You are on page 1of 19

HERVE Emergency shutdown (ESD)

BARON
SIL study
Have you heard about SIL studies? What does it mean?

What does SIL, SIF and SIS mean?

Terms defined in ANSI/ISA-84.00.01-2004 (IEC 61511-1) Functional


Safety: Safety Instrumented Systems for the Process Industry Sector

SIF: Safety Instrumented Function

SIS: Safety Instrumented System: Sensor + logic solver + final element

SIL: Safety Integrity Level: Level used for specifying the safety integrity
requirement of SIFs. There are 4 levels:

2016 Herv Baron


HERVE Emergency shutdown (ESD)
BARON
SIL study
Have you heard about SIL studies? What does it mean?

What does SIL, SIF and SIS mean?

Terms defined in ANSI/ISA-84.00.01-2004 (IEC 61511-1) Functional


Safety: Safety Instrumented Systems for the Process Industry Sector

SIF: Safety Instrumented Function

SIS: Safety Instrumented System: Sensor + logic solver + final element

SIL: Safety Integrity Level: Level used for specifying the safety integrity
requirement of SIFs. There are 4 levels:

2016 Herv Baron


HERVE Emergency shutdown (ESD)
BARON
SIL study
Have you heard about SIL studies? What does it mean?

What does SIL, SIF and SIS mean?


ANSI/ISA-84.00.01-2004 (IEC 61511-1)

Functional Safety: Safety Instrumented Systems for the Process Industry Sector

SIF: Safety Instrumented Function

SIS: Safety Instrumented System: Sensor + logic solver + final element

SIL: Safety Integrity Level: Level used for specifying the safety integrity
requirement of SIFs. There are 4 levels:

2016 Herv Baron


HERVE Emergency shutdown (ESD)
BARON
SIL study
Have you heard about SIL studies? What does it mean?

What does SIL, SIF and SIS mean?


ANSI/ISA-84.00.01-2004 (IEC 61511-1)

Functional Safety: Safety Instrumented Systems for the Process Industry Sector

SIF: Safety Instrumented Function

SIS: Safety Instrumented System: Sensor + logic solver + final element

SIL: Safety Integrity Level: Level used for specifying the safety integrity
requirement of SIFs. There are 4 levels:

2016 Herv Baron


HERVE Emergency shutdown (ESD)
BARON
SIL study

Step 1: SIL Determination, assignment workshop

Identification of Instrumented Interlocks on the P&IDs =


inventory of Safety Instrumented Function (SIF)

For each SIF:


Qualitative evaluation of consequences if the event the SIF is
designed to safeguard from
Qualitative evaluation of the likelihood of the event
Determination of risk level (likelihood * consequence) and
resulting SIF required performance (SIL level)

2016 Herv Baron


Deliverable: SIL assignment logsheet / worksheets
HERVE Emergency shutdown (ESD)
BARON

2016 Herv Baron


HERVE Emergency shutdown (ESD)
BARON
SIL study
LIKELIHOOD
DEFINITION POTENTIAL FREQUENCY
CATEGORY
A Possibility of repeated incidents 20 or more times per Facility life
B Possibility of isolated incidents 5 times per Facility life
C Possibility of occurring sometime Once in Facility life
D Not likely to occur Once every 10 Facility lives
E Practically impossible Once every 100 Facility lives

CONSEQUENCE CONSIDERATIONS
CATEGORY Health/Safety Public Disruption Environmental Impact Financial Impact
Abbreviation S Safety P Public E Environmental F Financial
Large Major/Extended Major Impact to
Fatalities/ Serious
I Impact on Public
Community Duration/ Full Scale Company
(10,000+) Response (>$50 million)
Significant
Small
Serious Injury to Serious/Significant Impact To
Community
II Personnel/ Limited
(1,000 to
Resource Company
Impact on Public Commitment ($2 - $50
10,000)
million)
Moderate
Medical Treatment for Moderate/Limited Impact To
Minor
III Personnel/ No Impact
(10 to 100)
Response of Short Company

2016 Herv Baron


on Public Duration ($500M - $2
million)
Minimal to Minor Impact
Minor Impact on Minor/Little or No
IV Personnel
None
Response Needed
To Company
(1 or 2) ($50M-$500M)
HERVE SIL Study
BARON
Step 1 Assignment workshop

? ?

2016 Herv Baron


HERVE SIL Study
BARON
Step 1 Assignment workshop

? ?

2016 Herv Baron


HERVE SIL Study
BARON
Step 1 Assignment workshop

? ?

2016 Herv Baron


HERVE SIL Study
BARON
Step 1 Assignment workshop

2016 Herv Baron


HERVE SIL Study
BARON
Step 1 Assignment workshop

? ? ?

2016 Herv Baron


HERVE SIL Study
BARON
Step 1 Assignment workshop

? ?

2016 Herv Baron


HERVE SIL Study
BARON
Step 1 Assignment workshop

? ?

2016 Herv Baron


HERVE SIL Study
BARON
Step 1 Assignment workshop

2016 Herv Baron


HERVE SIL Study
BARON

Step 1: SIL Determination, assignment workshop

Deliverable: SIL assignment logsheet / worksheets

Summary:

2016 Herv Baron


What is the second step of the SIL?
HERVE SIL Study
BARON

Step 2: calculations and recommendation

SIS Performance Verification

Evaluate the performance of each SIF, based on device


selection, architecture, voting, testing etc.

Compare to required SIL level and specify modifications to


the SIF design (device selection, component redundancy) or
testing intervals

Deliverable: SIS Performance Verification Results and

2016 Herv Baron


recommendations
HERVE SIL Study
BARON
Step 2 SIS Performance verification Results

2016 Herv Baron


HERVE SIL Study
BARON

Step 2: calculations and recommendation - Summary

2016 Herv Baron

You might also like