P UJ I R EJ EK I ENGINEERING ACTIVITY REPORT


Power Pl a n t Sol u ti on

Employee : MUHAMMAD AZKA Date of Status :

Duration Progress File/Document/Binder


Date Project Task Description
Hours % Document Adress
21-Jul-16 NG_PLANT_DAHANA Mechanical_Process_Detail_Design Review dokumen tangki dari Waskita ke Vendor 1 70% \\X2-250\server1\Pabrik Mesiu Dahana\dari Wask
21-Jul-16 NG_PLANT_DAHANA Mechanical_Process_Detail_Design Desain brine buffer tank 3 50% \\X2-250\server1\05-PERSONAL DATA\AZKA\Brine Buffer Tank
21-Jul-16 NG_PLANT_DAHANA Mechanical_Process_Detail_Design Isometrik proses 2 58% \\x2-250\SERVER1\Pabrik Mesiu Dahana\DA
22-Jul-16 NG_PLANT_DAHANA Mechanical_Process_Detail_Design Isometrik proses 4 58%
22-Jul-16 NG_PLANT_DAHANA General Merapikan dokumen 1 0%
22-Jul-16 NG_PLANT_DAHANA Mechanical_Process_Detail_Design Pipe Support 2 100%
24-Jul-16 NG_PLANT_DAHANA Mechanical_Process_Detail_Design Isometrik proses 4 60%
24-Jul-16 NG_PLANT_DAHANA General Merapikan dokumen & file 1 25%
24-Jul-16 NG_PLANT_DAHANA Mechanical_Process_Detail_Design Print & kumpulkan data untuk direview 1 0%
26-Jul-16 NG_PLANT_DAHANA Supervision_Construction Diskusi 6
27-Jul-16 NG_PLANT_DAHANA Isometrik proses finishing 3 67%
27-Jul-16 NG_PLANT_DAHANA Isometrik proses Revisi2 isometrik, review 1
27-Jul-16 NG_PLANT_DAHANA Support testing 2
28-Jul-16 NG_PLANT_DAHANA Isometrik proses Kerjakan pipa dari truck, dan finishing 3 70%
28-Jul-16 NG_PLANT_DAHANA Support Pipe support dicoba kerjakan 3
29-Jul-16 NG_PLANT_DAHANA Isometrik proses Kerjakan pipa dari truck, dan finishing 2 70%
29-Jul-16 NG_PLANT_DAHANA Support Pipe support dicoba kerjakan 4
2-Aug-16 NG_PLANT_DAHANA Mechanical_Process_Detail_Design Pasang air release valve + dwg nya, pipa utilitas 2
2-Aug-16 NG_PLANT_DAHANA Isometrik proses Finishing pipa proses 1.5
2-Aug-16 NG_PLANT_DAHANA TBE Belajar boiler dll, buat TBE draft 4
3-Aug-16 NG_PLANT_DAHANA Mechanical_Process_Detail_Design ARV untuk pipa steam dll 1
3-Aug-16 NG_PLANT_DAHANA Mechanical_Process_Detail_Design ARV untuk pipa proses 2
3-Aug-16 NG_PLANT_DAHANA Mechanical_Process_Detail_Design TBE 4
4-Aug-16 NG_PLANT_DAHANA Mechanical_Process_Detail_Design Isometrik proses 3
4-Aug-16 NG_PLANT_DAHANA Mechanical_Process_Detail_Design TBE 3
4-Aug-16 NG_PLANT_DAHANA Mechanical_Process_Detail_Design Kondensat problem 2
8-Aug-16 NG_PLANT_DAHANA Mechanical_Process_Detail_Design Buat schedule waskita 1
8-Aug-16 NG_PLANT_DAHANA Mechanical_Process_Detail_Design Condensate system 3
8-Aug-16 NG_PLANT_DAHANA Mechanical_Process_Detail_Design Pengarahan 1
8-Aug-16 NG_PLANT_DAHANA Mechanical_Process_Detail_Design TBE 3
17-May-17

