You are on page 1of 1

LINE

L K J H G F E D C B A1 A
78100

20' BUILDING SETBACK LINE


6100 6100 9850 10750 7550 7550 7550 7550 7550 5600 1950

BOUNDARY
4550

7 6 6 8 8 8 6 7
6

ARAS SILING
DETAIL C DETAIL E
( Refer 16.00 series ) ( Refer 16.00 series )

2900
2700
2700

800 600
7
ARAS SATU ARAS SATU

1100
(FFL 41.20) (FFL 41.30)

6425
625
ARAS SILING
800
6400

ARAS SILING
3500

2900
2700

ARAS BAWAH ARAS BAWAH


(FFL 37.70) (FFL 37.775)
Revision Date
200

ARAS TANAH
(FFL 37.50)

(RL 34.50)

PANDANAGAN HADAPAN
SKALA 1 : 200

A A1 B C D E F G H J K L
78100
LINE

1950 5600 7550 7550 7550 7550 7550 10750 9850 6100 6100
20' BUILDING SETBACK LINE

110mm thk. brickwall with


20mm thk. cement plaster
on bothsides and painted to
BOUNDARY

fascia board to manufacturer GLASS PANEL fascia board to manufacturer GLASS PANEL
architect's approval ( Refer 19.00 series ) ( Refer 19.00 series )
detail & architect's approval detail & architect's approval
4550
2800
7 6
All measurements must be checked at site by the contractor and notification to be made
8 8 8 6 6 7
6 to the Architects before commencement of work in the event of any discrepancy
arising from the drawings. All drawings must be read in conjunction
conjunction with other consultant's drawings.

ARAS SILING 425 STEEL STAIRCASE


( Refer 14.00 series ) ARAS SILING
Projek
CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH
2900

2700
2700
ARAS SATU
(FFL 41.30)
ARAS SATU PEJABAT JUALAN SEMENTARA DUA TINGKAT DI
4055 350 (FFL 41.20)
ATAS LOT 34025 HINGGA 34055 DAN
6425
625

5915

6400
ARAS SILING
SEBAHAGIAN TANAH KERAJAAN,

3500
TAMAN KUCHAI JAYA, MUKIM PETALING, KUALA
2900

2700
ARAS BAWAH
(FFL 37.775)
ARAS BAWAH LUMPUR
(FFL 37.70)

200
ARAS TANAH
(FFL 37.50) UNTUK TETUAN ALTIMAS SDN. BHD.

(RL 34.50)

PANDANGAN BELAKANG
SKALA 1 : 200

20' BUILDING SETBACK LINE


LINE

LINE
1 2 3 4

SETBACK LINE
10' BUILDING
13645
2245 5355 6045

20' BUILDING SETBACK LINE

LINE
LINE
4 3 2 1

SETBACK LINE

BOUNDARY
10' BUILDING

BOUNDARY
13645
6045 5355 2245
1 2 3 4
13645

BOUNDARY
LINE

LINE

BOUNDARY
2245 5355 6045
SETBACK LINE
20' BUILDING SETBACK LINE

10' BUILDING

Glass wall panel to refer


facade detail dwg no. 19.01
BOUNDARY

BOUNDARY

Pemilik / Pemaju
Saya bersetuju untuk bertanggungjawab atas segala kerosakan
ARAS SILING
pada bangunan di atas lot-lot bersebelahan akibat cadangan tersebut.
Ceiling board to architect's approval Fascia Board to architect's Window to refer

2900
Glass panel to detail approval
800

schedule
ARAS SILING
RC STAIRCASE
( Refer 14.00 series ) ( FL 41.30 ) ARAS SATU

6425
Glazing to detail Internal door, glazing & 1100 high railing to detail
2700

partition refer to ID's detail


ARAS SATU
Door to refer schedule

3525
(FFL 41.20) Railing & staircase to detail
7045

ARAS SATU ( FL 41.20 )


(Refer 14.00 series) Painted steel column to
engr's detail

5002
Painted steel column to
( FL 37.775 ) ARAS BAWAH ....................................................................................
engr's detail
3500

