The document lists specifications for building material extras used for two roof structures. It provides the name, cross section, length, number of pieces, and volume in cubic meters for 18 items for each roof structure. The total volume of materials needed for each roof is reported as 2.09 cubic meters for the first and 1.92 cubic meters for the second.
The document lists specifications for building material extras used for two roof structures. It provides the name, cross section, length, number of pieces, and volume in cubic meters for 18 items for each roof structure. The total volume of materials needed for each roof is reported as 2.09 cubic meters for the first and 1.92 cubic meters for the second.
The document lists specifications for building material extras used for two roof structures. It provides the name, cross section, length, number of pieces, and volume in cubic meters for 18 items for each roof structure. The total volume of materials needed for each roof is reported as 2.09 cubic meters for the first and 1.92 cubic meters for the second.