INSPECTION & TEST PLAN Fabrication of steel structure for upper tier 3
ACE pet Gonne B
AL BAYT STADIUM AT AL KHOR CITY | Doc. Code | i1017-01000-CMLSTA. | Rev: | pate | 27092016 2or”
Intervention Points _(#- Engineor's Assistant to be notified by Contractor of readiness of Hold Pol 1d Witness Intervention Points)
aa SSeS eee SNORT oa
et: [Activity Description crecking | Gontot naa |e 212) 8
Activity tobe | Control 4 g|g
Performed Pye
11 | venty wesiPaR's (W6) have ben sued EN 15808- EN [na] scope sth oke-aus-
cree en vstabr
13 | Quaificaton control | 9712 - SNT-TC- PRDIACIDT |" document | 4 | NA) R tert Q11017-01000-CML-STA-PK2-QMS-
‘4 14702 AWS Hm ya eM. sTAmKeaNS-
{G1 T017-01000-GML-STA-PK2-OMS-ITP-1007-C2 ITP Tor Fabrication of upper fr stelstucure ag, 1182INSPECTION & TEST PLAN Fabrication of steel structure for upper tier 3
At septs Qeann Bb
AL BAYT STADIUM AT AL KHOR CITY | Doc. Code | i1017-01000-CMLSTA. | Rev: | pate | 27092016 zoe?
Intervention Points _(#- Engineor's Assistant to be notified by Contractor of readiness of Hold Pol 1d Witness Intervention Points)
aa SSeS eee SNORT oa
ets [Activity Description crecking | Gontot naa |e 212) 8
Activity be | pcuments a 8|f
Performed Pye
a a a ae
|S TT
31 | iraceat 2016019, HO NA) R
32 | evidence of damage ‘CIM-CAM- HO NA) R
EN 10025 MAGIQC mm “+ MRR Report Certificates)
{G1 T017-01000-GML-STA-PK2-OMS-ITP-1007-C2 ITP Tor Fabrication of upper fr stelstucure ag. 1182INSPECTION & TEST PLAN Fabrication of steel structure for upper tier ais, g
At septs Qeann
AL BAYT STADIUM AT AL KHOR CITY | Doc. Code | @i1017-01000.cML'sTA- | Revi | pate | 271092016 2or”
Intervention Points __(#-Engineor’s Assistant to bo notified by Contractor of readiness of Hold Point and Witness Intervention Points)
Legend: H= Hold Point - IRE to be Issues and work shall not proceed without approvaliwaiver from responsible party ; W= Witness Point - IRE to be Issued and work may proceed if
responsible party does not attend ; R-"Record Review"-(The documents to be submitted for review): S="Surveillance”
Checks Intervention Pints Vericain/Qualty Records
et: Activity Description cresting | cont naw | F| | 2) 8
Activity tobe | Control 4 g|g
Performed P|2
7) [MATERIAL RECEIPT Welding Consumables
a consumables are speci within elude
Reconion ot ont
watdng ‘he Conval_ | MAGIQOIPRD + consumables Cortictes
consumables Documets conan)
k] wl n
42 | Material cortfcates review aMs-sPeoro0:
'5_| MATERIAL ISSUE - CUTTING - BEVELING - DRILLING - Material Issue to Fabrication Workshop/Culting Bays - Material lesue to Beveling an
Verily material gradetype and nestingtcuting
5.1 | shethes oe issues aga fabreaton draving Drawings. s|nals
faceaaity number after surface blast | Production anc | CIM-CAM:
52 qualiy contol | 2016019 aciPRD spn] s
53 OP MMA, s|rals
{G1 T017-01000-GML-STA-PK2-OMS-ITP-1007-C2 ITP Tor Fabrication of upper fr stelstucure ag. 1482«tte INSPECTION & TEST PLAN Fabrication of steel structure for upper tier
1, sant
No.: PK2-QMS-ITP-01001 C2 Cate ‘zrosi2ni6
Intervention Points _(#- Engineor's Assistant to be notified by Contractor of readiness of Hold Point Points)
pet: Activity Description checking eee Fo] 2/8
Ce Job Frequency | 3 | 3
Performed Funetion
inspect cut profiles and rn
5 TTT
5 cut, checking thickness, mate-al grades, Quality contro! the Con aciero s|na]s
zi PRE FABRICATION ASSENBLY_ Equipment Wanswrononi Doves
-quipment and measurement devices ‘Conform with
7A i” ree Quality control PRO-MIS. ‘the Cont: Qc/PRD BINT R *MOD-ESM
{G1 T017-01000-GML-STA-PK2-OMS-ITP-1007-C2 ITP Tor Fabrication of upper fr stelstucure ag, 15182INSPECTION & TEST PLAN Fabrication of steel structure for upper tier a
At septs Qeann Bb
AL BAYT STADIUM AT AL KHOR CITY | Doc, Code Q11017-0100D-CML-STA- Rev.: Date 27/09/2016 Zon
Intervention Points _(#- Engineor's Assistant to be notified by Contractor of readiness of Hold Pol 1d Witness Intervention Points)
aa SSeS eee SNORT oa
pet: Activity Description ermcting_| — contot peas |] 2] 2/8
Activity to be. $s]
Performed, | Documents Pye
5 FABRICATION ASSEMBLY Fup aa Tack Wong o tciarl Bocona|
81 | Drawings: Drawings S NAT S
‘and post set up CML-STA-PK2.
