Because this loss is dependent on the cur- cable, P=12R, (100 amp)2 X 0.1 ohm = 1,000 watts will
rent, and since the power to be transmitted is a func- be lost across the transmission line at the 100 volt trans-
tion of the applied volts (E) times the amps (P=IxE), mission level. The 1,CGO volt transmission level will cre-
signlflcant savings can be obtained by stepping the ate a loss of P=12R, (10 amp)2 X 0.1 ohm = 10 watts.
voltage up to a higher voltage level, with the corre- This is where transformers play an important role.
sponding reduction of the current value. Whether 100 c. Although power can be transmitted more efficient-
amps is to be tmnsmitted at 100 volts (P=IxE, 100amps ly at higher voltage levels, sometimes as high as 500 or
X 100 volts = 10,000 watts) or 10 amps is to be trans- 750 thousand volts (kv), the devices and networks at
2-l
TM 5-686
the point of utilization are rarely capable of handliig netic lines of force (flux lines) that cut across the sec-
voltages above 32,000 volts. Voltage must be stepped ondary windings. When these flux lines cut across a
down to be utilized by the various devices available. conductor, a current is induced in that conductor. As
By adjusting the voltages to the levels necessary for the the magnitude of the current in the primary increases,
various end use and distribution levels, electric power the growing flux lines cut across the secondary wind--
can be used both efficiently and safely. ing, and a potential is induced in that winding. This
d. All power transformers have three basic parts, a inductive liking and accompanying energy transfer
primary winding, secondary winding, and a core. Even between the two windings is the basis of the Inns--
though little more than an air space is necessary to formers operation (see figure Z-2). The magnetic lines
insulate an ideal transformer, when higher voltages of flux grow and expand into the area around the
and larger amounts of power are involved, the insulat- winding as the current increases in the primary. TCI
ing material becomes an integral part of the trans- direct these lines of flux towards the secondary, vari..
formers operation. Because of this, the insulation sys- ous core materials are used. Magnetic lines of force:,
tem is often considered the fourth basic part of the much like electrical currents, tend to take the path of
transformer. It is important to note that, although the least resistance. The opposition to the passage of flux:
windings and core deteriorate very little with age, the lines through a material is called reluctance, a charac-.
insulation can be subjected to severe stresses and tetitic that is similar to resistance in an electrical cir-.
chemical deterioration. The insulation deteriorates at a wit. When a piece of iron is placed in a magnetic field:
relatively rapid rate, and its condition ultimately deter- the lines of force tend to take the path of least resist-.
mines the service life of the transformer. ante (reluctance), and flow through the iron instead of
through the surrounding air. It can be said that the air
2-2. Magnetic flux has a greater reluctance than the iron. By using iron as
Thetransformer operates by applying an alternatii a core material, more of the flux lines can be directed~
voltage to the primary winding. As the voltage increas- from the primary winding to the secondary winding;
es, it creates a strong magnetic field with varying mag- this increases the transformers efficiency.
PRIMARY SECONDAR
2-3. Winding, current and voltage then the voltage induced in the secondary windings will
ratios be stepped down in the same ratio as the number of
turns in the two windings. If the primary voltage is 120
If the primary and secondary have the same number of
turns, the voltage induced into the secondary will be volts, and there are 100 turns in the primary and 10
the same as the voltage impressed on the primary (see turns in the secondary, then the secondary voltage will
figure 23). be 12 volts. This would be termed a step down trans-
a. If the primary has more turns than the secondary former as shown in figure 24.
2-2
TM 5-686
2-3
TM 5-686
clamping arrangement remains tight; any sudden the operating frequency, the inductance and capaci-
increase in noise or vibration of the transformer can tance of various items in or near the circuit operate at
indicate a loosening of the core structure. a frequency similar to a multiple of the operating fre-
quency. The Third Harmonic flows primarily in the
2-5. Core form construction core, and can triple the core losses. These losses occur
There are two basic types of core assembly, core form primarily in Wye-Wye configured transformers (see
and shell form. In the core form, the windings are chapter 3).
wrapped around the core, and the only return path for b. The flux that links the two windings of the trans-
the flux is through the center of the core. Since the core former together also creates a force that tends to push
is located entirely inside the windings, it adds a little to the conductors apart. One component of this force, the
the structural integrity of the transformers frame. Core axial component, tends to push the coils up and down
construction is desirable when compactness is a major on the core legs, and the tendency is for the coils to
requirement. Figure Z-6 illustrates a number of core slide up and over each other. The other component is
type configurations for both single and multi-phase the longitudinal force, where the adjacent coils push
transformers. each other outward, from side to side. Under normal
conditions, these forces are small, but under short cir-
2-6. Shell form construction cuit conditions, the forces can multiply to hundreds of
times the normal value. For this reason, the entire coil
Shell form transformers completely enclose the wind-
and winding assembly must be firmly braced, both on
ings inside the core assembly. Shell construction is
the top and bottom and all around the sides. Bracing
used for larger transformers, although some core-type
also helps to hold the coils in place during shipping.
units are built for medium and high capacity use. The
6. The bracing also maintains the separation that is a
core of a shell type transformer completely surrounds necessary part of the winding insulation, both from the
the windings, providing a return path for the flux lines tank walls, and from the adjacent windings.
both through the center and around the outside of the Nonconductive materials, such as plastic, hardwood or
windings (see figure Z-7). Shell construction is also plywood blocks are used to separate the windings from
more flexible, because it allows a wide choice of wind- each other and from the tank walls. These separations
ing arrangements and coil groupings. The core can also in the construction allow paths for fluid or air to circu-
act as a structural member, reducing the amount of late, both adding to the insulation strength, and helping
external clamping and bracing required. Tbis is espe- to dissipate the heat thereby cooling the windings. This
cially important in larger application where large is especially important in large, high voltage transform-
forces are created by the flux. ers, where the heat buildup and turn-to-turn separa-
a. Certain wiring configurations of shell form trans. tions must be controlled.
farmers, because of the multiple paths available for the d. The windings of the transformer most be separat-
flux flow, are susceptible to higher core losses due to ed (insulated) from each other and from the core, tank,
harmonic generations. As the voltage rises and falls at or other grounded material. The actual insulation
24
TM 5-686
between the turns of each winding can usually be pro- manual to insulating, unless otherwise stated, will be
vided by a thii enamel coating or a few layers of paper. implied to mean mineral oil.
This is because the entire voltage drop across the wind- g. Heat must be dissipated by fluid because no trans-
ings is distributed proportionately across each turn. In former is 100 percent efficient. There are many forms
other words, if the total voltage drop across a winding of losses in a transformer, and although they have dlf-
is 120 volts, and there are 100 hwns in that winding, the ferent sources, the resultant product of these losses is
potential difference between each turn is 1.2 volts heat build up within the tank. Transformer losses can
(120/100). be divided into two general categories, load losses and
e. Transformers are designed to withstand impulse no-load losses. No-load losses are independent of the
levels several times, and in some cases, hundreds of applied load, and include core losses, excitation losses,
times higher than one operating voltage. Thii is to pro- and dielectric losses in the insulation. Load loses con-
vide adequate protection in the caSe of a lightning sist of the copper losses across the windings t.hatare
strike, a switching surge or a short circuit. By allowing produced by the applied current (12R), and of the stray
oil to circulate between the windings, the turn-to-turn currents in the windings that appear when the load is
insulating level can be appreciably increased and the applied. These loses are wualIy listed by the manufac-
amount of heat built up in the windings can be effi- turer for each type of transformer. They are especially
ciently dissipated. important when considering the cooling requirements
J Most large power transformers have their windings of the transformer
immersed in some type of fluid. Although larger dry h Some of the important transformer equations are
type transformers ar constantly being produced, and as follows:
many new forms of construction, such as resin cast and Basic transformer ratio:
gas lilled, are being used for power applications, the
most common method of insulating the windings and I$, (# buns p~mw3 Ep (volts primary)
dissipating the heat ls by submerging the windings and N, (#hum secondary) = E, (volts secondary)
core in an insulating fluid. Silicone, trichloroethane,
current equation:
and a wide variety of low tie point hydrocarbon based
fluids are just a few of the fluids currently in use. This
$ XNp=ISXNS
manual primarily applies to mineral oil-lilled trans-
formers. Although there are similarities between rain Percent efficiency:
eral oil and many other fltids being used, the manufac-
turers specifications and instructions for each fluid output x 106% output x loOx
-
should always be considered. Any reference in this input output + losses
2-5
TM S-686
CHAPTER 3
3-1. Tapped primaries and ratio is changed, and the required secondary voltage
3-l
TM 5-686
with respect to the direction of current flow through jumper is connected between the Hl and X2 terminals,
the low-voltage terminals at any given instant in the the voltage read across the HZ and Xl terminals will be
alternating cycle. Transformers are constructed with greater than the applied voltage (see figure 234).
additive or subtractive polarity (see figures 34). The
terminal markings on transformers are standardized 3-3. Autotransformers
among the various manufacturers, and are indicative of Although
the examples illustrated up to this point have
the polarity. However, since there is always the possi- used two separate windings to transform the voltage
bility that the wlrlng of a transformer could have been and current, this transformation can be accomplished
changed, it is important to check the transformers by dividing one winding into sections. The desired
polarity before making any wiring changes. ratio can be obtained by tapping the winding at a.
c. The polarity is subtractive when the high-side lead prescribed point to yield the proper ratio between the
(Hl) is brought out on the same side as the low-side two sections. This arrangement is called an Autc+
lead (Xl). If a voltage is placed on the high-side, and a transformer.
jumper is connected between the Hl and Xl terminals a. Even though the winding is continuous, the
(see figure 3-5), the voltage read across the H2 and X2 desired voltages and currents can be obtained.
terminals will be less than the applied voltage. Most Although an autotransformer is made up of one contin-
large power transformers we constructed with sub- uous winding, the relationship of the two sections can
tractive polarity. be more readily understood lf they are thought of as
d. When the high-side lead (Hl) is brought out on the two separate windings connected in series. Figure 3-7
opposite side of the low-side lead (Xl) and is on the shows the current and voltage relationships in the VW
same side as the low side lead (X2), the polarity is addl- ious sections of an autotransformer.
tive. If a voltage is placed across the high-side, and a b. Autotransformers are inherently smaller than nor-,
3-2
TM 5-686
3-3
TM 5-686
es of a three-phase distribution system are displaced ondary windings. The basic three-phase transformer
120 degrees (one thiid of a cycle) apart (see figure 3-9). primary-to-secondary configurations are as follows:
d. Rather than draw sine waves to show the position -Delta-delta -Delta-wye
of the phases, the relative angular displacement
(degrees ahead of or later than) is depicted by phaaor -Wye-uye -Wyedelta
diagrams. Phasor diagrams are convenient because $ These configurations can be obtained by connect-
they not only show the angular displacement, but they ing together three single-phase transformers or by com-
also show how the phases are physically connected. bining three single-phase transformers in the same
Transformer manufacturers use phasor diagrams on tank. There are many variations to these configwa-
the nameplate of the transformer to indicate the con- tions, and the individual transformers design and apple-
nections and angular displacement of the primary and cation criteria should be considered.
secondary phases (see figure 3-10). The polarity of 9. The wye connection is extremely popular for use
three-phase transformers is determined both by where on the secondary of substation transformers. By con-
the leads are brought out of the transformer, and by the necting the loads either phase-to-phase or phase-to-
connection of the phases inside the tank. The two most neutral, two secondary voltages can be obtained on the
common connections for three-phase transformers are secondaxy. A common secondary voltage on many dis-
delta and wye (star). tribution transformers is ZOS/lZOV, with the 208V
e. Delta and wye are the connections and relations of (phase-to-phase) connections being used to supply
the separate phase on either the primary or the sec- motors, and the 120V (phase-to-neutral) connections
3-4
TM 5-686
3-5
TM 5-686
every possible point can defeat this protective scheme for each individual phase. This displacement is repre-
and render ground fault protection inoperative. sented on the transformers nameplate by a rotation of
the phasor diagrams between the primary and sec-
i. When the neutral conductor is grounded, it pro-
ondary. See the phasor diagrams in figure 3-12.
vides s stabilizing effect on the circuit. With the neutral
b. Most manufacturers conform to American
point solidly grounded, the voltage of any system con-
National Standards Institute (ANSI) Standard
ductor, with respect to ground, cannot exceed the
C57.12.70, Terminal markings for Distribution and
phase-to-phase voltage. Without grounding the neutral,
Power Wmsformers (R1993), for the lead markings of
any stable ground fault on one line raises We voltage of
larger (subtractive polarity) three-phase power trans-
the two remaining lines with respect to ground, to a
formem. The high-voltage lead, Hl is brought out on
point as high as tlw phase-to-phase voltage. The impli-
the right side when facing the high voltage side of the
cations are obvious; there will be less stress placed cm
transformer case. The remaining high-voltage leads H2
the system insulation components with the wye-
and H3 are brought out and numbered in sequence
grounded connection.
