Professional Documents
Culture Documents
deadline
Improve your bottom line
Life Sciences
Building Management Solutions
Put your
buildings to
work for you
Keep your product
pipeline flowing
Well show you how
Youre up against not only the competition, but regulatory demands for airtight proof
of compliance. There are no excuses. There is no room for error.
Since product quality and the safekeeping of The World Health Organization (WHO) emphasizes
research data are the lifeblood of a life sciences the factors that contribute to product quality in a
company, the last critical link in the facility delivery life sciences manufacturing operation. A BMS
chain is the turnover of a properly qualified BMS. has critical control and monitoring responsibilities
The need for more powerful, integrated and in the areas of Environmental and Personnel
secure building management solutions is tied to management. It also affects and is impacted
evolving regulatory compliance and increasing by Procedures, Premises, Equipment, and
business challenges. Validated Processes.
Escalating consequences of non-compliance: 483s (Notices of Inspectional Findings), Warning Letters, Substantial
Fines, New Product Introduction Delays, Product Seizures, Plant Shutdowns, Operating License Revocations. Schneider
Electric helps you comply with the requirements of regulatory agencies such as: FDA (USA), EMEA (Europe), MHRA (UK), Health
Canada, TGA (Australia), PMSB (Japan), CDSCO (India), SFDA (China).
Accelerate your return on investment
The process from discovery to approval of a new drug or device often takes
more than 10 years at a cost that can exceed $1 billion US. Further, between
clinical trials and promotion lies a critical phase in the life cycle of a new drug
or devicethe phase in which a building management systems value can help
accelerate revenue realization or bring less than optimal return on investment.
The gap between the lines of a problem facility scenario and a Schneider
Electric facility scenario in the diagram below shows the dramatic difference
in return on investment if a facility experiences a delay in turnover. Schneider
Electrics involvement early onfrom the pilot plant stage through the
complete life cyclewill accelerate your products time to market and assure
consistent, high levels of environmental quality that secure long-term returns
on your facility investment.
Scenario
tric
Elec
er
id
hne
c
Scenario
S
blem
o
Acceleration Pr
- Revenue +
of ROI
$0.00
Approval Launch
Pre-clinical Clinical Manufacturing Promotion Competition
Studies Trials
Time to Market
Typical drug life cycle/return on investment
Take the most direct route from
design to qualification
Well lead you down the right path
Even in an environment as complex as yours, a sophisticated BMS solution
can find efficiencies in controlling and monitoring critical systems, capturing
key data, and providing the proof of compliance your facility demands.
Corporate Offices
Warehousing Research
& Distribution & Discovery
Our clients include: Amgen Inc.; AstraZeneca; B. Braun Medical Inc.; Bayer AG; Biogen Idec; Boston Scientific Corporation;
Bristol-Myers Squibb; Canadian Blood Services; Cipla Ltd.; Eli Lilly and Company; F. Hoffmann-La Roche Ltd.; Genzyme
Corporation; GlaxoSmithKline plc.; Hma-Qubec; Johnson & Johnson Services, Inc.; Merck & Co., Inc.; Novartis AG; Novo Nordisk
A/S; Pfizer Inc.; Sanofi-aventis; STERIS Corporation; The American National Red Cross.
Critical facility issues have no
place to hide
Manage your total environment
Who is in the
Total Environment Management laboratory right now?
Where was the security
Total Environment Management (TEM) is guard at 3:00 am?
Schneider Electrics process to monitor and
control all the critical events and parameters
that can change the desired environmental state. Why was the pressure
setpoint changed?
This approach helps life sciences companies
reduce regulatory and business risks while
optimizing facility value.
When was the humidity
sensor last calibrated?
Maximize control, minimize risk
A TEM solution from Schneider Electric allows
you to know and record all critical facility issues.
All important events and parameters can be
captured along with authenticated operator IDs
and explanations for actions taken. Together,
this information provides complete event
traceability and user accountability, along with
offering a panoramic view of whats happening
in your facility. TEM delivers precise environmental
and security controls with the ability to answer
the questions of what happened when, why,
What is the Mean
where, and who was involved. Kinetic Temperature
(MKT) of the warehouse?
