Professional Documents
Culture Documents
_________________
Working Hours: Salaried (7:00-4:00) 1st Shift 2nd Shift 3rd Shift
***Nothing Follows****
15 men
TOTAL M-HRS 0
Note: Attach employee list if over twelve (12)
Work to be done:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Prepared by:
AM Esguerra / RM Borlaza/ JP Capili / JR Anore
Supervisor/Foreman
QFR-CHP-051_Initial Issue_Jan.1999
Serial No. _________________
Working Hours: Salaried (7:00-4:00) 1st Shift 2nd Shift 3rd Shift
3 man
TOTAL M-HRS 10
Note: Attach employee list if over twelve (12)
Work to be done:
1 Bid Documents Preparation for Supply and Installation of Insulation at Production Building
2 Revice of Initial Scope of Work (FDAS) versus FCP 2008 and Meralco (Update SLD & Load Schedule)
3 Docs. Preparation of Dusted Sticker (3M Brand) at building 1 & 3 and Monitoring of Vertical Blinds Installation