from right to left. The low-voltage lead, Xl is brought
3-5. Delta-wye and wye-delta out on the left side (directly opposite the Hl terminal)
when facing the low side of the transformer. The
displacements
remaining leads, X2 and X3 are numbered in sequence
Ascurrent and voltage are transformed in the individ- from left to right (see figure 3-13). It is important to
ual phases of a wye-delta or delta-wye transformer, note that these are suggested applications, and design
they can also have an angular displacement that occurs constraints can require that a transformer be built with
between the primary and secondary windings. That is, different markings. It is also important to remember
the primary wave-form of the A phase at any given that in many existing installations, there is the possibil-
instant is always 30 degrees ahead of or displaced from ity that the leads have been changed and do not con-
the wave form of the A phase on the secondary This 30 form to the standardized markings.
degree shift occurs only between the primary and sec- e. Figure 3-14 shows the standard delta-wye three-
ondary and is independent of the 120 degrees of dis- phase transformers nameplate illustrating many of the
placement between the other phases. topics covered in this chapter. The various primary tap
a. By convention, delta-delta and wye-wye tram+ voltages, along with the numbered connection points
formers have zero degrees angular displacement on the actual windings are referenced in the
between primmy and secondary See the phasor dia- Connections table. The wiring diagram shows the
grams in figure 3-11. The individual wave forms relationship and connections of the individual wind-
between the primary and secondary are identical at any ings, while the phasor diagrams show the phase angle
given instant. Delta-wye and wye-delta transformers relationship between the individual phases, and
have an angular displacement of 30 degrees. For these between the primary and secondary. Note also that the
types of connections, the high-voltage reference phase temperature requirements, the tank pressure capabili-
angle side of the transformer is 30 degrees ahead of the ties, and the expansion and contraction-versus-temper-
low-voltage reference phase angle at any given instant ature values are spelled out
3-6
TM 5-686
f, >
u TRANSFORMER 0;
!SERIALNO.940732.8 CLASS OA/FFA THREE PHASE 60 HERTZ
~ HV VOLTS 13800GY/7970
LV VOLTS 4160 DELTA MFG. DATE
KVA RATING 3750 CONTINUOUS 65 C RISE
IMPEDANCE MIN 7.00%AT 3750 KVA
HV NEUTRAL BUSHING
3-7
TM 5-686
CHAPTER 4
COOLING/CONSTRUCTION CLASSIFICATIONS
4-1
TM 5486
transformer, the liquid also acts as an insulator. Since 44. Tank construction
oils and synthetics will break down and lose their insu-
Transformers can also be classified according to tank
lating ability at higher temperatures, liquid tilled tram-
construction. Although the ideal transformer is a static
farmers are designed to operate at lower temperatures
device with no moving parts, the oil and the tank itself
than dry-types (temperature rises around 55 C). Just
are constantly expanding and contracting, or breath-
as with drytypes, liquid-fiued transformers can be self
ing, according to the changing temperatures caused by
cooled, or they can se external systems to augment
the varying load of the transformer.
the cooling capacity.
a. When the oil ls heated, it expands (0.08 percent
a. A self-cooled transformer depends on the surface
volume per C) and attempts to force air out of the
area of the tank walls to conduct away the excess heat.
tank. Thermal expansion can cause the oil level in the
This surface area can be increased by corrugating the
tank to change as much as 5 or 6 inches, depending on
tank wall, adding fins, external tubing or radiators for
the type of construction. This exhaust cycle causes no
the fluid. The varying heat inside the tank creates con-
harm. It is on the contraction cycle that outside air can
vection currents in the liquid, and the circulating liquid
be drawn into the tank, contaminating the oil.
draws the heat away from the core. The cooling class
b. When oxygen and moisture come in contact with
designation for self-cooled, oil-filled transformers is Ok
oil at high temperatures, the oils dielectric strength is
b. Fans are often used to help circulate the air
reduced, and sludge begins to form. Sludge blocks the
around the radiators. These fans can be manually or
flow of oil ln the tank and severely reduces the trans-
automatically controlled, and wiIl increase the trans-
formers cooling capacity. Various types of tank con-
formers kVA capacity by varying amounts, depending
struction are utilized to accommodate the trans-
on the type of constrction. The increase is usually formers expansion and contraction cycles while
around 33 percent, and is denoted on the transformers preventing the oil from being contaminated.
nameplate by a slash (0 rating. Slash ratings are deter-
mined by the manufacturer, and vary for different 4-5. Free breathing tanks
transformers. If loading is to be increased by the addi-
Free-breathing tanks are maintained at atmospheric
tion of pumps or fans, the manufacturer should be con-
pressure at all times. The passage of outside air is
tacted. The cooling class designation for a forced air-
cooled, olMlled transformer is OA/FA. directed through a series of baffles and filters.
c. Pumps can be used to circulate the oil in the tank Dehydrating compounds (such as calcium chloride or
and increase the cooling capacity. Although the con- silica gel) are often placed at the inlet to prevent the oil
vection currents occur in the tank naturally, moving the from being contaminated. Free breathing transformers
oil more rapidly past the radiators and other heat substantially reduce the pressure forces placed on the
exchangers can greatly increase their efficiency. The tank, but are not very effective at isolating the oil. Even
pumps are usually installed where the radiators join the if the moisture is removed, the air will still contain oxy-
tank walls, and they are almost always used in con- gen and cause sludging. Also, if the dehydrating corn-
junction with fans. The cooling class designation for pounds are not replaced regularly, they can become
forced oil and forced air cooled transformers is saturated and begin rehydrating the incoming air and
OAIR~/FOA. adding moisture to the oil.
d. To obtain improved cooling characteristics, an
auxiliary tubing system is often used to circulate water
4-6. Conservator tanks
through the transformers oil. This type of design is Conservator or expansion type tanks use a separate
especially suited for applications where sufficient air tank to minimize the contact between the transformer
circulation cannot be provided at the point of installa- oil and the outside air (see figure 4-l). This conserva-
tion, such as underground, inside of buildings, or for tor tank is usually between 3 and 10 percent of the
specialized applications in furnace areas. Because main tanks size. The main tank is completely filed
water is used to draw off the heat, it can be piped to a with oil, and a small conservator tank ls mounted
remote location where heat exchangers can be used to above the main tank level. A sump system is used tc
dissipate the heat. In thii type of construction, tubing is connect the two tanks, and only the conservator tank is
used to circulate water inside the tank. The tubing ch- allowed to be in contact with the outside ah.
culates through the oil near the top, where it is the a. By mounting the sump at a higher level in the con-,
hottest; great pains must be taken to ensure that the servator tank, sludge and water can form at the bottom
tubing does not leak, and to allow the water to mix with of the conservator tank and not be passed into the main
the oil. Water is especially desirable for this applica- tank. The level in the main tank never changes, and the
tion because it has a higher thermal capacity than oil. lf conservator tank can be drained periodically to remove
untreated water is used, steps must be taken to ensure the accumulated water and sludge. Conservator tank
that the pipes do not become clogged by contaminants, transformers often se dehydrating breathers at the
especially when hard water is used. The cooling class inlet port of the conservator tank to further minimize
designation for water-cooled transformers is FOW. the possibility of contamination.
4-2
TM 5-686
b. Although this design minimizes contact with the effective. The pressure in the tank is allowed to fluctw
oil in the main tank, the auxiliary tanks oil is subjected ate within certain levels (+/- 5 psi), and any excess
to a higher degree of contamination because it is mak- pressure is simply bled off into the atmosphere. When
ing up for the expansion and contraction of the main the transformer cools and begins its intake cyc:le, the
tank. Dangerous gases can form in the head space of in-going gas is supplied from a pressurized nitrogen
the auxiliary tank, and extreme caution should be exer- bottle. Nitrogen gas has little detrimental effect on the
cised when working around this type of transformer. transformer oil and is not a fire or explosion hazard.
The auxiliary tanks oil must be changed periodically, Inert gas systems (sometimes called pressurized gas
along with a periodic draining of the sump. systems) have higher Initial installation costs, and
require more periodic attention throughout their life
4-7. Gas-oil sealed tanks than non-pressurized gas systems,
The gas-oil sealed tank is similar to the conservator
tank, in that an auxiliary tank is used to minimize the
oils contact with the atmosphere (see figure 4-2).
However, in thii type of design, the main tank oil never
actually comes in contact with the auxiliary tanks oil.
When the main tanks oil expands and contracts, the
gas in the head space moves in and out of the auxiliruy
tank through a manometer type set-up. The auxiliary
tank is further divided into two sections, which are also
connected by a manometer. The levels of both sections
of the auxiliary tank and main tank can rise and fall
repeatedly, and the main tanks oil will never come in
contact with the outside atmospheres. The oil in the
auxiliary tank is subject to rapid deterioration, and just
as in the conservator type, gases and potent acids can
form in the auxiliary tank if the oil is not drained and
replaced periodically.
4-4
TM 5-686
CHAPTER 5
INSULATING FLUIDS
5-1. Oil oil. Two important tests for determining the insulating
strength of the oil are dielectric breakdown and mois-
Although new systems are fluids are constantly being ture content.
developed, mineral oil is the most common fluid in use d. The two most detrimental factors for insulating
today. Polychlorinated biphenyl (PCBs) are not accept- fluids are heat and contamination. The best way to pre-
able to the Environmental Protection Agency (EPA) for vent insulating fluid deterioration is to control over-
use in transformers. Any reference to oil or insulat- loading (and the resulting temperature increase), and
ing fluid in this section will be understood to mean to prevent tank leaks. Careful inspection and docu-
transformer mineral oil. The manufacturers instruc- mentation of the temperature and pressures level of the
tions and guidelines should be considered when deal- tank can detect these problems before they cause dam-
ing with fluids. age to the fluid. However, a regular sampling and test-
a. Insulating fluid plays a dual function in the tram+ ing routine is an effective tool for detecting the onset of
former. The fluid helps to draw the heat away from the problems before any damage is incurred.
core, keeping temperatures low and extending the life
of the insulation. It also acts as a dielectric material, 5-2. Oil testing
and intensifies the insulation strength between the ASTM has developed the standards for oil testing. The
windings. To keep the transformer operating properly, following tests we recommended for a complete analy-
both of these qualities must be maintained. sis of a transformers oil:
b. The oils ability to transfer the heat, or its thermal a. Dielectric breakdown (ASTM D-877 & D-1816).
efficiency, largely depends on its ability to flow in and The dielectric breakdown is an indication of the oils
around the windings. When exposed to oxygen or ability to withstand electrical stress. The most com-
water, transformer oils will form sludge and acidic monly performed test is ASTM D-877, and because of
compounds. The sludge will raise the oils viscosity, this, it is more readily used as a benchmark value when
and form deposits on the windings. Sludge deposits comparing different results. The oil sample is placed in
restrict the flow of oil around the winding and cause a test cup and an AC voltage is impressed on it. The
the transformer to overheat. Overheating increases the electrodes are two discs, exactly 1 in. in diameter and
rate of sludge formation (the rate doubles for every 10 placed 0.10 in. apart. The voltage is raised at a constant
C rise) and the whole process becomes a vicious rate, until an arc jumps through the oil between the two
cycle. Although the formation of sludge can usually be electrodes. The voltage at which the arc occurs is con-
detected by a visual inspection, standardized American sidered the dielectric strength of the oil. For systems
Society for Testing and Materials (ASTM) tests such as over 230 kV, this test is performed using spherical elec-
color, neutralization number, interfacial tension, and trodes spaced 0.04 or 0.08 in. apart (ASTM D-1816).
power factor can provide indications of sludge compo- Portable equipment is available for performing both
nents before visible sludging actually occurs. levels of this test in the field.
c. The oils dielectric strength will be lowered any b. Neutralization number (ASTM D-974). Acids are
time there are contaminants. If leaks are present, water formed as by-products of oxidation or sludging, :md are
will enter the transformer and condense around the rel- usually present any time an oil is contaminated. The
atively cooler tank walls and on top of the oil as the concentration of acid in an oil can be determined by
transformer goes through the temperature and pres- the amount of potassium hydroxide (KOH) needed to
sure changes caused by the varying load. Once the neutralize the acid in 1 g of oil. Although it is not a mea-
water condenses and enters the oil, most of it will sink sure of the oils electrical strength, it is an excellent
to the bottom of the tank, while a small portion of it indicator of the pressure of contaminants. It is espe-
will remain suspended in the oil, where it is subjected cially useful when its value is monitored over a number
to hydrolysis. Acids and other compounds are formed of sampling periods and trending data is developed.
as a by-product of sludge formation and by the hydrol- c. Interfacial tension (ASTM D-971 & D-228!j). The
ysis of water due to the temperature changes. Water, interfacial tension of an oil is the force in dynes per
even in concentrations as low as 25 ppm (parts per mil- centimeter required to rupture the oil film existing at
lion) can severely reduce the dielectric strength of the an oil-water interface. when certain contaminants,
5-1
TM 5-686
such as soaps, paints, varnishes, and oxidation prod- (2) There are other tests available, such as
ucts are present in the oil, the film strength of the oil is Flashpoint, Viscosity, and Specific Gravity.They are of
weakened, thus requiring less force to rupture. For in- limited value for interpretation of the oils quality,but
service oils, a decreasing value indicates the accumu- can be used for further investigation if unsatisfactory
lation of contaminants, oxidation products, or both. results are obtained for the tests listed above.
