You are on page 1of 5
© LaT Infra Engineering &T Infrastructure Engineering Ltd. (Gorey known LAT Rambo Censling Engines Lined) 4! 5 Floor, Triton Square (SKCL Building) C3-Cy, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai ~ 600 032. India "Te: 491-44-20509999 Fax: +91-4-22509600 E-mal:ntelchn@intielcom DRAWING / DOCUMENT TRANSMITTAL LNTIEL-C1162704-3348-T-PML April 21, 2037, To: MEP SANJOSE Kente Waked Road Pvt. Ltd Kind Attn: Mr. Ranjeet Kalapure , General Manager ~ Project Subject: Hard Copy Submission of Pipe culvert (2-No's) Drawings for Kante ~Waked Road Project Reference: Email dated 16.01.2016 Dear Sir, ‘The Hard copy of Pipe culvert Drawings (2-No's) are attached herewith for your Approval Si. [Drawing/ —_|Rev.*|Description \Copies |status |Remarks No. [Document No. ide § DaGy T [Pipe Calvert at Ch-agis618 4 |General Arrangement of Pipe Culvert 2 {Bard copy DOGS T_ [Pipe Calvert at Ch-igi=70r 4 2 [Cencral Arrangement of Pipe Culvert 2 [Hard Copy “hereon ogres te rvs reson of nd cients, ay, Soper ving and cme sabe removed om al pont oe and ‘Sate codes | Preliminary | 2 For Approval | 3 God or Constrston | 4 As-Pit ‘Thanking you and assuring you of our best services at all times, ‘Yours faithfully, for L&T Infrastructure Engineering Ltd. be Project Consultant $7 \roads \20v6\ 1162704 - dd Kante — waked correspondences ooi-outgoing \i94b-t-pmil-hard copy submission of pipe culverts drawings 4 copies docx Page G tar intra engineering L&T Infrastructure Engineenog.s DRAWING / DOCUMENT TRANSMITTAL LNTIEL- €1162703-193-T-BSR ‘April 20, 2017 Te MEP SANJOSE ARAWALI KANTE ROAD PVT LTD, Mumbai Kind Attn: Mr. Ranjeet Kalapure , General Manager ~ Project ‘Subject: _Arawali Kante ~ Submission of Hard Copies of Soil investigation reports and foundation recommendation reports Referenee: Work Order MSAKPL/OUT/2016-17/593¢ dated 11-07-2016 Dear Sir, ‘Weare herewith submitting Hard Copies of soil investigation reports and foundation recommendation reports. Drawing / sl. Status Document | Rev.* jeseription ies| smatl nal t | Re Deseripti copies} ooyeg | Remarks No. a. | SRoor | 02 Soil report for MJB @ 77+869 5 Hard Copy 2, | sRoo2 | o2 Soil report for MIB @ 96+741 5 Hard Copy Soil report for VUP @ 78+208,MNB @ sRoo3 | 02 | 89+800,MNB @ 100+046 & VUP @ Hard Copy 1104524 Soil report for MNB @ 1054728 & sRoog | 02 : Hard Co : 4 1114242 & LVUP @ 105+783& 114288) > ad Soil report for MNB @ 904590, @ SRoos | 02 5 Hard Co} . 4 924396, @ 102+925 & @ 1081027 | * £4 Soil report for LVUP @ 93983, e-nilisnoos |\ cap fou eere wereseieelenel Hard Copy 95610 & LVUP @ 1044537 Foundation recommendation report for | RPaor | A 5 2 | Hard cor ° Major Bridge at ch km 77+869 cy Foundation recommendation report for 8. | Re2og | A | vuPateh.km78+215andVuPatch, | 5 2 | Hardcopy km 1104572 “This revision supersedes the prosow rovisen of drawings and documents fen. Superseded davings and documents sal be omoved toa al ois fit tnd we {Sats code: Prelit | 2 For Approval |3 Good for Construction | ¢AS-But ‘mi\roads \2016 61162709 - dd arawal - ante \correspondences| outgoing \93-t-bsr-submission of hard copy for ‘oll investigation report and foundation recommendation report.dock "Pages ‘To: MEP SANJOSE ARAWALI KANTE ROAD PVT LTD, MUMBAI ) L&T Infra Engineering