You are on page 1of 118

U.S.

Department of Energy
Commercial Reference
Building Models of the
National Building Stock
Michael Deru, Kristin Field, Daniel Studer,
Kyle Benne, Brent Griffith, and Paul Torcellini
National Renewable Energy Laboratory

Bing Liu, Mark Halverson, Dave Winiarski,


and Michael Rosenberg
Pacific Northwest National Laboratory

Mehry Yazdanian
Lawrence Berkeley National Laboratory

Joe Huang
Formerly of Lawrence Berkeley National Laboratory

Drury Crawley
Formerly of the U.S. Department of Energy

NREL is a national laboratory of the U.S. Department of Energy, Office of Energy


Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC.

Technical Report
NREL/TP-5500-46861
February 2011

Contract No. DE-AC36-08GO28308


U.S. Department of Energy
Commercial Reference
Building Models of the
National Building Stock
Michael Deru, Kristin Field, Daniel Studer,
Kyle Benne, Brent Griffith, and Paul Torcellini
National Renewable Energy Laboratory

Bing Liu, Mark Halverson, Dave Winiarski,


and Michael Rosenberg
Pacific Northwest National Laboratory

Mehry Yazdanian
Lawrence Berkeley National Laboratory

Joe Huang
Formerly of Lawrence Berkeley National Laboratory

Drury Crawley
Formerly of the U.S. Department of Energy

Prepared under Task No. BEC71304

NREL is a national laboratory of the U.S. Department of Energy, Office of Energy


Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC.

National Renewable Energy Laboratory Technical Report


1617 Cole Boulevard NREL/TP-5500-46861
Golden, Colorado 80401 February 2011
303-275-3000 www.nrel.gov
Contract No. DE-AC36-08GO28308
NOTICE

This report was prepared as an account of work sponsored by an agency of the United States government.
Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty,
express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of
any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately
owned rights. Reference herein to any specific commercial product, process, or service by trade name,
trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation,
or favoring by the United States government or any agency thereof. The views and opinions of authors
expressed herein do not necessarily state or reflect those of the United States government or any agency thereof.

Available electronically at http://www.osti.gov/bridge

Available for a processing fee to U.S. Department of Energy


and its contractors, in paper, from:

U.S. Department of Energy


Office of Scientific and Technical Information
P.O. Box 62
Oak Ridge, TN 37831-0062
phone: 865.576.8401
fax: 865.576.5728
email: mailto:reports@adonis.osti.gov

Available for sale to the public, in paper, from:

U.S. Department of Commerce


National Technical Information Service
5285 Port Royal Road
Springfield, VA 22161
phone: 800.553.6847
fax: 703.605.6900
email: orders@ntis.fedworld.gov
online ordering: http://www.ntis.gov/help/ordermethods.aspx

Cover Photos: (left to right) PIX 16416, PIX 17423, PIX 16560, PIX 17613, PIX 17436, PIX 17721

Printed on paper containing at least 50% wastepaper, including 10% post consumer waste.
Executive Summary
The U.S. Department of Energy (DOE) Building Technologies program has set aggressive goals
for energy efficiency improvements in buildings that will require collaboration between the DOE
laboratories and the building industry. This report details the development of standard or
reference energy models for the most common commercial buildings to serve as starting points
for energy efficiency research. These models represent reasonably realistic building
characteristics and construction practices. Fifteen commercial building types and one
multifamily residential building were determined by consensus between DOE, the National
Renewable Energy Laboratory, Pacific Northwest National Laboratory, and Lawrence Berkeley
National Laboratory, and represent approximately two-thirds of the commercial building stock.
The reference buildings provide a common starting point to measure the progress of DOE energy
efficiency goals for commercial buildings. The models of the reference buildings are used for
DOE commercial buildings research to assess new technologies; optimize designs; analyze
advanced controls; develop energy codes and standards; and to conduct lighting, daylighting,
ventilation, and indoor air quality studies.
The input parameters for the building models came from several sources. Some were determined
from ASHRAE Standards 90.1-2004, 62.1-2004, and 62-1999 for new construction and Standard
90.1-1989 for post-1980 construction; others were determined from studies of data and standard
practices. National weighting factors are needed for each model in each location, so the relative
importance of each can be factored into nationwide analyses. These factors characterize the
number of buildings that are similar to each reference building type in each location.

iii
Acronyms and Abbreviations
ACH air changes per hour
AEDG Advanced Energy Design Guide
AF area factor
ANSI American National Standards Institute
ASHRAE American Society of Heating, Refrigerating and Air-Conditioning Engineers
CAV constant air volume
CBECS Commercial Buildings Energy Consumption Survey
COP coefficient of performance
DOE U.S. Department of Energy
EER energy efficiency ratio
FCU fan coil unit
GGHC Green Guide for Health Care
HSPF heating seasonal performance factor
HVAC heating, venting, and air conditioning
IESNA Illuminating Engineering Society of North America
ILD internal load density
IRAC individual room air conditioner
ISH individual space heater
LBNL Lawrence Berkeley National Laboratory
LPD lighting power density
MZ multizone
NREL National Renewable Energy Laboratory
OA outside air
PACU packaged air-conditioning unit
PBA principal building activity
PNNL Pacific Northwest National Laboratory
PTAC packaged terminal air conditioner
PTHP packaged terminal heat pump
SAMSON solar and meteorological surface observational network
SEER seasonal energy efficiency ratio
SHGC solar heat gain coefficient
SHW service hot water
SS split system
SSPC standing standards project committee
SZ single zone
VAV variable air volume
WLCNS wall construction

iv
Contents
Executive Summary ....................................................................................................................... iii
Acronyms and Abbreviations ........................................................................................................ iv
Contents .......................................................................................................................................... v
Figure ............................................................................................................................................ vii
Tables ............................................................................................................................................ vii
1.0 Introduction .......................................................................................................................... 1
2.0 Project Scope ....................................................................................................................... 2
2.1 Intended Uses of the Reference Building Models ............................................................ 2
2.2 Uses Not Intended for the Reference Building Models ................................................... 2
3.0 Previous Work ..................................................................................................................... 3
4.0 Overall Approach ................................................................................................................. 5
4.1 Determining Building Types ............................................................................................ 5
4.2 Determining Locations ..................................................................................................... 6
5.0 Energy Model Development ................................................................................................ 8
5.1 Program ............................................................................................................................ 8
5.1.1 Occupancy .................................................................................................................... 9
5.1.2 Ventilation .................................................................................................................. 11
5.1.3 Plug and Process Loads .............................................................................................. 14
5.1.4 Elevators ..................................................................................................................... 14
5.1.5 Commercial Kitchens ................................................................................................. 15
5.1.6 Service Hot Water Demand ........................................................................................ 17
5.1.7 Schedules .................................................................................................................... 18
5.1.8 Utility Tariffs .............................................................................................................. 19
5.2 Form ............................................................................................................................... 19
5.3 Fabric.............................................................................................................................. 20
5.3.1 Envelope Constructions .............................................................................................. 20
5.3.2 Infiltration ................................................................................................................... 29
5.4 Equipment ...................................................................................................................... 30
5.4.1 Interior Lighting ......................................................................................................... 30
5.4.2 Exterior Lights ............................................................................................................ 31
5.4.3 HVAC Equipment ...................................................................................................... 32
v
5.4.4 Fan Efficiencies .......................................................................................................... 38
5.4.5 Cooling Equipment Efficiencies................................................................................. 40
5.4.6 Refrigeration ............................................................................................................... 40
6.0 Weighting Factors .............................................................................................................. 45
7.0 Conculsions ........................................................................................................................ 47
8.0 References .......................................................................................................................... 48
Appendix A: Reference Building Internal Loads ......................................................................... 52
Appendix B: Schedules ................................................................................................................. 70

vi
Figure
Figure 1 Climate zone classification .............................................................................................. 7

Tables
Table 1 Categorization of 2003 CBECS Data for Reference Building Models ........................................... 6
Table 2 Selected Commercial Building Reference Model Locations .......................................................... 7
Table 3 Building Energy Model Input Categories ....................................................................................... 8
Table 4 Occupancy by Space Type ............................................................................................................ 10
Table 5 Outside Air Requirements (IP units)............................................................................................. 12
Table 6 Outside Air Requirements (SI units)............................................................................................. 13
Table 7 Plug and Process Load References ............................................................................................... 14
Table 8 Number of Elevators Installed and Motor Power ......................................................................... 15
Table 9 Commercial Kitchen Loads .......................................................................................................... 16
Table 10 Distribution of Kitchen Loads in Zone Energy Balance ............................................................. 16
Table 11 Peak Service Hot Water Demand and Data Sources................................................................... 17
Table 12 Reference Building Model Schedule Starting Points .................................................................. 18
Table 13 Reference Building Form Assignments ...................................................................................... 19
Table 14 Sources for Reference Building Form Data ................................................................................ 20
Table 15 Relationship of CBECS Roof Descriptions and Standard 90.1 Roof Constructions .................. 21
Table 16 Relationships Between CBECS Wall Descriptions and Standard 90.1 Wall Constructions ...... 22
Table 17 Recommended Roof Constructions by Building Type ............................................................... 23
Table 18 Recommended Wall Constructions by Building Type ............................................................... 24
Table 19 Roof U-Values (Btu/hft2F) by Reference Building Vintage .................................................... 25
Table 20 Steel Frame Wall U-Values (Btu/hft2F) by Reference Building Vintage ................................ 25
Table 21 Mass Wall U-Values (Btu/hft2F) by Reference Building Vintage........................................... 26
Table 22 Unheated Slab-On-Grade Floor Insulation by Reference Building Vintage R-Value
(hft2F/Btu) for 24-in. Vertical Insulation ......................................................................... 26
Table 23 Underground Wall Insulation by Reference Building Vintage R-Value (hft2F/Btu)............... 27
Table 24 Window Overall U-Value (Btu/hft2F) by Reference Building Vintage................................... 27
Table 25 Window Solar Heat Gain Coefficient by Reference Building Vintage ...................................... 28
Table 26 Reference Building Lighting Assumptions ................................................................................. 31
Table 27 Exterior Lighting Assumptions ................................................................................................... 32
Table 28 Parking Lot Lighting Levels ....................................................................................................... 32
Table 29 HVAC Equipment Types for Post-1980 and New Construction ................................................ 33
Table 30 HVAC Equipment Types for Pre-1980 Construction ................................................................. 34
vii
Table 31 Estimated Unitary Cooling Equipment Efficiencies for Pre-1980 Construction ........................ 35
Table 32 Estimated Water Chilling Equipment Efficiencies for Pre-1980 Construction .......................... 37
Table 33 Estimated Packaged Terminal Cooling Equipment Efficiencies for Pre-1980 Construction ..... 37
Table 34 Estimated Space Heating Equipment Efficiencies for Pre-1980 Construction ........................... 38
Table 35 Estimated Water Heating Equipment Efficiencies for Pre-1980 Construction ........................... 38
Table 36 Fan System Inputs ....................................................................................................................... 39
Table 37 Walk-In Refrigeration System Descriptions (IP Units) .............................................................. 41
Table 38 Walk-In Refrigeration System Descriptions (SI Units) .............................................................. 42
Table 39 Supermarket Refrigeration System Descriptions (IP Units) ....................................................... 43
Table 40 Supermarket Refrigeration System Descriptions (SI Units) ....................................................... 43
Table 41 Supermarket Compressor Descriptions....................................................................................... 44
Table 42 New Construction Reference Building Weighting Factors......................................................... 46
Table A-1 Reference Building Zone Internal Loads (IP units) .................................................................. 52
Table A-2 Reference Building Zone Internal Loads (SI units) .................................................................. 61
Table B-1 Quick Service Restaurant Hourly Operation Schedules ........................................................... 70
Table B-2 Hospital Hourly Operation Schedules....................................................................................... 72
Table B-3 Large Hotel Hourly Operation Schedules ................................................................................. 75
Table B-4 Large Office Hourly Operation Schedules................................................................................ 78
Table B-5 Medium Office Hourly Operation Schedules ........................................................................... 80
Table B-6 Midrise Apartment Hourly Operation Schedules...................................................................... 83
Table B-7 Outpatient Health Care Hourly Operation Schedules ............................................................... 85
Table B-8 Primary School Hourly Operation Schedules ........................................................................... 87
Table B-9 Retail Hourly Operation Schedules .......................................................................................... 90
Table B-10 Secondary School Hourly Operation Schedules ..................................................................... 91
Table B-11 Full Service Restaurant Hourly Operation Schedules............................................................. 95
Table B-12 Small Hotel Hourly Operation Schedules ............................................................................... 97
Table B-13 Small Office Hourly Operation Schedules............................................................................ 100
Table B-14 Strip Mall Hourly Operation Schedules ................................................................................ 102
Table B-15 Supermarket Hourly Operation Schedules............................................................................ 103
Table B-16 Warehouse Hourly Operation Schedules .............................................................................. 107

viii
1.0 Introduction
The U.S. Department of Energy (DOE) Building Technologies program has set aggressive goals
for energy efficiency improvements in buildings. This goal will require collaboration between
the DOE laboratories and the building industry. Several analysis activities are under way to
determine the best paths forward. Coordinating research activities and tracking progress require
common points of reference.
The purpose of this project was to develop standard or reference building energy models for the
most common commercial buildings to serve as starting points for analysis related to energy
efficiency research. These models represent realistic building characteristics and construction
practices. Fifteen commercial building types and one multifamily residential building (see Table
1 on page 14) were determined by consensus between DOE, the National Renewable Energy
Laboratory (NREL), Pacific Northwest National Laboratory (PNNL), and Lawrence Berkeley
National Laboratory (LBNL). These represent approximately two-thirds of the commercial
building stock. The remaining one-third is composed of several building types that are not easily
defined by a small number of models; however, some are similar to one or more of the 16
reference building types.
There are three versions of the reference building models for each building type: new
construction, post-1980 construction, and pre-1980 construction. All have the same building
form and area and the same operation schedules. The differences are reflected in the insulation
values, lighting levels, and HVAC equipment types and efficiencies. The new construction
models comply with the minimum requirements of ANSI/ASHRAE/IESNA Standard 90.1-2004
(ASHRAE 2004a), the post-1980 models meet the minimum requirements of Standard 90.1-1989
(ASHRAE 1989), and the pre-1980 models are built to a set of requirements developed from
previous standards and other studies of construction practices.
The reference building models are described in detail in this report and are available as
EnergyPlus input files (http://commercialbuildings.energy.gov/reference_buildings.html).
Spreadsheet scorecards document the model parameters and annual energy performance for each
building type and location.
Throughout the development of the reference buildings, the DOE Building Energy Codes
Program, the ASHRAE simulation working group, and Standard 90.1 subcommittees have
provided in-depth review of the underlying assumptions.

1
2.0 Project Scope
The reference building models cover 16 building types and 16 U.S. locations. They directly
characterize more than 60% of the commercial building stock and are very similar to other
commercial building types. The models are fully defined in the spreadsheet scorecards and are
available as EnergyPlus input files.
2.1 Intended Uses of the Reference Building Models
The purpose of these models is to represent new and existing buildings. The reference building
models will be used for DOE commercial buildings research to assess new technologies;
optimize designs; analyze advanced controls; develop energy codes and standards; and to
conduct lighting, daylighting, ventilation, and indoor air quality studies. They also provide a
common starting point to measure the progress of DOE energy efficiency goals for commercial
buildings. DOEs Building Energy Code Program and PNNL use these models for the
analytical support in the development of new versions of ASHRAE Standard 90.1. The models
provide consistency in modeling approaches and implementation across commercial buildings.
2.2 Uses Not Intended for the Reference Building Models
These reference building models are not intended to represent energy use in any particular
building. Rather, they are hypothetical models with ideal operations that meet certain minimum
requirements.
The reference building model definitions are not intended to act as targets to rate the energy
performance of single existing or proposed buildings. The models and weighting factors are not
appropriate for analysis at the state level, as the datasets used to generate the models and the
weighting factors are too small to form a valid statistical model at this level. Variations of these
models and weighting factors could be created for such purposes, but that is not the objective of
this project.

