INSPECTION & TEST PLAN Fabrication of steel structure for upper tier 3 ACE pet Gonne B AL BAYT STADIUM AT AL KHOR CITY | Doc. Code | i1017-01000-CMLSTA. | Rev: | pate | 27092016 2or” Intervention Points _(#- Engineor's Assistant to be notified by Contractor of readiness of Hold Pol 1d Witness Intervention Points) aa SSeS eee SNORT oa et: [Activity Description crecking | Gontot naa |e 212) 8 Activity tobe | Control 4 g|g Performed Pye 11 | venty wesiPaR's (W6) have ben sued EN 15808- EN [na] scope sth oke-aus- cree en vstabr 13 | Quaificaton control | 9712 - SNT-TC- PRDIACIDT |" document | 4 | NA) R tert Q11017-01000-CML-STA-PK2-QMS- ‘4 14702 AWS Hm ya eM. sTAmKeaNS- {G1 T017-01000-GML-STA-PK2-OMS-ITP-1007-C2 ITP Tor Fabrication of upper fr stelstucure ag, 1182 INSPECTION & TEST PLAN Fabrication of steel structure for upper tier 3 At septs Qeann Bb AL BAYT STADIUM AT AL KHOR CITY | Doc. Code | i1017-01000-CMLSTA. | Rev: | pate | 27092016 zoe? Intervention Points _(#- Engineor's Assistant to be notified by Contractor of readiness of Hold Pol 1d Witness Intervention Points) aa SSeS eee SNORT oa ets [Activity Description crecking | Gontot naa |e 212) 8 Activity be | pcuments a 8|f Performed Pye a a a ae |S TT 31 | iraceat 2016019, HO NA) R 32 | evidence of damage ‘CIM-CAM- HO NA) R EN 10025 MAGIQC mm “+ MRR Report Certificates) {G1 T017-01000-GML-STA-PK2-OMS-ITP-1007-C2 ITP Tor Fabrication of upper fr stelstucure ag. 1182 INSPECTION & TEST PLAN Fabrication of steel structure for upper tier ais, g At septs Qeann AL BAYT STADIUM AT AL KHOR CITY | Doc. Code | @i1017-01000.cML'sTA- | Revi | pate | 271092016 2or” Intervention Points __(#-Engineor’s Assistant to bo notified by Contractor of readiness of Hold Point and Witness Intervention Points) Legend: H= Hold Point - IRE to be Issues and work shall not proceed without approvaliwaiver from responsible party ; W= Witness Point - IRE to be Issued and work may proceed if responsible party does not attend ; R-"Record Review"-(The documents to be submitted for review): S="Surveillance” Checks Intervention Pints Vericain/Qualty Records et: Activity Description cresting | cont naw | F| | 2) 8 Activity tobe | Control 4 g|g Performed P|2 7) [MATERIAL RECEIPT Welding Consumables a consumables are speci within elude Reconion ot ont watdng ‘he Conval_ | MAGIQOIPRD + consumables Cortictes consumables Documets conan) k] wl n 42 | Material cortfcates review aMs-sPeoro0: '5_| MATERIAL ISSUE - CUTTING - BEVELING - DRILLING - Material Issue to Fabrication Workshop/Culting Bays - Material lesue to Beveling an Verily material gradetype and nestingtcuting 5.1 | shethes oe issues aga fabreaton draving Drawings. s|nals faceaaity number after surface blast | Production anc | CIM-CAM: 52 qualiy contol | 2016019 aciPRD spn] s 53 OP MMA, s|rals {G1 T017-01000-GML-STA-PK2-OMS-ITP-1007-C2 ITP Tor Fabrication of upper fr stelstucure ag. 1482 «tte INSPECTION & TEST PLAN Fabrication of steel structure for upper tier 1, sant No.: PK2-QMS-ITP-01001 C2 Cate ‘zrosi2ni6 Intervention Points _(#- Engineor's Assistant to be notified by Contractor of readiness of Hold Point Points) pet: Activity Description checking eee Fo] 2/8 Ce Job Frequency | 3 | 3 Performed Funetion inspect cut profiles and rn 5 TTT 5 cut, checking thickness, mate-al grades, Quality contro! the Con aciero s|na]s zi PRE FABRICATION ASSENBLY_ Equipment Wanswrononi Doves -quipment and measurement devices ‘Conform with 7A i” ree Quality control PRO-MIS. ‘the Cont: Qc/PRD BINT R *MOD-ESM {G1 T017-01000-GML-STA-PK2-OMS-ITP-1007-C2 ITP Tor Fabrication of upper fr stelstucure ag, 