Remarks
Beberapa hal perlu didiskusikan dengan pak Yusman dan tim
ZKA\Brine Buffer Tank
Buat pipa dari 101 ke 302, kalau RDM sudah balas, bikin pipa dari 302 ke 301
Buat pipa dari 101 ke 302, kalau RDM sudah balas, bikin pipa dari 302 ke 301, dan pipa2 lain yang memungkinkan

target 85%, bila sudah ada reply RDM 100%

diskusi ttg dokumen dll


PT. PUJ I REJ EKI ENGINEERING ACTIVITY REPORT
Power Plant Solution

Employee :

Duration Progress
Date Task Description
Hours %
18-Jul-16 Mechanical_Process_Detail_Design Diskusi mengenai teknis dan prosedural 5 100%
19-Jul-16 Mechanical_Process_Detail_Design Diskusi terkait kebutuhan kondensor pada steam s 3 100%
19-Jul-16 Mechanical_Process_Detail_Design Diskusi mengenai pipa yang menuju 301 dari 302 1 50%
19-Jul-16 Mechanical_Process_Detail_Design Desain tangki brine buffer tank 2 30%
20-Jul-16 Mechanical_Process_Detail_Design Desain tangki brine buffer tank 3 50%
20-Jul-16 Mechanical_Process_Detail_Design Review dokumen tangki dari Waskita ke Vendor 3 70%
21-Jul-16 Mechanical_Process_Detail_Design Desain brine buffer tank 4 100%
21-Jul-16 Mechanical_Process_Detail_Design Review dokumen tangki dari Waskita ke Vendor 2 100%
22-Jul-16 General Merapikan dokumen 1 25%
22-Jul-16 Mechanical_Process_Detail_Design Isometrik proses 3 100%
22-Jul-16 General Meeting internal dgn pak Yusman dan pak Atho 1.5 60%
23-Jul-16 Mechanical_Process_Detail_Design Isometrik proses (waste water) 2 60%
24-Jul-16 Mechanical_Process_Detail_Design Isometrik proses (waste water) 4 62%
25-Jul-16 General Perjalanan ke subang 2 100%
25-Jul-16 General Survey lapangan 2 100%
25-Jul-16 General Isometrik proses 1 62%
26-Jul-16 General Survey lapangan dll 1 100%
26-Jul-16 Mechanical_Process_Detail_Design Isometrik proses (waste water, dari 301 ke 304) 5 67%
26-Jul-16 Mechanical_Process_Detail_Design Diskusi dahana dll 2 100%
26-Jul-16 Mechanical_Process_Detail_Design Perjalanan pulang dari subang 2 100%
27-Jul-16 Mechanical_Process_Detail_Design Pembagian kerja TBE, supervisi, P&ID 1 100%
27-Jul-16 Mechanical_Process_Detail_Design Isometrik pipa proses dari truck 4 70%
28-Jul-16 Isometrik proses Kerjakan pipa dari truck, edit2 yang lain 6 75%
29-Jul-16 Mechanical_Process_Detail_Design Isometrik pipa proses dari truck 5 75%
29-Jul-16 Mechanical_Process_Detail_Design Pipe support tipe U 0.75 10%
31-Jul-16 Mechanical_Process_Detail_Design Isometrik pipa proses dari truck 1 75%
1-Aug-16 Mechanical_Process_Detail_Design TBE, diskusi pak Yusman, belajar dll 2 60%
1-Aug-16 Mechanical_Process_Detail_Design Isometrik pipa utilitas & proses, pemasangan air re 5 80%
2-Aug-16 Mechanical_Process_Detail_Design Kerjakan air valve untuk pipa utilitas, finishing isom 8 100%
3-Aug-16 Mechanical_Process_Detail_Design Air valve untuk pipa proses, isometrik proses 4 80%
3-Aug-16 Mechanical_Process_Detail_Design Permasalahan pipa kondensat, finishing pipa utilitas 3 100%
3-Aug-16 Mechanical_Process_Detail_Design Pipe support tipe U 0.5 50%
4-Aug-16 Mechanical_Process_Detail_Design Finishing pipa proses, diskusi, email waskita, dll 5 90%
4-Aug-16 Mechanical_Process_Basic_Design TBE boiler belajar 3 20%
5-Aug-16 Mechanical_Process_Detail_Design Condensate system, diskusi dll 6 50%
6-Aug-16 Mechanical_Process_Detail_Design Diskusi pak yusman 4 100%
