Professional Documents
Culture Documents
A Practical Approach of Planning and Optimization For Efficient Usage of GSM Network
A Practical Approach of Planning and Optimization For Efficient Usage of GSM Network
org/ijc
APracticalApproachofPlanningand
OptimizationforEfficientUsageofGSM
Network
USRahman1,M.A.Matin2,MRRahman1
1 DepartmentofElectricalEngineeringandComputerScience,NorthSouthUniversity,Bangladesh
2 DepartmentofElectricalandElectronicEngineering,InstitutTeknologiBrunei,BruneiDarussalam
*1 rashedur@northsouth.edu;2m.a.matin@ieee.org
Abstract rapidnetworkexpansionexceedinginitialprojections,
Planning of wireless networks is vital if operators wish to capacitylimitationsduetolackoffrequencyresources
make full use of the existing investments. This paper deals and subscribers mobility profile changing, we need a
withapracticalapproachofradionetworkplanningprocess continuous radio network planning (RNP) and
for efficient usage of GSM network. The key performance Optimization process that is required as the network
indicator (KPI) and drive test report of a Bangladeshi evolves. The RNP procedure involves among others
operator Teletalk Bangladesh Limited are used to make coverageandinterferenceanalysis,trafficcalculations,
proposalsonhowoperatorscanoptimizeradioresourcesas frequencyplanning,andcellparameterdefinitions.
well as provide the required QoS to the subscribers. This
study would help to plan operators to enhance coverage, Network optimization is a tradeoff between quality,
improvequalityandincreasecapacityinthedaystocome. traffic/revenues and investments. Without finetuned
Keywords network the customer complaints and work load are
increased and marketing becomes inefficient. The
RadioNetworkPlanning;Qos;OptimizationTools;KPI
planningandoptimizationtoolswillassisttheplanner.
However,allGSMoperatorsfindproblemswhichare
Introduction
solvedthroughKPIanddrivetestanalysis.Thispaper
Global system for mobile communication (GSM) addressesfewproblemsandprovidesthesolutionsof
standard for digital cellular communication was these problems. The following parameters such as
introduced in 1982 to create a common European coverage, capacity, quality and cost for planning are
mobile telephone standard that would formulate consideredduringplanningandoptimizationprocess.
specificationsforapanEuropeanmobilecellularradio
system. GSM Network is comprised of a mobile Radio Network Planning and Optimization
Station (MS) which is connected to the Base The radio network planning and optimization is
TransceiverStation(BTS)viaairinterface.Inaddition usually a comparative process and requires an initial
tootherhardware,BTScontainstheequipmentcalled baselineofKPIsandobjectives.Thesecanbederived
Transceiver (TRx), which is responsible for the from operators individual design guidelines, service
transmissionandreceptionofseveralradiofrequency requirements, customer expectation, market
(RF) signals to/from the end user. BTS is then benchmarks and others. Networks must be
connectedtothebasestationcontroller(BSC)viaabis dimensionedtosupportuserdemands.
interface. BSC usually handles radio resource
RNPand optimization process playa verysignificant
managementandhandoversofthecallsfromoneBTS
andvitalroleinoptimizinganoperationalnetworkto
(or cell/sector) to the other BTS (or cell/sector)
meettheeverincreasingdemandsfromthecustomers.
equipped in it. BSC is then connected to Mobile
Coverage is the most important quality determining
SwitchingCentre(MSC)[1].
parameter in a radio network. A system with good
TheperformanceofGSMnetworkismainlybasedon coveragewillalwaysbesuperiortoasystemwithless
radio network planning and optimization. Due to goodcoverage.Anareaisreferredtoasbeingcovered
increasing subscribers, the changing environments, ifthesignalstrengthreceivedbyanMSinthatareais
1
www.seipub.org/ijcInternationalJournalofCommunications(IJC)Volume1Issue1,December2012
2
InternationalJournalofCommunications(IJC)Volume1Issue1,December2012www.seipub.org/ijc
Collect MS measurement report data Problem: Fig. 2 shows that interference creating
(Downlinkonly!!) between Bagbari_1 TCH (14)and Mirpur1E_3 BCCH
(14). Mirpur 1E situated at the 3rd circle and it GSM
BER(RXQUAL)
height is 32m. Due to excess height of Mirpur 1E
Servingsignallevel overshootingbetweenBagbari_1TCH(14)andMirpur
ChannelNumber 1E_3BCCH(14)whichcreatinginterferenceatencircle
area.
CIandLAI
Recommendation: Work order is issued to reduce
TimingAdvance GSM height of Mirpur 1E so no need to change
BSICs frequencyatMirpur1E_3BCCH(14).
3
www.seipub.org/ijcInternationalJournalofCommunications(IJC)Volume1Issue1,December2012
Fig.3shows3BTSofwhichtheBTSofTajmahalRoad
isclosertotheredcircleservingzonethantheBTSof
SalimullahRoad_4.Asaresultofovershooting,itgave
poorRXLevel
Problem: Salimullah Road 1/4 is overshooting at both
encircleareaofTajmahalroadwithpoorRXLevel.
Recommendation:NeedtochangetiltSalimullahroad
1/4,from6to7degreewhichsolveourproblem.
