You are on page 1of 1

APPENDIX 4

List of Prescribed Activities Which Require Detailed EIA

1. Iron and steel industry.


2. Pulp and paper mills.
3. Cement plant.
4. Construction of coal fired power plant.
5. Construction of dams for water supply and hydroelectric power
schemes.
6. Land reclamation.
7. Incineration plant (scheduled wastes & solid wastes).
8. Construction of municipal solid waste landfill facility (including municipal
solid waste transfer station).
9. Project involving land clearing where 50% of the area or more having
slopes exceeding 25 degrees (except quarry).
10. Logging covering an area exceeding 500 hectares or more.
11. Development of tourist or recreational facilities on islands in surrounding
waters which are gazetted as national marine parks.
12. Construction of recovery plant (off-site) for lead-acid battery wastes.
13. Scheduled wastes recovery or treatment facility generating significant
amount of wastewater which is located upstream of public water supply
intake.
14. Non-ferrous - primary smelting.
15. Petrochemicals - all sizes.
16. Construction of oil refineries.
17. Prescribed activity using radioactive material(s) and generating
radioactive waste(s).