6-Aug-16 Mechanical_Process_Detail_Design Buat track record doc temp 1 100%
8-Aug-16 Mechanical_Process_Detail_Design Penjelasan ke pak Ruslan, diskusi pak Yus 2 100%
8-Aug-16 Mechanical_Process_Detail_Design Pembuatan template email & waskita 2 50%
8-Aug-16 Mechanical_Process_Detail_Design Flash steam calculation 1.5 60%
8-Aug-16 Mechanical_Process_Detail_Design Buat schedule, diskusi 1.5 100%
9-Aug-16 Mechanical_Process_Detail_Design Condensate system, belajar2 steam trap dll 2 70%
9-Aug-16 Mechanical_Process_Detail_Design Diskusi pak yusman ttg kondensat 3 100%
9-Aug-16 Mechanical_Process_Detail_Design Update doc control 1 30%
9-Aug-16 Mechanical_Process_Detail_Design Troubleshooting outlook 1 50%
10-Aug-16 Mechanical_Process_Basic_Design TBE Steam System 4 30%
10-Aug-16 General Review Dokumen RDM cat 0 1 10%
11-Aug-16 Mechanical_Process_Basic_Design TBE Steam System 4 50%
11-Aug-16 Mechanical_Process_Basic_Design TBE Cooling water System 2 100%
11-Aug-16 Mechanical_Process_Basic_Design TBE water treatment System 1.5 100%
12-Aug-16 Mechanical_Process_Basic_Design TBE Steam System 2.5 60%
15-Aug-16 Mechanical_Process_Basic_Design TBE Brine system 8 80%
16-Aug-16 Mechanical_Process_Basic_Design TBE Compressed air system 3 100%
16-Aug-16 Mechanical_Process_Basic_Design TBE Fire fighting system 1 20%
16-Aug-16 Mechanical_Process_Basic_Design Cek semua 1 100%
16-Aug-16 Mechanical_Process_Basic_Design TBE Brine system, pakai HYSYS 3 100%
18-Aug-16 Mechanical_Process_Basic_Design TBE Waste water, fire fighting, VAC 2 100%
18-Aug-16 Mechanical_Process_Basic_Design Analisis biaya steam system 4 100%
19-Aug-16 Mechanical_Process_Basic_Design TBE Steam System 4 100%
19-Aug-16 Mechanical_Process_Basic_Design Gathering mechanical doc last sent by waskita, dll 2 100%
22-Aug-16 Mechanical_Process_Detail_Design Pipe Support Tipe Z 2 95%
22-Aug-16 Mechanical_Process_Detail_Design Pipe Support Tipe Y 1.5 95%
22-Aug-16 Mechanical_Process_Detail_Design Pipe Support Tipe X 0.5 80%
22-Aug-16 Mechanical_Process_Detail_Design Pipe Support Tipe W 3 95%
23-Aug-16 Mechanical_Process_Detail_Design Pipe Support Tipe U 1 95%
23-Aug-16 Mechanical_Process_Detail_Design Pipe Support Tipe V 2.5 95%
23-Aug-16 Mechanical_Process_Detail_Design Pipe Support Tipe X 2.5 95%
23-Aug-16 Mechanical_Process_Detail_Design Pipe Support Tipe T 1.5 30%
24-Aug-16 Mechanical_Process_Detail_Design Pipe Support Tipe T 2 95%
24-Aug-16 Mechanical_Process_Detail_Design Pipe Support Tipe U 3 30%
25-Aug-16 Mechanical_Process_Detail_Design Pipe support tipe U + koordinat 4 95%
25-Aug-16 Mechanical_Process_Detail_Design Diskusi pak yus 3 100%
26-Aug-16 Mechanical_Process_Detail_Design Pipe support finishing dan pdf in 3 100%
26-Aug-16 DOkumen bantu print dan nyusun dan bikin cover 2.5 100%
27-Aug-16 Dokumen FSU, FRU, FAT, Cryogenic bantu print dan nyusun dan bikin cover 7 100%
28-Aug-16 Dokumen FSU, FRU, FAT, Cryogenic bantu print dan nyusun dan bikin cover 5 100%
29-Aug-16 dokumen bantu print dan nyusun dan bikin cover 2 100%
29-Aug-16 Dokumen scada print dan nyusun 1.5 50%
29-Aug-16 Mechanical_Process_Detail_Design belajar piping, spool, baca2 dll 2 100%
30-Aug-16 Meeting 2.5 100%
30-Aug-16 Review doc cat 0 1.5 30%