ASTM D-971 uses a platinum ring to physically break (3) Table &l lists the acceptable values for the
the interface and measure the force required. ASTM D- laboratory test results for various insulatingfltids.
2285 measures the volume of a drop of water that can
be supported by the oil without breaking the interface. 5-3. Dissolved gas in oil analysis
d. Power factor (ASTM D-924). The power factor is Theprimary mechanisms for the breakdown of lnsulat-
an indication of the amount of energy that ls lost as ing fluids are heat and contamination. An unacceptable
heat to the oil. When pure oil acts as a dielectric, very insulation resistance value will tell you only that the
little energy is lost to the capacitance charging. insulations resistance is not what is should be; it is
Contaminantswill increase the energv absorbed by the hard to draw any conclusions as to why the insulation
oil and wasted as heat. The power factor ls a function is deteriorating.The standardASTM tests for insulating
of the phasor angle (the angular displacement) fltids will provide information about the actual quality
between au AC potential applied to the oil and the of the oil, but the cause of the oils deterioration must
resulting current. The test is performed by passing a be determined by further investigation. Detection of
current through a test cell of known gap, and sing a certain gases in an oiHilled transformer is frequently
calibrated capacitance or resistance bridge to separate the fmt indication of a malfunction. Dissolved gas in
and compare the reactive and resistance portions of oil analysis is an effective diagnostic tool for determin-
the current passing through the oil. ing the problem in the transformers operation.
e. Color (ASTM D-1500). The color of a new oil is a. When insulating materials deteriorate, when
generally accepted as au Index of refmement. For in- sludge and acid is produced, or when arcing or over-
service oils, a darkening of the oil (h&her color num heating occurs, various gases are formed. Some of
her), observed over a number of test intervals, is an these gases migrate to the air space at the top of the
indication of contamination or deterioration. The color tank, but a significant amount is trapped, or
of au oil is obtained by comparison to numbered stan- entrained, in the oil. By boiling off these gases and
analyzing their relative concentrations with a gas chro-
dards. Although there are charts available, the most
matograph, certain conclusions can be drawn about
accurate way to determine the oils color is by the se
the condition of the transformer.
of a color wheel and a comparator. An oil sample is
b. Gases are formed in the oil when the insulation
placed in the comparator, and the color wheel is rotat-
system is exposed to thermal, electrical, and mechani-
ed until a match is obtained. This test is most effective
cal stresses. These stresses lead to the following gas-
when results are compiled over a series of test inter-
producing events:
vals, and trending data is developed.
(1) Overheating. Even though the insulation will
J Moisture content (ASTM D-1533). Moisture con-
not char or ignite, temperatures as low as 140 C will
tent is very important in determining the seniceability
begin to decompose the cellulose and produce carbon
of au oil; the presence of moisture (as little as 25 parts dioxide and carbon monoxide. When hot spot tempera-
per million) will usually result in a lower dielectric tures (which can be as high as 400 C) occur, portions
strength value. Water content is especially important in
of the cellulose are actually destroyed @y pyrolysis),
transformers with fluctuating loads. As the tempera- and much larger amounts of carbon monoxide are
ture increases and decreases with the changing load, formed.
the transformers oil can hold varying amounts of water (2) Corona and sparking. With voltages greater
in solution. Large amounts of water can be held in solu- than 10 kV, sharp edges or bends in the conductors will
tion at higher temperatures, and in this state (dis- cause high stress areas, and allow for localized low
solved) the water has a dramatic effect on the oils per- energy discharges. Corona typically produces large
formance. Water contamination should be avoided. amounts of free hydrogen, and is often difficult to dif-
(1) Water content is expressed in parts per million, ferentiate from water contamination and the resulting
and although water will settle to the bottom of the tank rusting and oxidation. When the energv levels are high
and be visible in the sample, the presence of free water enough to create a minor spark, quantitiesof methane,
is not an indication of high water content, and it is usu- ethane and ethylene will be produced. Sparks are usu-
ally harmless in this state. The dissolved water content ally defined as discharges with a duration of under one
is the dangerous factor; it is usually measured by phys- microsecond.
ical or chemical means. A Karl Fischer titrating appa- (3) Arcing. Arcing is a prolonged high energy dis-
ratus is one of the more common methods of measur- charge, and produces a bright flame. It also produces a
ing the dissolved water content. charsxteristic gas (acetylene), which makes it the easi-
5-2
TM J-686
est fault to identify. Acetylene will occur in a tram+ overload conditions, or if it, is actually overheating.
formers oil only if there is an arc. (d) The concentrations of hydrocarbon gases,
(a) Other conditions that will cause gases to such as Acetylene, ethylene, methane and ethane indi-
form in the transformers oil include tank leaks, oil con- cate the integrity of the transformers internal func-
tamination, sludging and residual contaminants from tions. Acetylene will be produced only by a high energy
the manufacturing and shipping processes. In most arc, and the relative concentrations of the others can
cases, the determinations that can be made are edu- indicate cellulose breakdown, corona discharge or
cated guesses, but they do at least provide a direction other faults.
and starting point for further investigation. Also, many (e) Tables E-2 and S3 show the various gases
of the gases can be detected long before the trans- that can be detected, their limits, and the interpreta-
formers condition deteriorates to the point of a fault or tions that can be made from their various concentra-
unacceptable test results. tions.
(b) In general, combinations of elements that (f) Dissolved gas in oil analysis is a relatively
occur naturally in pain, such as hydrogen (Hz), oxygen new science, and new methods of interpretation are
(O$, and nitrogen (Nz) reflect the physical condition constantly being devised. The Rogers Binary ratio, The
of the transformer. Higher levels of these gases can Domenberg Ratios, and the Key GasFIiotal Combustible
indicate the presence of water, rust, leaky bushings, or Gas methods are just a few. This type of analysis; is still
poor seals. not an exact science (it began in the 196Os), and as its
(c) Carbon oxides such as CO and CO2 reflect use becomes more widespread and the statiitic;ll base
the demand on the transformer. High levels of each can of results grows, the determinations will beconw more
show whether the transformer is experiencing minor refmed.
5-3
Suqqested 0~~8 Limits in PPM Names and Symbols for
for I,,-se Transformers GaSBB
% ~ 100 Hydrosen Hz
02 50,000 Ioxy9en 02
CZHZ 35 ~Carbon CO
iMonoxide
Cd I 65 Methane CH4
I 350 Ethane
co C24
54. Transformer oil sampling lx-shaped, I-quart cans with screw caps and foil
inserts are also good, especially when gas-in-oil analy-
Samples can be drawn from energized transformers,
sis is to be performed. Glass bottles and cans are well
although extreme caution should be observed when suited if the sample must be shipped or stored. For
working wound an energized unit. It is a good practice, standard oil testing, a small head space should be left
for both energized and de-energized units, to attach an
at the top of the container to allow for this expansion
auxiliary ground jumper directly from the sample tap to
and contraction. For dissolved gas in oil, the can
the associated ground grid connection.
should be filed all the way to the top to elite the
a. During the first year of a testing program, inspec-
infusion of atmospheric gases into the sample.
tions and sampling should be conducted at increased
c. Because the usefulness of oil testing depends on
frequencies. Baseline data must be established, and
the development of trending data, it is important for oil
more frequent testing will make it easier to determine
samples to be drawn under similar conditions. The
the rate of change of the various items. A conservative
temperature, humidity, and loading of the transformer
sampling interval would be taken immediately after
should be documented for each sample, and any varla-
energization, and every 6 months for the first year of a
tions should be considered when attempting to develop
newly initiated program. Specialized applications such
trending data. Samples should never be drawn in rain
as tap changers and regulators should be sampled more
or when the relative humidity exceeds 70 percent.
frequently Except for color and dielectric strength,
Different sampling techniques can alter the results, and
which can be tested easily in the field, it is recom-
steps should be taken to ensure that all samples are
mended that oil analysis be performed by a qualified
drawn properly.
laboratory
d. When possible, oil samples should always be
b. Glass bottles are excellent sampling containers
drawn from the sampling valve at the bottom of the
because glass is inert and they can be readily inspected
tank. Because water is heavier than oil, it will sink to
for cleanliness before sampling. Impurities that are
the bottom and collect around the sampling valve. To
drawn will be visible through the glass. The bottles can
get a representative sample, at least a quart should be
be stoppered or have screw caps, but in no instance
drawn off before the actual sample is taken. If a nom-
should rubber stoppers or liners be used; cork or alu-
ber of samples are taken, they should be numbered by
minum inserts are recommended. Clean, new rectangu-
the order in which they were drawn.
54
TM 5-686
Troubleshooting Chart
h) Nitrogen with high hydrogen and 3igh energy arc causing rapid
other hydrocarbons including ;deterioration of oil
acetylene
e. The sample jars should be clean and dry, and both applications because they provided excellent insulat-
the jars and the oil should be wanner than the SW ing properties and almost no fire hazards. In the 196Os,
rounding air. If the transformer is to be de-energized for it was discovered that PCB, and especially the products
service, the samples should be taken as soon after de- of its oxidation were harmful to the environment and to
energization as possible, to obtain the warmest oil dur- the health of personnel. The USEPA began regulating
ing the sampling. The sample jars should also be thor- PCBs in the 198Os, and although the regulations are
oughly cleaned and dried in an oven; they should be constantly being changed and updated, prudent and
kept warm and unopened until immediately before the conservative policies should always be applied when
sample is to be drawn. dealing with PCBs. PCB should not be allowed tc come
in contact with the skin, and breathing the vapors or
J-5. Synthetics and other insulating the gases produced by an arc should be avoided. Safety
fluids goggles and other protective equipment should be
Althoughtherearea number of synthetic compounds worn when handling PCBs. Even though PCBs .we no
available, such as silicone, trichloroethane, and various longer being produced, there are still thousands of PCB
aromatic and parafiic hydrocarbons, the most com- transformers in the United States alone. Transformers
mon transformer insulating fluids currently in use are that contain PCBs should be marked with yellow,
mineral oil and PCBs. The use of PCB has been severe- USEPA-approved stickers. The concentration of PCB
ly restricted recently, and special attention should be should be noted on the sticker, and all personnel work-
given to its maintenance and disposal. ing on or around the transformer should be aware of
a. PCB [polychlotinated biphmyL). PCBs have been the dangers involved. A PCB transformer should be
used extensively in industry for nearly 60 years. PCBs diked to contain any spills, and all leaks should be rec-
were found to be especially suited for transformer tied and reported as soon as possible. If the trans-
5-5
TM 5-686
former requires addition fluid, only approved insulating water to migrate from the top to the bottom of the tank
fluids, such as RTemp should be mixed with the PCB. If as the temperature changes. This is especially detri-
the handling and disposal of PCB materials is required, mental in transformers that undergo large or frequent
only qualiied personnel should be involved, and strict loading and temperature changes.
documentation of all actions should be maintained. It is (2) Silicone also changes in volume more during
recommended that only qualified professionals, trained the temperature changes and this places greater stress
in spill prevention and containment techniques, be per- on the various gaskets and cowls on the tank. Added
mitted to work on PCB transformers. pressure compensating and relief devices are usually
b. Silicone. Silicone fluid is also used widely for found on silicone units.
many applications. It is nearly as tire resistant as PCB, (3) Many other types of insulating fluids are au-
and provides many of the same performance benefits. rently in use for specialized applications. Although they
It is also more tolerant of heat degradation and co&- may have complex chemical make-ups, most of the
mination than most other fluids, and will not sludge maintenance strategies listed in this section will apply;
when exposed to oxidation agents. contamination and overheating are their worst ene-
(1) The specific gravity of silicone, however, mies. The manufacturers instruction booklets should
changes with temperature. Silicones density varies be referred to when working with these fluids.
between 0.9 and 1.1 times that of water, which causes
5-6
TM5-686
CHAPTER 6
6-l
TM 5-686
applying the gas blanket and breaking the vacuum. Dry clearly marked on the delivery receipts, and the mam-
air will be needed if the tank must be entered for facturer should be contacted. If an internal inspection
inspection or equipment installation. As a safety pre- is required, the manufacturers and or camiers WC+
caution, bottled pure oxygen must be available anytime sentatives may need to be present.
anyone enters the tank.