2
3.0 Previous Work
Several projects have created prototypical building energy models. The most familiar are from
LBNL, which developed a series of prototypical buildings over several years. Huang et al.
(1991) and Huang and Franconi (1999) present extensive summaries of work in this area; Huang
et al. (2005) present an analysis of 1999 building data. Three recent efforts to develop
prototypical energy models of buildings include a set of standardized energy simulation models
for commercial buildings from the University of Massachusetts (Stocki et al. 2005), a residential
building benchmark model from the DOE Building America program (Hendron 2007), and an
assessment of the entire commercial building stock by NREL (Griffith et al. 2007). Projects that
focused on single building types were carried out to create the Advanced Energy Design Guides
(AEDGs) for small office, small retail, warehouses, K12 schools, highway lodging, and small
healthcare (ASHRAE 2009).
Huang et al. (1991) developed 481 prototypical commercial buildings (37 building types and
13 locations) for a market assessment of cogeneration systems. The building types, sizes, and
locations were selected based on the best potential to use cogeneration. The purpose of the
project was to model the energy use in existing commercial building stock as closely as
reasonable. The paper presents a summary of building characteristics databases, engineering
studies, characterizations, and prototypes for energy simulations. The data included the
Nonresidential Building Energy Consumption Survey, which later became the Commercial
Buildings Energy Consumption Survey (CBECS) (EIA 2005), and F.W. Dodge building stock
and forecast data (McGraw-Hill 2005). They completed sensitivity analyses to better understand
the effects of building size, external wall models, thermal zoning, and HVAC types on the
simulated energy use.
Huang and Franconi (1999) estimated the heating and cooling loads in existing commercial
buildings by component and the efficiencies of the equipment used to meet those loads. They
used 120 prototypical buildings covering 12 building types of old and new construction. The
models were updated versions of the 1991 Huang et al. models based on 1989 CBECS data. The
models were extrapolated to represent the regional and national building stock with weighting
factors derived from the 1992 CBECS.
Stocki et al. (2005) present a set of standardized assumptions for commercial building energy
analyses. They define seven building types: large office, small office, retail, education,
apartment, small hotel, and hospital. These are meant to represent typical commercial buildings;
however, there is little justification for the types chosen. The building sizes were based on work
by Huang and Franconi (1999). Energy-related parameters conform to ASHRAE Standards
90.1-2001 (ASHRAE 2001) and 62.1-1999 (ASHRAE 1999). These models could be used to
analyze energy performance of any of the seven building types in any climate; however, there is
no method to extend the results beyond each type and size.
The Building America benchmark model (Hendron 2007) provides a common baseline for
determining energy savings of new residential buildings. Hourly energy simulations are used to
determine the savings. The size and location of the benchmark (baseline) building are set to
match the proposed building, but everything else is defined by a set of modeling rules. The
operating schedules are clearly defined and are used for both building simulations.

3
Griffith et al. (2007) completed an assessment of the commercial building sector for the potential
to reach net zero energy. They autogenerated energy simulation models for all the buildings in
1999 CBECS (EIA 2002), except refrigerated warehouses. This effort resulted in5,375 models
which were used to examine potentials of different technology scenarios for the commercial
building stock. While robust, the number of buildings results in a computational burden for
extensive analysis.

4
4.0 Overall Approach
It is impractical to model every new commercial building, or even to represent every building
sub-sector, so we selected a small number of prevalent building types and developed weighting
factors to represent a percentage of the commercial building stock. A goal was set to represent
70% of the U.S. commercial building floor area.
National data from the 2003 CBECS (EIA 2005) were used to determine the appropriate, average
mix of representative buildings. We selected 16 building types and developed weighting factors
to adjust for the percentage of the building stock represented by each building type for 16
locations. This mix of buildings and locations demonstrates the climatic and geographic effects
in each construction vintage. The three vintages of 16 building types in 16 locations result in
768 models.
Creating energy simulation input files is tedious and time consuming, and mistakes are common.
Analysis activities of the national building sub-sectors can involve creating hundredsor even
thousandsof input files. To alleviate some of the workload and minimize the potential for
mistakes, we developed computer programs to create the input files for the energy simulations
based on sets of easily implemented rules. The input files by location are autocreated from a
seed file for each building type and vintage based on rules from appropriate energy efficiency
standards for climate-variable parameters.
4.1 Determining Building Types
The best publicly available data on commercial buildings are from CBECS (EIA 2005), for
which the 2003 version contains 5,215 buildings. The CBECS variables PBA8 and PBAplus8
separate the commercial sector into 29 categories and 51 subcategories based on principal
building activity (PBA). Analysis of the CBECS data provided the project team with the most
typical building types, and the final set of building types was selected by consensus among DOE,
NREL, LBNL, and PNNL. The set of 15 building types from CBECS is listed in Table 1, along
with the PBA numbers. A midrise apartment building model is also included to total 16 building
types. Multifamily housing buildings are not included in CBECS, and the midrise apartment
model was developed from other data in a separate PNNL study (Gowri et al. 2007).
This set of 15 commercial building types represents 3,279 buildings (of 5,215) from the full
CBECS dataset. This subset represents 44 billion ft2 (4.1 billion m2) or 62% of the total
weighted floor area in the survey (64% if the vacant buildings are removed from the total) and
65% of the total energy consumption. The remaining CBECS building types include buildings
that vary significantly in size, internal loads, and operation; several building types would need to
be added to reach the 70% goal. Religious worship buildings are the next-largest group of
buildings, which would raise the percentage of the total weighted floor area to 67%. However,
they represent 74% of the new construction from 2003 to 2007 contained in the McGraw-Hill
Construction Starts Database (Jarnagin and Bandyopadhyay 2010).

5
Table 1 Categorization of 2003 CBECS Data for Reference Building Models
Name PBA8 PBAPLUS8
Small Office 2 2, 3, 4, 5, 6, 7
Medium Office 2 2, 3, 4, 5, 6, 7
Large Office 2 2, 3, 4, 5, 6, 7
Primary School 14 28
Secondary School 14 29
Stand-Alone Retail 25 42
Strip Mall 23 50
Supermarket 6 14
Quick Service Restaurant 15 32
Full Service Restaurant 15 33
Small Hotel 18 39
Large Hotel 18 38
Hospital 13 35
Outpatient Healthcare 8 18,19
Warehouse 5 9, 10
Midrise Apartment N/A N/A

4.2 Determining Locations


Locations were selected to represent significant portions of the existing building stock and all
U.S. climate zones. Population is a good indicator of building distribution; however, if it were
the only criterion, some climate zones would not be represented. Approximately 78% of the
population is located in five of the 15 climate zones. To represent all U.S. climate zones and the
highest building densities, we selected the most populous cities in each climate zone.
Briggs et al. (2003) developed a climate zone classification system for DOE and ASHRAE
Standard 90.1-2004 based on SAMSON (NCDC 1993) weather data, as shown in Figure 1. An
important characteristic of these climate zones is that they tend to run in eastwest bands across
the country; subdivisions for moist, dry, and marine divide these bands. As part of this effort,
PNNL developed a set of typical locations (cities) based on their representativeness in each
climate zone. The selections had little to do with population or number of buildings.
We selected a revised set of locations as a balance of the representativeness of the climate and
the number of buildings in each climate zone (see Table 2). Two locations were selected for
climate zone 3B because they represent different climates within one zone, which is evident from
the reference building model energy simulation results. These subclimate zones are designated
as 3B-CA for the California coast and 3B-other for the remaining part of climate zone 3B.

6
Figure 1 Climate zone classification
(Credit: Briggs et al. [2003]; DOE [2005])

Table 2 Selected Commercial Building Reference Model Locations


Number Climate Zone Representative City TMY2 Weather file location
1 1A Miami, Florida Miami, Florida
2 2A Houston, Texas Houston, Texas
3 2B Phoenix, Arizona Phoenix, Arizona
4 3A Atlanta, Georgia Atlanta, Georgia
5 3B-CA Los Angeles, California Los Angeles, California
6 3B-other Las Vegas, Nevada Las Vegas, Nevada
7 3C San Francisco, California San Francisco, California
8 4A Baltimore, Maryland Baltimore, Maryland
9 4B Albuquerque, New Mexico Albuquerque, New Mexico
10 4C Seattle, Washington Seattle, Washington
11 5A Chicago, Illinois Chicago-OHare, Illinois
12 5B Denver, Colorado Boulder, Colorado
13 6A Minneapolis, Minnesota Minneapolis, Minnesota
14 6B Helena, Montana Helena, Montana
15 7 Duluth, Minnesota Duluth, Minnesota
16 8 Fairbanks, Alaska Fairbanks, Alaska

7
5.0 Energy Model Development
The intent of the reference building models is to characterize the energy performance of typical
building types under typical operations. Detailed building energy models require several pieces
of information that are not available from standard data sources; therefore, information from
several sources was combined in a sensible way to represent typical performance. To better
organize the efforts, we divided the model inputs into program, form, fabric, and equipment
(see Table 3).

Table 3 Building Energy Model Input Categories


Program Form Fabric Equipment
Location Number of floors Exterior walls Lighting
Total floor area Aspect ratio Roof HVAC system types
Plug and process loads Window fraction Floors Water heating equipment
Ventilation requirements Window locations Windows Refrigeration
Occupancy Shading Interior partitions Component efficiency
Space environmental conditions Floor height Internal mass Control settings
Service hot water demand Orientation Infiltration
Operating schedules

The program and form for the small office, schools, warehouse, small hotel, and outpatient
healthcare were taken, with slight modifications, from the work on the AEDGs for these building
types. PNNL developed the midrise apartment model for its work to support the development of
Standard 90.1. The program and form of the remaining models were developed from analysis of
CBECS (EIA 2005) and Time-Saver Standards for Building Types (DeChiara and Crosbie 2001)
and from experience with these building types.
The fabric and equipment parameters set by energy standards were determined from ASHRAE
Standards 90.1-2004 (ASHRAE 2004a), 62.1-2004 (ASHRAE 2004b), and 62-1999 (ASHRAE
1999) for new construction and Standard 90.1-1989 (ASHRAE 1989) for post-1980 construction.
NREL, PNNL, and LBNL performed research to determine the remaining model inputs. PNNL
completed a series of reports analyzing 2003 CBECS and past energy standards to determine
many of the energy model parameters used in these models. Winiarski et al. (2007a; 2007b;
2008) published two reports and a conference paper that analyzed envelope construction and
some building form characteristics. The HVAC system types were determined from the results
of a study by Winiarski et al. (2006) of system types and efficiencies for pre-1980 and post-1980
models and from input from the standing standards project committee (SSPC) 90.1 Simulation
Working Group and Mechanical Subcommittee for the new construction models. Throughout
the development of the reference building models, the DOE Building Energy Codes Program, the
ASHRAE simulation working group, and SSPC 90.1 subcommittees have provided in-depth
review of the models and the underlying assumptions.
5.1 Program
The building program includes the activity, location, occupancy, plug and process loads, service
water heating demand, and schedules. The PBAs were determined during the process of
analyzing the national building data (see Table 1). The reference building models are intended to
8
look much more like real buildings as compared to the generic boxes often used for energy
simulation studies. LBNL developed the original geometry characterization of the reference
building models (except for the midrise apartment), including the shape, floor area, number of
floors, and thermal zoning based on previous work and analysis of 2003 CBECS (EIA 2005).
Nine models were completely changed and modifications were made to the other models based
on input from industry and further data analysis. PNNL, NREL, and the AEDG project
committees developed the models for the small office, primary and secondary schools,
warehouse, small hotel, and outpatient health care for the AEDGs for these respective building
types (ASHRAE 2009). NREL developed the stand-alone retail and supermarket reference
building models based on work with national retailers and CBECS. NREL and PNNL developed
the strip mall model from CBECS data and from a review of actual strip mall layouts.
Table 13 lists the building floor areas and many form parameters. Appendix A lists the zone
level program parameters in IP units (Table A-1) and SI units (Table A-2) for each model.
5.1.1 Occupancy
Occupancy information is included in CBECS; however, close inspection reveals that these data
are unreliable. For example, office building occupancy (based on the number of workers on the
main shift from the 1999 CBECS [EIA 2002]) ranges from 334 ft2/person to 300,000 ft2/person
(31 m2/person to 27,871 m2/person) with a mean of more than 25,000 ft2/person (2,323
m2/person). The occupancy rates for the reference building models were instead taken from the
AEDG studies for the appropriate building types and from the default occupancy rates in
Standard 62.1-2004 (ASHRAE 2004b) following a recommendation by the ASHRAE 90.1
Simulation Working Group. Changes were made for dining, kitchen, storage, and shipping and
receiving areas, where these occupancy rates exceed the 2003 International Building Code
maximum (ICC 2003). The occupancy rates by space type are listed in Table 4, either as the
total number of occupants per space or as occupant density. Appendix A lists occupancy by
zone for each model.
Pless et al. (2007) documented the primary school model with 650 students and the secondary
school with 1200 students; however, the occupancy densities and schedules from the energy
models resulted in much higher numbers of students. The classroom occupancy schedules were
adjusted by factors of 0.75 for the primary school and 0.70 for the secondary school to arrive at
the student numbers documented in the project report.
The hotel guest rooms were assumed to have 1.5 occupants each, and occupancy rates for the
two hotel models were assumed to be 65% to align with the industry average occupancy rate and
Jiang et al. (2008). Rooms were randomly assigned occupants in the small hotel model so 50 of
the 77 rooms are occupied. The occupancy, lighting, and hot water schedules for the unoccupied
rooms were set to zero. The plug load schedule was set to a constant value of 20% for all rooms.
The thermal zoning and the use of multipliers in the large hotel model do not allow for this type
of control; therefore, a set of schedules was created to reduce the occupancy and loads to match
the 65% occupancy rate across all guest rooms.

9
Table 4 Occupancy by Space Type

Occupancy Occupancy
Space Type per Space ft2/person m2/person Data Source
Apartment 3.0 Gowri et al. 2007
Auditorium seating area 10.8 1 Pless et al. 2007
Cafeteria/FF dining 15 1.4 ICC 2003
Classrooms 43 4 Pless et al. 2007
Corridor (school) 107.6 10 Pless et al. 2007
Corridor (public spaces) 1000 93 Engineering judgment
Hotel guest room 1.5 Jiang et al. 2008
Gym (primary school) 35.8 3.3 Pless et al. 2007
Gym (secondary school) 10.8 1.0 Pless et al. 2007
Gym, auxiliary (secondary school) 35.8 3.3 Pless et al. 2007
Kitchen (commercial) 200 18.6 ICC 2003
Laundry 250 23. Jiang et al. 2008
Library/Media center 46.8 4.4 Pless et al. 2007
Lobby (school) 0.0 Engineering judgment
Lobby (hotel) 33.3 3 ASHRAE 2004b
Lobby (office building) 100 9.3 ASHRAE 2004b
Office 200 18.6 ASHRAE 2004b
Office (apartment) 2.0 Gowri et al. 2007
Office (school) 215 20 Pless et al. 2007
Office (warehouse) 5.0 Liu et al. 2007
Reception areas 33.3 3.1 ASHRAE 2004b
Restaurant dining rooms 15 ICC 2003
Restroom (school) 1076 100 Pless et al. 2007
Sales 66.7 6.2 ASHRAE 2004b
Shipping/Receiving 300 28 ICC 2003
Storage 300 28 ICC 2003
Supermarket 125 11.6 ASHRAE 2004b
Warehouse 0.0 Liu et al. 2007
Hospital spaces
Critical and intensive care 50 4.7 Doebber et al. 2009
ER exam rooms and triage 50 4.7 ASHRAE 2004b
Laboratory 200 18.6 GGHC 2007
Nurses station/waiting rooms 750 69.7 Engineering judgment
Operating/surgical cystoscopic rooms 200 18.6 GGHC 2007
Patient room 200 18.6 GGHC 2007
Physical therapy 200 18.6 GGHC 2007
Radiology 200 18.6 GGHC 2007
Outpatient spaces
Nurses station 50 4.7 GGHC 2007
Operating room 50 4.7 GGHC 2007
Procedure room 50 4.7 GGHC 2007
Exam room 50 4.7 GGHC 2007
Clean/soiled areas 50 4.7 GGHC 2007
Recovery room 50 4.7 GGHC 2007

10
5.1.2 Ventilation
The ventilation or outside air (OA) requirements are listed by space type in Table 5 (IP units)
and Table 6 (SI units). Standard 90.1-2004 refers to Standard 62-1999 as a normative reference,
so the ventilation requirements from Standard 62-1999 Table 2 are used (ASHRAE 1999). The
occupancy rates were taken from the AEDG technical support documents for those buildings
with AEDGs and the default occupancy rates from 62.1-2004 for other building types as
recommended by the Standard 90.1 Simulation Working Group. The occupancy rates in
Standard 62.1-2004 are considered to be more realistic than those in 62-1999. We assumed that
the ventilation requirements are the same for all vintages of reference building models because
reliable data for older buildings are not available. We will reevaluate this assumption as more
information about existing buildings becomes available.
The OA requirements for the hospital and the outpatient facility were determined from the 2007
Green Guide for Health Care (GGHC 2007), the 2001 Guidelines for Design and Construction
of Hospital and Health Care Facilities (AIA 2001), and from Standard 62-1999.
A brief discussion of the ventilation design practices for hospitals is worthwhile. Most hospitals
are designed to comply with AIA (2001). This document is updated periodically; e.g., 1987,
1992, 1996, 2001, and 2006. The Centers for Medicare and Medicaid Services references the
2001 edition, but most consultants design to the current version. Compliance is law in many
states, and is a requirement for reimbursement for Medicare and Medicaid. Regardless, very few
hospitals choose to not accept Medicare and Medicaid patients. In 2004 most designs probably
would have complied with the 2001 edition. Today most are shifting to the 2006 edition,
although it is not generally required by law.

