SAP HR Upgrade Plan

CURRENT

Component Release SP-Level

SAP_HR 604 87

EA-HR 606 49

TARGET

Component Release SP-Level

SAP_HR 604 98

EA-HR 606 60

PRE REQUISITE

SL Toolset

Tool Release Status

SPAM/SAINT 7.02/0059 If required

Download Software Update SUM10SP16_2-


Manager (SUM) 20006676.SAR
R3trans Latest If required
Kernel 600 Latest If required

PATCHES
Status
Generate stack file only for HR Patches using
Maintenance Planner
Download Patches
Copy stack XML file and Patches in EPS/in Directory

PRE-CHECKS

S.No Check Status


1 Check the free space requirements in ERD
after downloading Patches
2 Take Full Backup
3 Terminate released jobs using Report
BTCTRNS1

PROCESS
Start Upgrading using SUM in Development

POST PROCESSING
Release all the background jobs (BTCTRNS2)
Run SGEN ( SGEN compiles all programs.SGEN reduces ABAP load on the system)
Take full Backup
PLANNING A SYSTEM UPDATE OR UPGRADE USING MAINTENANCE PLANNER

Prerequisites

To perform any kind of update or upgrade, the system should be in a Verified state,
indicating that the
System description complies with SAP product modelling

Maintenance Planner
https://support.sap.com/solution-manager/processes/maintenance-
management/maintenance-planner.html

In the above Link lick on Maintenance Planner we reach the below screen
https://apps.support.sap.com/sap(bD1lbiZjPTAwMQ==)/support/mp/index.html

Click Explore Systems

Choose the System (ERD) Currently the system is not in Verified state
Click on the system ERD we get the screen below
Click Verify

I have selected SCC-DIMP 606 from Planning and clicked confirm on top right corner
I have selected Ignore IW BEP 200 from planning and clicked confirm.

Click Next
There was a popup in the above screen which disappeared in few seconds
I clicked Next

I clicked on Download Correction File which was getting downloaded at bottom left corner
I clicked on the Circle on top left corner

Now I clicked on Home on above screen

Now I will click on Explore Systems


In above screen ERD is still in ERROR state

I have made the changes with the help of Gordon and verified all ERP systems
NEW

Created a Track for ERP Systems

Click on Explore System Tracks


Click on ERP_Systems

Click Plan

Select Install or Maintain Enhancement Package we get below

Select EHP6 for SAP ERP 6.0 (Selected this because we are only updating HR Patches) and
select the current the current SP Level.
Click Confirm Selection

Did not select anything and clicked Next


Did not select anything and clicked Confirm Selection

Reached Screen below

Expanded ABAP then unchecked all and just selected SAP_HR & EA-HR

Also unchecked all Stack independent files

Then Clicked on on top right corner got the popup below in which I have
clicked on Select ALL and then clicked OK

Now click Next


Click on Download Stack XML, after the file was downloaded I copied to DEVHERP011 at
E:usr\sap\trans\EPS\IN