31-Aug-16 Review doc cat 0 2 100%
31-Aug-16 Review doc cat 1 2 50%
31-Aug-16 Print scada 1.5 100%
1-Sep-16 Review doc cat 1 2
1-Sep-16 Review doc cat 2 1.5
1-Sep-16 Review doc cat 3 1
2-Sep-16 Review doc cat 3 4 60%
2-Sep-16 Diskusi pak Yus dahana 1.5
5-Sep-16 Review doc. Cat 3, meeting, dll 5
6-Sep-16 scada system schedule, activity report, datasheet 6.5 60%
7-Sep-16 scada system buat S-curve, laporan pengawasan 7 70%
8-Sep-16 scada system review laporan activity, foto2, buat laporan akhir 6.5 75%
8-Sep-16 Meeting, ngajar2in dll 1.5 0%
9-Sep-16 scada system buat S-curve, monthly report 6
14-Sep-16 perjalanan ke jakarta 4
14-Sep-16 training solidworks lesson1-4, intro 3
15-Sep-16 training solidworks lesson 5-13 kecuali 8-9 6.5
16-Sep-16 training solidworks advanced lesson 1-9 4
16-Sep-16 perjalanan ke bandung 3.15
19-Sep-16 laporan keuangan 0,75
19-Sep-16 Belajar PLTM, dll 2,5
20-Sep-16 Belajar pltm, turbin untuk pltm dan pltmh 6
20-Sep-16 Print scada datasheet 1,5
21-Sep-16 Diskusi pak Djoko dan Pak Agus, belajar PLTM 1,5
21-Sep-16 Print, bolong kertas, dll 3,5
22-Sep-16 Bolong kertas, buat cover 2
22-Sep-16 Belajar buku microhydro, diskusi 4
23-Sep-16 Meeting mingguan 1.5
23-Sep-16 S-curve Scada, dll 1
23-Sep-16 Belajar PLTM 1
24-Sep-16 Scada, perapihan dokumen dll 2.5
26-Sep-16 Review pra FS PLTM Cimandiri 5 60%
26-Sep-16 Diskusi, perhitungan, dll 1.5
27-Sep-16 buat proposal, presentasi 7.5
27-Sep-16 meeting + perjalanan 4
28-Sep-16 Review pra FS PLTM Cimandiri 5.5 100%
29-Sep-16 belajar PLTM, diskusi 6
30-Sep-16 Meeting, survey lapangan + perjalanan, meeting pak yusman 12
1-Oct-16 Meeting pak yusman, review 4
3-Oct-16 Meeting waskita, survey + perjalanan 8
4-Oct-16 Schedule, engineering, meeting pak Yusman 6.5
5-Oct-16 Meeting Waskita, bahas tentang schedule, engineering, ketemu KMI + perjalanan 12
6-Oct-16 Meeting internal, pengumpulan datasheet terakhir, schedule 6.5
7-Oct-16 Meeting Waskita, meeting engineering dan subkon waskita + perjalanan 12
8-Oct-16 Brine buffer tank, MoM 5.5
9-Oct-16 Brine buffer tank 1 90%
10-Oct-16 Brine buffer tank, diskusi dll 5
10-Oct-16 Checklist pekerjaan 3 70%
11-Oct-16 Supervisi+perjalanan 5
11-Oct-16 MoM, issue 1.5
11-Oct-16 Meeting internal 1.5
12-Oct-16 Supervisi+perjalanan+scan 9
13-Oct-16 Supervisi+perjalanan+checklist 7
14-Oct-16 Supervisi+checklist+perjalanan 9
16-Oct-16 Ngobrol pak yusman ttg dahana, ac, buat laporan supervisi dan checklist 5
17-Oct-16 Perjalanan + supervisi 8
18-Oct-16 Supervisi DBAK dan PMS, meeting 7
19-Oct-16 Supervisi, ketemu DMP (survey site), pengukuran pipa DBAK, desain AC 9
20-Oct-16 Supervisi, desain AC dan fan 6
21-Oct-16 Supervisi, desain fan, meeting, perjalanan 5
25-Oct-16 Fan 201 & 202, weekly report, diskusi pak yus 7
26-Oct-16 Supervisi + perjalanan 9
27-Oct-16 Supervisi 8
28-Oct-16 Supervisi + perjalanan 9
29-Oct-16 Estimasi panjang pipa 304 5
30-Oct-16 Weekly report, estimasi panjang pipa 304 4
31-Oct-16 Supervisi+perjalanan 8
19-Dec-16 Starting simulasi fan dengan ejector 7 10%
20-Dec-16 Simulasi fan / ejector 7 30%
21-Dec-16 Simulasi fan / ejector 4 30%
21-Dec-16 Simulasi fan / ejector, meeting pak nengah 2 50%
22-Dec-16 Simulasi fan / ejector 6 70%
23-Dec-16 Simulasi fan / ejector 6 80%
25-Dec-16 Finishing ejector/fan 2.25 95%