(5) ,Safety equipment. At least two 20.pound CO2 6-4. Moving and storage
extinguishers must be available for internal or external If at all possible, the internal inspection should be con-
use. One 20.pound dry powder extinguisher should be ducted before the transformer is unloaded. If the tram?-
available for use on the exterior of the transformer. All former must be unloaded for an internal inspection, it
personnel should be thoroughly trained and capable of should be moved directly to the point of installation.
implementing tire-fighting, spill containment, first aid, a. When unloading the transformer or placing it in
and other emergency procedures. position, be sure to use the designated lifting eyes or
(6) Miscellaneous equipment. A camera should be jacking points. the transformer should be handled in
available to document any discrepancies that are found the normal upright position, and in no case should it be
during the receiving or internal inspections. Large tents tilted more than 15 degrees. Spreaders should be used
or enclosures will be required if the transformer must to hold the liiig cables apart, particularly if they are
be opened or filled in inclement weather. Ladders or short and may bear against external assemblies or
scaffolding will be necessary depending on the size of bushings. Do not attempt to lift or drag the transformer
the transformer. Explosion-proof lamps enclosed in a by placing a loop or sling around it, and do not use
fine stainless steel mesh will be required to provide light radiators, bushings, or other auxiliaw equipment for
inside the tank. Drop cloths or plastic sheets should be climbing or to lift the transformer. Transformers ar
used to prevent material from dropping into the tank or extremely dense and heavy, much heavier than circuit
winding assembly. AU tools or materials that enter the breakers or other switchgear items. A conserntive
tank must be accounted for; it is a good idea to attach safety factor should always be applied when a trans-
strings to any small objects that enter the tank. former must be lifted.
b. An internal inspection is called for if there is eti-
6-3. Receiving and inspection dence of damage, or if the transformer is to be stored.
Whenthe transformer arrives, all paperwork should be When the unit, is to be stored for more than 3 months,
checked to ensure that the transformer is constructed it should be protected from the weather. All scratches
and equipped exactly as specified. Parts lists should be or paint defects should be touched up before storage. If
checked and all parts should be counted to ensure that the transformer is filled with oil, it should be tightly
nothing has been omitted. Any auxiliary equipment or sealed so that no moisture or air can enter the case. If
shipping crates should be inspected for evidence of the transformer is shipped filled with inert gas, period-
damage. Careful attention should also be paid to mois- ic inspection should d&ermine that a positive pressure
ture barriers or waterproof wrappings; if they are tom of about 2 psi is maintained at all times. Water-cooled
or damaged, the equipment inside may need to be dried transformers should have the water-cooling coils filled
out,. with alcohol or other similar antifreeze to eliminate any
a. The external inspection should be completed danger of freezing or contamination.
before the transformer is unloaded, and, if major prob- c. Regular inspection and documentation procedures
lems are discovered, an internal inspection should be should be conducted during transformer storage. All
conducted. External inspection should verify the fol- inspection and service procedures should be thorough-
lowing: ly documented, and any discrepancies or adverse con-
(1) Tie rods and chains are undamaged and tight. ditions should be noted. Pumps and fans should be
(2) Blocking and bracing are tight. operated for 30 minutes, once a month. At the end of
(3) There is no evidence of load shifting in transit. the storage period, oil samples should be drawn and
(4) If there is an impact recorder, whether it indi- analyzed for dielectric strength, power factor, and
cates any severe shocks. water content. Insulation resistance and power factor
(5) Whether there are indications of external dam tests should be conducted on the transformer and com-
age, such as broken glass or loose material. pared to the original factory data.
(6) Whether there are any obvious dents or cl. Larger transformers are often shipped without oil.
scratches in the tank wall or auxiliary compartments. They are vacuum filed with hot oil at the factory to
(7) Whether there is evidence of oil leakage. impregnate the winding insulation with oil. The oil is
(8) Whether there is positive pressure or vacuum then removed for shipping. This oil impregnation is vital
in the tank. to the windings insulation strength, and will be lost if
(9) Whether porcelain items have been chipped or the transformer is stored for too long without oil. Most
bent at their mounting flanges. manufacturers recommend a maximum storage tie of
b. If any of the above items are noted, it should be 3 months without oil. If this storage time is exceeded,
6-2
TM 5-686
hot oil vacuum degasification must be performed, and without oil can be made with a number of different
the manufacturers guidelines should be followed. instruments. The Alnor Model 7300 is commonly used
for transformer start up. Dew point testers operate on
6-5. Internal inspection the principle that moisture in a gas will precipitate or
If an internal inspection is called for, or if the trans. fog in a definite relationship to the temperature and
former must be opened to install bushings and other the degree of moisture in the air. By ascertaining that
auxiliary equipment, two factors should be of prima-y the outside air is low enough in moisture content, and
importance: (1) to make every attempt to minimize the that the temperature of the transformers components
time the transformer is opened; (2) to take whatever is high enough, the possibility of introducing unwanted
measures necessary to ensure that no moisture, foreign moisture into the transformer can be nearly elinxinated.
material, or other contaminants enter the tank. J Tents and heated temporary enclosures can be
a,. The time element can be minimized by assembling used to provide a controlled environment if the work
all necessary tools and materials before We tank is must be completed in inclement wether. Even if>& the
opened. Personnel conducting the inspection/assembly external conditions are satisfactory, it is a good idea to
should review all procedures and be prepared to com- blow a pressurized stream of bottled dry air through
plete their work as quickly as possible. They should the tank while it is open. Creating a slight positive pres-
also be prepared to implement any fire fighting or sure will prevent outside air from entering the tank.
emergency procedures. If the tank must be entered, all 9. If the transformer is shipped filled with oil, the
personal should empty their pockets and ensure that internal inspection can be conducted by lowering the
no loose debris is in their pant cuffs or on their shoes. oil level to just above the windings. This can usually be
Approved shoe coverings should be worn by anyone accomplished by installing the radiators and allowing
who will be on top or inside the transformer. It is also the oil to flow into them. Be certain radiators hax been
good idea to use drop cloths under all internal work cleaned and pressure checked before installing, and
where practical, and to inventory and tie-off all tools gaskets and valves are installed correctly. An explosion
being used. One person should be responsible for polic- proof spotlight with an oil resistant cord can be low-
ing the people and materials into and out of the trans- ered into the tank to conduct the inspection.
former, and for making certain nothing is left in the h. If the oil must be lowered below the windin:p, and
transformer. the windings are exposed for more than 24 hours, all of
0. Transformers are capable of stepping harmless the oil should be removed and the transformer refilled
voltages up to dangerous levels. This applies to both using hot vacuum degassing techniques. Because the
low level test potentials, and to static charges built up equipment required for hot vacuum degassing is rather
between equipment, windings, tank walls, and person- involved and costly, it is recommended that the manu-
nel. This danger is further complicated by the flamma- facturer or qualified professional be present for the
bility of transformer oil. All windings, bushings, pumps, operation.
pipes, filter equipment and external connections i. The objective of the internal inspection is to locate
should be solidly grounded during the inspection, test- any damage that may have occurred during shipment.
ing, and assembly procedures. Grounds should also be Examine the top of the core and coil assembly, all hor-
applied to any component of the transformer immedi- izontal surfaces, and especially the underside of the
ately after a test potential is applied to the component. cover for signs of moisture. All leads, bolted mechani-
c. Transformer tanks are usually pressurized with dry cal and electrical joints, current transformers and insu-
nitrogen for shipping. The pressure must be broken lation structures should be thoroughly inspected. The
slowly and dry air must be introduced; an oxygen con- tap changer should be exercised, and all connections
tent of 20 to 25 percent should be confirmed before verified. Terminal boards should be checked to see that
entering the tank. It is important to remember that tank connections are as specified.
pressures as low as 1 psi will blow covert and fittings j. Although most testing should be performed only
off as they are being removed. Ensure that all tank and while the coils are submerged in oil, if the inspection is
compartment pressures have been equalized before being conducted because of problems noted during the
opening the tank. external or internal inspections, the following tests
d. After the tank pressure has been equalized, and should be conducted:
the proper oxygen content has been verified, the tem- (1) Power factor tests for all winding to ground
perature of the core and coils should be measured. The and windings to winding values.
tank should not be opened unless the temperature of (2) Turns ratio tests for all windings and tap posi-
the internal portion of the transformer is at least 2F tions.
above the dew point of the outside air. The dew point is (3) Ratio and polarity tests for all current, trans-
a meazure of the ability of the surrounding air to allow formers.
moisture to condense on the transfomwrs surfaces. (4) Winding resistance checks for all primary and
e. Dew point mea.surement.s of transformers shipped secondary windings.
6-3
TM 5-686
(5) Discount the grounding connections between drying and determining when the transformer is suffi-
the core assembly and the tank, and perform insulation ciently dry The manufacturer should be contacted if
resistance tests with a megger. excessive moisture is suspected.
k. These test values should be compared to the facto-
ry supplied test data. All temperature and humidity 6-7. Vacuum filling
readings should be recorded to facilitate this com- Newoil Cancontaienough
contaminants
to cause a
ptiSXl. fault when the transformer is first energized. The pres-
ence of small quantities of contaninants will begin on
6-6. Testing for leaks ongoing degradation of the oils quality. The quality of
If the test results indicate a moisture or contamination transformer oil depends on its purity; many factors in
problem with the transformer, if the gauges register shipping and storage cannot be controlled once the oil
zero pressure on arrival, or if moisture is discovered leaves the refinery. The most effective way to ensure
during the internal inspection, the transformer should that no impurities are introduced into the oil is to filter
be tested for leaks before final vacuum filling begins. the oil and fill the tank under vacuum. Filtering will
a. Most transformers are pressurized to approxi- remove any entrained water IX- other contaminants,
mately 3 psi for shipping. It is important to remember and as the stream of oil hits the vacuum, most small
that this pressure will fluctuate according to tempera- bubbles will be drawn out of the liquid and explode
ture; a zero pressure gauge reading is not a sure sign of s they equalize with the vacuum condition in the tank.
a leak. If the pressure registers zero in the sunlight and a. Oil should be tested before it is introduced into the
at nighttime (over a range of more than 10 F), then a transformer. This should include field testing for
leak can be suspected. dielectric, and drawing samples for laboratory analysis.
If problems are encountered later, the results of thii
b. Leaks can be detected by applying a positive pres-
testing can provide valuable information for determin-
sure to the tank. All bushings, radiatorr, gauges and
ing why and how problems are occurring. Testing also
auxiliary equipment should be installed before a leak
provides a good indication of how effective the filtering
check is conducted. Some items may need to be
and vacuum operations were.
blanked off for the pressure check, and the pressure
b. Before vacuum filling operations can begin, it is
should be raised slowly so as not to damage the sudden
important to determine the maximum vacuum level the
pressure relay or any other sensing devices. Verify the
tank can withstand, and to ensure that any auxiliary
maximum pressure capabilities of the tank (usually
devices can also withstand the same vacuum level.
found on the nameplate or in the shipping specitica-
Items such as conservator tanks and compartment
tions) and use bottled nitrogen to apply the pressure,
dividers will not be capable of withstanding the full
being careful to always stay at least 1 psi below the
vacuum applied to the tank. Additional pipe and fittings
maximum allowable. If the tank is empty, a soap/glyc-
must be used to valve off or equalize the pressure that
erin solution should be applied to all seams, gaskets
will be created by the vacwrn. Other items, such as
and fittings. Bubbling and sputtering noises will indi- dehydrating breathers and pressure vacuum bleeders
cate the location of the leak. If the tank is tilled with oil, will have to be removed or valved off. It is important to
the soap solution should be applied above the oil level, consult the manufacturers literature on these devices
and chalk dust applied below the oil level. Chalk dust before applying the vacuum.
will darken noticeably where any oil is seeping out. c. It is also important to remember that the tank will
c. Small leaks at seams and welds can be carefully deflect according to the varying pressures. All rigid
hammered shut with a ball peen hammer, although connections to the tank, except at the base, should be
larger ones may require welding or epoxy patching. disconnected before applying the vacuum. This is espe-
Leaking gaskets should be replaced, and fittings can cially true for bushings, lightning arresters, and other
usually be removed and resealed using glyptal, Teflon porcelain equipment.
tape, or other sealing compounds. The manufacturer d. Once the necessary preparations have been made,
should be contacted to ensure the use of proper corn- the vacuum/filtering apparatus should be connected as
pounds. Vacuum filling operations can begin once the shown in figure 6-l.
leads have been replaced and the interior of the trans- e. When hooking up the equipment and applying the
former has been determined to be dry. vacuum, the following conditions should be observed:
d. The core and coils may need tobe dried if a major (1) All pipe connections from the pump to the
leak was found, if the transformer has been opened for transformer tank should be as short and as large in
an extended period, or if unsatisfactory test results diameter as possible.
were obtained for any of the preliiinary testing. (2) All transformer leads, pumps, and bushings
Drying the transformer is an involved and potentially should be grounded to prevent the build-up of static
damaging process; effective drying of the ccxe insula- charge.
tion requires temperatures in excess of 90 C. (3) The vacuum gauge should be installed on the
Manufacturers recommend a variety of procedures for top of the tank itself, and not on any of the vacuum
64
TM5686
lines. Use an aneroid or thermocouple gauge; the use of g. While the vacuum is being applied, the trans-
mercury gauges is recommended only if provisions are former is especially susceptible to contamination by
made to contain the mercury in the event that the outside factors. There should be no leaks in the tank,
gauge is broken. hoses, or any of the auxiliary equipment, and the entire
(4) The oil inlet should be positioned so that oil set-up should be protected from rain or moisture.
will not enter the vacuum pump. A liquid trap should be h. When the tank has been filled to the proper level,
installed in the vacuum lines to protect the pump from the vacuum should be broken slowly with nitrogen and
the oil. pressurized to 3 psi. Once the pressurized nitro,gen is
(5) The flow of oil should be controlled so that oil applied, the cooling pumps should be operated for at
cannot enter the sudden pressure relay or other auxil- least 1 hour to reduce the possibility of trapped resid-
iary equipment. ual gas. The transformer should then be allowed to
(6) All valves to radiators and heat exchangers stand without load for at least 12 hours before any tests
should be open. are performed.