3500

110mm thk. brickwall with Window to refer


wall tiles finish to architect & schedule MR TAN CHOON HOCK (K/P.: 571008-10-5819)
ARAS BAWAH
ID's approval (Pengarah Urusan)

3275
(FFL 37.70)
700

ARAS BAWAH( FL 37.70 )


200

ARAS TANAH
(FFL 37.50)
ARAS TANAH ( FL 37.50 )
( FL 34.50 ) ARAS TANAH ALTIMAS SDN. BHD.
No. 2, Jalan 1/128, Taman Gembira,

KERATAN A-A PANDANGAN SISI KIRI PANDANGAN SISI KANAN 58200 Kuala Lumpur.
Tel : (603) 7983 7399 Fax : (603) 7981 8813

SKALA 1 : 200 SKALA 1 : 200 SKALA 1 : 200


ARKITEK:
"Saya memperakui bahawa detail-detail dalam pelan-pelan ini adalah menurut
kehendak-kehendak Undang-Undang Kecil Bangunan Seragam Wilayah
Persekutuan Kuala Lumpur 1985 dan saya setuju terima tanggung-jawab penuh
dengan sewajarnya."

LINE
L K J H G F E D C B A1 A
78100

20' BUILDING SETBACK LINE


6100 6100 9850 10750 7550 7550 7550 7550 7550 5600 1950
4550
DETAIL D ............................................................

BOUNDARY
( Refer 16.00 series )
Ar. Teh Chin Keit
DETAIL A railing to detail DETAIL B
( Refer 16.00 series ) ( Refer 16.00 series )
ARKITEK
1750 7 6 6 8 8 8
6 7 No. Pendaftaran LAM : A/T 126
6

WATER TANK
TO ENGR'S DETAIL
ARAS SILING

2900
STORE SHOW UNIT (279703 U)
2700
2700

SHOW UNIT
TO ID'S DETAIL
TYPE B ARAS SATU B-7-8, Block B, Megan Avenue 1, No. 189,
ARAS SATU SALES OFFICE TYPE A
TO ID'S DETAIL TO ID'S DETAIL (FFL 41.30) Jalan Tun Razak, 50400 Kuala Lumpur
(FFL 41.20) TO ID'S DETAIL
Tel : (603) 2163 3113 Fax : (603) 2163 3163
6600

6425
625
ARAS SILING
800
6400

ARAS SILING E-mail : aa@aaarchitects.com.my


SHOW UNIT
3500

2900
2700

ARAS BAWAH
(FFL 37.70)
PROJECT OFFICE
TO ID'S DETAIL
TOILET (M)
TO ID'S DETAIL
TOILET (F)
TO ID'S DETAIL SLIDING DOOR
SALES GALLERY
TYPE D1
TO ID'S DETAIL
ARAS BAWAH
(FFL 37.775)
TENDER DRAWING
200

ARAS TANAH
(FFL 37.50)
Tajuk Lukisan
PEJABAT JUALAN
(RL 34.50) KERATAN A-A & KERATAN B-B
PANDANGAN HADAPAN
PANDANGAN BELAKANG
KERATAN B-B PANDANGAN SISI KIRI & SISI KANAN
SKALA 1 : 200 Skala: 1 : 200 Dilukis: NASRUL
Tarikh: JUNE 2017 Disemak: TCK / JAMIE

FOR INFORMATION FOR CONSTRUCTION


FOR APPROVAL FOR SUBMISSION
FOR TENDER FOR CONTRACT
No. Kerja: Blok/Fasa : Peringkat:
AA1703S - TD
No. Lukisan: Pindaan:
3.01 B
X:\AA-Project\AA1703S ALTIMAS SALES GALLERY\
Fail CAD:
04-Tender (TD)\02.00 - BASE PLAN
C HAK CIPTA TERPELIHARA
Hak cipta terpelihara. Tidak dibenarkan mengeluar ulang dalam apa-apa juga cara, baik
secara elektronik, fotostat, mekanik, rakaman atau lain-lain, mana-mana bahagian
kandungan lukisan/fail ini sebelum mendapat izin bertulis daripada A & A Architects Sdn.
Bhd.