27-Dec-16 Supervisi + perjalanan, meeting 7
28-Dec-16 Supervisi, meeting pak fahmi mahmud, bikin laporan 7
29-Dec-16 Supervisi, survey dengan pak yusman, design review 7
30-Dec-16 Pembuatan layout fan, lanjutan venturi 6
3-Jan-17 Pembuatan weekly report minggu 5 nov, 1,2,3 dec, bkin list finding 8
4-Jan-17 Pembuatan list finding + dasar 2
4-Jan-17 Meeting waskita + perjalanan 7
5-Jan-17 Troubleshooting dengan DBAK, issue2 yang belum selesai, checklist, diskusi, pembuatan ejector, dll 9
6-Jan-17 meeting pak fahmi mahmud, diskusi DBAK, tapping PG, dll 8
7-Jan-17 buat MoM, simulasi ejector, diskusi, itung2 dll 8
8-Jan-17 perforated plate, water chiller, air boiler, dll 9
9-Jan-17 perjalanan + supervisi, diskusi dll 10
10-Jan-17 supervisi, buat dokumen hydrotest, air boiler dll 8
11-Jan-17 supervisi 8
12-Jan-17 Review design, tes pompa dll 8
13-Jan-17 Hydrotest 14
14-Jan-17 supervisi 7
16-Jan-17 desain ejector, diskusi 3
17-Jan-17 Supervisi, tes grounding 9
18-Jan-17 Supervisi, desain perforated, engineering 8
19-Jan-17 Supervisi, weekly report, checklist, as built 10
20-Jan-17 Supervisi, pertanyaan RDM, pekerjaan DBAK 101 7
22-Jan-17 Diskusi pak yus, ceklist, dll 4
23-Jan-17 Supervisi, persiapan boiler, review design, diskusi 8
24-Jan-17 Supervisi, klarifikasi demin, operasi WTP, persiapan uji boiler 8
25-Jan-17 Supervisi, persiapan boiler 8
26-Jan-17 Supervisi, persiapan boiler 8
30-Jan-17 Pembuatan weekly report dan insulasi 4
31-Jan-17 Pembuatan laporan boiler, supervisi, pengarahan as-built, weekly report 8
1-Feb-17 Pembuatan laporan insulasi, revisi laporan boiler, weekly report, pengarahan as-built 8
2-Feb-17 Revisi laporan boiler, pembuatan steam header, pengarahan as-built 8
3-Feb-17 Revisi laporan boiler, supervisi AC 101, perjalanan pulang 8
4-Feb-17 Meeting kordinasi awal untuk survey 0.75
5-Feb-17 Meeting pak Yusman, tentang dahana dan PLTMH 3
6-Feb-17 Survey ke desa cibuluh + perjalanan schedule, activity report, datasheet 15
7-Feb-17 Pembuatan laporan desa + meeting pak sigit 5.5
7-Feb-17 weekly report, review, koordinasi 3
8-Feb-17 Report survey + meeting 5
8-Feb-17 diskusi dahana pak yusman + review design 2
9-Feb-17 Supervisi DBAK, review instalasi 304, steam header review, perjalanan subang 8
10-Feb-17 Supervisi dahana, koordinasi dengan DMP & DBAK, listing material 304, perjalanan subang 9
11-Feb-17 cari referensi WTP showa, desa cibuluh 2
13-Feb-17 Supervisi, koordinasi waskita, list material 304, meeting dahana waskita metafora kemenhan, perjalanan subang, tes commissioning kompresor 10
14-Feb-17 Tescom compressor, buat weekly, supervisi, meeting pak fahmi terkait isu utilitas 8
15-Feb-17 weekly report, koordinasi waskita DMP, supervisi 7
15-Feb-17 showa wtp, dengan KKE 1
16-Feb-17 Supervisi, koordinasi gasparini terkait header 304 dan pipa 304, list material dibutuhkan, k 8
17-Feb-17 buat laporan compressor, supervisi venturi, pneumatic tes awal, koordinasi gasparini utk isometrik dan navis 304, perjalanan subang 9
20-Feb-17 Troubleshooting venturi, koordinasi [gasparini achim terkait connection proses/utilitas, supervisi DBAK, buat laporan weekly, perjalanan subang 9
21-Feb-17 Koordinasi DBAK dan update progess, koordinasi DMP dietrich terkait koneksi, weekly report, diskusi terkait isu utilitas dgn waskita (water chiller) 9