23 reparations avein accordance to | Productionane | Construction ecran | “yeilanee | Td s ;
Drawings aqualiy conta! | “Drawings | pe Conrol pretean
{G1 T017-01000-GML-STA-PK2-OMS-ITP-1007-C2 ITP Tor Fabrication of upper fr stelstucure ag, 162RIE
ste INSPECTION & TEST PLAN Fabrication of steel structure for upper tier 3
_— Bb
Doe. Code | a11017-01000-cmL-sTa- | Rev.: sue
No.: PK2-QMS-TP-01001 C2 Date | 27ogao16 | See
Intervention Points (#- Engineer's Assistant tobe notified by Contractor of readiness of Hold Point and Witness intervention Points)
Legend: H= Hold Point - IRE to be Issues and work shall not proceed without approvaliwaiver from responsible party ; W= Witness Point - IRE to be Issued and work may proceed if
responsible party does not attend ; R="Record Review’ (The documents to be submitted for review): S="Surveillance”
Checks Intervention Points Verification/Quality Records
pet Activity Description cresting | cont naw | F| | 2) 8
acivitytobe | Control. sm g1F
Performed Pile
Verty tack wold preheat temperature and
88 | application S| NAT Ss
2 FABRICATION ASSEMBLY - Welding of Struc welding)
a1 s [nals
92 corset s [nls
Suveltance
22 | veriy correct wel consumables are being used cipro auirg | Ss | Na] Ss
Documents production
94 s| nals
85 | recuirement fo contol dstorion s|n}s
{G1 T017-01000-GML-STA-PK2-OMS-ITP-1007-C2 ITP Tor Fabrication of upper fr stelstucure ag. TIRIE
ste INSPECTION & TEST PLAN Fabrication of steel structure for upper tier 3
_— Bb
Doc. Code | it017-01000-cmL-sta- | Rev.:
No.: PK2-QMS-ITP-01002 C2
Date | 27/09/2016 zore
Intervention Points __(#-Engineor’s Assistant to bo notified by Contractor of readiness of Hold Point and Witness Intervention Points)
Legend: H= Hold Point - IRE to be Issues and work shall not proceed without approvaliwaiver from responsible party ; W= Witness Point - IRE to be Issued and work may proceed if
responsible party does not attend ; R="Record Review’ (The documents to be submitted for review): S="Surveillance”
Checks Intervention Points Verification/Quality Records
Ret: Activity Description pcteeting | contrat Reauired : S 2/8
Performed | Documents Pyle
70_[ FABRICATION ASSEMBLY - VISUAL INSPECTION / TREACEABILITY OF COMPLETED STRUCTURAL ITEM- Inspection of Comploted Structural Nem
Construction
Drawings e [nade
Spoon For each
pacer | SPR | etement nuit + TCR Report
102 | Very that aceabilty numbering ave stamped cwm-toR: vlads
zoreaie
11_ [FABRICATION ASSEMBLY - NDT INSPECTION OF COMPLETED STRUCTURAL ITEM - NDT Pest Weld Completion
11.1 | Visual Inspection lop-cvl Kls|a + REV Report
1OP-CPM oy + MPI Report
Foreach | H | S| R or
“ clement built + PTI Report
Conform er
Quality contro! the Cont ac Seo
Documents
onic test inspection lop-cur Kls|a “UT Report
11.4 | Stud Inspection (tay) EN 14555 His] + STI Report
{G1 T017-01000-GML-STA-PK2-OMS-ITP-1007-C2 ITP Tor Fabrication of upper fr stelstucure ag, 1882INSPECTION & TEST PLAN Fabrication of steel structure for upper tier 3
ACE pet Gonne B
AL BAYT STADIUM AT AL KHOR CITY | Doc. Code | i1017-01000-CMLSTA. | Rev: | pate | 27092016 2or”
Intervention Points _(#- Engineor's Assistant to be notified by Contractor of readiness of Hold Pol 1d Witness Intervention Points)
aa SSeS eee SNORT oa
et: [Activity Description crecking | Gontot naa |e 212) 8
Activity tobe | Control 4 g|g
Performed Pye
a TOT
Production and ‘oF eact
comme |
Q11017- oe tobe a
123 | Jsing approved Repa! ‘STA-PK2- HP NAT R
| ESS oa STOTT
Quay cont ocr | ,coueact | Pa | + DTR Report
monn
{G1 T017-01000-GML-STA-PK2-OMS-ITP-1007-C2 ITP Tor Fabrication of upper fr stelstucure ag. 19182INSPECTION & TEST PLAN Fabrication of steel structure for upper tier 3
At septs Qeann Bb
AL BAYT STADIUM AT AL KHOR CITY | Doc. Code | i1017-01000-CMLSTA. | Rev: | pate | 27092016 zoe?