3) Case03:
Reporttype:TrafficStatisticandOMC
FIG.2SNAPSHOTOFDT
2) Case02:
Reporttype:Customercomplains. Fig.4:snapshotofDT
Complaintype:Badnoise,calldroppingcontinuously, Fig.4showsthatBanasreeBLKE3wasservinginstead
poorsoundquality ofBansreeBLKE2thoughBanasreeBLKE2wasnear
about the serving zone. It didnt give poor RXLevel
butitcreatedhandoverproblem.Becauseofswapping,
itmessedupwithneighborcellrelationship.
In900Band,BanasreeBlkE2&BanasreeBlkE3are
swappedwithoneanotherwhichcanberectifiedthis.
FIG.5IN900BANDBANASREEBLKE2&BANASREEBLKE3
FIG.3SNAPSHOTOFDT ARESWAPPEDWITHONEANOTHER
4
InternationalJournalofCommunications(IJC)Volume1Issue1,December2012www.seipub.org/ijc
In Fig. 6, we can see a swapping was occurred for BograEx2 16.63 73.328 49.36
wrongconnectionbetweenfeedercableandcombiner
port and a faulty connection point of ant2 cable and BograEx2 15.23 68.176 48.62
comberportwasseen.
BograEx2 23.36 74.04 47.65
Recommendation: It is offered to change the
connection between feeder and combiner and placed BograEx3 18.34 52.3 68.264
ant2 cable to right combiner that was installed for
sector2andalsochangedant3cabletothecombiner, BograEx3 24.45 51.65 68.576
whichwasinstalledforsector3.
BograEx3 24.95 52.97 65.08
ProposalofNewBTSSetUpDuetoHighCongestion
Bogra 23.56 72.816 52.816
Date:November,2011
Medical1
Area:Bogra
Bogra 18.98 74.816 64.816
Customer complain type: Noise, call dropping
Medical1
continuously,badsoundquality
ThesoftwareTornedoNassetmoduleisusedforRF Bogra 24.67 68.164 63.264
Planning. First we have accumulated the KPI data Medical1
from NSN (Nokia Siemens Network) server which is
shown in the table 1. The orange marked regions Bogra 24.56 41.32 69.456
where this problem occurred are Bogra exchange, Medical2
Sutrapur, Jalesharitola, Bogra Medical, NuraniMor,
Bogra 23.56 50.132 68.465
Tinmatha,Subgram,BograMW.
Medical2
FromthefollowingtableI,wecanseethattherangeof
traffic of this specific area was (1530), which is very Bogra 23.97 49.698 57.659
high. For this reason, handover success rate was very Medical2
poor(2870)fromthetable1andthecalldropratewas
high.FromtheaboveKPIdata,therangeis2545. Bogra 2.032 2.013 97.62
Medical3
Through this KPI analysis, we got the reason behind
call drop. Call drop rate was high because of high 7.328 92.653
Bogra 5.84
congestion and poor handover success rate. Then a
Medical3
drive test has been attempted in Bogra Staff Quarter
for checking the receiving power of signal. We Bogra 4.67 6.264 91.62s.
observedthatthereceivinglevelofsignalinthatarea Medical3
is poor. To reduce the congestion and traffic adding
5
www.seipub.org/ijcInternationalJournalofCommunications(IJC)Volume1Issue1,December2012
Conclusions REFERENCES
Increased services and subscriber numbers are Amaldi, E., A. Capone, F. Malucelli and F. Signori, UMTS
pushing service providers to acquire new planning radio planning: optimizing base station configuration.
strategies. The aim of these strategies is to maintain In Proceedings of 56th Vehicular Technology
network efficiently. In this paper, it has been Conference.Vol.2,pp.768772.
analytically proved that we can optimize an existing EN/LZB 119 2731 R2, User Descriptions and Engineering
cellular network using optimization tools and fine GuidelinesforRadioNetworkFeatures
parameter tuning. We need some input for planning
ERICSSON, GSM System Survey, Ericsson Radio Systems
and optimization we can get these information from
AB.
traffic statistic, customer complain and drive test.
GSM 05.05 (phase 2), Radio Transmission and Reception,
After analyzing all required data we can know what
ETSI,Version4.12.0,1995.
stepsweneedtodo.
GSM Introduction Siemens; Paper Pulished by NSN;
EachoperatorhastheirownKPI.Operatorwantsto providedbyTeletalkBangladeshLtd.
fulfilltheirtargetaccordingtotheirKPIandtheymust Halonen T., Romero J., Melero J.: GSM, GPRS and EDGE
think about it within their bandwidth limitation. This Performance.JohnWiley&SonsLtd,2003.
study would help to plan operators to enhance ImageGuideBook&IntranetofTeletalk.
coverage,improvequalityandincreasecapacityinthe
2/10056FCU101206Uen,RevA,RFGuidelines,GSM900.
days to come. Every mobile operator should give
3/100 56FCU 101 206 Uen, Rev A, RF Guidelines, DCS
attention towards better network dimensioning &
1800.
topology, allocated bandwidth, traffic prediction &
5/100 56FCU 101 206 Uen, Rev A, Location Area
modeling, network operational expense, and setting
DimensioningGuideline.
fine tuning about network parameter settings during
S. Maruyama, K. Tanahashi, T. Higuchi Base Transceiver
radio network planning. Secondly, operator must
StationforWCDMASystemFUJITSUSci.Tech.J.pp.7.
ensure better quality of service to customers which
TEMSInvestigation4.0Manual.
compel cellular operators to optimize network
performance to meet revenue and commercial targets W.C.Jakes,Jr,MicrowaveMobileCommunications,John
aswell. Wiley&sons,newYork,1974(p.126).