REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


PROJECT MANAGEMENT OFFICE - BUREAU OF DESIGN
MANILA, PHILIPPINES

VARIOUS DPWH PROPOSED PROJECTS


(DETAILED ENGINEERING DESIGN AND/OR SPECIAL STUDIES)
STANDARD THREE-STOREY
SCHOOL BUILDING
(3 & 6 - CLASSROOMS)

REVIEWED: RECOMMENDING APPROVAL: APPROVED : CONCURRED :

MARIANO C. DEL CASTILLO GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON ARMIN A. LUISTRO
OIC, BUILDINGS DIVISION, BOD DIRECTOR IV, BOD UNDERSECRETARY SECRETARY SECRETARY
DEPARTMENT OF EDUCATION
VARIOUS DPWH PROPOSED PROJECTS
(DETAILED ENGINEERING DESIGN AND/OR SPECIAL STUDIES)

STANDARD THREE-STOREY
SCHOOL BUILDING
(3 & 6 - CLASSROOMS)

JOINT VENTURE OF
BILL OF QUANTITIES

A. SIX-CLASSROOMS

I. Mobilization / Demobilization

II. Temporary Facilities

III. Safety and Health

VII. Masonry Works

IV. Earthworks
VIII. Fabricated Materials and Hardwares

V. Termite Control Works

VI. Concrete Works

VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS BOD 1
STANDARD THREE-STOREY BILL OF QUANTITIES G-1
JOVEN T. SANTOS DOMICIANO B. LUSICA GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON 36
SCHOOL BUILDING
QUANTITY ENGINEER COST ENGINEER PROJECT MANAGER OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 6-CLASSROOMS )
BILL OF QUANTITIES

XIV. Plumbing / Sanitary Works

IX. Finishing Works

X. Carpentry Works

XI. Roof and Framing Works

XII. Painting Works

XIII. Electrical Works

VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS BOD 2
STANDARD THREE-STOREY BILL OF QUANTITIES G-2
JOVEN T. SANTOS DOMICIANO B. LUSICA GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON 36
SCHOOL BUILDING
QUANTITY ENGINEER COST ENGINEER PROJECT MANAGER OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 6-CLASSROOMS )
BILL OF QUANTITIES

A. THREE-CLASSROOMS

I. Mobilization / Demobilization

II. Temporary Facilities

III. Safety and Health

VII. Masonry Works

IV. Earthworks
VIII. Fabricated Materials and Hardwares

V. Termite Control Works

VI. Concrete Works

VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS BOD 3
STANDARD THREE-STOREY BILL OF QUANTITIES G-3
JOVEN T. SANTOS DOMICIANO B. LUSICA GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON 36
SCHOOL BUILDING
QUANTITY ENGINEER COST ENGINEER PROJECT MANAGER OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 3-CLASSROOMS )
BILL OF QUANTITIES