11
Table 5 Outside Air Requirements (IP units)
Default
Occupancy OA Total OA OA Data Sources
Space Type ft2/person cfm/person cfm/ft2 cfm/ft2 ACH Occupancy Ventilation
Auditorium seating area 10.8 15 1.39 Pless et al. 2007 ASHRAE 1999
Bath (cfm/room) 20 ASHRAE 1999
Cafeteria/FF dining 15 20 1.33 ICC 2003 ASHRAE 1999
Classrooms 43.1 15 0.35 Pless et al. 2007 ASHRAE 1999
Corridor (school) 0.10 0.10 ASHRAE 1999
Corridor (public spaces) 0.05 0.05 ASHRAE 1999
Hotel guest room (cfm/room) 30 ASHRAE 1999
Gym (primary school) 35.8 20 0.56 Pless et al. 2007 ASHRAE 1999
Gym (secondary school) 10.8 20 1.86 Pless et al. 2007 ASHRAE 1999
Kitchen (commercial) 200 15 0.075 ICC 2003 ASHRAE 1999
Kitchen (residential, cfm/room) 25 ASHRAE 1999
Living areas (residential) 15 ASHRAE 1999
Lobby (school, treat as a corridor) 0.10 0.10 ASHRAE 1999
Lobby (hotel) 33.3 20 0.60 ASHRAE 2004b ASHRAE 1999
Lobby (office building) 100 20 0.20 ASHRAE 2004b ASHRAE 1999
Office 200 20 0.10 ASHRAE 2004b ASHRAE 1999
Reception areas 33.3 15 0.45 ASHRAE 2004b ASHRAE 1999
Restaurant dining rooms 15 20 1.33 ICC 2003 ASHRAE 1999
Restroom (cfm/wc or urinal) 50 ASHRAE 1999
Sales 66.7 0.30 0.30 ASHRAE 2004b ASHRAE 1999
Shipping/receiving 300 0.15 0.15 ICC 2003 ASHRAE 1999
Storage 300 0.15 0.15 ICC 2003 ASHRAE 1999
Supermarket 125 15 0.12 ASHRAE 2004b ASHRAE 1999
Warehouse 0.05 0.05 ASHRAE 1999
ER waiting room ASHRAE 2004b AIA 2001
Operating/surgical cystoscopic rooms Pless et al. 2007 AIA 2001
Critical and intensive care ASHRAE 2004b AIA 2001
Patient room ASHRAE 2004b AIA 2001
Examination room 50 0.30 0.30 ASHRAE 2004b GGHC 2007
Clean linens 0.30 0.30 GGHC 2007
Soiled linens 1.50 1.50 GGHC 2007
Nurse station 0.15 0.15 GGHC 2007
Physical therapy 50 0.30 0.30 ASHRAE 2004b GGHC 2007
Radiology 0.30 0.30 GGHC 2007
Anesthesia storage 1.20 1.20 GGHC 2007

12
Table 6 Outside Air Requirements (SI units)
Default Total
OA OA Data Sources
Space Type Occupancy OA
m /person L/s/person L/s/m2
2
L/s/m2 ACH Occupancy Ventilation
Auditorium seating area 1.00 7.08 7.08 Pless et al. 2007 ASHRAE 1999
Bath (cfm/room) 9.44 0.00 ASHRAE 1999
Cafeteria/FF dining 1.39 9.44 6.77 ICC 2003 ASHRAE 1999
Classrooms 4.00 7.08 1.77 Pless et al. 2007 ASHRAE 1999
Corridor (school) 0.51 0.51 ASHRAE 1999
Corridor (public spaces) 0.25 0.25 ASHRAE 1999
Hotel guest room (cfm/room) 14.16 ASHRAE 1999
Gym (primary school) 3.33 9.44 2.83 Pless et al. 2007 ASHRAE 1999
Gym (secondary school) 1.00 9.44 9.44 Pless et al. 2007 ASHRAE 1999
Kitchen (commercial) 18.59 7.08 0.38 ICC 2003 ASHRAE 1999
Kitchen (residential, cfm/room) 11.80 ASHRAE 1999
Living areas (residential) 7.08 ASHRAE 1999
Lobby (school, treat as a corridor) 0.51 0.51 ASHRAE 1999
Lobby (hotel) 3.10 9.44 3.05 ASHRAE 2004b ASHRAE 1999
Lobby (office building) 9.29 9.44 1.02 ASHRAE 2004b ASHRAE 1999
Office 18.59 9.44 0.51 ASHRAE 2004b ASHRAE 1999
Reception areas 3.10 7.08 2.29 ASHRAE 2004b ASHRAE 1999
Restaurant dining rooms 1.39 9.44 6.77 ICC 2003 ASHRAE 1999
Restroom (cfm/wc or urinal) 23.60 ASHRAE 1999
Sales 6.20 1.52 1.52 ASHRAE 2004b ASHRAE 1999
Shipping/receiving 27.88 0.76 0.76 ICC 2003 ASHRAE 1999
Storage 27.88 0.76 0.76 ICC 2003 ASHRAE 1999
Supermarket 11.62 7.08 0.61 ASHRAE 2004b ASHRAE 1999
Warehouse 0.25 0.25 ASHRAE 1999
ER waiting room ASHRAE 2004b AIA 2001
Operating/surgical cystoscopic rooms Pless et al. 2007 AIA 2001
Critical and intensive care ASHRAE 2004b AIA 2001
Patient room ASHRAE 2004b AIA 2001
Examination room 4.65 1.52 1.52 ASHRAE 2004b GGHC 2007
Clean linens 1.52 1.52 GGHC 2007
Soiled linens 7.62 7.62 GGHC 2007
Nurse station 0.76 0.76 GGHC 2007
Physical therapy 4.65 1.52 1.52 ASHRAE 2004b GGHC 2007
Radiology 1.52 1.52 GGHC 2007
Anesthesia storage 6.10 6.10 GGHC 2007

13
5.1.3 Plug and Process Loads
Determining the plug or process load intensity is difficult because available measured data are
scarce. Thus, we had to make several assumptions based on experience with a small number of
buildings, previous work by Huang et al. (1991), levels from ASHRAE (1989), and the AEDG
series. The plug and process loads and schedules are determined at the zone level based on the
activities in each zone. The models will be updated as new data become available. Appendix A
lists all the plug loads by zone for each building model in IP and SI units. Table 7 lists the main
references for the plug and process loads by building type. Kitchen loads for all building models
with kitchens are discussed in the Commercial Kitchen sections.

Table 7 Plug and Process Load References


Building/Zone Data Source
Small Office Engineering judgment
Medium Office Engineering judgment
Large Office Engineering judgment
Primary School Pless et al. 2007
Secondary School Pless et al. 2007
Stand-Alone Retail Engineering judgment
Strip Mall Engineering judgment
Supermarket Engineering judgment
Small Hotel Jiang et al. 2008
Large Hotel Huang et al. 1991
Hospital Doebber et al. 2009, GGHC 2007
Outpatient Healthcare Doebber et al. 2009, GGHC 2007
Warehouse Liu et al. 2007
Midrise Apartment Hendron 2007

The laundry facility loads for the hotels were modified from Jiang et al. (2008), who assumed
60-lb (27-kg) commercial washing machines that use 3.4 Btu/h (1,390 W) of electricity per cycle
and gas dryers that use 2.6 Btu/h (750 W) of electricity per cycle. They also assumed 9 lb (4.1
kg) of laundry per room per day and that the washed laundry retains water equal to 87.5% of its
dry weight. For the assumed 65% occupancy, the small hotel requires 8 loads per day and the
large hotel requires 18 loads per day. To calculate gas use, we assumed a heat of vaporization of
1000 Btu/lb (2,326 kJ/kg) of water and a thermal efficiency of the gas dryer of 80%. The total
energy use for washing and drying was divided evenly over 8 hours. (See Appendix A for the
electricity and gas loads for each space.)
5.1.4 Elevators
Elevators are included in all buildings with multiple floors. They are modeled in EnergyPlus as
a zone load but labeled as elevators, so they are reported separately in the EnergyPlus output.
The number of elevators in the reference building models was determined from rules of thumb
presented by Beyer (2009) (see Table 8). The office buildings have one elevator for every
45,000 ft2 (4,181 m2), plus one service elevator for the large office building. The hotels have one
14
elevator for every 75 rooms, and the large hotel includes one service elevator for every two
public elevators, plus one additional elevator for the dining and banquet facilities on the top
floor. The hospital has one public and one service elevator for every 100 beds (250 total), plus
two elevators for the offices and cafeteria on the top floor. The outpatient healthcare model has
the minimum recommendation of two elevators. The apartment building has one elevator for
every 90 units, and the secondary school has two elevators.

Table 8 Number of Elevators Installed and Motor Power


Number of Motor Power
Building Type
Elevators (w/each)
Medium Office 2 14,610
Large Office 12 18,537
Secondary School 2 14,610
Small Hotel 2 14,610
Large Hotel 6 18,537
Hospital 8 18,537
Outpatient Healthcare 3 14,610
Midrise Apartment 1 14,610

For buildings with fewer than six stories (counting the basement), we assumed the elevators use
hydraulic motors with no over counter weighting, weigh 2,500 lb (1,134 kg), travel 150 fpm (46
mpm), and have a mechanical efficiency of 58%. In this case, the heat gain was added to the
first floor core zone. For buildings six stories and higher, we assumed the elevators use traction
motors with 40% over counter weighting, weigh 2,500 lb (1,134 kg), travel 350 fpm (1.78 m/s),
and have a mechanical efficiency of 64%. In this case, the heat gain was added to the top floor
core zone. The following equation is used to calculate the motor power in horsepower (Baldor
Electric Company 1998). The schedules were taken from ASHRAE (1989).

W V [1 OCW ]
Motor HP =
33,000 m
where
W = weight of car (lb)
V = speed of car (fpm)
OCW = over counter weight (fraction of car capacity)
m = mechanical efficiency of elevator (fraction)

5.1.5 Commercial Kitchens


Six reference buildings have commercial kitchens, and the supermarket has a deli and a bakery
that use similar types of equipment. Commercial kitchens have high electric and gas equipment
densities for refrigeration, food preparation, and dishwashing, and often have high ventilation
requirements. The internal loads in kitchens can vary tremendously depending on the types and
amounts of food served. The internal loads included in the reference buildings are shown in
Table 9, along with the SHW and ventilation requirements. These loads represent the installed
15
capacity; actual peak demand and total energy use are determined by applying the operating
schedules in Appendix B. The electricity loads include reach-in refrigerators, and some of the
electric food preparation load is assumed to be in the dining zones. Walk-in coolers and freezers
are modeled as separate EnergyPlus objects and are discussed in the Refrigeration section.

Table 9 Commercial Kitchen Loads


SHW
Meals Gas Electricity Electricity SHW Temp. at Hooded
per Load Load in Dining gal/h Fixture Exhaust cfm
Building Day (kW) (kW) Zone (L/h) F (C) (L/s)
Primary School 400 160 40 20% 100 (379) 120 (49) 3,300 (1,557)
Secondary School 600 242 60 20% 133 (503) 120 (49) 4,000 (1,888)
Supermarket Deli 6 5 5 (19) 120 (49)
Supermarket Bakery 11 3 5 (19) 120 (49) 2,500 (1,180)
Quick Service Restaurant 800 150 50 30% 40 (151) 120 (49) 3,300 (1,557)
Full Service Restaurant 780 167 75 30% 133 (503) 120 (49) 4,000 (1,888)
Large Hotel 780 167 75 30% 133 (503) 120 (49) 4,000 (1,888)
Hospital 800 283 75 0% 150 (568) 120 (49) 5,300 (2,501)

We assume the kitchens in the full service restaurant, large hotel, and schools have similar loads
and can be scaled with the estimated number of meals served each day. The kitchen electricity
and gas process loads and the exhaust flow rates are based on information from Brown (2007),
Fisher (2003), Smith et al. (1999), Smith and Fisher (2001), data from the California Energy
Commission (CEC 2004) and SGE (2004), a review of actual kitchen designs, and examination
of annual utility data from more than 1000 operating commercial kitchens. Table 10 shows the
energy distribution of the kitchen loads within the EnergyPlus zone energy balance. All gas
appliances are assumed to be under exhaust hoods, so a high fraction of the energy is lost out
the exhaust hood and not added to the space load.

Table 10 Distribution of Kitchen Loads in Zone Energy Balance


Gas Electrical
Fraction Equipment Equipment Exhaust Hoods
Lost 0.7 0.20 1.0
Latent 0.1 0.25 0.0
Radiant 0.2 0.30 0.0
Convective 0.0 0.25 0.0

The kitchen exhaust rates are shown in the final column of Table 9. Transfer air from the dining
zones is used for all or part of the make-up air requirements, depending on how much air is
available from the dining areas. This transfer air is modeled with an EnergyPlus ZoneMixing
object in the kitchen zone and a zero power exhaust fan in the dining zone. EnergyPlus version
4.0 has two limitations that force a modeling workaround for the exhaust fans and make-up air:

16
Exhaust fans are controlled with an onoff schedule only, and cannot have a fractional
schedule; therefore, the fans are assumed to run at full flow.
EnergyPlus does not account for the transfer air from adjacent zones when the OA
requirements are calculated. It determines the OA as the maximum of the exhaust fan
flow rate and the minimum OA schedule multiplied by the peak OA flow rate without
consideration of the transfer air.
To work around this problem, we calculated the hourly energy use of the exhaust fans in a
spreadsheet and entered it in the EnergyPlus model as an electricity load to the zones. The OA
requirements for the kitchens are set with the zone sizing object and an hourly schedule.
5.1.6 Service Hot Water Demand
The peak service hot water (SHW) demand for each reference building space type is shown in
Table 11, along with the temperatures at the fixture and the sources of data. These numbers are
used in conjunction with the operating schedules to estimate the total hot water consumption.
Hot water use in kitchens is included in the Commercial Kitchen section. Natural gas water
heaters are used in all cases; storage tanks are kept at 140F (60C).

Table 11 Peak Service Hot Water Demand and Data Sources


Temp. at
Use Rate Fixture
Space Type gal/h L/h F C Data Sources
Guest room (small hotel) 1.75 6.6 110 43 Jiang et al. 2008, ASHRAE 2007
Guest room (large hotel) 1.25 4.7 110 43 Jiang et al. 2008, ASHRAE 2007
Laundry (small hotel) 67.5 255.5 140 60 Jiang et al. 2008, ASHRAE 2007
Laundry (large hotel) 156.6 592.8 140 60 Jiang et al. 2008, ASHRAE 2007
Restrooms (primary school) 56.5 214.0 110 43 ASHRAE 2007
Restrooms (secondary school) 104.4 395.0 110 43 ASHRAE 2007
Gym (secondary school) 189.5 717.2 110 43 ASHRAE 2007
Small office 3.0 11.4 110 43 Jarnagin et al. 2006, ASHRAE 2007
Medium office (per floor) 9.9 37.5 110 43 Jarnagin et al. 2006, ASHRAE 2007
Large office (per floor) 21.3 80.6 110 43 Jarnagin et al. 2006, ASHRAE 2007
Apartment 3.5 13.2 110 43 Gowri et al. 2007
Outpatient healthcare 30.0 113.5 110 43 Doebber et al. 2009
Hospital
ER waiting room 1.0 3.8 120 49 Engineering judgment
Operating/surgical cystoscopic 2.0 7.6 120 49 Engineering judgment
Laboratory 2.0 7.6 120 49 Engineering judgment
Patient room 1.0 3.8 120 49 Engineering judgment

Data for the two hotel buildings are from Jiang et al. (2008) and ASHRAE (2007). Average hot
water use per guest room is assumed to be 14 g/day (53 L/day) in the small hotel and 10 g/day
(38 L/day) in the large hotel from Table 7 (ASHRAE 2007). These total daily consumption
values are the product of the peak value and the SHW schedule, which assumes a total full load
equivalent consumption over 8 hours per day and gives the hourly peak loads shown in Table 11.
17
The laundry facility loads were modified from Jiang et al. (2008). We assumed 9 lb (4.1 kg) of
laundry per room per day and 1.2 gal/lb (9.9 L/kg) of laundry of 140F (60C) hot water. The
total hot water load for washing was divided evenly over 8 hours.
The average hot water use for schools is 0.6 gal/student/day (2.3 L/student/day) for primary
schools and 1.8 gal/student/day (6.8 L/student/day) in secondary schools (ASHRAE 2007). We
assumed that the secondary school uses 0.6 gal/student/day (2.3 L/student/day) in the restrooms
to match the use in the primary school and 1.2 gal/student/day (4.5 L/student/day) in the
gymnasium showers. The primary school has 650 students and the secondary school has 1200
students. The total daily hot water use was divided over the hot water use schedule to arrive at
the peak values shown in Table 11.
For the offices, we assumed 1 gal/occupant/day (3.8 L/occupant/day) divided evenly over a 9-h
occupancy period. We assumed 310 gal/day (1,172 L/day) for the outpatient healthcare model
over a 14-h occupancy period, with the operating rooms consuming the most SHW of all the
space types. Healthcare space types consumed similar quantities of SHW in the hospital model,
but most use occurred in the commercial kitchen associated with the hospital cafeteria.
5.1.7 Schedules
Few data are available that enable us to determine the best operating schedules for building
energy simulations. We used the schedules from the AEDG Technical Support Documents for
the schools, lodging, warehouse, and healthcare models and a PNNL study for the apartment
model (see Table 12). For the other models we started with Standard 90.1-1989 Section 13,
which includes schedules for use with the Energy Cost Budget Method (ASHRAE 1989).
Schedules published in the original version of 90.1-1989 were modified by Addendum L in 1994
by a public review process, and are published with minor modifications in Section G of the
Users Manual for 90.1-2004 (ASHRAE 2004c). Although these schedules are not perfect, no
better published source of schedules has been identified. We started with these schedules and
made modifications based on experience with monitoring real buildings to account for
differences in zone-level and equipment operations, and lighting and plug loads. In 90.1-1989
(with addenda), the lights and equipment share the same schedules, but case study research and
broad anecdotal evidence suggest that plug and process loads do not track lighting loads and that
during off hours the plug loads are higher, probably because of information technology and
security equipment. Therefore, we created new plug and process schedules and developed
additional schedules for spaces that operate on different schedules, based on experience with
monitoring buildings. All the schedules for each model are included in Appendix B.