J Once the equipment has been assembled, make
i. After the 12.how standing period, the following
certain that enough oil is on site to complete the job
tests should be performed to establish baseline data for
without stopping. During the vacuum and liquid-filling
the transforlner.
operations, the temperature of the core and coils must
(1) namformw turn.5 ratio. Thistesten.surethat
be above 0 C. The oil temperature should be at least
no material or tools are shorting the windings.
2 C higher, but in no case less than 10 C. The length
(2) Insulation resistance-diekcttiic absorption.
of time and the magnitude of the vacuum wilJ depend
on a number of factors, including the size of the tank, This test is used to determine whether any grounds
the length of time the tank was opened, and the voltage have been left on the windings, and whether the insu-
rating of the transformer. The individual manufactur- l&ion quality is strong enough for energization.
ers recommendations should be consulted, and the fol- (3) Winding continuitg resistance test. Thii test
lowing times should be considered as minimums: should be compared to the factory supplied readimgs; a
(1) Apply the vacuum for at least 3 hours before reading that is ore than 10 percent higher could indi-
oil-filling begins. cate loose internal connections.
(2) Never allow the vacuum to fall below 80 per- (4) Power factor test. This test will indicate the
cent of the original level while pumping the oil in. quality of the combined insulating fluid and winding
(3) Maintain the vacuum for at least 3 hours after insulation. It will also provide important baseline data
the transforIner is full. for future testing. Values in excess of 1 percent could
6-5
TM 5-686
indicate dampness in the transformer. Consult the man- k. After 12 hours, the load should be applied slowly,
ufacturers instructions for drying procedures. and We transformer should be carefully monitored m
(5) InsulatingJZufluid testi%g. This test will help to the load is being applied. Even though satisfactory test
provide additional information if any discrepancies are results have been obtained, personnel should stay &ax
noted in the above testing. Samples should be drawn of the transformer during the first 24 hours of ener..
for the complete series of lab tests, including dissolved gization. it is during tbis time that any entrapped air
gas, and dielectric strength field testing. The dielectric will come to the surface, and the possibility of a fault 01
strength for new oil should be at least 35 kV. a short should always be considered.
j. After the testing is completed, the transformer 2. All of the acceptance test data should be recorded
should be energized for at least 12 hours before apply- and used as baseline data for future testing. It is a good.
ing the load. Because very high currents can be devel- idea to keep copies of all test data, start-up documm
oped when the transformer is first energized, any tation, and product information in a file cabinet with ail
upstream fuses or fused devices should be checked of the other electrical system documents The proper
immediately after the power is applied. If a fuse should documentation, storage and accessibility of all product,
blow, and if the transformer is allowed to operate with- information, tests and procedures is one of the most,
out one or two fuses, it could be damaged, even if no important factors in a comprehensive and effective
load is applied. maintenance program.
6-6
TM 5-686
CHAPTER 7
TRANSFORMER TESTING
7-l. Test data value (20 C), the data for different test intervals can be
compared to indicate the rate of deterioration of the
Electrical performance testing is one of the most
transformer.
important components of a comprehensive mainte-
nance program. Test data, when taken under, or COT- 7-2. Direct current testing
rected to, standard conditions, will yield valuable data
about the rate of deterioration of a piece of electrical Transformer tests can be divided into two categories,
equipment. Once this rate is determined, service fac- alternating current (AC) and direct current (DC).
tors can be adjusted, and potential problems alleviated. Direct current testing is widely accepted because of the
a. Almost all electrical failures, in all sorts of electri- portability of the equipment and because of the nonde-
cal equipment, can be traced to a failure of the insula- structive nature of the tests. Because the test potential
tion. Periodic testing will indicate the condition of the can be applied without the reactive component (capac-
insulation at the time of the test, but does little to show itive and inductive charging and recharging), DC tests
the actual amount of deterioration the insulation has can be performed at higher levels without stressing the
undergone during its service life. Only by establishing insulation to the same degree as an AC test. It is impor-
baseline data and performing regular tests under con- tant to note that, even though a winding failure may
trolled conditions can trending data be developed to result, it probably resulted from an incipient con~dltlon
yield true indications of the insulations condition. that the test was designed to detect. If the deficiency
6. Insulating fluids analysis is probably the most had gone undetected, the failure may have occurred at
practical and indicative test of a transformers condi- an unplanned time and resulted in additional equip-
tion. It provides the opportunity to actually remove a ment damage.
portion of the transformers insulation and subject it to a. When a DC potential is applied across an i,nsula-
a series of standardized tests under controlled labora- tion, there are three components to the resulting cur-
tory conditions, with the benefit of complex laboratory rent. An understandl of the nature of these currents
equipment. One of the most important liiks in the will help with the application of the tests and the inter-
effectiveness of insulating fluids testing is the quality of pretation of the resulting data.
the sample. (1) Capacitarcce clUrrgir1g CurreTLt. when the insu-
6. Except for sampling and inspection, all trans- lation resistance is being measured between two con-
former tests should be performed on deenerglzed ductors, the conductors act like the plates in a capaci-
equipment. Even for sampling and inspections, the tank tor. These plates absorb a certain amount of
ground should be verified before coming into contact electrical energy (the charging current) before the
with any of the transformers outer surfaces. The test.5 applied voltage is actually developed acro~ them. This
listed in this chapter and in chapter 10 should be per- current results in stored energy that should be dls-
formed only after the circuits are de-energized and charged after the test by shorting across the insulation.
checked both at the source and at the test location. See (2) Dieleclric absorption cwrat. As noted above,
the safety procedures in chapter 1. the two conductors between which the potential is
d. One of the most important factors in conducting being applied act like a capacitor. The winding insula-
transformer tests is the condition of the unit under test. tion and the insulating fluid then act as dielectric mate-
A thorough inspection of the unit should be performed rials and absorb electrical energy as their molecules
before the test, and any questionable conditions should become polarized, or charged. The absorption current
be noted on an inspection record. All temperature and decreases as the materials become charged, resulting
pressure readings should be recorded along with the in an apparent increase in the insulation resistance.
atmospheric conditions (temperature and humidity) at The absorption current results in stored energy that
the tie of the test. takes longer to dissipate than it did to build. The insu-
e. Test procedures should be as similar as possible lation should be shorted for a time period equal to or
from one test to another. All connections, test voltages longer than the time the test was applied, preferably
and time intervals should be repeated exactly for each longer.
test cycle. By performing the tests in a set method, and (3) Leakage current. This is the current that actu-
correcting all test results to a standard temperature ally flows throughout the insulation or across i.ts sur-
7-1
TM 5-686
face. Its magnitude is usually very small in relation to (c)The following conditions should be observed
the rated current of the device, and it is usually when performing an insulation resistance test: Make
expressed in microamperes (one millionth of an amp). sure that both the tank and core iron are solidly
It indicates the insulations actual conductivity, and grounded. Disconnect any systems that may be con-
should be constant for a steady applied voltage. nected to the transformer winding, including high and
Leakage current that increases with tie for a constant low voltage and neutral connections, lightning
applied voltage indicates a potential problem. arrestors, fan systems, meters, and potential trans-
b. The following tests are designed to provide indica- formers. Potential transformers are often located on th
tions of the transformers condition and suitability for lie sides of breakels or disconnects; when the discon-
service. The recommended frequency and relationship nect is opened, there will still be a path available to
in a comprehensive maintenance/testing program is ground. Short circuit all high and low voltage windings
discussed in chapter 10. together at the bushings connections; jumpers should
(1) Insulation resistance-dielectric absorption test- be installed to ground, and no winding should be left
lng. The insulation resistance test is probably the best floating. The ground connection on grounded windings
known and most often used electrical test for insula- must be removed. If the ground cannot be convenient-.
tion. It is used primarily to detect low resistance paths ly removed, the test cannot be performed on that wind..
to ground or between windings that result from car- lng. Such a winding must be treated as part of the
bonization, deterioration, or the presence of moisture grounded circuit.
or dii. It will not indicate the actual quality of the insu- (d) Using a megohmmeter with a minimumscale
l&ion, but when conducted under controlled condl- of 20,000 megohms, measure the insulation resistance
tions, with the data compiled for a number of service across the connections as shown in figure 7-l.
intervals, trending data can be developed, and definite (e) The terminal markings are referenced as fol-
conclusions can be drawn as to the insulations rate of lows: The L terminal is the line or Hot terminal of the
deterioration. instrument,where the test potential is generated. The E
(a) High and medium voltage insulation systems terminalis the Earthor ground connection. The G ter-
are usually designed to withstand large potentials and minal is the Guard terminal,it is used to isolate a cer-
large quantities of electricity. Because of this, special tain portion of the circuit from the test.
equipment must be used to perform resistance tests. (f) These test connections are considered the
Ohms Law applies for all systems, and no matter how bare minimum for a maintenance testing cycle, and
high the applied voltage, or how resistance the insu- should be applied only to a transformer that has
lating material,there will be a measurable leakage cw- already been in service. They will not detect shorts
rent, and there will be a resultant resistance value. between the individual windings on the high or low
Because of these conditions, leakage currents are usu- side. For acceptance testing, or for investigative pur-
ally stated in micro-amps (one millionth of an amp) and poses, the tests diagramed in figure 7-7 can be applied.
resistance values in megohms (one million Ohms). (g) The test voltages should be as close as pos-
Most hand-held meters are not capable of reading these sible to the voltage rating of the component to which it
extremes accurately, and special equipment is used. is being applied. Suggested test voltages are found in
Even if a unit can read these extremes accurately, it table 7-1.
must also be able to supply the necessary quantities of Q All fmal insulation resistance values should
electricity to charge the massive conductors and con- be corrected to 20 C to compensate for varying condi-
tacts found in a transformer. tions at the time of the test, and to allow for compari-
(b) An insulation resistance test is usually per- son of readings taken at different test intervals. The
formed with a megger, an instrument that is not only winding temperature, and not the atmospheric temper-
capable of reading high resistance values, but is also ature, should be used for insulation resistance tests. It
able to produce the necessary currents and voltages to is important to note that when a transformer is de-ener-
obtain the readings. Megger test potentials are usually gized, there is a proportional change between the actu-
applied at 500, 1,000, 2,500, and 5,000 volts DC. These al temperature of the windings and the exterior tank or
potentials are obtained by using a motor driven or oil temperature indicated by the temperature gauges.
hand-crank operated magneto. The hand crank units Average readings should be taken for various points on
are both lightweight and portable, and because they the transformer tank, and then the insulation resis-
require no batteries or external source, they are also tance readings corrected to 20 C. This is accomplished
extremely dependable. Motor-driven units, on the other by applying the conversion factors in table 7-2.
hand, are capable of achieving higher and more con- (i) There are many schools of thought as to what
stant test voltages, but are practically useless without is considered an acceptable insulation resistance value.
batteries or a external source. Both units are available A widely accepted rule of thumb for insulation resis-
in models capable of producing accurate readings for tance values is the kV ratingof the item under test plus
resistance levels as high as 100,000megohms. one megohm. This should be considered as a bare ti-
7-2
TM 5-686
imumvalue, and any values equal to five times this taking resistance readings at the end of l- and 10-
amount should be investigated. If the investigation minute intervals. The apparent increase in the resis-
reveals nothing, then the humidity and condition of the tance is due to the dielectric charging of the insulation.
item under test should be considered. A 10 megobm The polarization index is computed by dividing the l-
resistance value for a piece of 5 kV equipment should minute value into IO-minute value.
not be accepted without investigation, but if the humid- (1) The dielectric absorption ratio is computed
ity is high, and the insulation is dirty, that value may be in the same way, except that 60.second intervals are
acceptable. used. These values should, theoretically, be indepen-
(j) The final criterion for evaluating insulation dent of temperature or other outside factors.