22-Feb-17 Koordinasi isometrik inside building, pak Fahmi, supervisi DBAK 8
23-Feb-17 Supervisi instalasi pipa DBAK (modifikasi), koordinasi untuk instalasi building 304, koordinasi isometrik inside building 8
24-Feb-17 Supervisi DBAK, meeting koordinasi pak Fahmi, isometrik inside building 8
25-Feb-17 Koordinasi terkait steam trap, isometrik inside building, koordinasi pak fahmi dan pak mahmud, perjalanan bandung 3
26-Feb-17 Isometrik inside building, diskusi dengna pak Yusman terkait engineering, analisis steam trap 3
27-Feb-17 As-built VAC, supervisi dan koordinasi terkait engineering dengan DBAK (pak Tri, pak Fahmi, bu Ayu), survey untuk outside building isometrik, isometrik inside building finishin 8
28-Feb-17 Revisi as-built VAC, isometrik outside building, supervisi untuk AC dan fan venturi, koordinasi untuk fabrikasi building 304, supervisi pengujian nitrogen & DBAK 10
1-Mar-17 As-built isometrik outside building, revisi as-built VAC, supervisi pengujian nitrogen 9
2-Mar-17 As-built isometrik outside building, pembicaraan masalah engineering, meeting dengan team, supervisi pengujian nitrogen (masih fail) 9
3-Mar-17 Eksperimen venturi, diskusi untuk pengujian, as-built isometrik outside building, as-built P&ID, meeting dengan team, supervisi pengujian nitrogen 9
4-Mar-17 Eksperimen venturi dengan manometer, supervisi pengujian brine chiller, weekly report, koordinasi DBAK, isometrik outside building finishing as built 9
5-Mar-17 as built layout mekanikal dan P&ID finishing, perjalanan subang 3
6-Mar-17 perjalanan subang, finishing P&ID as built dan isometrik, supervisi DBAK, koordinasi pak fahmi, meeting internal 8
7-Mar-17 Revisi seluruh as built drawing menjadi tanggal hari ini, as built PFD, finishing as built layout equipment, meeting internal, koordinasi pak yusman terkait issue mekanikal 9
8-Mar-17 Revisi dan update document/project control, perhitungan air exchange brine chiller, weekly report, venturi, supervisi dan diskusi terkait waste water pump, berita acara untuk was 10
9-Mar-17 Supervisi dan pengujian venturi, propose untuk sistem venturi existing, weekly report, DBAK, uji venturi troubleshooting 8
10-Mar-17 Uji venturi (troubleshooting), weekly report, tescom WTP dengan dahana, koordinasi dgn KKE utk WTP dan demin (diskusi), perjalanan bandung 9
11-Mar-17 simulasi venturi 1.5
13-Mar-17 perjalanan subang, as built novec fire fighting system, diskusi pak sigit, koordinasi dbak terkait tes, pengukuran venturi (m/s) 5.5
14-Mar-17 tes nitrogen generator dan compressed air dengan dahana, analisis permasalahan 10
15-Mar-17 trial nitrogen generator + compressed air, tes dgn dahana + training dengan dahana, simulasi raw water & troubleshooting 13
16-Mar-17 tes cooling tower dengan dahana, tes WTP dengan KKE, tes brine chiller system dan troubleshooting, meeting pak yus 13
17-Mar-17 meeting waskita dbak, tes nitrogen compress, masalah2 di utilitas, ujicoba make up cooling, venturi duct baru, condensate pump, meeting pak yus 9
18-Mar-17 tes internal nitrogen dan compress, form pengujian, weekly 8
19-Mar-17 tes internal nitrogen dan compress, buat presentasi, weekly 9
20-Mar-17 Tes boiler, weekly, supervisi venturi, presentasi ng plant 9