Table 12 Reference Building Model Schedule Starting Points


Principal Building Activity Data Source
Office ASHRAE 1989
Education Pless et al. 2007
Retail ASHRAE 1989
Food Sales ASHRAE 1989
Food Services ASHRAE 1989
Lodging Jiang et al. 2008
Healthcare Doebber et al. 2009
Warehouse Liu et al. 2007
Apartment Gowri et al. 2007

18
5.1.8 Utility Tariffs
Utility rate schedules are needed to calculate energy costs, which are important for analyzing the
economics of energy efficiency and energy production technologies. Electricity and natural gas
are the only two energy forms considered for the reference buildings. Utility rate schedules vary
widely across the country and within each census division, and capturing this variability is
difficult. Also, utility rates can vary significantly from year to year. Utility rate schedules were
selected from the EnergyPlus UtilityTariffObject.imf file when locations were selected. They
were taken from the Tariff Analysis Project (http://tariffs.lbl.gov/) and directly from the utility
company Web sites. These data are from 2004 and may not reflect current prices.
Tax rates on utilities vary at the city and county government levels, and most utility companies
do not publish these with their tariffs because they vary within the service territory. However,
taxes form an important part of energy costs in the commercial sector and should be included in
the modeling. These data were filled by assuming that energy taxes are equal to the state sales
tax rate plus 2% to cover city and county taxes based on a brief review of utility tax rates.
5.2 Form
Building form parameters are listed in Table 3. The form parameters for each reference building
are shown in Table 13. Aspect ratio is defined as the overall length in the eastwest direction
divided by the overall length in the northsouth direction. Expert opinion was used to determine
the aspect ratios and floor-to-floor height for each building type. Ceiling plenums are included
in the large office and medium office models. The sources for the other form parameters are
shown in Table 14.

Table 13 Reference Building Form Assignments


Floor-to- Floor-to-
Floor Area Aspect No. of Floor Height Ceiling Height Glazing
Building Type ft2 m2 Ratio Floors ft m ft m Fraction
Small Office 5,500 511 1.5 1 10 3.05 10 3.05 0.21
Medium Office 53,628 4,982 1.5 3 13 3.96 9 2.74 0.33
Large Office 498,588 46,320 1.5 12* 13 3.96 9 2.74 0.38
Primary School 73,960 6,871 E-Shape 1 13 3.96 13 3.96 0.35
Secondary School 210,887 19,592 E-Shape 2 13 3.96 13 3.96 0.33
Stand-Alone Retail 24,962 2,294 1.3 1 20 6.10 20 6.10 0.07
Strip Mall 22,500 2,090 4.0 1 17 5.18 17 5.18 0.11
Supermarket 45,000 4,181 1.5 1 20 6.10 20 6.10 0.11
Quick Service Restaurant 2,500 232 1.0 1 10 3.05 10 3.05 0.14
Full Service Restaurant 5,500 511 1.0 1 10 3.05 10 3.05 0.17
11** 3.35** 11** 3.35**
Small Hotel 43,200 4,013 3.0 4 0.11
9 2.74 9 2.74
3.8** 13** 3.96** 13** 3.96**
Large Hotel 122,120 11,345 6 0.27
5.1 10 3.05 10 3.05
Hospital 241,351 22,422 1.3 5* 14 4.27 14 4.27 0.15
Outpatient Healthcare 40,946 3,804 1.4 3 10 3.05 10 3.05 0.19
Warehouse 52,045 4,835 2.2 1 28 8.53 28 8.53 0.006
Midrise Apartment 33,740 3,135 2.7 4 10 3.05 10 3.05 0.15
* Plus basement (not included in the table number)
** First floor

19
Table 14 Sources for Reference Building Form Data
Principal Building Activity Data Source
Small Office Jarnagin et al. 2006, EIA 2005
Medium Office EIA 2005
Large Office EIA 2005
Primary School Pless et al. 2007
Secondary School Pless et al. 2007
Stand-Alone Retail EIA 2005
Strip Mall EIA 2005
Supermarket EIA 2005
Quick Service Restaurant Huang et al. 1991
Full Service Restaurant Huang et al. 1991
Small Hotel Jiang et al. 2008
Large Hotel Huang et al. 1991
Hospital Huang et al. 1991
Outpatient Healthcare Doebber et al. 2009
Warehouse Liu et al. 2007
Midrise Apartment Gowri et al. 2007

5.3 Fabric
The fabric includes the construction types and thermal properties of the walls, roofs, floors, and
windows. Winiarski et al. (2007a; 2007b) analyzed CBECS 2003 to determine pre-1980 and
post-1980 construction types. They assumed that the new construction models and the post-1980
use the same construction types.
5.3.1 Envelope Constructions
CBECS PBAplus information was used to map data from the 2003 CBECS dataset to the
reference building types. Office buildings were divided into small, medium, and large, based on
the number of floors (small is defined as single story, medium as two to four stories, and large
more than four stories).
CBECS provides seven categories of roof construction material plus an other category and a
not one major type category. The most common roof descriptions were determined for each
reference building type by percentage of roof area and fraction of buildings. (No consideration is
given to skylight area.) Roof area is assumed to correspond to the building footprint. This
implies that roof area is equal to the projected roof area on the building footprint. No attempt
was made to estimate the relative increase in roof area for sloped roofs compared to flat roofs.
Standard 90.1-2004 defines three primary roof types based on the location of insulation relative
to the roof with the following assumptions:

20
Insulation Entirely Above Deck. Has continuous insulation above the structural roof
deck.
Metal Building. Has insulation compressed between structural members.
Attic and Other. Insulation is laid between roof joists.
A fourth option for determining roof insulation levels in Standard 90.1-2004 is defined as single-
rafter roofs, a subclass of Attic and Other, in which the roof above and the ceiling below are
attached to the same rafter. For these assemblies, the requirement in Standard 90.1-2004 is the
lesser of two values: the attic requirement or a separate requirement that the rafter cavity be
filled with fiberglass insulation. We consider single-rafter roofs in the Attic and Other
classification; no further consideration is given to single-rafter roofs.
Comparison of the three ASHRAE Standard 90.1-2004 roof types with the 2003 CBECS roof
descriptions indicates that the only description that can be unambiguously mapped to a Standard
90.1 roof type is the CBECS built-up classification mapped to 90.1 Insulation Entirely Above
Deck. Slate, shingles, shakes, and tiles of any material map fairly well to the Standard 90.1 Attic
and Other category, as these are typically installed over an attic or single-rafter roof. Less
straightforward is mapping the CBECS Asphalt, Fiberglass, Other classification. This category
can be mapped to 90.1s Attic and Other in the case of asphalt shingles, but could also be
mapped to Insulation Entirely Above Deck in the case of a built-up roof with an asphalt topcoat.
The CBECS Metal Surface category may be mapped to 90.1 Metal Building, or it may indicate
that a metal roof has been used in place of shingles over an attic roof structure. The CBECS
Plastic, Rubber, Synthetic category most likely maps to the Insulation Entirely Above Deck
category (most commonly where a synthetic membrane is placed over foam), although
commercially available recycled rubber and plastic shingles could be installed over an attic.
These relationships are shown in Table 15.

Table 15 Relationship of CBECS Roof Descriptions and Standard 90.1 Roof Constructions
Standard 90.1 Roof Construction
Insulation Entirely
CBECS Roof Descriptions Above Deck Metal Building Attic and Other
Asphalt, fiberglass, other X X
Built-up X
Concrete X
Metal surfacing X X
No one major type
Other
Plastic, rubber, synthetic X X
Slate, tile shingles X
Wood shingles, shakes, other X

CBECS provides the Wall Construction (WLCNS) statistic as a classification of the major wall
construction type for each building. The CBECS WLCNS categories are:
Brick, stone, or stucco
Concrete block or poured concrete
Decorative or construction glass
21
Precast concrete panels
Sheet metal panels
Siding, shingles, tiles, or shakes
Window or vision glass
No one major type
Other.
For each reference building, Table 16 lists the top five CBECS WLCNS choices in decreasing
order of occurrence by percentage of calculated total opaque wall area or number of buildings.
To determine the percentage of total opaque wall area, we removed the window area from the
frequency statistic (total wall area). Some buildings have their primary wall construction in
CBECS characterized as vision or construction glass, which is not opaque. Thus, these buildings
tend to rank lower than if we had ranked buildings by total wall area including glazed area.

Table 16 Relationships Between CBECS Wall Descriptions and Standard 90.1 Wall Constructions
ASHRAE Standard 90.1 Wall Construction
Metal Building Steel Framed Wood Framed
CBECS Wall Descriptions Mass Wall Wall Wall and Other Wall
Brick, stone, stucco X X X X
Concrete, block or poured X
Precast concrete panels X
Sheet metal panels X
Siding, shingles, tiles, shakes X X
Decorative or construction glass X
Window or vision glass X
No major type Unknown Unknown Unknown Unknown
Other Unknown Unknown Unknown Unknown

Standard 90.1-2004 defines four wall types based on the functional performance of the wall, with
the following assumptions:
Mass Wall. Has continuous insulation.
Metal Building Wall. Has insulation compressed between metal members, possibly
augmented by continuous insulation to decrease the overall U-factor.
Steel Framed Wall. Is a simple frame wall with different structural members (and
therefore different thermal bypass factors).
Wood Framed and Other Wall. Is a simple frame wall with different structural
members (and therefore different thermal bypass factors).
Mass Wall in Standard 90.1-2004 must be defined as a wall with a heat capacity exceeding
7 Btu/ft2F (143 MJ/m2C) or 5 Btu/ft2F (102 MJ/m2C), provided that it has a material unit
weight not greater than 120 lb/ft3 (4.7 GJ/m3). The 7 Btu/ft2F is for any weight wall; the
5 Btu/ft2F (102 MJ/m2C) is only for walls lighter than 120 lb/ft3 (4.7 GJ/m3). Thus, regardless
of insulation type and placement, walls exceeding this level of heat capacity are treated as mass
walls for setting minimum U-factor requirements. The definition is such that a 4-in. (10-cm)
brick facing on a frame wall construction does not create a mass wall under the Standard 90.1
definition.
22
Comparing the four Standard 90.1-2004 wall types with the 2003 CBECS wall descriptions
indicates that the brick, stone, and stucco description could conceivably be mapped to any one of
the four ASHRAE 90.1 WLCNSs. This is problematic because the brick, stone, and stucco
description is the single most common in the 2003 CBECS for all the reference building types
examined in this analysis. These relationships between the Standard 90.1-2004 roof types and
the 2003 CBECS wall descriptions are shown in Table 16.
The recommended roof and wall constructions for each model and each construction vintage are
shown in Table 17 and Table 18. Winiarski et al. (2006) recommended an attic roof construction
for the new construction small hotel; however, Jiang et al. (2008) recommended insulation
entirely above deck for the roof, which is used in the reference small hotel model. Gowri et al.
(2007) determined the constructions for the midrise apartment building model and assumed they
were the same for all vintages of the reference building.

Table 17 Recommended Roof Constructions by Building Type


Building Type Pre-1980 Post-1980 New Construction
Insulation entirely
Small Office Attic and other Attic and other
above deck
Insulation entirely Insulation entirely Insulation entirely
Medium Office
above deck above deck above deck
Insulation entirely Insulation entirely Insulation entirely
Large Office
above deck above deck above deck
Insulation entirely Insulation entirely Insulation entirely
Primary School
above deck above deck above deck
Insulation entirely Insulation entirely Insulation entirely
Secondary School
above deck above deck above deck
Insulation entirely Insulation entirely Insulation entirely
Stand-Alone Retail
above deck above deck above deck
Insulation entirely Insulation entirely Insulation entirely
Strip Mall
above deck above deck above deck
Insulation entirely Insulation entirely Insulation entirely
Supermarket
above deck above deck above deck
Insulation entirely
Quick Service Restaurant Attic and other Attic and other
above deck
Insulation entirely
Full Service Restaurant Attic and other Attic and other
above deck
Insulation entirely
Small Hotel Attic and other Attic and other
above deck
Insulation entirely Insulation entirely Insulation entirely
Large Hotel
above deck above deck above deck
Insulation entirely Insulation entirely Insulation entirely
Hospital
above deck above deck above deck
Insulation entirely Insulation entirely Insulation entirely
Outpatient Healthcare
above deck above deck above deck
Insulation entirely
Warehouse Metal building roof Metal building roof
above deck
Insulation entirely Insulation entirely Insulation entirely
Midrise Apartment
above deck above deck above deck

23
Table 18 Recommended Wall Constructions by Building Type
Building Type Pre-1980 Post-1980 New Construction
Small Office Steel frame Mass Mass
Medium Office Steel frame Steel frame Steel frame
Large Office Mass Mass Mass
Primary School Steel frame Steel frame Steel frame
Secondary School Steel frame Steel frame Steel frame
Stand-Alone Retail Steel frame Mass Mass
Strip Mall Steel frame Steel frame Steel frame
Supermarket Mass Mass Mass
Quick Service Restaurant Mass Wood frame Wood frame
Full Service Restaurant Steel frame Steel frame Steel frame
Small Hotel Steel frame Steel frame Steel frame
Large Hotel Mass Mass Mass
Hospital Mass Mass Mass
Outpatient Healthcare Steel frame Steel frame Steel frame
Warehouse Metal building Metal building Metal building
Midrise Apartment Steel frame Steel frame Steel frame

The choice of a wall or roof type for a reference building has energy implications. Versions of
ASHRAE Standard 90 (dating back to 90-75) have different assembly U-factor requirements for
different wall and roof types. For example, Standard 90.1-2004 has a variation for roof assembly
U-factor of 0.034 to 0.065 (depending on roof type) in Zone 5 (typical of Chicago, Illinois). This
same building in the same location could show a variation in wall assembly U-factor of 0.084
to 0.113 for lightweight construction.
The overall U-values of opaque constructions and fenestrations must be determined for the
different vintages of baseline building models. The new construction reference building models
follow Standard 90.1-2004; the post-1980 models follow Standard 90.1-1989. For the pre-1980
models, we chose to follow values from Briggs et al. (1987), who estimated envelope thermal
properties by construction year for office buildings. We estimated the envelope thermal
properties from the Briggs paper for 1970 construction and assumed that these values apply
across all building and construction types. Table 19 through Table 25 show the roof and wall U-
values, slab-on-grade and underground R-values, window U-values, and solar heat gain
coefficients (SHGCs) for all construction types and for the three vintages of reference buildings.
The U-values include the interior and exterior film coefficients from Standard 90.1-2004.
Standard 90.1-2004 contains residential and nonresidential construction performance parameters.
The residential constructions are more stringent and should be used for whole buildings or floors
of buildings where 50% or more of the spaces adjacent to the exterior walls are used primarily
for living and sleeping quarters. This definition requires that the residential constructions be
used for the small hotel and midrise apartment, for floors 24 of the hospital, and for floors 26
of the large hotel.
24
Table 19 Roof U-Values (Btu/hft2F) by Reference Building Vintage
90.1-2004 New Construction New
Climate 90.1-1989 Pre- Post- Insulation Construction
Location Zone Table 1980 1980 Above Deck Attic
Miami, FL 1A 8A-15 0.100 0.074 0.063 0.034
Houston, TX 2A 8A-10 0.100 0.066 0.063 0.034
Phoenix, AZ 2B 8A-18 0.100 0.046 0.063 0.034
Atlanta, GA 3A 8A-8 0.100 0.072 0.063 0.034
Los Angeles, CA 3B-CA 8A-6 0.100 0.100 0.063 0.034
Las Vegas, NV 3B-other 8A-14 0.100 0.048 0.063 0.034
San Francisco, CA 3C 8A-5 0.100 0.088 0.063 0.034
Baltimore, MD 4A 8A-25 0.086 0.058 0.063 0.034
Albuquerque, NM 4B 8A-23 0.089 0.059 0.063 0.034
Seattle, WA 4C 8A-19 0.085 0.064 0.063 0.034
Chicago, IL 5A 8A-26 0.072 0.053 0.063 0.034
Denver, CO 5B 8A-28 0.076 0.051 0.063 0.034
Minneapolis, MN 6A 8A-33 0.060 0.045 0.063 0.027
Helena, MT 6B 8A-32 0.060 0.049 0.063 0.027
Duluth, MN 7 8A-36 0.060 0.040 0.063 0.027
Fairbanks, AK 8 8A-38 0.060 0.031 0.048 0.027