resistance values should be the amount of change from (m) The polarization index and dielectric
the manufacturers factory test values, or from the last absorption ratios are also subject to different methods
test interval. The manufacturer should be contacted if of interpretation. In any case, they should alw.ays be
any values are significantly lower than the factory greater than one, and any downward trend in their
values. value over a number of test intervals indicates deterio-
(k) To obtain useful data that is indicative of the ration that should be investigated.
dielectric capabilities of the transformers insulation, it (2) Winding resistance measurements. If a mea-
is recommended that a polarization index or dielectric surement of the winding resistance shows no apprecia-
absorption ratio be computed for all resistance read- ble change from the factory test values, then it can be
ings. The polarization index is determined by holding assumed that there are no loose connections.
the applied voltage of the megohmmeter constant, and Maintenance testing should include only the applied
7-3
TM 5-686
tap position. Three-phase wye windings should be mea- highly recommended that the manufacturer be contacti
sured phase to neutral, and delta windings should be ed before performing this test, and that only manufac-
separated to read individual windings, if possible. If the turers procedures be followed in conducting this test.
windings cannot be separated, three separate readings @I) DC Step Voltage Testing is often performed
should be taken, with each winding measured in paral- on transformers at less than the rated voltage of the
lel with the other two, and the results evaluated as a winding under test. Voltages are applied in equal incre-
function of the parallel and series connections ments at timed intervals (usually 1 minute) and the rate
involved. In this instance, the comparison of the three of change of the leakage currents is monitored. When
readings (the difference should be no greater than 1 the applied potential is plotted against the leakage cur-
percent) will indicate whether or not there are any rents (on Log-Log paper) the rate of change should
problems. yield a reasonably linear slope. Leakage current jumps
(a) The winding resistance can be measured of more than 100-150 percent times the previous value
with a low resistance ohmmeter, or with a Kelvin usually indicate a problem, and the test should be dis.-
bridge. Be sure to make good contact with the winding continued so that the circuit can be investigated. Like
leads, and to wait 3 minutes after initial contact before all of the other tests, this test is especially useful when
taking a reading. This delay is necessary due to the repeated tests over extended time intervals are consid--
induction created by the transformer windings. ered, and trending data is generated.
Because the windings will store energy, it is important
to shut off the test set and allow the energy to dissipate 7-3. Alternating current testing
before removing the test leads. AC testing is especially valuable when the tram-.
(b) If the factory test values are available, or if formers reactive capabilities are to be measured. For
the transformer cannot be disconnected, the resistance maintenance testing, this includes power factor testing
values for each winding should be compared to those (measuring the capacitive quality of the insulation sys-
of the adjacent windings. A difference of one percent tem) and turns ratio testing (measuring the inductance
indicates a potential problem. that links the primary and secondary). Although AC
(3) Contact resistance. Loose connections can testing requires more energy to perform at the rated
result in overheating and possible equipment, failure. frequency, and larger test sets are involved to reach the
All high and low voltage and ground connections same operating levels as DC, AC testing more closely
should be inspected, and if any abnormal conditions simulates the operating condition of the transformer.
are noted, the contact resistance should be measured The following tests are recommended for regularly
to ensure that solid contact is being made. This testing scheduled maintenance:
works especially well in conjunction with infrared a. Tkmsformer twns ratio. The transformer turns
scanning. If a connection shows hot on the IR scan, and ratio (TTR) test is used to determine, to a high degree
its contact resistance cannot be lowered by tightening, of accuracy, the ratio between the primary and sec-
it should be replaced. ondary of the transformer. This test is used to verify
(4) DC high potential testing. The DC high poten- nameplate ratio, polarity, and tap changer operation for
tial test is applied at above the rated voltage, and can both acceptance and maintenance testing. It can also
cause damage to the transformer if special precautions be used as an investigative tool to check for shorted
are not taken. When a leakage current passes through turns or open windings. If the turn to turn insulation
the insulation system of an oil-tilled transformer, dii- begins to break down in either winding, it will show up
ferent amounts of the total voltage are dropped in the in successive TTR tests.
solid (paper) and liquid (oil) parts of the insulation. (1) Although there are a number of methods avail-
These voltage drops are caused by the resistance of able, the most accurate method is by the use of a null
each insulating component, and heat is created. Under balance test set. The ratio determined by the test set
normal AC operation, only a small amount (l/4) is should agree with the indicated nameplate voltage
dropped across the solid insulation. The remaining 3/4 ratio, within a tolerance of -t 0.5 percent.
is dropped in the oil, where the heat can be easily dis- (a) If a high exciting current is developed at low
sipated, and little harm is done. voltage, it could indicate a short in the windings or an
(a) When a DC potential is applied, nearly 3/4 of unwanted short across the exciting clamps.
the voltage is dropped across the solid insulation. This (b) If there is a normal exciting current and volt-
changing stress is further complicated when higher age, but not galvanometer deflection, there is the pos-
than operating level voltages are applied. DC Over- sibility of an open circuit or a lack of contact at the test
potential testing is of little value as a maintenance test, leads.
and is usually conducted for acceptance purposes, or (c) Actual test results for most transformers will
after repair of transformers. In any event, high poten- show a slight ratio difference for the different legs of
tial testing should not be conducted unless a satisfac- the core, due to the different return paths for the
tory result is obtained for the insulation resistance. It is induced magnetic flux.
7-4
(2) The transformer ratio can also be computed by
applying a voltage to the primary, and using two volt
meters to read the voltage applied to the primary and
the voltage induced in the secondary. This method
depends on the combined accuracies of both volt
meters, and is usually accurate to only about 1 percent.
b. Insulationpowerfactor. Insulation power factor is
similar to system power factor, in that it is a ratio of the
reactive and resistance components (apparent and real
power) of the applied potential. However, where is is
desirable to have a system power factor as close as pos-
sible to one (purely resistance), an insulations power
factor is expected to be as Neal zero (purely capacitive)
as possible. Insulation power factor is more akin to the
dissipation factor that is used as a criterion to evaluate
the efficiency of capacitors. The transformers insula-
tion is expected to perform as a capacitor.
(1) Any time two conductors are at diiferent
potentials, there is a capacitance between them. There
is a capacitance between the individual windings, and
between each winding and the tank in a transformer.
The oil and celh~lose insulation that separate the wind-
ings from each other and from the tank act as dielectric
materials when an alternating current is applied.
Uncontaminated oil and winding insulation are excel-
lent dielectric materials, and will consume little energy
in the capacitive charging and discharging that OCCUE
in an AC system. this charging current is expressed in
volt amperes, and under ideal conditions, is complete-
ly returned to the system in each full cycle. Figure 7-3
illustrates this relationship.
(2) The capacitive nature of the insulation changes
as the oil becomes contaminated. Contaminants con-
sume energy in the charge/discharge cycle, and this
energy is lost as heat. Because this power is consumed
and dissipated as heat, it appears as a resistive compo-
nent, and can be expressed in watts. The diagram in fig-
ure 7-3 is modified in figure 74 to show this resistive
component.
Power factor testing is performed by measuring the
total volt-amperes drawn by the system. A capacitance
bridge, resistance bridge, or combination of volt, amp,
and watt meters is used to separate the resistance and
reactive components. The power factor is then
expressed as a ratio of the resistive energy that is con-
sumed as heat (watts), to the apparent (vector sum of
reactive and resistance) energy that flows into the sys-
tem (volt-amperes). Figure 7-5 shows a typical meter-
ing system for measuring power factor. The power fac-
tor can also be expressed as a function (the cosine) of
the phase angle between the applied voltage and the
resulting current. If the insulation was purely resistive,
the current would occur at exactly the same time as the
voltage was applied (the phase angle, or displacement,
between the current and the voltage would be zero).
The cosine of 0 D is one, representing a 100 percent
power factor.
TM 5-686
VOLTMETER AMMETER
Q m E
I /
!A9 -i
AC WATTMETER TEST
SOURCE SPECIMEK
7-6
TM 5-686
CHAPTER 8
8-1
TM S-686
c. Mechanical pressure-relief devices. These devices e. Relief diaphragms. Relief Diaphragms are usually
relieve sudden or accumulated internal pressure at a found on conservator type transformers. Relief
predetermined value. They are usually mounted on the diaphragms consist of a bakelite, thin metal, or glass
top of the tank, and consist of a diaphragm, a spring- diaphragm mounted on a large pipe that extends above
loaded mechanism, and an indicating flag (see figure the level of the conservator tank. The diaphragm mate-
E-2). When the pressure exceeds a preset level, the rial is designed to rupture at a predetermined pressure
diaphragm is raised and the excess pressure is bled off. level. Other than inspecting for evidence of rupture,
The indicating flag remains raised, so that the occw- there is little or no maintenance to be performed on
rence will be noted during the next inspection cycle. these devices. Relief diaphragms must be replaced
Some pressure relief devices are also equipped with after rupturing.
contacts that are used to actuate external relays, J Sudden pressure relays. These devices consist of
alarms, or circuit breakers. the space above the tank a bellows, a small orifice, and a set of relay contacts
must be purged with dry nitrogen, and the diaphragm that are slaved to the mechanical movement of the bel-
reset any time a relief device is found with its indicat- lows (see figure 8-3). When the transformer undergoes
ing flag popped. the pressure changes experienced during normal oper-
d. Mechanical pressure relief valve testing. A ation, the small orifice bleeds off the pressure, and the
mechanical pressure relief device cannot be tested bellows will not move. When an arc or an internal fault
without removing it from the tank. Since removal is occurs, the large volume of gas generated over rela-
impractical, it should be inspected regularly to ensure tively short time frame pushes on the bellows and actu-
there are no cracks in the diaphragm and that the ates the contacts. The contacts are used to actuate an
diaphragm/spring mechanism is free to operate. The alarm, a circuit breaker, or another relay. There are
operation of any relay contact and the associated con- variations in the design of sudden pressure relays, but
trol wiring should also be checked periodically, they all operate on the same basic principle. Sudden
8-2
TM 5-686
pressure relays are not actuated by any set pressure a. Both average reading and hot spot temperature
level; they operate when the rate of change of pressure gauges can use a bulk-type detecting unit that is
exceeds a preset value. Because arcing or internal immersed in the oil either near the top of the oil level
faults generate large quantities of gas, over a short peri- (see figure 84), or near the windings at the spot that
od of tie sudden pressure relays are effective in is expected to be the hot test. A capillary tube is con-
detecting fault conditions. Sudden pressure relays pro- nected to the bulb and brought out of the tank. The
vide little protection against over-pressure tank con&- temperature indication is provided either by a, linew
tions occurring over an extended t,ime period. marking on the tube itself, or by a dial-type indicator.
9. Sudden pressure why testing. The sudden pres-
Dial-type gauges can have up to three sets of contacts
sure relay is usually mounted in the gas space above
that will actuate any of the following devices:
the oil level, and it is important to ensure that oil does
(1) The lowest setting usually actuates e:nternal
not enter the unit. The operation of the relay is verified
cooling fans that will come on at a preset temperature
by checking that the orifice remains open, and that the
level. The fans will shut off once the temperature has
bellows is free to move. The control wiring artd the COII-
tact operation should also be verified. been reduced to the prescribed level.
(2) The contacts can also be set to actuate remote
8-4. Pressure gauges alarms that will alert maintenance personnel of the
condition of the transformer. These devices must be
Most transformers are equipped with a pressure gauge.
The gauge assembly consists of a pressure sensitive reset even though the temperature has returned to
element (a bulb or a diaphragm), an indicator attached normal.
to the element, and a dial calibrated for the required- (3) The highest and most critical contact setting
vacuum range of the tank. Although there is little or no on the temperature gauge is connected to a r&y or a
maintenance to be performed on a pressure gauge, its circuit breaker that will trip out and de-energize the
operation should be verified if no changes are noted transformer.
during a number of inspection intervals. b. Most dial-type gauges (see figure S--5) are
equipped with a red indicating needle that has no
8-5. Temperature gauges spring return and will indicate the highest tempera-
Temperature gauges are either of the hot spot or ture seen since it was last reset. This slaved hand nee-
average tank temperature type. There are many dle reading should be recorded for each ins;pection
designs in use. Most average tank temperature gauges interval, and the needle should be reset to ambient
consist of a spiral wound bi-metallic element that is temperature so that it will indicate the maximum tem-
directly coupled to a dial-type indicator. perature for the next inspection interval.
8-3
TM 5-686
;;.
T
:..
2
:. 3%
3 :~
.
.. .,
. . .
; I
4
:
:
1 :.
,, 1.
