Risk Assessment Template
Risk Assessment Template
(2.4) Persons Doing Work. (2.5) Main Equipment Involved. (2.6) Other Personnel at Risk.
(2.8) How Could This Activity Affect the Safety of the Vessel / Safety of Personnel.
(2.10) Identify Additional Assessments That Must be Completed / Referred to Prior to Work Commencing.
Identify Any Permit to Work / Safe Systems of Work that Apply (As identified under section 3.0)
Manual Handling Activities*3 Manoeuvring of heavy loads at sea
Use of flammable / oxidising / explosive Sharp objects (knives, razors, medical sharps
substances*1 etc)
PLEASE USE THE TABLE OVERLEAF TO DESCRIBE THE CONTROL MEASURES TO BE PUT IN PLACE
TO REDUCE THE RISK FROM THE IDENTIFIED HAZARDS
(4.0) Assess the Level of Risk (refer risk matrix 6.0 overleaf) (4.1) Control Measures and Re-Assessment (refer risk matrix 6.0 overleaf)
Hazard Likelihood: Risk Rating: Revised Revised Revised
Consequence:
(b) = (a) x (b) (a) (b) = (a) x (b)
(a)
Description of Activity and 3 Major Controls to be Implemented:
Associated Uncontrolled Hazards 3 High High (6 to 9) 3 Major 3 High High (6 to 9)
2 Serious
2 Med Med (3 to 4) 2 Serious 2 Med Med (3 to 4)
1 Slight
1 Low Low (1 to 2) 1 Slight 1 low Low (1 to 2)
H, M, L H, M, L
Page 5 of 8
(5.0) Assessor Details
Name of Assessor
Signature
Page 6 of 8
Date
Name of Line
Manager
Signature
Date
(b) Likelihood 3 6 9
High (3) Medium High High
(b) Likelihood 2 4 6
Medium (2) Low Medium High
(b) Likelihood 1 2 3
Page 7 of 8
Low (1) Low Low Medium
NOTE: IF AFTER THE CONTROL MEASURES HAVE BEEN APPLIED THE RISK REMAINS HIGH THEN THE OPERATION
MUST BE RE-ASSESSED AND WORK MUST NOT COMMENCE UNTIL THE RISK HAS BEEN LOWERED.