XIV. Plumbing / Sanitary Works

IX. Finishing Works

X. Carpentry Works

XI. Roof and Framing Works

XII. Painting Works

XIII. Electrical Works

VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS BOD 4
STANDARD THREE-STOREY BILL OF QUANTITIES G-4
JOVEN T. SANTOS DOMICIANO B. LUSICA GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON 36
SCHOOL BUILDING
QUANTITY ENGINEER COST ENGINEER PROJECT MANAGER OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 3-CLASSROOMS )
TABLE OF CONTENTS
GENERAL ARCHITECTURAL STRUCTURAL PLUMBING ELECTRICAL
G-1 BILL OF QUANTITIES A-1 PERSPECTIVE, TABLE OF CONTENTS S-1 GENERAL NOTES P-1 GROUND FLOOR, TYPICAL SECOND & THIRD EE - 1 GENERAL NOTES, LEGEND,
G-2 BILL OF QUANTITIES FLOOR PLUMBING LAYOUT, FLUORESCENT LIGHT FIXTURE MOUNTING
G-3 BILL OF QUANTITIES A-2 KEY PLAN S-2 GENERAL NOTES GROUND FLOOR, TYPICAL SECOND & THIRD DETAIL, LOAD SCHEDULE, PANEL BOARD
FLOOR WATER LINE LAYOUT DIAGRAM AND ELECTRICAL RISER DIAGRAM ( 3-CL )
G-4 BILL OF QUANTITIES A-3 GROUND FLOOR PLAN, SECOND FLOOR & THIRD FLOOR PLAN, S-3 FOUNDATION PLAN, 2nd & 3rd FLOOR FRAMING PLAN
FRONT ELEVATION, SCHEDULE OF FINISH P-2 ISOMETRIC DRAINAGE LINE LAYOUT, EE - 2 POWER LAYOUT AND LIGHTING LAYOUT ( 3-CL )
S-4 COLUMN SCHEDULE, SCHEDULE OF FOOTING, ROOF DRAINAGE LAYOUT,
A-4 REAR ELEVATION, LEFT & RIGHT ELEVATION, SCHEDULE FOOTING BEAMS, TYPICAL FOOTING DETAIL SECTION OF DRAIN PIPE EE - 1 GENERAL NOTES, LEGEND FLUORESCENT LIGHT
LONGITUDINAL SECTION & CROSS SECTION DETAIL, ELEVATION OF COLUMN & DETAIL OF WALL AND SPOT DETAIL FIXTURE MOUNTING DETAIL, LOAD SCHEDULE,
FOOTINGS PANEL BOARD DIAGRAM AND ELECTRICAL
A-5 GROUND FLOOR, SECOND FLOOR & THIRD FLOOR REFLECTED P-3 ISOMETRIC WATER LINE LAYOUT RISER DIAGRAM ( 6-CL )
CEILING PLAN, ROOF PLAN S-5 PLAN FOOTING F-3, ELEVATION FOOTING F-3, AND SEWER LINE LAYOUT
PLAN FOOTING CF-1 & TYPICAL ELEVATION OF EE - 2 POWER LAYOUT AND LIGHTING LAYOUT ( 6-CL )
A-6 SCHEDULE OF DOORS & WINDOWS, DETAIL PLAN, MICRO-PILE P-4 PLAN OF SEPTIC TANK, LONGITUDINAL
ELEVATIONS & SECTION OF RAMP, SPOT DETAILS SECTION, CROSS SECTION DETAIL,
S-6 SCHEDULE MAIN BEAMS, SCHEDULE OF SECONDARY MANHOLE COVER DETAIL, CATCH BASIN
A-7 SECTION DETAIL OF EAVES, SPOT DETAIL CORNER CEILING, BEAMS, SCHEDULE OF SLABS, TYPICAL SLAB DETAIL, LEGEND AND PLUMBING NOTES
CONCRETE SUN BREAKER DETAIL, PERSPECTIVE, SECTION & ELEVATION, TYPICAL BEAM ELEVATION &
SPOT DETAIL OF CEILING, PLAN & SECTION OF VENTILATION TYPE OF STIRRUPS

A-8 STAIR DETAILS S-7 DETAIL OF STAIR, RAMP DETAIL,


DETAIL OF DC-1, DETAIL OF STAIR ON GRADE &
A-9 BAY SECTIONS, DOOR FRAME TYPICAL PLAN & DETAIL OF WALL ON FTB
SECTION, JALOUSIE DETAILS & FIRE ESCAPE DETAILS
S-8 ROOF FRAMING PLAN
A - 10 DETAIL PLAN OF TOILET & SECTION,
DETAIL OF COUNTER SINK, URINAL SECTION & DETAIL S-9 ELEVATION OF END WALL FRAME,
DETAIL SECTION OF PC-1,
A - 11 DETAILS OF BLACKBOARD CONNECTION OF PURLINS TO RG-4,
CONCRETE SUN BREAKER DETAIL

