You are on page 1of 4

30.

00m

30.25m

Y
X
Z Load 101

Whole Structure
Dead Load:
100mm Thk Deck Slab Considered.
300mm Sand Load Considered (4.3KN/m2)
Live Load:
As per municipality requirements, For non-accessible roof Live Load with deck slab = 2.0KN/
m2 Considered
30.00m

30.25m

Y
X
Z Load 101

Whole Structure
Entity Color Legend
UB533X210X101
UC305X305X97
TUB1501506.0
UC203X203X46
TUB20202.0
Default Plate Color
Default Solid Color

30.00m

30.25m

Y
X
Z Load 101

Whole Structure
Sunday, April 09, 2017, 10:50 AM
STAAD SPACE -- PAGE NO. 9

STEEL TAKE-OFF
--------------

PROFILE LENGTH(METE) WEIGHT(KN )

360. 246 TO 265 267 TO 270 273 275 TO 294 296 TO 299 302 304 TO 323 325 TO 328
ST UB533X210X101 110.00 109.007
ST UC203X203X46 220.00 99.205
ST UC305X305X97 220.00 207.874
ST TUB1501506.0 335.97 88.266
----------------
TOTAL = 504.351 Excluding connection details

************ END OF DATA FROM INTERNAL STORAGE ************

361. CHECK CODE MEMB 1 2 10 TO 24 27 28 31 33 34 37 38 41 TO 213 244 246 TO 265 -


362. 267 TO 270 273 275 TO 294 296 TO 299 302 304 TO 323 325 TO 328

STAAD.Pro CODE CHECKING - (BSI )


***********************

PROGRAM CODE REVISION V2.13_5950-1_2000

C:\Users\REJANI\Desktop\SWEIHAN FACILITIES PROJECT\STAAD FILE\SWEIHAN ROOF OPTION-03 ton.anl Page 9 of 23

You might also like