.:..y
8-6. Tap changers b. Load tap changers: Load tap changers are usually
located on the secondary side of the transformer. They
Asnoted in chapter 3, transformers are often required
are used to control the current and voltage as the load
to operate under changing primary voltages, or to pro-
is varied. Load tap changing transformers are used
vide a number of different secondary voltages. Most
especially for furnace applications, and to regulate the
transformers are equipped with a tap changer (see fig-
ure W), and any number of taps can be brought off of changing voltages found in large substations.
either of the windings to accomplish this voltage (1) Because load tap changers are required to open
change. Tap changers can be conveniently divided into and close the circuit while it is hot, they incorporate a
two categories: no-load tap changers and load tap numbe of devices to minimize the switching time and
changers. the amount of enera (the arc) released. Some tap
a. No-load tap changers. No-load tap changing is changers use vacuum bottle type breakers to interrupt
usually accomplished on the primary side of a step- the current flow, while others use a conventinal
down power transformer. The taps are usually provid- main/arcing contact mechanism, much like that found
ed 2-l/2 percent intervals above and below the rated in a circuit breaker. Other tap changers use resistor or
voltage, nd the transformer must be de-energized reactor circuitry in the mechanism to limit the current
before the tap position can be changed. The taps are flow at the tie the switching occurs. Load tap chang-
changed either by turning a hand wheel, moving a ers can be either automatic or manual, and can be used
selector switch, or lowering the oil level, opening the to vary the voltage and current by as much as 2 or 3 per-
manhole, and actually reconnecting the winding leads cent , depending on application.
to various positions on a terminal board. No-load tap (2) Most load tap changers are immersed in oil and
changers are usually used to accommodate long-term are contained in a separate compartment from the pri-
varitions in the priamry voltage feed. mary and secondary windings. Because of the large
84
TM 5-686
8-5
TM 5-686
the switching activity, the oil in the tap changer com-
partment should be sampled and analyzed twice as
often as the main tank oil.
8-6
TM 5-686
CHAPTER9
9-l
TM 5-686
problems. If the IR scan is performed annually, it 9-3. Documentation
should be performed 6 months after the annual mainte-
nance outage, to maximize prtection between the Performing the work on the transformer is all well and
hands-on service intervals. good, but the information gained is practically useless
c. Sam.pling. Drawing samples of the transformers if it cannot be easily accessed and compared to other
fluid provides the opportunity to actually remove a por- test results. To ensure that all inspection, test, analysis,
tion of the transformers insulation and subject it to a maintenance, and repair data can be used most effec-
battery of standardized tests, under controlled labora- tively, the data must be properly documented and read-
tory conditions, with the benefit of complex laboratory ily accessible. This usually involves keeping records of
equipment. Most transformers can be sampled while all activities in a centralized filing system.
energized, so there is no major inconvenience involved. a. Although the technician performing the work is
Although samples should be taken more frequently at ultimately responsible for getting the information on
the outset of a program (every 6 months), once the paper, a properly constructed record will not only help
baseline data and the rate of deterioration have been the technician, but will also help the personnel respon-
determined, the frequency can usually be adjusted sible for organizing and storing the data. Every record,
according to the needs of the transformer (normally whether it is an inspection, test, or repair record should
once a year). have as much information about the transformer and
d. Maintenance. Most maintenance functions the test conditions as possible. This includes the mar-
require an outage since they present a hazard to the ufactorer, the kVA rating, the serial number, and the
personnel involved. Maintenance functions involve voltage ratings. There should also be space on the
periodic actions that are performed as a result of the record to note the temperature, humidity, and weather
expected wear and tear and deterioration of the trans conditions at the time of the activity. Another factor
former. They include wiping down all bushings and that can be extremely important is the loading condi-
external surfaces, topping off fluids, tightening connec- tions immediately prior to (for de-energized activities)
tions, reconditioning deteriorated oil, recharging gas or during (for inspections or sampling) the service pro-
blankets and checking gas bottles, touching-up the cedure. All of this information can be extemely helpful
paint, ftig minor leaks, and doing any maintenance for interpreting the results.
required for fan systems and tap changer systems. Most b. Several factors should be tanken into considera-
of these operations should be performed annually, tion when devising a maintenance program for a spe-
when the transformer is de-energized for testing. cific transformer. The two most important factors are
e. Testing. Testing provides functional verification of the environment in which the transformer is operating
the condition of the transformer. All transformer test- and the load to which it is being subjected. Although
ing requires an outage. The tests that should be per- We exact effect these conditions will have on the trax-
formed on a regularly scheduled basis are: Power fac- former may not be known at the outset, the rate of
tor, Insulation resistance-Dielectric absorption, Turns deterioration should be determined by the end of the
ratio and Winding resistance. Testing is an important first year of the program and any arJjustment can be
part of a comprehensive program because it uses elec- made after that.
tricity to verify the operating condition of the trans-
9-k Scheduling
former. Most outdoor transformers should be tested
annually, although lightly loaded transformers in favor- It is very easy to prescribe maintenance and testing,
able environments can get by with testing every 3 and most facilities management personnel will agree to
years. More frequent testing should be performed at the benefits of the program. It is when the outage must
the outset of a program to determine the specific trans- be obtained to perform the work that the problems
formers needs. arise. This is where the comprehensive part of the pro-
_fIRepair. Although there is little distinction between gram comes into play. It is the responsibility of the
maintenance and repair activities, the planned or maintenance department to work with all the depart-
unplanned nature of the work will usually determine its ments involved to schedule the necessary outages.
category. The whole idea of the comprehensive pro- a. Once all involved parties have decided to institute
gram is to minimize the amount of unplanned down- a preventive maintenance and testing program, the
time necessary for repairs. When the deterioration of maintenance needs of the transformer and the avail-
the transform& oil is monitored, and arrangements are ability of the outages necessary to perform the work
made to recondition the oil during a planned outage, it must be considered. Because the power transformer
can be called a maintenance function. When a txm- usually affects a large portion of the electrical service
former fault occurs, and subsequent testing reveals to a facility, scheduling outages can be extremely difii-
that the oil is unift for service, the unplanned oil recon- cult. Quite often, the work must be performed at night
ditioning becomes a repair function; in this case, there or during off-peak hours over the weekend. Although
is a much more significant inconvenience factor. this can someties cause major inconveniences, the
9-2
TM 5-686
work must be performed, and the biggest help the gram and annually for the remainder of its service life.
maintenance penonneVdepartment can provide is to If problems are noted, or if the oil begins to deteriorate
minimize the time required for the outage. at an accelerated pace, the transformer should be sam-
b. Except for visual inspections, infrared (IR) inspec- pled more frequently. Tap changers and wxiliary
tions and sampling, all transformer maintenance/test- switching compartments should also be sampled more
ing procedures require an outage. Unless there are frequently. The information for each sampling interval
redundant sytems such as generators and alternate should be transcribed onto a record that will allow easy
feeds, the outage will black out portions of the facility. trending analysis. if an outside contractor is called into
It is important that all equipment be assembled and to perform the sampling and analysis, the record
prepaations be made before the switch is thrown. This should include the smaple information shown, espe-
includes having all the necessary test equipment and cially the atmospheric conditions at the time of the test.
spare parts on hand. Although it may be difficult to esti- e. The comprehensive maintenance and testing pro-
mate the amount of time each setice procedure will gram will be most effective if the various electrical
require, as the program is implemented, these factors tests are coordianted by a central department. The test-
will be easier to estimate, and they will be performed ing and maintenance of equipment other than trans
more quickly as the maintenance personnel become farmers in the fcilitys electrical distribution system
more experienced. should be integrated into an overall program. by cen-
c. The transformer should be inspected on a weekly tralizing the maintenance activities for all of the facti-
basis. This inspection should be thoroughly docwnent- tys electrical equipment, other items in each individual
ed, and should include all gauge readings, load cur- circuit can be investigated to help explain any prob-
rents, and the visual condition of all the transformers lems being experienced on a specific piece of equip-
auxiliary equipment. If unexplained maximum temper- ment. Centralizing the various inspection/test/repair
atures occur or if there is an accelerated deterioration, records also promotes the development of trending
dally inspections, or the use of load recording instru- data, and the analysis of test data over a number of test
menta should be considered. Infrared scanning can intervals. This centralized Gling system should also be
also be performed without an outage. The IR scan used to generate schedules and to plan activities. If
should be performed every 6 or 12 months, depending possible, a computerized system should be used to gen-
on the transformer type and application. erate schedules and to plan activities. If possible, a
d. The transformers insulating fluid should be sam computerized system should be established to indicate
pled every 6 months during the iirst year of the pro- when the items in the sytem are due for service.
TM 5-686
CHAPTER 10
1&l . Introduction shown in figure l&l. The pie chart shows typical fail-
ure distribution of transformers with on-load tap
Asa key component of all AC power systems, a prop-
changers (OLTC). As indicated, winding and OIXC fail-
erly functioning power transformer is essential for
ures dominate; consequently, the focus of most moni-
maintenance system integrity. Consequently, new and
toring techniques is to collect data from parameters
improved monitoring and diagnostic techniques contm-
that can be used to assess the condition of winding and
ue to be developed to minimize unplanned system out-
ages and costly repairs. tap changers. Dissolved gases In oil and partial dis-
charges (PD) are common pammeterS monitored rela&
1O-2. Transformer monitoring ed to winding and insulation condition. Temperature
and vibration monitoring are commonly used for
For the purposes of this section, monitoring refers to
on-line measurement techniques, where the emphasis
assessing OLTC condition.
is on collecting peltinent data on transformer integrity b. Dissolved Gases in oil: As mentioned in paragraph
and not on interpretation of data. Transformer moni- &3 of this manual, dissolved gas-in-oil analysis is an
toring techniques vary with respect to the sensor effective diagnostic tool for determining problems in
used, transformer parameters measured, and measure- transformer operation. However, this analysis is typi-
ment techniques applied. Since monitoring equipment cally performed off-post, where sophisticated (and usu-
is usually permanently mounted on a transformer, it ally expensive), equipment is used to determine gas
must also be reliable and inexpensive. content. To reduce the risk of missing incipient faults
a. To minimize costs, it Is important to minimize the due to long sampling intervals, monitoring techniques
number of measurements taken. It is therefore neces- are being developed to provide warnings with respect
sary to identify parameters that are most indicative of to changes in gas types and concentrations observed
transformer condition. Consequently, selection of these within a transformer. Conventional dissolved gas-in-oil
parameters must be based on failure statistics, as analysis is performed after a warning is issued. Several
core
terminals 3%
accessories OLTC
12% 41%
tank/flu
13%
windings
19%
TM 5-686
transformer gases and corresponding sources are listed between internal transformer PD and external PD
in Table10-l. sources, such as discharges from surrounding power
c.The main challenges to on-line gas monitoring are equipment. An alternative method has been proposed
not only to develop accurate and low cost sensors, but recently to differentiate between internal and external
sensors that are versatile enough to detect the pres- PD, and is based on the combined use of signals from a
ence of multiple gases. Several new sensor technole capacitive tap and signals from an inductive coil fitted
gies are now commercially available to measure con- around the base of the bushing. A warning signal is pro-
centration changes of multiple gases, and many more vided if PD activity develops inside the tank; therefore,
are in development. The HYDRAN technology for this technique does not indicate the seriousness of the
example, by Syprotec Inc. (Montreal, Quebec), uses a internal defect.
selectively permeable membrane and a miniature elec- (2) Taperature. The load capability of a tram+
trochemical gas detector to measure the presence of former is determined by the maximum allowable hot
hydrogen, carbon monoxide, ethylene and acetylene spot temperature of the winding. Hot spot values are
dissolved in oil. The chemical reactions, which result usually calculated from measurements of oil tempera-
when these gases permeate through the membrane and tures and load current. A more expensive technique is
mix with oxygen, generate electrical current that is to use distributive fiber optic temperature sensory
measured as a voltage drop across a load resistor. Thii Since tap changer condition is a key transformer com-
voltage drop is used to determine a composite parts- ponent, another method consists of metering and mon-
per-million value of the four gases. Thii technology is itoring the differential temperature between the main
used to detect change in gas concentrations only. If tank and tap changer compartment. This method can
change is detected, an alarm is triggered, which indi- be used for detecting coking of contacts. For example,
cates that an an oil sample should be taken from the the Barrington TDM-ZL, by Barrington Consultants
transformer and analyzed to evaluate the nature and (Santa Rosa, CA), measures oil temperature in the tap
severity of the fault. The Transformer Gas Analyzer, changer compartment and in the main tank. This tech-
developed by Micromonitors, is also designed to detect nology is designed to interface with a SCADA system
hydrogen, carbon monoxide, ethylene, and acetylene in and also provides local digital indication for main tank,
mineral oil-filled transformers. The instrument oper- OLTC, differential, peak and valley oil temperatures.
ates on a real-time basis with sensors immersed direct- (3) Vibration: Vibration monitoring has also been
ly in the oil inside the transformer, and is based on proposed for detecting mechanical and electrical faults
metal insulator semiconductor technology. The AMS in the OLTC compartments. The method is still under
500 PLUS, by Morgan Shaffer Company, measures both development, but could prove to be an effective tech-
dissolved hydrogen and water continuously, on-line. nique for detecting OLTC mechanical problems such as
Asea Brown Boveri is developing st?nsors based on failing bearings, springs, and drive mechanisms, as well
metal oxide technology; however, these sensors are as deteriorating electrical contracts
still in the field prototype stage. (4) Other Methods: Recently, there has been a con-
(1) Partial Discharges: The most ccanmon method siderable amount of research effort focused on improv-
for on-line detection of partial discharges (PD) is the ing the intelligence of transformer monitoring systems.
