GENERAL
1 INTRODUCTION
2 REFERENCE DOCUMENTS
2.1 SPECIFICATIONS
2.2 DRAWINGS
3 RESPONSIBLE PERSONS
4 TEST EQUIPMENT
4.1 CALIBRATION
4.2 EQUIPMENT LIST
5 TEST PROCEDURES
5.1 TEST POINT PROCEDURES
5.1.1 Pipe to Soil Potentials
5.1.2 Pipe to Soil Potential - "Off Potential"
5.2 TRANSFORMER-RECTIFIER PROCEDURES
5.2.1 D.C. output measurements
5.2.2 D.C. output settings
5.2.3 Reference potentials
5.3 INSULATING FLANGE TESTING
5.4 ADDITIONAL TESTS
6 HEALTH AND SAFETY
6.1 GENERAL
6.2 SAFETY HANDBOOK
6.3 RISK ASSESSMENTS
6.3.1 General hazards
6.3.2 Specific hazards applicable to Inspection Procedures
6.4 CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH (C.O.S.H.H.)
Method Statement
Page 2 of 7
1 INTRODUCTION
This Method Statement covers standard cathodic protection inspection and testing procedures.
2 REFERENCE DOCUMENTS
2.1 Specifications
British Standard 7361: Part 1: 1991 The Code of Practice for Cathodic Protection for Land and
Marine Applications
2.2 Drawings
As required.
3 RESPONSIBLE PERSONS
Activities associated with the inspection and testing of cathodic protection system shall be carried
out by suitably experienced and trained personnel.
Service Technicians will respond to the appropriate Project Engineer.
Project Engineers report to the Manager, Engineering Services
4 TEST EQUIPMENT
4.1 Calibration
Test meters utilised during commissioning of the Cathodic Protection system shall be calibrated to
National or International measurement standards
Method Statement
Page 3 of 7
5 TEST PROCEDURES
Method Statement
Page 4 of 7
5.2.3 Reference potentials
(If a remote reference electrode is terminated in the cabinet)
i) Open TR Cabinet
ii) Observe and note readings on Reference electrode meter, if fitted
iii) If terminals are provided, connect portable multimeter, measure and record the
structure/electrolyte potential.
Method Statement
Page 5 of 7
6 HEALTH AND SAFETY
6.1 General
It is the intention of BAC that all test and inspection procedures are carried out in a safe manner in
accordance with the Health and Safety At Work Act and any other relevant legislation.
If required by the Client, BAC personnel will attend any Site Safety Induction Courses before
carrying out work on site.
Method Statement
Page 6 of 7
supervision of qualified personnel. Site owners/operators should have their own
procedures for entry into confined spaces and these should always be followed.
Always ensure the correct permit has been issued and that all correct procedures
have been carried out before continuing.
Under no circumstances should a person working alone enter a confined space.
There must always be someone outside the confined space to raise the alarm in
case of emergency.
Method Statement