Intervention Points _(#- Engineor's Assistant to be notified by Contractor of readiness of Hold Pol 1d Witness Intervention Points)
aa SSeS eee SNORT oa
sain ily
civivtobe | ang ae
na
‘Conform with Botore the
v4 |Verty equipment and measurement devices | paintinapector | pao-mis | ineconval | acipro feermenceme| | vq | swonesm
calibration Documents. nt otthe
|
7 aa
{G1 T017-01000-GML-STA-PK2-OMS-ITP-1007-C2 ITP Tor Fabrication of upper fr stelstucure ag, 20182INSPECTION & TEST PLAN Fabrication of steel structure for upper tier 3
At septs Qeann Bb
AL BAYT STADIUM AT AL KHOR CITY | Doc. Code | i1017-01000-CMLSTA. | Rev: | pate | 27092016 zoe?
Intervention Points _(#- Engineor's Assistant to be notified by Contractor of readiness of Hold Pol 1d Witness Intervention Points)
aa SSeS eee SNORT oa
sain ily
civivtobe | ang ae
172 | contamination) and water wash of the surface, Paint inspector ‘the Control QciPRD elementtobe | “| NA] R «STR Report
2
181 | steel temperatur ‘humidity, dew point HO NAy R
{G1 T017-01000-GML-STA-PK2-OMS-ITP-1007-C2 ITP Tor Fabrication of upper fr stelstucure ag. 21182INSPECTION & TEST PLAN Fabrication of steel structure for upper tier 3
ACE pet Gonne B
AL BAYT STADIUM AT AL KHOR CITY | Doc. Code | i1017-01000-CMLSTA. | Rev: | pate | 27092016 2or”
Intervention Points _(#- Engineor's Assistant to be notified by Contractor of readiness of Hold Pol 1d Witness Intervention Points)
aa SSeS eee SNORT oa
vi aot g/2)8/8
Ref: Activity Description ne Control Required | | p] oO | o
ity g|g
civivtobe | ang fiz
‘104 | Release note 4 Riw uty requency detailed on
{G1 T017-01000-GML-STA-PK2-OMS-ITP-1007-C2 ITP Tor Fabrication of upper fr stelstucureRIE
ste INSPECTION & TEST PLAN Fabrication of steel structure for upper tier 3
_— Bb
Doc. Code | it017-01000-cmL-sta- | Rev.:
“
sue
No.: PK2-QMS4ITP-01001 C2 | Date | 27/0s2016 o
Intervention Points __(#-Engineor’s Assistant to bo notified by Contractor of readiness of Hold Point and Witness Intervention Points)
Legend: H= Hold Point - IRE to be Issues and work shall not proceed without approvaliwaiver from responsible party ; W= Witness Point - IRE to be Issued and work may proceed if
responsible party does not attend ; R="Record Review’ (The documents to be submitted for review): S="Surveillance”
Checks Intervention Points Verification/Quality Records
Ret: Activity Description pcteeting | contrat Reauired : S 2/8
Performed | Documents Pyle
‘ATTACHMENT 1
+: 100% visual test and 10% magnetic particle test.
Joints (PUP) : 100% visual test and 20% magnetic particle test,
Technical Joints (Complete Pent 100% magnetoscopic test and 100 % ultrasonic test
Penetration J
any): 100% visual
test 1/50 stud on each piece (minimun 2 for piece).
{G1 T017-01000-GML-STA-PK2-OMS-ITP-1007-C2 ITP Tor Fabrication of upper fr stelstucure a9, 23182