S - 10 TRUSS DETAILS & CONNECTION DETAILS

S - 11 BASE PLATE DETAILS, ANCHOR BOLT DETAIL, ROOF


PANEL SIDE LAP DETAIL, J-BOLT TO PURLIN CONN.
DETAIL, J-BOLT SPACING, PURLIN CONN. DETAIL,
SECTION, TRUSS DETAIL AT GUTTER END

S - 12 FIRE ESCAPE ELEVATION

S - 13 FIRE ESCAPE DETAILS

VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS BOD 5
NOTE : STANDARD THREE-STOREY TABLE OF CONTENTS A-1
GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON 36
SCHOOL BUILDING
OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 6-CLASSROOMS )
( 3-CLASSROOMS )
THIRD FLOOR PLAN

( 3-CLASSROOMS ) ( 3-CLASSROOMS )

GROUND FLOOR PLAN SECOND FLOOR PLAN


K E Y P L A N

VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS BOD 6
NOTE : STANDARD THREE-STOREY KEY PLAN A-2
GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON 36
SCHOOL BUILDING
OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 3-CLASSROOMS )
SECOND FLOOR PLAN FRONT ELEVATION SCHEDULE OF FINISH

GROUND FLOOR PLAN THIRD FLOOR PLAN

VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS GROUND FLOOR PLAN, BOD
SECOND FLOOR & THIRD FLOOR PLAN, 7
NOTE : STANDARD THREE-STOREY FRONT ELEVATION, A-3
GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON 36
SCHOOL BUILDING SCHEDULE OF FINISH
OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 6-CLASSROOMS )
RIGHT SIDE ELEVATION LEFT SIDE ELEVATION CROSS SECTION

REAR ELEVATION LONGITUDINAL SECTION

VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS BOD
REAR ELEVATION, LEFT & RIGHT 8
NOTE : STANDARD THREE-STOREY ELEVATION, LONGITUDINAL SECTION A-4
GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON & CROSS SECTION 36
SCHOOL BUILDING
OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 6-CLASSROOMS )
SECOND FLOOR REFLECTED CEILING PLAN ROOF PLAN

GROUND FLOOR REFLECTED CEILING PLAN THIRD FLOOR REFLECTED CEILING PLAN

VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS BOD
GROUND FLOOR, SECOND FLOOR & 9
NOTE : STANDARD THREE-STOREY THIRD FLOOR REFLECTED CEILING A-5
GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON PLAN, ROOF PLAN 36
SCHOOL BUILDING
OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 6-CLASSROOMS )
SPOT DETAIL
DETAIL ELEVATION OF RAMP
DETAIL SECTION OF RAMP
SPOT DETAIL

DETAIL SECTION

SCHEDULE OF DOORS AND WINDOWS DETAIL PLAN OF RAMP

VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS SCHEDULE OF DOORS & WINDOWS, BOD 10
NOTE : STANDARD THREE-STOREY DETAIL PLAN, DETAIL PLAN, ELEVATION A-6
GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON & SECTION OF RAMP, SPOT DETAILS 36
SCHOOL BUILDING
OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 6-CLASSROOMS )
SECTION ( CEILING )

SECTION DETAIL (VENT.)

SPOT DETAIL

PERSPECTIVE ( CEILING )
CONCRETE
SUNBREAKER DETAIL DETAIL PLAN (VENT.)

SECTION DETAIL (EAVES) SPOT DETAIL (EAVES)


SPOT DETAIL (CORNER CLG.)

VARIOUS DPWH SECTION DETAIL OF EAVES,


(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS SPOT DETAIL CORNER CEILING, BOD
CONCRETE SUNBREAKER DETAIL, 11
NOTE : STANDARD THREE-STOREY PERSPECTIVE, SECTION & A-7
GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON 36
SCHOOL BUILDING SPOT DETAIL OF CEILING,
OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 6-CLASSROOMS ) PLAN & SECTION OF VENTILATION