PROJECT: SRLF
ACTIVITY Date of Date of Time of
RFI No SATIP No SAIC No SUBCON
NUMBER Request Inspection Inspection

1 SRLF-R-W-PI-2014 3.1 SATIP-H-100-01 SAIC-H-2027 KAEFFER 12-Dec-16 13-Dec-16 02.00PM

SAIC-H-2028
2 SRLF-R-W-PI-2015 3.2 SATIP-H-100-01 KAEFFER 12-Dec-16 13-Dec-16 03.00PM

SAIC-H-2031
3 SRLF-R-W-PI-2016 3.5 SATIP-H-100-01 KAEFFER 12-Dec-16 13-Dec-16 03.00PM

4 SRLF-R-W-PI-2017 3.1 SATIP-H-100-01 SAIC-H-2027 KAEFFER 12-Dec-16 13-Dec-16 02.00PM

SAIC-H-2028
5 SRLF-R-W-PI-2018 3.2 SATIP-H-100-01 KAEFFER 12-Dec-16 13-Dec-16 03.00PM

SAIC-H-2082
6 SRLF-R-W-PI-2019 4.1 SATIP-H-002-11 KAEFFER 12-Dec-16 13-Dec-16 08:00AM
AINTING-WGP-KAEFER
4-Jun-1
Location POSCO E&C
Job Discipline
Description RFI Description NAPID Inspector
Inspector
SAPMT

INSPECTION OF SURFACE PREPARATION PRIOR TO PRIMER COAT


APPLICATION / MECHANICAL DAMAGE AREA LINE NO # Q98-60S-
NON LIVE PLANT
MECHANICAL 1165-05-001,Q98-60S-1165-06-001,Q98-60S-1165-07-001,Q98- ABDUL HANNAN ALTAF KHAN. SILVERIO
AREA . 60S-1147-05-001,Q98-60S-1147-06-001Q98-60S-1147-07-
001,COATING SYSTEM APCS-11C, TOTAL 16 SPOOL.

IN PROCESS INSPECTION FOR PRIMER COAT APPLICATION /


MECHANICAL DAMAGE AREA LINE NO # Q98-60S-1165-05-
NON LIVE PLANT
MECHANICAL 001,Q98-60S-1165-06-001,Q98-60S-1165-07-001,Q98-60S-1147- ABDUL HANNAN ALTAF KHAN. SILVERIO
AREA . 05-001,Q98-60S-1147-06-001Q98-60S-1147-07-001,COATING
SYSTEM APCS-11C, TOTAL 16 SPOOL.

INSPECTION OF FINAL COAT APPLICATION / MECHANICAL


NON LIVE PLANT DAMAGE AREA LINE NO #Q98-60C-1201-04-001,Q98-60S-1147-
MECHANICAL 04-001,Q98-60S-1164-04-001,Q98-60S-1165-04-001,COATING ABDUL HANNAN ALTAF KHAN. SILVERIO
AREA .
SYSTEM APCS-11C, TOTAL 9 SPOOL.

INSPECTION OF SURFACE PREPARATION PRIOR TO PRIMER COAT


LIVE PLANT APPLICATION / MECHANICAL DAMAGE AREA LINE NO #Q68-SF-
MECHANICAL 1755-02-001/C,Q68-SF-1755-03-001/A,B,C,COATING SYSTEM ABDUL HANNAN ALTAF KHAN. SILVERIO
AREA,Q68
APCS-11C, TOTAL 4 SPOOL.

IN PROCESS INSPECTION FOR PRIMER COAT APPLICATION /


LIVE PLANT MECHANICAL DAMAGE AREA LINE NO #Q68-SF-1755-02-
MECHANICAL 001/C,Q68-SF-1755-03-001/A,B,C,COATING SYSTEM APCS-11C, ABDUL HANNAN ALTAF KHAN. SILVERIO
AREA,Q68
TOTAL 4 SPOOL.

FINAL INSPECTION OF STOPAQ WRAPPING PRIOR TO


BACKFILL ,A VISUAL INSPECTION OF PACKAGE NO #Q98-U-001-
UG FIRE WATER
MECHANICAL 02-UHT-05, Q98-FW-2912,2913,2914,2915,2916,Q98-U-001-02- ABDUL HANNAN ALTAF KHAN. SILVERIO
LINE UHT-06,Q98-FW-2954,2955,2956,2957,Q98-U-001-02-UHT-
07,Q98-FW-2999,APCS-113C.
4-Jun-17
QMIS NO.

37783

37784

37785

37786

37787

37788