Table 20 Steel Frame Wall U-Values (Btu/hft2F) by Reference Building Vintage


90.1-2004 Pre-1980 Post-1980 New Construction
Climate 90.1-1989 Btu/ Btu/ Btu/
Location Zone Table hft2F W/m2K hft2F W/m2K hft2F W/m2K
Miami, FL 1A 8A-15 0.230 1.306 1.000 5.678 0.124 0.704
Houston, TX 2A 8A-10 0.230 1.306 0.150 0.852 0.124 0.704
Phoenix, AZ 2B 8A-18 0.230 1.306 0.240 1.363 0.124 0.704
Atlanta, GA 3A 8A-8 0.225 1.278 0.130 0.738 0.124 0.704
Los Angeles, CA 3B-CA 8A-6 0.230 1.306 0.220 1.249 0.124 0.704
Las Vegas NV 3B-other 8A-14 0.230 1.306 0.160 0.909 0.124 0.704
San Francisco, CA 3C 8A-5 0.224 1.272 0.130 0.738 0.124 0.704
Baltimore, MD 4A 8A-25 0.178 1.011 0.089 0.505 0.124 0.704
Albuquerque, NM 4B 8A-23 0.184 1.045 0.100 0.568 0.124 0.704
Seattle, WA 4C 8A-19 0.175 0.994 0.092 0.522 0.124 0.704
Chicago, IL 5A 8A-26 0.156 0.886 0.082 0.466 0.084 0.477
Denver, CO 5B 8A-28 0.161 0.914 0.082 0.466 0.084 0.477
Minneapolis, MN 6A 8A-33 0.145 0.823 0.065 0.369 0.084 0.477
Helena, MT 6B 8A-32 0.145 0.823 0.072 0.409 0.084 0.477
Duluth, MN 7 8A-36 0.136 0.772 0.058 0.329 0.064 0.363
Fairbanks, AK 8 8A-38 0.125 0.710 0.045 0.256 0.064 0.363

25
Table 21 Mass Wall U-Values (Btu/hft2F) by Reference Building Vintage
Pre-1980 Post-1980 New Construction
90.1-2004
Climate 90.1-1989 Btu/ Btu/ Btu/
Location Zone Table hft2F W/m2K hft2F W/m2K hft2F W/m2K
Miami, FL 1A 8A-15 0.230 1.306 1.000 5.678 0.580 3.293
Houston, TX 2A 8A-10 0.230 1.306 0.340 1.931 0.580 3.293
Phoenix, AZ 2B 8A-18 0.230 1.306 0.410 2.328 0.580 3.293
Atlanta, GA 3A 8A-8 0.225 1.278 0.290 1.647 0.151 0.857
Los Angeles, CA 3B-CA 8A-6 0.230 1.306 1.000 5.678 0.151 0.857
Las Vegas, NV 3B-other 8A-14 0.230 1.306 0.290 1.647 0.580 3.293
San Francisco, CA 3C 8A-5 0.224 1.272 0.490 2.782 0.580 3.293
Baltimore, MD 4A 8A-25 0.178 1.011 0.120 0.681 0.580 3.293
Albuquerque, NM 4B 8A-23 0.184 1.045 0.190 1.079 0.151 0.857
Seattle, WA 4C 8A-19 0.175 0.994 0.100 0.568 0.151 0.857
Chicago, IL 5A 8A-26 0.156 0.886 0.100 0.568 0.151 0.857
Denver, CO 5B 8A-28 0.161 0.914 0.140 0.795 0.151 0.857
Minneapolis, MN 6A 8A-33 0.145 0.823 0.071 0.403 0.123 0.698
Helena, MT 6B 8A-32 0.145 0.823 0.079 0.449 0.123 0.698
Duluth, MN 7 8A-36 0.136 0.772 0.061 0.346 0.123 0.698
Fairbanks, AK 8 8A-38 0.125 0.710 0.047 0.267 0.104 0.591

Table 22 Unheated Slab-On-Grade Floor Insulation by Reference Building Vintage R-Value


(hft2F/Btu) for 24-in. Vertical Insulation
90.1-2004 90.1-1989 New
Location Climate Zone Table Pre-1980 Post-1980 Construction
Miami, FL 1A 8A-15 0.0 0.0 NR
Houston, TX 2A 8A-10 0.0 0.0 NR
Phoenix, AZ 2B 8A-18 0.0 0.0 NR
Atlanta, GA 3A 8A-8 0.0 6.0 NR
Los Angeles, CA 3B-CA 8A-6 0.0 0.0 NR
Las Vegas, NV 3B-other 8A-14 0.0 0.0 NR
San Francisco, CA 3C 8A-5 0.0 6.0 NR
Baltimore, MD 4A 8A-25 0.0 8.0 NR
Albuquerque, NM 4B 8A-23 0.0 7.0 NR
Seattle, WA 4C 8A-19 0.0 8.0 NR
Chicago, IL 5A 8A-26 0.0 8.0 NR
Denver, CO 5B 8A-28 0.0 8.0 NR
Minneapolis, MN 6A 8A-33 0.0 8.0 NR
Helena, MT 6B 8A-32 0.0 8.0 NR
Duluth, MN 7 8A-36 0.0 8.0 NR
Fairbanks, AK 8 8A-38 0.0 8.0 10.0

26
Table 23 Underground Wall Insulation by Reference Building Vintage R-Value (hft2F/Btu)
90.1-2004 90.1-1989 New
Location Climate Zone Table Pre-1980 Post-1980 Construction
Miami, FL 1A 8A-15 0.0 0.0 NR
Houston, TX 2A 8A-10 0.0 0.0 NR
Phoenix, AZ 2B 8A-18 0.0 0.0 NR
Atlanta, GA 3A 8A-8 0.0 7.0 NR
Los Angeles, CA 3B-CA 8A-6 0.0 0.0 NR
Las Vegas, NV 3B-other 8A-14 0.0 0.0 NR
San Francisco, CA 3C 8A-5 0.0 7.0 NR
Baltimore, MD 4A 8A-25 0.0 9.0 NR
Albuquerque, NM 4B 8A-23 0.0 8.0 NR
Seattle, WA 4C 8A-19 0.0 9.0 NR
Chicago, IL 5A 8A-26 0.0 10.0 NR
Denver, CO 5B 8A-28 0.0 10.0 NR
Minneapolis, MN 6A 8A-33 0.0 12.0 NR
Helena, MT 6B 8A-32 0.0 11.0 NR
Duluth, MN 7 8A-36 0.0 13.0 7.5
Fairbanks, AK 8 8A-38 0.0 16.0 7.5

Table 24 Window Overall U-Value (Btu/hft2F) by Reference Building Vintage

90.1-2004 90.1-1989 New


Location Climate Zone Table Pre-1980 Post-1980 Construction
Miami, FL 1A 8A-15 1.22 1.22 1.22
Houston, TX 2A 8A-10 1.22 1.22 1.22
Phoenix, AZ 2B 8A-18 1.22 1.22 1.22
Atlanta, GA 3A 8A-8 1.22 0.72 0.57
Los Angeles, CA 3B-CA 8A-6 1.22 1.22 0.57
Las Vegas, NV 3B-other 8A-14 1.22 1.22 0.57
San Francisco, CA 3C 8A-5 1.22 0.72 1.22
Baltimore, MD 4A 8A-25 1.22 0.59 0.57
Albuquerque, NM 4B 8A-23 1.22 0.72 0.57
Seattle, WA 4C 8A-19 1.22 0.72 0.57
Chicago, IL 5A 8A-26 0.62 0.59 0.57
Denver, CO 5B 8A-28 0.62 0.59 0.57
Minneapolis, MN 6A 8A-33 0.62 0.52 0.57
Helena, MT 6B 8A-32 0.62 0.52 0.57
Duluth, MN 7 8A-36 0.62 0.52 0.57
Fairbanks, AK 8 8A-38 0.62 0.52 0.35

27
Table 25 Window Solar Heat Gain Coefficient by Reference Building Vintage
90.1-2004 90.1-1989 New
Location Climate Zone Table Pre-1980 Post-1980 Construction
Miami, FL 1A 8A-15 0.54 0.25 0.25
Houston, TX 2A 8A-10 0.54 0.25 0.25
Phoenix, AZ 2B 8A-18 0.54 0.25 0.25
Atlanta, GA 3A 8A-8 0.54 0.25 0.25
Los Angeles, CA 3B-CA 8A-6 0.54 0.44 0.25
Las Vegas, NV 3B-other 8A-14 0.54 0.25 0.25
San Francisco, CA 3C 8A-5 0.54 0.39 0.34
Baltimore, MD 4A 8A-25 0.54 0.36 0.39
Albuquerque, NM 4B 8A-23 0.54 0.36 0.39
Seattle, WA 4C 8A-19 0.54 0.39 0.39
Chicago, IL 5A 8A-26 0.41 0.39 0.39
Denver, CO 5B 8A-28 0.41 0.39 0.39
Minneapolis, MN 6A 8A-33 0.41 0.39 0.39
Helena, MT 6B 8A-32 0.41 0.39 0.39
Duluth, MN 7 8A-36 0.41 0.49 0.49
Fairbanks, AK 8 8A-38 0.41 NR NR

Standard 90.1-2004 has different roof U-values depending on the construction type; the U-value
for Attic and Other is typically about half that for Insulation Entirely Above Deck. Standard
90.1-1989 has only one value for the roof U-value, and the Briggs paper does not differentiate by
construction type. Therefore, we use the same roof U-value for all construction types in the pre-
1980 and post-1980 constructions.
Standard 90.1-1989 has varying levels of insulation for mass walls, depending on the internal
load density (ILD), the wall heat capacity, the amount of fenestration, and the location of the
insulation. We made the following assumptions:
The ILD for all building types is 1.53 W/ft2.
The heat capacity of the walls is greater than 15 Btu/ft2F.
The percent fenestration is in the lower of the two ranges.
The insulation is on the interior of the mass wall.
Briggs et al. (1987) published wall U-values for mass walls only. Thus, we used the same value
for the pre-1980 steel frame wall construction. This paper does not include underground walls,
and we assumed that there is no insulation on pre-1980 underground walls for all locations.
Standard 90.1-1989 contains ranges of window U-values and shading coefficients, depending on
the window-to-wall glazing fraction and ILD. We assumed the highest U-values from 90.1-1989
for the post-1980 reference buildings, which agree very closely with other versions of Standard
90.1 for most locations. We used the SHGC from Standard 90.1-1999 for the post-1980
reference buildings. For the pre-1980 reference buildings, we assumed the windows in climate
zones 14 are single glazed 0.25-in. (.6-cm) bronze tinted glass and for climate zones 58,
double-glazed bronze and clear glass windows. For new construction following 90.1-2004, we

28
assumed all windows are fixed except the midrise apartment building, which is assumed to have
operable windows.
5.3.2 Infiltration
Infiltration is different in each building and varies continuously with changing environmental
and building operating conditions. Modeling approaches to infiltration are typically very simple
because of the lack of knowledge about the sizes and distribution of cracks in the building
envelope, the permeability of the envelope, the flow of air internal to the building, and the
pressure distribution in and around the building. EnergyPlus allows a simple approach and a
more detailed air flow nodal network approach to infiltration modeling. We chose the simple
approach to simplify the assumptions needed and to decrease simulation run times.
The simple method has an empirical correlation that modifies the infiltration as a function of
wind speed and temperature difference across the envelope. The difficulty in using this equation
is determining valid coefficients for each building type in each location. The EnergyPlus
documentation presents two sets of correlation coefficients, both of which were derived from a
small number of measurements taken from published reports. These coefficients vary
dramatically and provide very different results that cause great uncertainty in determining which
numbers to use. Therefore, we chose to model a fixed infiltration rate (which may not be
realistic for hourly modeling), but we feel that it can represent the average impact over a year.
Even in the simple model, we have to make assumptions about the infiltration level and how it is
affected by the operation of the mechanical ventilation systems. A proposed addendum to
Standard 90.1-2004 included an airtightness level for building envelopes. This document
proposed that one approach to meeting the standard would be to perform a pressurization test to
show that the building leakage does not exceed 0.4 cfm/ft2 at 0.3 in. w.c. (2 L/s/m2 at 75 Pa) of
above-grade envelope area (exterior walls and roof). This airtightness level provides a number
that can be used for the energy simulations and was assumed to be the level for new construction
reference building models.
For existing buildings, we turn to measured airtightness data. Persily (1998) collected data from
139 buildings that showed a wide scatter in airtightness and little correlation between building
age and airtightness. The average leakage rate across all building types and locations was 1.5
cfm/ft2 at 0.3 in. w.c. (7.5 L/s/m2 at 75 Pa) of above-grade envelope area. This number is used
for the pre-1980 and post-1980 reference building models.
Several assumptions have to be made to go from leakage rates to the simple infiltration model in
the building energy simulation. The infiltration was calculated based on the above-grade
envelope area (exterior walls and roof), then converted to a pressure of 0.016 in. w.c. (4 Pa),
assuming a flow exponent of 0.65. This lower pressure was assumed to be the average pressure
difference across the envelope without pressurization or depressurization from the HVAC and
exhaust fans.

Infiltration is often assumed to drop to zero when buildings are pressurized in energy models,
because there is a lack of evidence about what really happens and lack of knowledge about how
to model it in an energy simulation. We assumed that the uncontrolled infiltration is reduced to
25% of the value calculated at 0.016 in. w.c. (4 Pa) when the ventilation system is running.
When the ventilation system is off (no OA), the infiltration is modeled at the full leakage rate
calculated at 0.016 in. w.c. (4 Pa). Infiltration is modeled at constant air changes per hour
29
(ACH). We assumed that constant ACH models the average effects over the year and in
different locations. This is a gross simplification, but is necessary without moving to more
complicated flow network simulations.
5.4 Equipment
The equipment category includes interior and exterior lighting, HVAC, SWH equipment, and
commercial refrigeration systems.
5.4.1 Interior Lighting
We used the building area method or the space-by-space method from Standard 90.1-2004 to
determine maximum lighting power densities (LPDs) for the new construction models and
Standard 90.1-1989 for the existing building models (see Table 26). For space types not defined
in Standard 90.1-2004 for the hospital and outpatient models, we took LPD values from GGHC
(2007). The LPDs for each zone in each building are listed in Appendix A.
The LPDs in the strip mall were divided into three levels: high in two stores, medium in three
stores, and low in five stores to simulate a mix of stores based on research from Liu et al. (2006).
We assumed that the typical pre-1980 building lighting systems were updated to at least the
Standard 90.1-1989 LPDs. Standard 90.1-1989 provides prescriptive criteria and system
performance criteria approaches for determining the allowed lighting power. The prescriptive
criteria approach provides building-level LPDs. The system performance criteria approach
provides space-level LPDs and an area factor (AF) multiplier. The LPD for reference buildings
with multiple space types was determined as the product of the allowable unit power density
from ASHRAE (1989). The AF is defined as
(
AF = 0.2 + 0.8 1 0.9 n )
10.21(CH 2.5)
n= 1
Ar

where
AF = area factor
Ar = room area, ft2
CH = ceiling height, ft

30
Table 26 Reference Building Lighting Assumptions
Existing Stock Models New Construction Models
Building Type (ASHRAE 90.1-1989) (ASHRAE 90.1-2004)
Small Office Table 6-5 Offices Table 9.5.1 office
Medium Office Table 6-5 Offices Table 9.5.1 office
Large Office Table 6-5 Offices Table 9.5.1 office

Primary School Table 6-6a by space type


Table 9.6.1 by space type
(classroom AF = 1.0)
Secondary School Table 6-6a by space type
Table 9.6.1 by space type
(classroom AF = 1.0)
Stand-Alone Retail Table 6-6b retail space type C; Table 9.6.1 sales area, active
Table 6-6a fine storage for back storage
2 Stores: 5.6 W/ft2 (60.26 W/m2) 2 Stores: 2.23 W/ft2 (24 W/m2)
(Table 6-6b space type A) (Table 9.6.1 retail plus accent
3 Stores: 3.3 W/ft2 (35.51 W/m2) lighting)
Strip Mall
(Table 6-6b space type C) 3 Stores: 1.7 W/ft2 (18.3 W/m2)
5 Stores: 2.7W/ft2 (29.05 W/m2) (Table 9.6.1 retail)
(Table 6-6b space type F) 5 Stores: 1.28 W/ft2 (13.8 W/m2)
Table 6-6b retail space type E;
Supermarket Table 6-6a office category 1; Table 9.6.1 sales area, active
storage
Table 6-6a fine storage for back
Quick Service Restaurant Table 6-6a by space type Table 9.6.1 family dining; food prep
Full Service Restaurant Table 6-6a by space type Table 9.6.1 family dining; food prep
Small Hotel Table 6-6b by space type Table 9.6.1 by space type
Large Hotel Table 6-6b by space type Table 9.6.1 by space type
Hospital Table 6-6b by space type Table 9.6.1 by space type
Table 6-5 offices and Table 9.6.1 by space type
Outpatient Healthcare Table 6.6b dental suite/ GGHC 2007
examination Table L-1 where appropriate
Warehouse Table 9.6.1 office, bulk storage,
Table 6-6a by space type
fine storage
Hendron 2007, 90.1-1989 Hendron 2007, 90.1-2004
Midrise Apartment
Table 6-6a for corridor Table 9.6.1 for corridor

5.4.2 Exterior Lights


Exterior lighting is included in all reference building models following the values shown in
Table 27 and Table 28. All exterior lighting operates on an astronomical clock that turns on the
lights when the sun is down and turns them off when the sun is up. Exterior faade lighting is
included in all buildings around the perimeter of the building per area of the first floor exterior
walls plus the first floor plenum exterior walls. Exterior lights were added to the main entryway
doors and other exterior doors in all models. Exterior canopy lights were included in the small
hotel, large hotel, and hospital emergency room entrances. The hotel canopies are considered to
be high traffic areas and the hospital emergency room entrance is considered to be a low traffic
31
area for Standard 90.1-1989. The quick service restaurant model includes lighting for the drive-
through window. Standard 90.1-1989 does not have a category for drive-through windows;
therefore, we used the Standard 90.1-2004 value for the existing stock models.

