Professional Documents
Culture Documents
Well Testing Assignmment
Well Testing Assignmment
Oil well produced at 500 bpd for 3 days followed by a build up test.
h, f = 22
Bo, RB/STB = 1.3
Phi = 0.2
Ct = 2.00E-05
Oil Vis, cp = 1
Rw = 0.3
Calculate Permeability, initial pressure and skin using the following information:
Shut-in
Time afer pressure
shut-in (hours) (psig)
0 1150
2 1794
4 1823
8 1850
16 1878
24 1890
48 1910