21-Mar-17 Tes brine chiller, tes venturi, weekly, diskusi boiler, presentasi ng plant, troubleshoot brine 8
22-Mar-17 tes brine chiller, cek isometrik dan as built 8
23-Mar-17 Isometrik 304, koordinasi untuk desain line drain 304 503, weekly report, laporan tes 10
24-Mar-17 perjalanan bandung, laporan tes boiler & compressor, isometrik 304 5
25-Mar-17 laporan tes kompresor nitrogen & boiler 5
26-Mar-17 isometrik building 304, desain drain 304 503 4
27-Mar-17 perjalanan bandung, weekly, analisis brine chiller 3
28-Mar-17 tes flow dan head pompa, supervisi WTP dengan KKE 9
29-Mar-17 tes brine chiller, supervisi venturi, waste water pump 8
30-Mar-17 revisi as built isometrik inside building, P&ID, PFD, VAC, weekly report 9
31-Mar-17 tes brine chiller, supervisi dan tescom demin water plant, revisi as built P&ID, isometrik, VAC, perjalanan bandung 8
2-Apr-17 input data tes brine chiller 1
3-Apr-17 Analisis brine chiller, cari literatur, perjalanan subang 4
4-Apr-17 Koordinasi pipa 304 dgn KMI, prosedur pengetesan compressed air, weekly report, koordinasi utk tes 7
5-Apr-17 Tes compressed air dengan dahana, laporan tes compressor, koordinasi pengujian pompa dgn waskita & DBAK 8
6-Apr-17 Tes raw & process water dgn dahana, tes cooling water 9
7-Apr-17 Tes pompa brine, weekly report, as built revisi, perjalanan bandung 6
10-Apr-17 Perjalanan subang, revisi as built drawing, analisis hasil pengujian brine chiller, weekly report 7
11-Apr-17 input data tes brine chiller 9
12-Apr-17 Tes cooling water pump, tes brine, meeting, as built drawing 8
13-Apr-17 perjalanan bandung 1.5
17-Apr-17 as built drawing, meeting, weekly report, laporan uji brine, penghitungan volume insulasi, perjalanan subang 8
18-Apr-17 as built drawing revisi 7
19-Apr-17 meeting dgn dbak & waskita, studi manual nitrogen, dryer, analyzer 7
20-Apr-17 simulasi training nitrogen generator, studi manual nitrogen system, tes pompa cooling & cooling tower 8
21-Apr-17 training nitrogen, diskusi dgn tim dbak, perjalanan bandung 6
24-Apr-17 Meeting dengan Pak Yusman, Dahana 2.5
25-Apr-17 Persiapan tes commissioning, pembuatan sequence operasi, permasalahan & pertanyaan yang mungkin muncul, identifikasi manual antara DMP dan utilitas, penjelasan masin 7
26-Apr-17 Perjalanan ke subang, troubleshooting & koneksi SCADA dgn arwenia, koordinasi dengan pak Tri 6
27-Apr-17 Tes commissioning utilitas, diskusi dengan pak Yusman, perjalanan bandung 9
28-Apr-17 Perapian dokumen Dahana dan katalog, input data ke server 5.5
2-May-17 Weekly report, konversi pdf ke work Kupang IIB, koordinasi penggantian pompa cooling water, ubah template 6
3-May-17 listing standard mechanical, diskusi pak yusman, ubah template, koordinasi dgn tim 6
4-May-17 listing standard dari dokumen kupang 7
5-May-17 konversi dari word ke pdf IIC, listing standard sipil 6
6-May-17 list ada/tidak standard yg tersedia dengan yg dibutuhkan utk pembangkit 0.75
8-May-17 Revisi PFD as built, finishing standard list dan convert pdf ke word, koordinasi dgn pak Yus 7
9-May-17 Proposal CDTI untuk very low head turbine, koordinasi pak Pambudi 6
10-May-17 Proposal CDTI untuk very low head turbine 5
15-May-17 review deliverable list, review piping design criteria (IIA),
Date of Status : 17-May-17