Table 27 Exterior Lighting Assumptions


Existing Stock Models New Construction Models
Area (90.1-1989) (90.1-2004)
Faade 0.25 W/ft2 (2.69 W/m2) 0.2 W/ft2 (2.15 W/m2)
Main entry doors 30 W/ft (98.4 W/m) 30 W/ft (98.4 W/m)
Other doors 25 W/ft (82.0 W/m) 20 W/ft (65.6 W/m)
2 2
Canopy (heavy traffic) 10 W/ft (108 W/m ) 1.25 W/ft2 (13.5 W/m2)
Canopy (light traffic) 4 W/ft2 (43 W/m2) 1.25 W/ft2 (13.5 W/m2)
Drive through 400 W
2 2
Parking lot 0.18 W/ft (1.9 W/m ) 0.15 W/ft2 (1.6 W/m2)

Table 28 Parking Lot Lighting Levels


Total Parking Lot Lighting Level
Existing Stock New Construction
Building Type Parking Lot Area Models Models
Small Office 8,910 ft2 (828 m2) 1,604 W 1,337 W
2 2
Medium Office 86,832 ft (8,067 m ) 15,630 W 13,025 W
2 2
Large Office 325,087 ft (30,201 m ) 58,516 W 48,763 W
2 2
Primary School 14,718 ft (1,367 m ) 2,649 W 2,208 W
2 2
Secondary School 59,263 ft (5,506 m ) 10,667 W 8,889 W
2 2
Stand-Alone Retail 35,018 ft (3,253 m ) 6,303 W 5,253 W
2 2
Strip Mall 42,368 ft (3,936 m ) 7,626 W 6,355 W
2 2
Supermarket 63,810 ft (5,928 m ) 11,486 W 9,572 W
2 2
Quick Service Restaurant 10,125 ft (941 m ) 1,823 W 1,519 W
2 2
Full Service Restaurant 22,275 ft (2,069 m ) 4,010 W 3,341 W
2 2
Small Hotel 33,696 ft (3,130 m ) 6,065 W 5,054 W
2 2
Large Hotel 88,544 ft (8,226 m ) 15,938 W 13,282 W
2 2
Hospital 77,493 ft (7,199 m ) 13,949 W 11,624 W
2 2
Outpatient Healthcare 82,924 ft (7,704 m ) 14,926 W 12,439 W
2 2
Warehouse 20,048 ft (1,862 m ) 3,609 W 3,007 W
2 2
Midrise Apartment 28,578 ft (2,655 m ) 5,144 W 4,287 W

5.4.3 HVAC Equipment


ASHRAE (2004) specifies HVAC equipment for baseline buildings. This information is used to
develop reference buildings and does not necessarily represent typical construction practices.
Winiarski et al. (2006) performed an analysis of 2003 CBECS to estimate typical HVAC system
types by building type to use with the reference buildings. They examined the data in two sets:
32
all buildings with a construction year of 1980 or earlier and the remaining buildings built after
1980. The final equipment types selected represented the largest percentage of floor area. The
results for post-1980 and new construction are shown in Table 29 and for pre-1980 construction
in Table 30. Strip malls were not included and are assumed to have the same systems as the
stand-alone retail model. The number of chillers and condenser type (air or water) were
determined by discussions with the ASHRAE Standard 90.1 mechanical subcommittee.

Table 29 HVAC Equipment Types for Post-1980 and New Construction


Building Type Heating Cooling Air Distribution
PACU (packaged air- SZ CAV (single-zone
Small Office Furnace
conditioning unit) constant air volume)
MZ VAV (multizone
Medium Office Furnace PACU
variable air volume)
Chiller (2) water
Large Office Boiler MZ VAV
cooled
Primary School Boiler PACU CAV
Secondary School Boiler Chiller air cooled MZ VAV
Stand-Alone Retail Furnace PACU SZ CAV
Strip Mall Furnace PACU SZ CAV
Supermarket Furnace PACU CAV
Quick Service Restaurant Furnace PACU SZ CAV
Full Service Restaurant Furnace PACU SZ CAV
ISH (individual
IRAC (individual room
Small Hotel space heater), SZ CAV
air conditioner), PACU
furnace
FCU (fan coil unit)
Large Hotel Boiler Chiller (2) air cooled
and VAV*
Hospital Boiler Chiller water cooled CAV and VAV**
Outpatient Healthcare Furnace PACU CAV and VAV**
Warehouse ISH, furnace PACU SZ CAV
Midrise Apartment Furnace PACU-SS (split system) SZ CAV
* Hotels may be characterized with two system types serving different areas. Both multizone systems (VAV or
CAV) may serve public spaces (lobby/conference rooms), whereas single zone fan coil systems may be common
for living areas.
** Hospitals may use CAV systems in some operating and critical care type areas with variable air flow used for
pressurization, but classic VAV multizone systems in areas such as offices. CBECS buildings reporting VAV are
significantly less common in pre-1980 construction (67% versus 95% in post-1980 hospitals).

33
Table 30 HVAC Equipment Types for Pre-1980 Construction
Building Type Heating Cooling Air Distribution
Small Office Furnace PACU SZ CAV
Medium Office Furnace PACU SZ CAV
Large Office Boiler Chiller (2) water cooled MZ VAV
Primary School Boiler PACU CAV
Secondary School Boiler PACU CAV
Stand-Alone Retail Furnace PACU SZ CAV
Strip Mall Furnace PACU SZ CAV
Supermarket Furnace PACU CAV
Quick Service Restaurant Furnace PACU SZ CAV
Full Service Restaurant Furnace PACU SZ CAV
Small Hotel ISH IRAC SZ CAV
Large Hotel Boiler Chiller (2) air cooled FCU and MZ CAV*
Hospital Boiler Chiller water cooled FCU, CAV and VAV**
Outpatient Healthcare Furnace PACU CAV and VAV**
Warehouse Furnace, ISH PACU SZ CAV
Midrise Apartment Furnace PACU-SS SZ CAV
* Hotels may be characterized with two system types serving different areas. Both multizone systems (VAV or
CAV) may serve public spaces (lobby/conference rooms), whereas single zone fan coil systems may be common
for living areas.
** Hospitals may use CAV systems in some operating and critical care type areas with variable air flow used for
pressurization, but classic VAV multizone systems in areas such as offices. CBECS buildings reporting VAV are
significantly less common in pre-1980 construction (67% versus 95% in post-1980 hospitals).

Equipment sizing for all reference building models is determined from design day runs by
EnergyPlus for each location with a sizing factor of 1.2. Nominal coefficient of performance
(COP), energy efficiency ratio (EER), seasonal energy efficiency ratio (SEER), and boiler and
furnace efficiencies are taken from the appropriate energy standard based on equipment type and
size. Performance curves and HVAC system models are used to model how performance might
vary when operating away from the nominal operation point using the models available in
EnergyPlus. Economizer operation is determined from the cooling system size and climate zone
following 90.1-2004 requirements. Exception (e) to Section 6.5.1 in 90.1-2004 for systems
serving residential spaces eliminates the requirement for economizers for systems smaller than
27 tons and 56 tons, depending on climate zone. Moreover, economizers are not used in any
healthcare critical systems that are required to operate within specified humidity constraints.
The equipment efficiencies are determined from 90.1-2004 for the new construction reference
building models, 90.1-1989 for the post-1980 reference building models, and from an analysis of
historical equipment efficiencies and equipment lifetimes for the pre-1980 reference building
models (Winiarski and Halverson 2008). The equipment efficiencies for pre-1980 reference
building models for cooling equipment are shown in Table 31, for space heating equipment in
Table 32, and for water heating equipment in Table 33 through Table 35.
34
Table 31 Estimated Unitary Cooling Equipment Efficiencies for Pre-1980 Construction
Capacity Efficiency Average Life
Equipment Category Heating Section Equipment Subcategory
(Btu/h) Metric Efficiency (years)
Any Single package SEER 11.06 15
065,000
Any Split SEER 11.09 15
65,000 Electric or none Split and single package EER 9.63 15
135,000 Other Split and single package EER 9.63 15
135,000 Electric or none Split and single package EER 9.28 15
Air conditioners, air cooled
240,000 Other Split and single package EER 9.28 15
240,000 Electric or none Split and single package EER 8.92 15
760,000 Other Split and single package EER 8.92 15
Electric or none Split and single package EER 8.63 15
> 760,000
Other Split and single package EER 8.63 15
Any Split and single package EER 10.50 19
065,000
Any Split and single package EER 10.50 19
65,000 Electric or none Split and single package EER 10.75 19
Air conditioners, water or evaporatively cooled 135,000 Other Split and single package EER 10.58 19
135,000 Electric or none Split and single package EER 10.04 19
240,000 Other Split and single package EER 9.87 19
Electric or none Split and single package EER 10.04 19
>240,000
Other Split and single package EER 9.87 19
Any Single package SEER 11.33 15
065,000
Any Split SEER 11.33 15
65,000 Electric or none Split and single package EER 9.61 15
135,000 Other Split and single package EER 9.61 15
Heat pumps, air cooled
135,000 Electric or none Split and single package EER 9.27 15
240,000 Other Split and single package EER 9.27 15
Electric or none Split and single package EER 8.92 15
> 240,000
Other Split and single package EER 8.92 15
017,000 All All EER 10.09 19
17,00065,000 All All EER 10.46 19
Heat pumps, water source 65,000
All All EER 10.99 19
135,000
135,000 All All EER 10.99 19

35
Capacity Efficiency Average Life
Equipment Category Heating Section Equipment Subcategory
(Btu/h) Metric Efficiency (years)
240,000
Heat pumps, ground water source 0135,000 All All EER 14.53 19
Heat pumps, ground source 0135,000 All All EER 11.89 19
Any Single package HSPF 6.93 19
065,000
Any Split HSPF 7.04 19
65,000 Electric or none Split and single package COP47 3.03 19
135,000 Other Split and single package COP47 3.03 19
Heat pumps, air cooled
135,000 Electric or none Split and single package COP47 2.94 19
240,000 Other Split and single package COP47 2.94 19
Electric or none Split and single package COP47 2.94 19
> 240,000
Other Split and single package COP47 2.94 19
017,000 All All COP68 3.88 19
Heat pumps, water source 17,000
All All COP68 3.88 19
135,000
Heat pumps, ground water source 0135,000 All All COP50 NA 19
Heat pumps, ground source 0135,000 All All COP32 NA 19
COP32 heating COP at 32F ground source temperature
COP47 heating COP at 47F outdoor air source temperature
COP50 heating COP at 50F ground water source temperature
COP68 heating COP at 68F water source temperature
HSPF heating seasonal performance factor
NA analysis incomplete

36
Table 32 Estimated Water Chilling Equipment Efficiencies for Pre-1980 Construction
Capacity Equipment Efficiency Average Life
Equipment Category
(tons) Subcategory Metric Efficiency (years)
<150 All COP 2.70 23
Chiller, air cooled, electrically operated 150300 All COP 2.64 23
> 300 All COP 2.64 23
< 150 Reciprocating COP 3.98 23
Chiller, water cooled, electrically operated 150300 Reciprocating COP 3.98 23
> 300 Reciprocating COP 3.98 23
<150 Screw/scroll COP 4.13 23
Chiller, water cooled, electrically operated 150300 Screw/scroll COP 4.50 23
> 300 Screw/scroll COP 5.11 23
< 150 Centrifugal COP 4.53 23
Chiller, water cooled, electrically operated 150300 Centrifugal COP 4.93 23
> 300 Centrifugal COP 5.54 23
Chiller, air cooled, absorption, single effect All - COP 0.55 23
Chiller, water cooled absorption, single effect All - COP 0.69 23
Chiller, double effect, direct fired All - COP 0.98 23
Chiller, double effect, indirect fired All - COP 0.98 23

Table 33 Estimated Packaged Terminal Cooling Equipment Efficiencies for Pre-1980 Construction
Capacity Efficiency Average Life
Equipment Category
(Btu/h) Metric Efficiency (years)
9,000 EER 9.79 10
PTAC
12,000 EER 9.22 10
9,000 EER 9.67 10
PTHP
12,000 EER 9.09 10
9,000 COP47 2.86 10
PTHP-heating
12,000 COP47 2.78 10
9,000 EER 8.82 10
PTAC < 42 16 in.
12,000 EER 8.24 10
9,000 EER 8.76 10
PTHP < 42 16 in.
12,000 EER 8.18 10
9,000 COP47 2.69 10
PTHP heating < 42 16 in.
12,000 COP47 2.60 10

COP47 heating COP at 47F outdoor air source temperature


HSPF heating seasonal performance factor
NA analysis incomplete
PTAC packaged terminal air-conditioning
PTHP packaged terminal heat pump

37
Table 34 Estimated Space Heating Equipment Efficiencies for Pre-1980 Construction
Efficiency Average Life
Equipment Category Capacity
Metric Efficiency (years)
< 225 kBtu/h Ec 0.80 15
Furnace
225 kBtu/h Ec 0.80 15
Duct furnace All Ec 0.80 15
Unit heater, gas All Ec 0.80 15
< 300 kBtu/h Et 0.73 30
Boiler, gas, hot water 3002500 kBtu/h Et 0.74 30
> 2500 kBtu/h Et 0.76 30

Ec combustion efficiency (1-flue losses)


Et thermal efficiency

Table 35 Estimated Water Heating Equipment Efficiencies for Pre-1980 Construction


Efficiency Average Life
Equipment Category Capacity
Metric Efficiency (years)
< 12 kW EF NA 7
Electric storage water heater
> 12 kW SL NA 7
< 75,000 Btu/h EF NA 7
Et 0.80 7
> 75,000, <155,000 Btu/h
Gas storage water heater SL NA 7
Et 0.80 7
> 155,000 Btu/h
SL NA 7
50200 kBtu/h EF NA 15
> 200 Kbtu/h, < 10 gal Et 0.80 15
Gas instantaneous water heater
Et 0.79 15
> 200 Kbtu/h, > 10 gal
SL NA 15
> 300, < 12,500 kBtu/h, < 10 gal Et 0.79 25
Hot water supply boiler, gas Et 0.78 25
> 300, < 12,500 kBtu/h, > 10 gal
SL NA 25
Ec combustion efficiency (1-flue losses)
EF energy factor
Et thermal efficiency
SL standby loss (rating to be defined either in Btu/h or in % per hour of stored water heat above ambient)
NA analysis incomplete

5.4.4 Fan Efficiencies


EnergyPlus requires the fan pressure rise, total efficiency, motor efficiency, and fraction of the
motor in the air stream. For all cases, we assumed that the fraction of the motor in the air stream
is 1.0. The other inputs are summarized in Table 34 for each fan type. Electrical motor
efficiencies must comply with the requirements of the Energy Policy Act of 1992, which are
38
listed in Table 10.8 of Standard 90.1-2004. To simplify the standard implementation, we assume
all motors are open, four-pole, 1800-rpm. Table 36 lists nominal motor efficiency. The actual
motor efficiency is determined for each case automatically by applying the standard after a sizing
run is completed. Fan system flow rates are determined by EnergyPlus during system sizing.
Table 36 Fan System Inputs

Pressure Rise Fan Nominal


Mechanical Total Fan Motor
System Type in. w.c. Pa Efficiency Efficiency** Efficiency
Exhaust fans* 0.5 125 (a) 0.338 (a)
Unit heaters 0.2 50 0.650 0.536 0.825
PTAC and FCU fans 1.33 330 0.650 0.520 0.800
CAV < 7,487 cfm 2.5 622 0.650 (b) (c)
CAV > 7,487 cfm, < 20,000 cfm 4.46 1110 0.650 (b) (c)
CAV > 20,000 cfm 4.09 1,018 0.650 (b) (c)
VAV < 4,648 cfm 4.0 995 0.650 (b) (c)
VAV > 4,648 cfm, < 20,000 cfm 6.32 1572 0.650 (b) (c)
VAV > 20,000 cfm 5.58 1388 0.650 (b) (c)
* Exhaust fans are modeled as exterior loads, so only the total efficiency is important.
** Total fan efficiency is the product of fan mechanical efficiency and nominal motor efficiency. For example, a
nominal motor efficiency of 85% and a fan mechanical efficiency of 65% produce a total fan efficiency of 55.25%.
Motor nameplate horsepower is assumed to be the first available motor size in ASHRAE 90.1-2004, Table 10.8
greater than 110% of the motor brake horsepower, as calculated by the pressure rise and fan mechanical efficiency
shown in Table 38 and the fan airflow as sized in the EnergyPlus simulation.