use of acoustical sensors mounted external to the The approach is to compare the results of actual mea-
transformer. One example of a commercially available surements for example, using the sensors mentioned
acoustic emission monitoring instrument is the Corona above) with predictions obtained through simulation
500, by NDT International, Inc., which is designed to models. Model parameters are determined to best tit
detect partial discharge of electrical transformers past transformer measurements. For normal tram-
while on-lie. The main difficulty with using acoustical former operation, simulation results should match the
sensors in the field, however, is in distinguishing results obtained from actual measurements. However,
lo-2
TM 5-686
measurementsdeviating from predictions may indicate example, the prototype system uses a fuzzy set to man-
a problem with the transformer. The claim is that this age three diagnostic uncertainties, including: norms,
technique can provide very sensitive measures of trans- gas ratio boundaries, and key gas analysis. Results
former performance. For example, the Massachusetts from the prototype study indicate that an expert sys-
Institute of Technology uses adaptive mathematical tem could be a useful tool to assist maintenance per-
models of transformer subcomponents that tone them- sonnel.
selves to each transformer using parameter estimation. c. Artificial Neural Network Approach: With a similar
They have used the model-based approach for accorate focus as the expert system and fuzzy-set approach,
on-line prediction of top oil temperatore, which has researchers are also wing artificial neural nehvorks
been veritied using data from a large transformer in (ANN) to reveal some of the hidden relationships in
service. Of course, other performance predictions can transformer fault diagnosis. Very complex systems can
be made using appropriate measurable quantities such be characterized with minimal explicit knowledge
as dissolved gas content. using ANNs. The relationship between gas composition
and incipient-fault condition is learned by the ANN
1 O-3. Transformer diagnostics from actual experience. The aim of using ANN is to
For the purposes of this section, diagnostics refers t the achieve better diagnosis performance by detecting rela-
interpretation of data and measurements that are per- tionships that are not apparent (that is, relationships
formed off-line. Diagnostics are used as a response to that might otherwise go unnoticed by the human eye).
warning signals and to determine the actual condition For example, cellulose breakdown is a source of car-
of a transformer. Since it is not a permanent part of a bon monoxide; however, overheating, corona and arc-
transformer, diagnostic equipment is typically much ing all cause this type of breakdown. The primary dif&
more sophisticated and expensive than monitoring culty is in identifying and acquiring the data necessary
equipment. for properly training an ANN to recognize certain com-
a. Dissolved gas-in-oil analysis is the most common plex relationships. The more complex a relationship is,
method for incipient fault detection. This section will the more training data are needed. The study presented
focus on discussing the results of two research efforts in th Zhang, Ding, Liu, Griffin reference used tive gases
including: (1) an expert system approach based on dis- as input features including, hydrogen, methane, e&me,
solved gas analysis, and (2) an artificial neural network ethylene, and acetylene. The results of the study look
approach to detect incipient faults. promising, and indicate that the reliability of the ANN
b. Expert System Approach. The analysis of the mix- approach might be improved by incorporating DGA
tore of faulty gases dissolved ln transformer mineral oil trend data into ANN training, such as increasing rates
has been recognized for many years as an effective of gas generation.
method for the detection of incipient faults. Experts
from industry, academia, and electric utilities have 104. Conclusions
reported worldwide on their experiences, and have Several new on-line monitoring technologies are now
developed criteria on the basis of dissolved gas analy- commercially available, and more are in development.
sis (DGA). The objective of one expert system Research is being conducted that is focused on provid-
approach is to develop a rule-based expert system to lng on-line diagnostic capability using model-based
perform transformer diagnosis similar to a human techniques. A trend toward developing more accurate
expert. Results from a prototype expert system based and effective incipient fault diagnostics, based on past
on DGA has been published. The main difficulty to be experience with dissolved gas-in-oil analyses, is evi-
overcome is transforming qualitative human judgments dent from the recent development of expert systems
into quantitative expressions. The prototype expert and artificial neural networks. As sensor technology
system uses fuzzy-set models to facilitate this transfor- and interpretation skills mature, it is likely thax a shift
mation. In short, the fuzzy-set model is used for repro- will be made toward performing on-line diagnostics.
senting decision roles using vague quantities. For
10-3
TM5686
APPENDIX A
REFERENCES
Related Publications
American National Standawls Institute [ANSI)):
11 West 42nd Street, New York, NY 1036
ANSI c57.
Lead markings of large transformers
ASTM D-887
Test for dielectric strength of oil
ASTM D-924
Test of oil power factor
ASTM D-971
Test of oil fdm strength
ASTM D-974
Test for contaminants in oil
ASTM D-1500
Test of oil color
ASTM D-1533
Test of moisture content in oil
ASTM D-1816
Test for dielectric strength of oil above 230 KV
ASTM B-2285
Test of oil film strength using a different method than ASTM D-971
A-l
TM S-686
GLOSSARY
Section I
Abbreviations
-4,AMP
amperes
AC
alternating current
ANSI
American National Standards Institute
ASTM
American Society for Testing Material
BIL
basic impulse level
C
Centigrade
CFM
cubic feet per minute
DC
direct current
F
Fahrenheit
II.?.
hertz
IEEE
Institute of Ekxtrical and Electronics Engineers
IR
infrared
kV
kilo volts
kVA
kilo volt amperes
kVAR, kilovars
kilo volt amperes reactance
kW
kilo watts
MiDiampere
1 millionth of an ampere
Megohm
1 million ohms
Milliohm
1 millionth Of an ohm
G-1
TM 5-686
NEC
National Electrical Code
NEMA
National Electrical Manufa&wxs Association
NFPA
National Fire Protection Association
PCB
polycholorinakd biphenyls
PF
power factor
PB
pouvior hydrogene
PPM
parts per million
PSI
pounds per square inch
PT
potential transformer
V
volt
VAB
volt amperes reactance
W
watt
Section II
Terms
AA
An Ansi (American National Standard Institute) cooling class designation indicating open, natwaLdraft ventilated
transformer construction, usually for dry-type transformers.
Ambient Temperature
The temperature of the surrounding atmosphere into which the heat of the transformer is dissipated.
Ampere
unit of current flow.
Autotransformer
A transformer in which part of the winding is common to both the primary and the secondary circuits
BIL
Basic Impulse Level, the crest (peak) value that the insulation is required to withstand without failure.
Bushing
An electrical insulator (porcelain, epoxy, etc.) that ls used to control the high voltage stresses that occur when an
energized cable must pass through a grounded barrier.
02
TM 5-686
cast-coil Transformer
A transformer with high-voltage coils cast in an epoxy resin. Usually used with 5 to 15 kV transformers.
Continuous Rating
Gaines the constant load that a transformer can carry at rated primary voltage and frequency tit&Jut exceeding the
specified temperature rise.
Copper Losses
See Load Losses.
Core-Form Construction
A type of core construction where the winding materials completely enclose the core.
Current Transformer
A transformer generally used in instrumentation circuits that measure or control current.
Delta
A standard three-phase connection with the ends of each phase winding connected in series to form a closed loop
with each phase 120 degrees from the other. Sometimes referred to as 3-wire.
Delta Wye
A term or symbol indicating the primary connected in delta and the secondary in wye when pertainiig to a.three-
phase transformer or transformer bank.
Distribution Transformers
Those rated 5 to 120 kV on the high-voltage side and normally used in secondary distribution systems. An aplicable
standard is ANSI C-57.12.
Dripproof
Constructed or protected so that successful operation is not interfered with by falling moisture or dirt.
A transformer in which the transformer core and coils are not immresed in liquid.
FA
An ANSI cooling class designation indicating a forced air ventilated transformer, usually for dry type transformers
and typically to increae the transformers and typically to increase the transformers KVA rating above the natural
ventilation or AA rating.
Fan Cooled
Cooled mechanically to stay withii rated temperature rise by additllo of fans internally and/or externally. Normally
used on large transformers only.
FOA
An ANSI cooling class designation indicating forced oil cooling using pumps to circulate the oil for increased cool-
ing capacity.
FOW
An ANSI cooling class designation indicating forced oil water cooling using a separate water loop in the oil to take
the heat to a remote heat exchanger. Typically used where air cooling is diflicult such as underground.
Frequency
On AC circuits, designate number of times that polarity alternates from positive to negative and back again, such as
60 hertz (cycles per second).
Grounds or Grounding
Connecting one side of a circuit to the earth through low-resistance or low-impedance paths. This help prevent
transmitting electrical shock to personnel.
63
TM 5-686
transformers. The terminations on the high-voltage windings are identified by Hl, H2, etc., and on the low-voltage
by Xl, X2, , etc.
Impedance
Retarding forces of current flow in AC circuits.
Indoor lhnsformer
A transformer that, because of its construction, is not suitable for outdoor service.
Insulating Materials
Those materials used to electrically insulate the transformer windings from each other and to ground. Usually clas-
siiied by degree of strength or voltage rating (0, A, B, C, and H).
Liquid-immersed Transformer
A transformer with the core and coils immersed in liquid (as opposed to a dry-type transformer).
Load
The amount of electricity, in kVA or volt-amperes, supplied by the transformer. Loads are expressed as a function of
the current flowing in the transformer, and not according to the watts consumed by the equipment the transformer
feeds.
Load Losses
Those losses in a transformer that are incident to load canylng. Load losses include the 12Rloss in the winding, core
clamps, etc., and the circulating currents (ii any) in parallel windings.
Mid-tap
A reduced-capacity tap midday in a winding--usuaUy the secondary.
Moisture-resistant
Constructed or treated so as to reduce harm by exposure to a moist atmosphere.
OA
An ANSI cooling class designation indicating an oil filled transformer.
Pamllel Operation
Single and three-phase transformers having appropriate terminals may be operated in parallel by connecting simi-
larly-marked terminals, provided their ratios, voltages, resistances, reactances, and ground connections are
designed to permit paralleled operation and provided their angular displacements are the same in the case of three-
phase transformers.
Polarity Test
A standard test performed on transformers to determine instantaneous direction of the voltages in the primary com-
pared to the secondary (see Transformer Tests).
Poly-phase
More than one phase.
Power Factor
The ratio of watts to volt-amps in a circuit.
Primary Taps
Taps added in the primary winding (see Tap).
G-4
TM 5-686
Primary Winding
The primary winding on the energy input (supply) side.
Rating
The output or input and any other characteristic, such as primary and secondary voltage, current, frequency, power
factor and temperature rise assigned to the transformer by the manufacturer.
Ratio Test
A standard test of transformers used to determine the ratio of the primary to the secondary voltage.
Reactance
The effect of inductive and capacitive components of the circuit producing other than unity power factor.
Reactor
A device for introducing inductive reactance into a circuit for motor starting, operating transfornwrs in parallel, and
controlling current.
Scott Connection
Connection for polyphase transformers. Usually used to change from two-phase to three-phase to three-phase to
two-phase.
Sealed Transformer
A transformer completely sealed from outside atmosphere and usually contains an inert gas that is slightly pressw-
ized
SecondaryTaps
Taps located in the secondary winding (see Tap).
SeriesIMultiple
A winding of two similar coils that can be connected for series operation or multiple (parellel) operation.
Shell-type Construction
A type of transformer construction where the core completely surrounds the coil.
Star Connection
Same a.9wye connections.
Step-down Transformer
A transformer in which the energy transfer is from the high-voltage winding to the low-voltage winding or windings.
step-up nansformer
A transformer in which the energy transfer is from the low-voltage winding to a high-voltage winding or windings.
T-Connection
Use of Scott Connection for three-phase operation.
A connection brought out of a winding at some point between its extremities, usually to permit changing the volt-
age or current ratio.
Temperature Rise
The increase over ambient temperature of th winding due to energizing and loadiig the transformer.
Total Losses
The losses represented by the sum of the no-load and the load losses.
Tra.m3former
An electrical device, without continuously moving parts, which, by electro-magnetic induction, transforms energy
from one or more circuits to other circuits at the same frequency, usually with changed values of voltage and cur-
rent.
05
TM 5-686
Volt-amperes
Circuit volts multiplied by circuit amperes.
Winding Losses
See Load Losses.
G-6
TM 5-686
The proponent agency of this publication Is the Chief of Eagiaeem, United States Army. Users are
invited to send comments and suggested improvements on DA Form 2028 (Recommended Changes
to PabIlcatloas and Blank Forms) directly to HQUSACE, (ATlNz CECPW-EE), Washington, DC
20314-1000.
I I
DENNIS J. REIMER
General, United States Army
Off~ciaI: Chief of Staff
JOEL B. HUDSON
Administrative Assistant to ihe
Secretary of the Army
Distribution:
To be distributedin accordsme with Initial DistributionNumber (IDN), 344686, requirementsfor TM &686.