INTHEL- Ci62709-198-7-BSR ‘april20, 2077 ‘Thanking you and assuring you of our best services at all times, ‘Yours faithfully, {for L&T Infrastructure Engineering Ltd. Glee" Bandaru Subbarao Senior Engineering Consultant ‘= \Fronds\2016\e1162709 - dd aravall -kante|correspondences| ontgotng\i9g-t bar submission of hard copy for ofl investigation report and foundation recommendation report.docx Page 2 © L&T Infra Engineering L&T Infrastructure Engineering Ltd. (Gorey ov ss UT RamblConog Eee ted) ‘4° & 50 Floor, Triton Square (SKCL Building) ¢3-C7, Thiru-Vi-Ka Industral Estate, Guindy, Chennai — 600 032. India ‘Tel: ¥91-49-22509999 Fax: +91-44-22509600 E-mail: Inielchn@intieLeom DRAWING / DOCUMENT TRANSMITTAL LNTIEL-Cr162704-193-T-BSR April 19, 2017 To: MEP SANJOSE KANTE WAKED ROAD PVT LTD, Mumbai Kind Attn: Mr. Ranjeet Kalapure , General Manager — Project Subject: Kante to Waked ~ Hard Copy Submission of Soil investigation reports Reference: Work Order MSKWPI/OUT/2016-17/594d dated 12-07-2016 DearSir, ‘Weare herewith submitting the Hard Copies of Sol investigation reports Iprawing / Sl.No. [Document Rev." Description Icopies | Remarks Ino. 2 7 | sro | o Soil Report of MIB @ 11710 5 2, | SRoo2 | 00 | Soil Report for Elevated Structure @ CH153+200 | 5 ve sRoog | or Soil Report of FO 122100 5 47 | sroog | ot Soll report for flyover 126+040 5 5.7 | sroos | or | soiReportof MNB @ 127+190,192+680 &150+760 | 5 Soil Report of MNB @ Se | S808 | | sareasoatese6rong8osaszsosssasorns | § 7. | sway | | Stmemtinnurerasasoeneatur | ‘Thanking you and assuring you of our best services at all times, Yours faithfully, for L&T Infrastructure Engineering Ltd. Gltshe- K Bandaru Subbarao Senior Engineering Consultant ‘roads \2016\e1362704 - dd Kante - waked\ correspondences outgoing 133-t-bsr- submission of hard copies for soil investigation report.docx Page (@ormery known at LA Rambo Costing egies Lint) ‘40 & 5 Floor, Triton Square (SKCI. Building) 3-C7, Thiru-Vi-Ka Industral Estate, Guindy, Chennai —-600 032. India ‘Tek +91-44-22509999 Fax: +91-44-22509600 E-mail: Intielehn@ Intel. com DRAWING / DOCUMENT TRANSMITTAL LNTIEL-C1162703-194-T-PML April 21, 2017 © LAT Infra Engineering L&T Infrastructure Engineering Ltd. To: MEP SANJOSE ARAWALI KANTE ROAD PVT LTD, Mumbai Kind Attn: Mr. Ranject Kalapure , General Manager ~ Project Subject: Hard copy submission of Pipe Culverts. Reference: Work Order :MSAKPL/OUT/2016-17/599C dated 11-07-2016 Dear Sir, ‘The hard copy drawing for Culverts is attached herewith for your Approval. Si. |Drawing/ _ |Rev.*|Description (Copies |Status [Remarks No. [Document No. [code § (General Arrangement of Pipe Culvert at Ch- 1 ppGso2 | B 2 | Hard Coy 50: baad 4 Py : poste | n [Generel Arrangement ofPipe Culvert at Che |, 2 | Hard Copy * This revision supersedes the previous revision of drawings and document, Wf any. Superseded drawings end documents shal be removed fom allpoinof tue and, {Status codes: | 1 Preliminary | 2 For Approval | 3 Good fr Construction | 4 As-Built ‘Thanking you and assuring you of our best services at all times, Yours faithfully, for L&T Infrastructure Engineering Ltd. aware WY Project Consultant {nile exchange\svb\194b-t-pmi- submission of hard copy for comments on pipe culvert docx Paget

You might also like