Exhaust fans typically have lower total efficiencies than space-conditioning fans. We assume a
pressure rise of 0.5 in. w.c. (125 Pa) and a total fan efficiency of 0.338 for reference building
exhaust fans. Because the heat from exhaust fans is released to the outdoors, only their total
efficiencies are important. For space-conditioning fans, nominal motor efficiency would be
important if one were to test the effect of lessening the fraction of motor heat in the air stream.
Although the reference building models use 1.0 for that fraction, nominal motor efficiencies
were chosen from 90.1-2004, Table 10.8, for consistency with typical practice. The two
remaining model inputs that determine the power draw of the fan and the amount of fan heat
gained by the space are fan mechanical efficiency and pressure rise. For simplicity, the reference
building models use one fan mechanical efficiency value, 0.65, and vary the pressure rise to
achieve the desired fan power.
For unit heaters, we assumed a pressure rise of 0.2 in. w.c. (50 Pa) and a fan motor efficiency of
0.825. For all PTACs and FCUs, we assumed a pressure rise of 1.33 in. w.c. (330 Pa) and a
motor efficiency of 0.80. This corresponds to a power per flow rate of 0.3 W/cfm (636 W/m3/s),
corresponding with Standard 90.1-2007, Appendix G methodology. The pressure rise values of
constant- and variable-volume air handlers are chosen to most closely approximate the fan power
limitation determined in Standard 90.1-2004, Table 6.5.3.1. Below 5 hp (3.7 kW), which
corresponds to 7,487 cfm at 2.5 in. w.c. (3.53 m3/S at 620 Pa) for constant-volume fans and
4,648 cfm at 4.0 in. w.c. (2.19 m3/s at 1000 Pa) for variable-volume, fans are not regulated by
these limitations. Representative pressure rises are assumed in these cases (see Table 34).
39
Additionally, 2.0 in. w.c. (498 Pa) is added to fans in the hospital and outpatient healthcare
models to account for extra filtration.
5.4.5 Cooling Equipment Efficiencies
EnergyPlus requires the efficiency of cooling equipment to be input as the COP for the
compressors and condenser fans. We used an automated routine that looks up the equipment
efficiencies from Standard 90.1-2004 based on equipment type and size determined from an
EnergyPlus sizing run. These efficiencies reported in Standard 90.1-2004 include the energy of
the supply air fan. The efficiencies of small residential size equipment are reported as SEER,
which must first be converted to EER. We use an approximation developed by Nexant for the
Public Utilities Commission of Texas (2003), based on data from Carrier Corporation for
conversion from SEER to EER.
EER = SEER 0.697 + 2.0394
The COP of a unit is simply the cooling power output (Qcool) divided by the electrical power
input (Pelec) in consistent units:
COP = Q cool Pelec

The EER is the cooling power output in Btu divided by the electrical power input in W and
requires a simple unit conversion to arrive at the COP:
COP = EER / 3.412
However, energy modeling software requires the COPcomp of the compressor as an input, not the
overall COP of the cooling equipment. The EER values specified in ASHRAE 90.1-2004 refer
to overall efficiencies, so an extra calculation must be done to obtain COPcomp. The COPcomp
value is calculated by subtracting the power of the supply fan rated at ARI standard conditions
from the total power input to the unit. To approximate subtraction at ARI standard conditions,
PNNL has developed the following relationship between COPcomp and EER (PNNL 2004), with
R = 0.12 as a reasonable value to represent a broad class of products. R represents the ratio of
supply fan power to total equipment power at the rating condition.
( EER / 3.413) +R
COPcomp =
1 R
5.4.6 Refrigeration
Walk-in coolers and freezers are included in all commercial kitchens, based on data from
Westphalen et al. (1996). The kitchen refrigeration systems are listed in Table 37 and Table 38.
The refrigeration systems in the supermarket reference building are based on Westphalen et al.
(2006) Faramarzi and Walker (2004), Deru and MacDonald (2007), and MacDonald and Deru
(2007). The supermarket refrigeration systems are listed in Table 39 through Table 41.

40
Table 37 Walk-In Refrigeration System Descriptions (IP Units)
Cooling Evaporator Condenser Anti- Case Heat
Area Length Capacity Fan Fan Lighting Defrost Sweat Temp. Rejection
Building Type (ft2) (ft) (kBtu/h) COP (W) (W) (W/ft2) (W) (W) (F) Location
Walk-In Coolers
Primary School 120 12 9.2 3 200 350 1 0.00 0 35 Outdoors
Secondary School 240 24 19.1 3 400 750 1 0.00 0 35 Outdoors
Quick Service Restaurant 100 10 7.7 3 200 330 1 0.00 0 35 Outdoors
Full Service Restaurant 100 10 7.7 3 200 330 1 0.00 0 35 Outdoors
Large Hotel 120 12 9.2 3 200 350 1 0.00 0 35 Outdoors
Hospital 360 29 27.0 3 600 1000 1 0.00 0 35 Outdoors
Walk-In Freezers
Primary School 120 12 9.2 1.5 250 350 1 2000 0 10 Outdoors
Secondary School 240 24 18.3 1.5 500 750 1 3000 0 10 Outdoors
Quick Service Restaurant 80 8 5.7 1.5 180 329 1 2000 0 10 Outdoors
Full Service Restaurant 80 8 5.7 1.5 180 329 1 2000 0 10 Outdoors
Large Hotel 120 24 9.2 1.5 250 350 1 2000 0 10 Outdoors
Hospital 360 36 27.5 1.5 760 1000 1 4000 0 10 Outdoors

41
Table 38 Walk-In Refrigeration System Descriptions (SI Units)
Cooling Evaporator Condenser Anti- Case Heat
Area Length Lighting Defros
Building Type Capacity COP Fan Fan Sweat Temp. Rejection
(m2) (m) 2
(W/m ) t (W)
(kW) (W) (W) (W) (C) Location
Walk-In Coolers
Primary School 11.2 3.7 2.7 3 200 350 10.8 0.00 0 1.7 Outdoors
Secondary School 22.3 7.3 5.6 3 400 750 10.8 0.00 0 1.7 Outdoors
Quick Service Restaurant 9.3 3.0 2.2 3 200 330 10.8 0.00 0 1.7 Outdoors
Full Service Restaurant 9.3 3.0 2.2 3 200 330 10.8 0.00 0 1.7 Outdoors
Large Hotel 11.2 3.7 2.7 3 200 350 10.8 0.00 0 1.7 Outdoors
Hospital 33.5 8.9 7.9 3 600 1000 10.8 0.00 0 1.7 Outdoors
Walk-In Freezers
Primary School 11.2 3.7 2.7 1.5 250 350 10.8 2000 0 23.3 Outdoors
Secondary School 22.3 7.3 5.4 1.5 500 750 10.8 3000 0 23.3 Outdoors
Quick Service Restaurant 7.4 2.4 1.7 1.5 180 329 10.8 2000 0 23.3 Outdoors
Full Service Restaurant 7.4 2.4 1.7 1.5 180 329 10.8 2000 0 23.3 Outdoors
Large Hotel 11.2 7.3 2.7 1.5 250 350 10.8 2000 0 23.3 Outdoors
Hospital 33.5 11.0 8.1 1.5 760 1000 10.8 4000 0 23.3 Outdoors

42
Table 39 Supermarket Refrigeration System Descriptions (IP Units)
Cooling Evaporator Anti- Case
Area Length Lighting Defrost SST Compresso
Building Type Capacity Fan Sweat Temp.
(ft2) (ft) (W/ft) (W/ft) (F) r Rack
(Btu/h/ft) (W/ft) (W/ft) (F)
Medium Temperature
Multideck meat cases 120 1500 26.7 11.8 135 20 15 36 A
Other multideck cases 260 1500 12.5 18.3 0 0 15 36 A
Meat walk-in 400 50 400 50 400 50 0 15 36 C
Other walk-in 2600 325 2600 325 2600 325 0 15 36 C
Low Temperature
Reach-in cases 268 560 20 33 400 71 25 5 B
Single-level open cases 128 550 10 0 420 24 25 10 B
Walk-in freezer 1000 125 640 32 8 232 0 25 10 D

Table 40 Supermarket Refrigeration System Descriptions (SI Units)


Cooling Evaporator Anti- Case
Area Length Lighting Defrost SST Compresso
Building Type Capacity Fan Sweat Temp.
(m2) (m) (W/m) (W/m) (C) r Rack
(W/m) (W/m) (W/m) (C)
Medium Temperature
Multideck meat cases 36.6 1442 88 39 443 66 9.4 2.2 A
Other multideck cases 79.2 1442 41 60 0 0 9.4 2.2 A
Meat walk-in 37.2 15.2 385 164 1312 164 0 9.4 2.2 C
Other walk-in 241.5 99.1 2500 1066 8530 1066 0 9.4 2.2 C
Low Temperature
Reach-in cases 81.7 538 66 108 1312 233 31.7 15.0 B
Single-level open cases 39.0 529 33 0 1378 79 31.7 12.2 B
Walk-in freezer 92.9 38.0 615 105 26 761 0 31.7 23.3 D

43
Table 41 Supermarket Compressor Descriptions
Condenser Heat
Compressor Condenser
System Type COP Fan Rejection
Rack Type
(W) Location
A Medium temperature 2.5 4500 Air cooled Outdoors
B Low temperature 1.3 4500 Air cooled Outdoors
C Medium temperature 2.5 4500 Air cooled Outdoors
D Low temperature 1.3 4500 Air cooled Outdoors

44
6.0 Weighting Factors
The weighting factors characterize the number of buildings that are similar to each reference
building type in each location. The weighting factors allow information from the individual
reference buildings to be expanded to represent all buildings of this type in a region or combined
to represent the whole country. Data for developing the weighting factors for U.S. commercial
buildings are limited; CBECS is the best publicly available source for existing buildings. The
database provides a wealth of information about the operational characteristics of buildings, but
the number of buildings is limited and some of the data are masked to protect building identity.
These limitations make it difficult to develop reliable statistical analysis across all building types
and locations. The economic census from the U.S. Department of Commerce (U.S. Census
Bureau 2005) contains economic data for commercial building activity by building type.
However, it is difficult to determine building area from these data and to divide the building
types into the subtypes such as small, medium, and large office buildings.
The McGraw-Hill Construction Projects Starts Database draws from permit data for new
commercial building starts in the United States and represents more than 90% of new
commercial buildings. Data are collected in real time and the collection process is independently
monitored to ensure most U.S. commercial construction is covered. The strength of this database
lies in the number of samples, the frequency of data collection, the detailed data about location of
the projects down to the local community level, and the fact that high-rise residential buildings
are included (contrary to CBECS). A weakness is the lack of characteristic data.
Jarnagin and Bandyopadhyay (2010) analyzed the McGraw-Hill database from 2003 to 2007 to
develop weighting factors for the new construction reference buildings. Total building area for
each model type and climate zone was determined over the five-year period. These numbers
were divided by five to find the annual average then divided by the area of the reference
buildings to find the weighting factors shown in Table 42.
Weighting factors for the pre-1980 and post-1980 reference buildings have not been developed,
because adequate data about the existing building stock have not been identified. Weighting
factors may be developed when data become available.

45
Table 42 New Construction Reference Building Weighting Factors
Climate Zone
Building Type
1A 2A 2B 3A 3B 3C 4A 4B 4C 5A 5B 6A 6B 7 8
Small Office 201.9 2559.5 695.7 2316.1 1142.2 187.0 2251.0 113.9 294.8 2213.0 774.1 580.2 72.7 77.8 11.3
Medium Office 31.9 200.5 72.0 188.9 176.4 33.5 293.5 9.0 48.3 261.4 84.4 73.6 8.6 8.1 1.7
Large Office 2.7 8.6 1.6 11.8 7.6 3.1 30.0 0.0 4.1 11.7 3.2 3.5 0.0 0.3 0.0
Primary School 11.4 167.0 29.4 169.0 79.8 8.5 160.1 5.4 16.8 164.6 40.0 30.1 6.7 4.2 0.6
Secondary School 10.1 95.5 14.4 118.8 51.4 6.9 126.3 4.0 15.2 143.2 27.5 26.1 5.4 4.7 0.8
Stand-Alone Retail 118.9 1176.9 268.5 1264.6 662.8 101.3 1349.3 63.1 227.1 1818.0 420.0 502.7 48.3 57.5 7.2
Strip Mall 80.8 582.6 149.1 600.2 367.9 60.8 592.9 13.2 62.8 601.5 118.4 89.8 9.4 4.0 0.8
Supermarket 3.2 48.5 13.9 58.2 36.0 4.9 93.8 1.6 10.8 113.4 15.6 24.7 2.8 3.0 0.5
Quick Service
41.3 484.9 107.4 538.8 334.3 36.6 471.0 28.2 75.7 680.1 135.8 134.3 16.4 18.9 1.2
Restaurant
Full Service
21.7 254.0 59.1 267.7 114.2 13.9 305.9 14.0 24.6 344.2 74.7 74.6 9.6 8.8 0.3
Restaurant
Small Hotel 3.1 88.1 9.1 82.0 34.8 6.7 96.3 6.2 12.0 111.7 27.4 32.6 9.4 6.3 1.2
Large Hotel 11.8 67.3 13.5 68.8 85.9 11.4 103.8 4.0 13.3 99.6 21.6 24.6 6.3 4.2 0.4
Hospital 2.2 26.2 5.3 25.6 14.9 2.1 33.7 1.2 5.8 44.5 12.0 12.1 1.3 1.8 0.1
Outpatient
12.0 183.4 43.4 187.8 88.8 19.8 264.3 7.5 58.5 342.0 70.4 110.7 10.8 12.6 0.7
Healthcare
Warehouse 88.8 658.6 147.6 754.2 584.3 39.1 621.8 17.2 110.7 910.1 175.0 118.4 12.5 11.0 0.6
Midrise Apartment 100.8 428.9 36.6 323.6 338.1 102.2 664.3 8.6 145.5 439.9 124.9 122.9 22.1 12.7 0.0

46
7.0 Conculsions
The reference building models represent important starting points for energy simulation
exercises and form standard reference points for building energy analysis projects. The models
are being used for research projects by DOE, national laboratories, and industry to perform
research on advanced building systems, assess the impact of new policies, and advance building
energy codes and standards. They continue to evolve and expand; new versions are available for
public use. The models are available as EnergyPlus input files on the DOE Web site
(http://commercialbuildings.energy.gov/reference_buildings.html). Spreadsheet scorecards are
also available for each building type to document the model parameters and annual energy
performance by location.

47
8.0 References
AIA. (2001). AIA Guidelines for Design and Construction of Hospital and Health Care
Facilities: 2001 Edition. Washington, D.C.: American Institute of Architects.
ASHRAE. (1989). Energy Efficient Design of New Buildings Except Low-Rise Residential
Buildings. ANSI/ASHRAE/IESNA Standard 90.1-1989. Atlanta, GA: American Society of
Heating, Refrigerating and Air-Conditioning Engineers.
ASHRAE. (1999). Ventilation for Acceptable Indoor Air Quality. ANSI/ASHRAE Standard
62-1999. Atlanta, GA: American Society of Heating, Refrigerating and Air-Conditioning
Engineers.
ASHRAE. (2001). Energy Standard for Buildings Except Low-Rise Residential Buildings.
ANSI/ ASHRAE/IESNA Standard 90.1-2001. Atlanta, GA: American Society of Heating,
Refrigerating and Air-Conditioning Engineers.
ASHRAE. (2004a). Energy Standard for Buildings Except Low-Rise Residential Buildings.
ANSI/ ASHRAE/IESNA Standard 90.1-2004. Atlanta, GA: American Society of Heating,
Refrigerating and Air-Conditioning Engineers.
ASHRAE. (2004b). Ventilation for Acceptable Indoor Air Quality. ANSI/ASHRAE Standard
62.1-2004. Atlanta, GA: American Society of Heating, Refrigerating and Air-Conditioning
Engineers.
ASHRAE. (2004c). 90.1 Users Manual ANSI/ASHRAE/IESNA Standard 90.1-2004. Atlanta,
GA: American Society of Heating, Refrigerating and Air-Conditioning Engineers.
ASHRAE. (2007). 2007 ASHRAE HVAC Applications Handbook. Atlanta, GA: American
Society of Heating, Refrigerating and Air-Conditioning Engineers.
ASHRAE. (2009). Advanced Energy Design Guides. Atlanta, GA: American Society of
Heating, Refrigerating and Air-Conditioning Engineers. Available at www.ashrae.org/
publications/page/1604. Last accessed October 2009.
Baldor Electric Company. (1998). Baldor Motors and Drives: AC Elevator Drives. Fort Smith,
AR: Baldor Electric Company.
Beyer, R. (2009). Specification Series: Elevators - First Things First. Atlanta, GA: Elevator
Advisors, Inc. First appeared in Architectural Record, November 1992. McGraw-Hill, Inc.
Available at www.elevatoradvisors.com/docs/BeyerSpecSeries.pdf. Last accessed October 2009.
Briggs, R.S.; Crawley, D.B.; Schliesing, J.S. (1987). Analysis and Categorization of the Office
Building Stock, Topical Report. Des Plains, IL: Gas Technology Institute. GRI-87/0244.
Briggs, R.S.; Lucas, R.G.; Taylor, T. (2003). Climate Classification for Building Energy
Codes and Standards: Part 2 - Zone Definitions, Maps and Comparisons, Technical and
Symposium Papers. ASHRAE Winter Meeting, Chicago, IL, January 2003. Atlanta, GA:
American Society of Heating, Refrigerating and Air-Conditioning Engineers. Available at
http://resourcecenter.pnl.gov/html/ ResourceCenter/1420.html. Last accessed October 2009.