File/Document/Binder
Remarks
Document Adress
Diskusi awal terkait brine buffer tank dan masalah non teknis
\\X2-250\server1\Pabrik Mesiu Dahana\DATA Output revisi P&ID
Masih butuh konfirmasi RDM terkait hal ini
\\X2-250\server1\05-PERSONAL DATA\AZKA\Brine Buffer Tank
\\X2-250\server1\05-PERSONAL DATA\AZKA\BrinDesain dengan menggunakan inventor, convert ke autoCad
\\X2-250\server1\05-PERSONAL DATA\AZKA\BrinBeberapa hal perlu didiskusikan dengan pak Yusman dan tim
\\X2-250\server1\05-PERSONAL DATA\AZKA\Brine Buffer Tank
\\x2-250\SERVER1\Pabrik Mesiu Dahana\DA Buat pipa dari 101 ke 302, kalau RDM sudah balas, bikin pipa dari 302 ke 301

Buat pipa waste water, menunggu balasan rdm

Memberi keterangan ke mbak Hani

Tunggu cek pak yusman jadi atau ngagk

R0

Hold dulu

Gagal
butuh pertimbangan ke waskita

Diskusi dengan pak Yusman, analisis biaya


Diskusi pak yusman, simulasi dgn HYSIS

kasar, butuh dicek pak Yusman

HARUS dicek
HARUS dicek

HARUS dicek
HARUS dicek
HARUS dicek
HARUS dicek

HARUS dicek

HARUS dicek

kira2 durasi, progres tergantung sugeng


kira2
perlu diskusi ke pak andun, ada data baru curah hujan
10 halaman 1 hari
30 halaman 3 hari
1 minggu
PROJECT LIST

GENERAL_WORK *Entry project name below this table for upd


DESIGN_REVIEW_OF_REGASIFICATION_UNIT
SUPERVISION_OF_REGASIFICATION_UNIT
PROJECT_MANAGEMENT_CONSULTANT
PENGADAAN_GANGWAY_TOWER
PLN_BATAM_-_LNG_SUPPLY_CHAIN_SYSTEM
PLN_BATAM_-_FEASIBILITY_STUDY_OF_MOBILE_POWERPLANT
PENGADAAN_QUICK_RELEASE_MOORING_HOOK
NG_PLANT_DAHANA
SOIL_TEST_500KV_NEW_AUR_DURI_PERANAP
CDTI_SPANYOL
below this table for updating drop down list in project column