You have to monitor what you control
Why not use the same system for both functions?
We have worked extensively with life sciences Schneider Electric systems can support this
industry organizations like the BMS special approach, but a single BMS, designed so that the
interest group of the Good Automated direct impact subsystems are identified, partitioned,
Manufacturing Practice (GAMP) Forum to determine and validated, fulfills the same requirements. The
best industry practices. The GAMP Forum is part result is tighter control with the same degree of
of the International Society for Pharmaceutical monitoring integrity. This approach yields cost-
Engineering (ISPE). The diagram below depicts the efficiencies from initial capital procurement through
functional requirements of a BMS in a regulated the operational life of the system.
facility. One way to reduce BMS validation efforts
is to partition the fulfillment of system requirements
with the use of a fully qualified, independent system
to monitor, log, and report.
Reporting
Measurement/Outputs
Hit your product impact target
Well improve your aim
Your BMS plays an important role across the product impact spectrum
and Schneider Electric systems are designed to monitor, log, archive, and
report information on a highly granular basis.
Importance
Regulatory
Schneider Electrics Project alarms, server
Requirements
room environment
Delivery Approach
Consistent use of field- and time-proven Bu l Equipment run-
s in e ca
s s Cri ti times, filter
methodologies, along with rigorous ISO 9001 Bu
s ines le
quality controls, combined with skilled project and Al
lF s Valuab rs
differential pressures
aci
l i ty m e te
account management, contribute to the superior Events & Para Office space
results you can expect from Schneider temperatures, parking
lot barrier position
Electric. Our extensive country, branch, and
partner organizations draw on an international
pool of highly trained and experienced project
managers, engineers, and technicians to deploy
our global expertise. Well established relationships
System Design System Test
with architecture, engineering, and construction Specifications Specifications
management firms prevalent in life sciences
User PQ Test Plan Performance
strengthen our delivery capability. Requirements Qualification
The Schneider Electric Validation Toolkit Contains: Sample Applications, Project Planning Guide, Project Quality Assurance Manual,
User Requirements Specification (URS), Functional Specification (FS), Detailed Design Specification (DDS), Factory Acceptance Test
(FAT), Site Acceptance Test (SAT), Project Validation Plan, Installation Qualification (IQ), Operational Qualification (OQ), Performance Qualification
(PQ), Summary Qualification Report, Traceability Matrix, 21 CFR Part 11 Assessment.
Theyre called critical subsystems
for a reason
Based on a detailed product impact assessment,
Schneider Electric systems can be partitioned to isolate
critical control, monitoring, alarming, and reporting
subsystems from the overall BMS architecture.
Secure
Server
GxP Areas Room
Non-GxP Areas
Digital Video
Recording
Door Supervisory Door Supervisory
Module Controller Module Controller
Access Access
Control & Biometric Control & Lighting
Monitoring Sensors Monitoring
Intrusion Intrusion
Monitoring Monitoring
Terminal VAV Terminal VAV
Unit Controller Unit Controller
Particulate Power
Monitoring Monitoring
Touch Screen
Secured Resources Display
Lower cost. Lower risk.
Guaranteed performance.
Expertise you can count on
Schneider Electric lets me know theres a problem immediately so I can take the appropriate action quickly.
In a nutshell, I can run my facility from anywhere!
Tom Martin, Facility Manager, Amgen
Whats at risk if your data isnt secure?
Everything
The CFR Compliance Pack adds to these capabilities with powerful archiving
and reporting tools allowing you to create PDF files protected with digital Typical operator dialog screens
signatures. For all system changes, operators can be forced to provide for a critical alarm condition.
electronic signatures and an explanation of their actions.
An integrated BMS is the central
nervous system of your facility
A smart facility is a smooth running and profitable facility
Schneider Electric
One High Street
North Andover, MA 01845 USA
Phone: +1 978 975 9600
Fax: +1 978 975 9698 This document has been
www.schneider-electric.com/buildings printed on recycled paper