15182 INSPECTION & TEST PLAN Fabrication of steel structure for upper tier a At septs Qeann Bb AL BAYT STADIUM AT AL KHOR CITY | Doc, Code Q11017-0100D-CML-STA- Rev.: Date 27/09/2016 Zon Intervention Points _(#- Engineor's Assistant to be notified by Contractor of readiness of Hold Pol 1d Witness Intervention Points) aa SSeS eee SNORT oa pet: Activity Description ermcting_| — contot peas |] 2] 2/8 Activity to be. $s] Performed, | Documents Pye 5 FABRICATION ASSEMBLY Fup aa Tack Wong o tciarl Bocona| 81 | Drawings: Drawings S NAT S ‘and post set up CML-STA-PK2. 23 reparations avein accordance to | Productionane | Construction ecran | “yeilanee | Td s ; Drawings aqualiy conta! | “Drawings | pe Conrol pretean {G1 T017-01000-GML-STA-PK2-OMS-ITP-1007-C2 ITP Tor Fabrication of upper fr stelstucure ag, 162 RIE ste INSPECTION & TEST PLAN Fabrication of steel structure for upper tier 3 _— Bb Doe. Code | a11017-01000-cmL-sTa- | Rev.: sue No.: PK2-QMS-TP-01001 C2 Date | 27ogao16 | See Intervention Points (#- Engineer's Assistant tobe notified by Contractor of readiness of Hold Point and Witness intervention Points) Legend: H= Hold Point - IRE to be Issues and work shall not proceed without approvaliwaiver from responsible party ; W= Witness Point - IRE to be Issued and work may proceed if responsible party does not attend ; R="Record Review’ (The documents to be submitted for review): S="Surveillance” Checks Intervention Points Verification/Quality Records pet Activity Description cresting | cont naw | F| | 2) 8 acivitytobe | Control. sm g1F Performed Pile Verty tack wold preheat temperature and 88 | application S| NAT Ss 2 FABRICATION ASSEMBLY - Welding of Struc welding) a1 s [nals 92 corset s [nls Suveltance 22 | veriy correct wel consumables are being used cipro auirg | Ss | Na] Ss Documents production 94 s| nals 85 | recuirement fo contol dstorion s|n}s {G1 T017-01000-GML-STA-PK2-OMS-ITP-1007-C2 ITP Tor Fabrication of upper fr stelstucure ag. TI RIE ste INSPECTION & TEST PLAN Fabrication of steel structure for upper tier 3 _— Bb Doc. Code | it017-01000-cmL-sta- | Rev.: No.: PK2-QMS-ITP-01002 C2 Date | 27/09/2016 zore Intervention Points __(#-Engineor’s Assistant to bo notified by Contractor of readiness of Hold Point and Witness Intervention Points) Legend: H= Hold Point - IRE to be Issues and work shall not proceed without approvaliwaiver from responsible party ; W= Witness Point - IRE to be Issued and work may proceed if responsible party does not attend ; R="Record Review’ (The documents to be submitted for review): S="Surveillance” Checks Intervention Points Verification/Quality Records Ret: Activity Description pcteeting | contrat Reauired : S 2/8 Performed | Documents Pyle 70_[ FABRICATION ASSEMBLY - VISUAL INSPECTION / TREACEABILITY OF COMPLETED STRUCTURAL ITEM- Inspection of Comploted Structural Nem Construction Drawings e [nade Spoon For each pacer | SPR | etement nuit + TCR Report 102 | Very that aceabilty numbering ave stamped cwm-toR: vlads zoreaie 11_ [FABRICATION ASSEMBLY - NDT INSPECTION OF COMPLETED STRUCTURAL ITEM - NDT Pest Weld Completion 11.1 | Visual Inspection lop-cvl Kls|a + REV Report 1OP-CPM oy + MPI Report Foreach | H | S| R or “ clement built + PTI Report Conform er Quality contro! the Cont ac Seo Documents onic test inspection lop-cur Kls|a “UT Report 11.4 | Stud Inspection (tay) EN 14555 His] + STI Report {G1 T017-01000-GML-STA-PK2-OMS-ITP-1007-C2 ITP Tor Fabrication of upper fr stelstucure ag, 1882 INSPECTION & TEST PLAN Fabrication of steel structure for upper tier 3 ACE pet Gonne B AL BAYT STADIUM AT AL KHOR CITY | Doc. Code | i1017-01000-CMLSTA. | Rev: | pate | 27092016 2or” Intervention Points _(#- Engineor's Assistant to be notified by Contractor of readiness of Hold Pol 1d Witness Intervention Points) aa SSeS eee SNORT oa et: [Activity Description crecking | Gontot naa |e 212) 8 Activity tobe | Control 4 g|g Performed Pye a TOT Production and ‘oF eact comme | Q11017- oe tobe a 123 | Jsing approved Repa! ‘STA-PK2- HP NAT R | ESS oa STOTT Quay cont ocr | ,coueact | Pa | + DTR Report monn {G1 T017-01000-GML-STA-PK2-OMS-ITP-1007-C2 ITP Tor Fabrication of upper fr stelstucure ag. 19182 INSPECTION & TEST PLAN Fabrication of steel structure for upper tier 3 At septs Qeann Bb AL BAYT STADIUM AT AL KHOR CITY | Doc. Code | i1017-01000-CMLSTA. | Rev: | pate | 27092016 zoe? Intervention Points _(#- Engineor's Assistant to be notified by Contractor of readiness of Hold Pol 1d Witness Intervention Points) aa SSeS eee SNORT oa sain ily civivtobe | ang ae na ‘Conform with Botore the v4 |Verty equipment and measurement devices | paintinapector | pao-mis | ineconval | acipro feermenceme| | vq | swonesm calibration Documents. nt otthe | 7 aa {G1 T017-01000-GML-STA-PK2-OMS-ITP-1007-C2 ITP Tor Fabrication of upper fr stelstucure ag, 20182 INSPECTION & TEST PLAN Fabrication of steel structure for upper tier 3 At septs Qeann Bb AL BAYT STADIUM AT AL KHOR CITY | Doc. Code | i1017-01000-CMLSTA. | Rev: | pate | 27092016 zoe? Intervention Points _(#- Engineor's Assistant to be notified by Contractor of readiness of Hold Pol 1d Witness Intervention Points) aa SSeS eee SNORT oa sain ily civivtobe | ang ae 172 | contamination) and water wash of the surface, Paint inspector ‘the Control QciPRD elementtobe | “| NA] R «STR Report 2 181 | steel temperatur ‘humidity, dew point HO NAy R {G1 T017-01000-GML-STA-PK2-OMS-ITP-1007-C2 ITP Tor Fabrication of upper fr stelstucure ag. 21182 INSPECTION & TEST PLAN Fabrication of steel structure for upper tier 3 ACE pet Gonne B AL BAYT STADIUM AT AL KHOR CITY | Doc. Code | i1017-01000-CMLSTA. | Rev: | pate | 27092016 2or” Intervention Points _(#- Engineor's Assistant to be notified by Contractor of readiness of Hold Pol 1d Witness Intervention Points) aa SSeS eee SNORT oa vi aot g/2)8/8 Ref: Activity Description ne Control Required | | p] oO | o ity g|g civivtobe | ang fiz ‘104 | Release note 4 Riw uty requency detailed on {G1 T017-01000-GML-STA-PK2-OMS-ITP-1007-C2 ITP Tor Fabrication of upper fr stelstucure RIE ste INSPECTION & TEST PLAN Fabrication of steel structure for upper tier 3 _— Bb Doc. Code | it017-01000-cmL-sta- | Rev.: “ sue No.: PK2-QMS4ITP-01001 C2 | Date | 27/0s2016 o Intervention Points __(#-Engineor’s Assistant to bo notified by Contractor of readiness of Hold Point and Witness Intervention Points) Legend: H= Hold Point - IRE to be Issues and work shall not proceed without approvaliwaiver from responsible party ; W= Witness Point - IRE to be Issued and work may proceed if responsible party does not attend ; R="Record Review’ (The documents to be submitted for review): S="Surveillance” Checks Intervention Points Verification/Quality Records Ret: Activity Description pcteeting | contrat Reauired : S 2/8 Performed | Documents Pyle ‘ATTACHMENT 1 +: 100% visual test and 10% magnetic particle test. Joints (PUP) : 100% visual test and 20% magnetic particle test, Technical Joints (Complete Pent 100% magnetoscopic test and 100 % ultrasonic test Penetration J any): 100% visual test 1/50 stud on each piece (minimun 2 for piece). {G1 T017-01000-GML-STA-PK2-OMS-ITP-1007-C2 ITP Tor Fabrication of upper fr stelstucure a9, 23182

You might also like