OSC Inlet Finger Maintenance Report 2012

This photo report documents a major maintenance painting project conducted in 2012 on an OSC Inlet Finger and associated overhead piping at an unspecified location. Before and after photos show the valve body, flanges, stud bolts, actuator and overhead piping before being painted and after the final coat was applied as part of the maintenance painting work. The report was prepared by Hisham Hashim.

Uploaded by

hash117
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views1 page

OSC Inlet Finger Maintenance Report 2012

This photo report documents a major maintenance painting project conducted in 2012 on an OSC Inlet Finger and associated overhead piping at an unspecified location. Before and after photos show the valve body, flanges, stud bolts, actuator and overhead piping before being painted and after the final coat was applied as part of the maintenance painting work. The report was prepared by Hisham Hashim.

Uploaded by

hash117
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

PHOTO REPORT

Description Major Maintenance Painting year 2012 Location OSC Inlet Finger

OSC Inlet Finger Area Before. Overhead 24 Associated Piping At SDV 3020,3100
& 3150 Before.

Valve Body, Flanges, Stud Bolts & Actuator Overhead 24 Associated Piping After Apply Final
Coat ( Lawit Line ).

Overhead 24 Associated Piping At SDV 3020,3100


& 3150 After Apply Final Coat.
Prepared by : Hisham Hashim