48
Brown, S.L. (2007). Dedicated Outdoor Air System for Commercial Kitchen Ventilation.
ASHRAE Journal 49(7), 2435. Atlanta, GA: American Society of Heating, Refrigerating and
Air-Conditioning Engineers.
CEC. (2004). Design Guide 2 Improving Commercial Kitchen Ventilation System Performance:
Optimizing Makeup Air. Sacramento, CA: California Energy Commission.
DeChiara, J.; Crosbie, M.J. (2001). Time-Saver Standards for Building Types, 4th ed. McGraw-
Hill Professional.
Deru, M.; MacDonald, M. (2007). Wal-Mart Experience: Part Two. ASHRAE Journal
49(10):2227. Golden, CO: National Renewable Energy Laboratory, NREL/JA-550-42503.
Available at www.nrel.gov/docs/fy09osti/45742.pdf. Last accessed October 2009.
DOE. (2005). Map of DOEs Proposed Climate Zones. Available at www.energycodes.gov/
implement/pdfs/color_map_climate_zones_Mar03. Last accessed July 2010.
Doebber, I.; Bonnema, E.; Pless, S.; Torcellini, P. (2009). Technical Support Document:
Development of the Advanced Energy Design Guide for Small Hospitals and Health Care
Facilities 30% Energy Savings. Golden, CO: National Renewable Energy Laboratory,
NREL/TP-550-46314. Available at www.nrel.gov/docs/fy10osti/46314.pdf. Last accessed
October 2009.
EIA. (2002). 1999 Commercial Buildings Energy Consumption Survey. Washington, DC: EIA.
Available at www.eia.doe.gov/emeu/cbecs/1999publicuse/99microdat.html. Last accessed
October 2009.
EIA. (2005). 2003 Commercial Buildings Energy Consumption Survey. Washington, DC:
Energy Information Administration. Available at www.eia.doe.gov/emeu/cbecs/
cbecs2003/introduction.html. Last accessed October 2009.
Faramarzi, R.T.; Walker, D.H. (2004). Investigation of Secondary Loop Supermarket
Refrigeration Systems. 500-04-013. Sacramento, CA: California Energy Commission.
Fisher, D. (2003). Predicting Energy Consumption. ASHRAE Journal 45(6), K8K13.
Atlanta, GA: American Society of Heating, Refrigerating and Air-Conditioning Engineers.
GGHC. (2007). Green Guide for Health Care: Best Practices for Creating High Performance
Healing Environments, Version 2.2. www.gghc.org. Last accessed October 2009.
Gowri, K.; Halverson, M.A.; Richman, E.E. (2007). Analysis of Energy Saving Impacts of
ASHRAE 90.1-2004 for the State of New York. Richland, WA: Pacific Northwest National
Laboratory, PNNL-16770.
Griffith, B.; Long, N.; Torcellini, P.; Judkoff, R.: Crawley, D.; Ryan, J. (2007). Assessment of the
Technical Potential for Achieving Net Zero-Energy Buildings in the Commercial Sector.
Golden, CO: National Renewable Energy Laboratory. NREL/TP-550-41957. Available at
www.nrel.gov/docs/fy08osti/41957.pdf. Last accessed February 2010.
Hendron, R. (2007). Building America Research Benchmark Definition, Updated December 20,
2007. Golden, CO: National Renewable Energy Laboratory, NREL/TP-550-42662. Available
at www.nrel.gov/docs/fy08osti/42662.pdf. Last accessed October 2009.

49
Huang, J.; Akbari, H.; Rainer, L.; Ritshard, R. (1991). 481 Prototypical Commercial Buildings
for 20 Urban Market Areas. Berkeley, CA: Lawrence Berkeley National Laboratory.
Huang, J.; Franconi, E. (1999). Commercial Heating and Cooling Loads Component Analysis.
Berkeley, CA: Lawrence Berkeley National Laboratory, LBL-37208.
Huang, J.; Roberson, J.A.; Sezgen, O. (2005). Analysis of 1999 CBECS Data by Commercial
Building Type. Draft. Berkeley, CA: Lawrence Berkeley National Laboratory, LBNL-57457.
ICC. (2003). 2003 International Building Code. Country Club Hills, IL: International Code
Council, Inc.
Jarnagin, R.E.; Liu, B.; Winiarski, D.W.; McBride, M.F.; Suharli, L.; Walden, D. (2006).
Technical Support Document: The Development of the Advanced Energy Design Guide for
Small Office Buildings. Richland, WA: Pacific Northwest National Laboratory, PNNL-16250.
Jarnagin, R.E.; Bandyopadhyay, G. (2010). Determination of Weighting Factors for the
ASHRAE Commercial Building Prototypes for Standard 90.1-2010. Richland, WA: Pacific
Northwest National Laboratory, PNNL-19116.
Jiang, W.; Jarnagin, R.E.; Gowri, K.; McBride, M.; Liu, B. (2008). Technical Support
Document: The Development of the Advanced Energy Design Guide for Highway Lodging
Buildings. Richland, WA: Pacific Northwest National Laboratory, PNNL-17875.
Liu, B.; Jarnagin, R.E.; Winiarski, D.W.; Jiang, W.; McBride, M.; Crall, G.C. (2006). Technical
Support Document: The Development of the Advanced Energy Design Guide for Small Retail
Buildings. Richland, WA: Pacific Northwest National Laboratory, PNNL-16031.
Liu, B.; Jarnagin, R.E.; Jiang, W.; Gowri, K. (2007). Technical Support Document: The
Development of the Advanced Energy Design Guide for Small Warehouse and Self-Storage
Buildings. Richland, WA: Pacific Northwest National Laboratory, PNNL-17056.
MacDonald, M.; Deru, M. (2007). Wal-Mart Experience: Part One. ASHRAE Journal 49(9)
1425; Golden, CO: National Renewable Energy Laboratory, NREL/JA-550-42015. Available
at www.nrel.gov/docs/fy09osti/45742.pdf. Last accessed October 2009.
McGraw Hill. (2005). Dodge Database. McGraw Hill Construction. Available at
http://dodge.construction.com/. Last accessed October 2009.
NCDC. (1993). Solar and Meteorological Surface Observational Network (SAMSON), 1961-
1990, 3-volume CD-ROM set. NCDC, Asheville, NC: National Climatic Data Center.
Persily, A.K. (1998). Airtightness of Commercial and Institutional Buildings, Proceedings of
ASHRAE Thermal Envelopes VII Conference. Atlanta, GA: American Society of Heating,
Refrigerating and Air-Conditioning Engineers.
Pless, S.; Torcellini, P.; Long, N. (2007). Technical Support Document: Development of the
Advanced Energy Design Guide for K-12 Schools30% Energy Savings. Golden, CO: National
Renewable Energy Laboratory, NREL /TP-550-42114. Available at www.nrel.gov/docs/
fy07osti/42114.pdf. Last accessed October 2009.
PNNL. (2004). Technical Support Document: Energy Efficiency Program for Commercial and
Industrial Equipment: Advanced Notice of Proposed Rulemaking for Commercial Unitary Air

50
Conditioners and Heat Pumps. For the U.S. Department of Energy. Richland, WA: Pacific
Northwest National Laboratory.
Public Utilities Commission of Texas. (2003). Deemed Savings, Installation & Efficiency
Standards: Commercial and Industrial Cooling Equipment. Boulder, CO: Nexant, Inc.
Available at www.puc.state.tx.us/rules/rulemake/27903/16_25.184-14.pdf. Last accessed
October 2009.
SGE. (2004). Design Guide 1 Improving Commercial Kitchen Ventilation System Performance:
Selecting and Sizing Exhaust Hoods. Rancho Cucamonga, CA: Southern California Edison.
Smith, V.A.; Fisher, D.R. (2001). Estimating Food Service Loads and Profiles. ASHRAE
Transactions 2001, 107(2). Atlanta, GA: American Society of Heating, Refrigerating and Air-
Conditioning Engineers.
Smith, V.A.; Young, R.; Spata, A.J.; Fisher, D. (1999). Virtual vs. Real: Modeling the Energy
Performance of a Quick Service Restaurant. ASHRAE Transactions 1999, 105. Atlanta, GA:
American Society of Heating, Refrigerating and Air-Conditioning Engineers.
Stocki, M.; Curcija, D.C.; Bhandari, M.S. (2005). The Development of Standardized Whole
Building Simulation Assumptions for Energy Analysis for a Set of Commercial Buildings (draft
May 31 2005). Amherst, MA: University of Massachusetts.
U.S. Census Bureau. (2005). 2002 Economic Census: Sector 23: Construction: Geographic
Area Series: Value of Construction Work for Establishments by Type of Construction: 2002.
Washington, DC: U.S. Department of Commerce. Available at http://factfinder.census.gov/
servlet/IBQTable?_bm=y&-geo_id=&-ds_name=EC0223A6&-_lang=en. Last accessed
October 2009.
Westphalen, D.; Zogg, R.A.; Varone, A.F.; Foran, M.A. (1996). Energy Savings Potential for
Commercial Refrigeration Equipment. For the U.S. Department of Energy. Cambridge, MA:
Arthur D. Little, Inc.
Winiarski, D.W.; Jiang, W.; Halverson, M.A. (2006). Review of Pre- and Post-1980 Buildings
in CBECS HVAC Equipment. Richland, WA: Pacific Northwest National Laboratory.
Winiarski D.W.; Halverson, M.A.; Jiang, W. (2007a). Analysis of Building Envelope
Construction in 2003 CBECS Pre-1980 Buildings. Richland, WA: Pacific Northwest National
Laboratory. PNNL-SA-55594.
Winiarski, D.W.; Jiang, W; Halverson, M.A. (2007b). Analysis of Building Envelope
Construction in 2003 CBECS Post-1980 Buildings. Richland, WA: Pacific Northwest National
Laboratory. PNNL-SA-55888.
Winiarski, D.W.; Halverson, M.A.; Jiang, W. (2008). DOEs Commercial Building
Benchmarks - Development of Typical Construction Practices for Building Envelope and
Mechanical Systems from the 2003 CBECS. In Proceedings of 2008 Summer Study on Energy
Efficiency in Buildings, American Council for an Energy Efficient Economy.
Winiarski, D.W.; Halverson, M.A. (2008). Equipment Efficiency for Existing Benchmark
Buildings. Internal report. Richland, WA: Pacific Northwest National Laboratory.

51
Appendix A Reference Building Internal Loads
Table A-1 Reference Building Zone Internal Loads (IP units)
1989 2004 Elec. Gas
2
Area Vol. ft / Lights Lights Proc. Proc. Vent. Exhst Infil. SWH
2 3 2 2 2 2
Building Type/Zone ft ft person Wft Wft W/ft W/ft cfm cfm ACH gal/h
Quick Service Restaurant 2,501 25,015
Dining 1,250 12,508 15.0 1.44 2.1 12.0 0.0 1667.3 0.0 0.64 0.0
Kitchen 1,250 12,508 200.0 1.55 1.2 28.0 120.0 93.8 3300.0 0.64 40.0
Attic 2,501 9,264 0.0 0.00 0.0 0.0 0.0 0.0 0.0 1.00 0.0
Hospital 241,350 3,138,208
Basement 40,250 322,083 400.0 0.70 1.1 0.8 0.0 2012.5 0.0 0.00 0.0
ER_Exam1_Mult4_Flr_1 300 4,201 50.0 3.84 2.7 1.5 0.0 140.0 0.0 0.24 1.0
ER_Exam2_Flr_1 300 4,201 50.0 3.84 2.7 4.0 0.0 140.0 0.0 0.42 1.0
ER_Exam3_Mult4_Flr_1 300 4,201 50.0 3.84 2.7 1.5 0.0 140.0 0.0 0.18 1.0
ER_Exam4_Flr_1 300 4,201 50.0 3.84 2.7 4.0 0.0 140.0 0.0 0.42 1.0
ER_Exam5_Mult4_Flr_1 300 4,201 50.0 3.84 2.7 2.0 0.0 140.0 0.0 0.24 1.0
Office1_Mult4_Flr_1 150 2,101 142.9 2.40 1.1 1.1 0.0 21.0 0.0 0.24 0.0
Lobby_Flr_1 15,875 222,303 140.0 1.29 1.5 0.1 0.0 2267.8 0.0 0.07 0.0
Corridor_Flr_1 6,125 85,772 1000.0 1.36 1.0 0.0 0.0 306.2 0.0 0.04 0.0
ER_NurseStat_Flr_1 13,300 186,248 160.0 2.10 1.1 1.4 0.0 6208.3 0.0 0.02 0.0
OR1_Flr_2 600 8,402 200.0 9.75 2.2 4.0 0.0 420.1 0.0 0.30 2.0
OR2_Mult5_Flr_2 600 8,402 200.0 9.75 2.2 4.0 0.0 420.1 0.0 0.12 2.0
OR3_Flr_2 600 8,402 200.0 9.75 2.2 4.0 0.0 420.1 0.0 0.18 2.0
OR4_Flr_2 2,400 33,609 200.0 7.89 2.2 4.0 0.0 1680.5 0.0 0.00 6.0
IC_PatRoom1_Mult5_Flr_2 225 3,150 200.0 3.84 0.8 3.0 0.0 105.0 0.0 0.24 0.0
IC_PatRoom2_Flr_2 300 4,201 200.0 3.84 0.8 3.0 0.0 140.0 0.0 0.42 0.0
IC_PatRoom3_Mult6_Flr_2 225 3,150 200.0 3.84 0.8 3.0 0.0 105.0 0.0 0.24 0.0
ICU_Flr_2 6,652 93,147 50.0 3.84 0.8 3.0 0.0 3104.9 0.0 0.09 0.0
ICU_NurseSat_Flr_2 7,199 100,806 200.0 2.17 1.0 2.0 0.0 719.9 0.0 0.00 0.0
Corridor_Flr_2 6,125 85,772 1000.0 1.36 1.0 0.0 0.0 122.5 0.0 0.04 0.0
OR_NurseSat_Flr_2 10,900 152,639 140.0 2.12 1.2 1.0 0.0 1557.1 0.0 0.05 0.0
PatRoom1_Mult10_Flr_3 225 3,150 200.0 2.19 0.7 2.0 0.0 105.0 0.0 0.24 1.0
PatRoom2_Flr_3 375 5,252 200.0 2.19 0.7 2.0 0.0 175.1 0.0 0.38 1.0
PatRoom3_Mult10_Flr_3 218 3,046 200.0 2.19 0.7 2.0 0.0 101.5 0.0 0.24 1.0
PatRoom4_Flr_3 375 5,252 200.0 2.19 0.7 2.0 0.0 175.1 0.0 0.38 1.0
PatRoom5_Mult10_Flr_3 225 3,150 200.0 2.19 0.7 2.0 0.0 105.0 0.0 0.24 1.0
PhysTherapy_Flr_3 5,250 73,519 200.0 2.50 0.9 1.5 0.0 393.7 0.0 0.00 1.0
PatRoom6_Flr_3 300 4,201 200.0 2.19 0.7 2.0 0.0 140.0 0.0 0.42 1.0
PatRoom7_Mult10_Flr_3 218 3,046 200.0 2.19 0.7 2.0 0.0 101.5 0.0 0.24 1.0
PatRoom8_Flr_3 300 4,201 200.0 2.19 0.7 2.0 0.0 140.0 0.0 0.42 1.0
NurseSat_Lobby_Flr_3 9,750 136,534 140.0 2.13 1.2 1.0 0.0 1392.8 0.0 0.00 0.0
Lab_Flr_3 2,850 39,910 200.0 2.10 1.4 4.0 0.0 285.0 0.0 0.00 2.0
Corridor_SE_Flr_3 6,100 85,422 1000.0 1.36 1.0 0.0 0.0 305.0 0.0 0.02 0.0
Corridor_NW_Flr_3 6,100 85,422 1000.0 1.36 1.0 0.0 0.0 305.0 0.0 0.02 0.0
PatRoom1_Mult10_Flr_4 225 3,150 200.0 2.19 0.7 2.0 0.0 105.0 0.0 0.24 1.0
PatRoom2_Flr_4 375 5,252 200.0 2.19 0.7 2.0 0.0 175.1 0.0 0.38 1.0
PatRoom3_Mult10_Flr_4 218 3,046 200.0 2.19 0.7 2.0 0.0 101.5 0.0 0.24 1.0
PatRoom4_Flr_4 375 5,252 200.0 2.19 0.7 2.0 0.0 175.1 0.0 0.38 1.0
PatRoom5_Mult10_Flr_4 225 3,150 200.0 2.19 0.7 2.0 0.0 105.0 0.0 0.24 1.0
Radiology_Flr_4 5,250 73,519 200.0 2.21 0.4 10.0 0.0 393.7 0.0 0.00 1.0
PatRoom6_Flr_4 300 4,201 200.0 2.19 0.7 2.0 0.0 140.0 0.0 0.42 1.0
PatRoom7_Mult10_Flr_4 218 3,046 200.0 2.19 0.7 2.0 0.0 101.5 0.0 0.24 1.0
PatRoom8_Flr_4 300 4,201 200.0 2.19 0.7 2.0 0.0 140.0 0.0 0.42 1.0
NurseSat_Lobby_Flr_4 9,750 136,534 140.0 2.13 1.2 1.0 0.0 1392.8 0.0 0.00 0.0
Lab_Flr_4 2,850 39,910 200.0 2.10 1.4 4.0 0.0 285.0 0.0 0.00 2.0
Corridor_SE_Flr_4 6,100 85,422 1000.0 1.36 1.0 0.0 0.0 305.0 0.0 0.02 0.0

52
1989 2004 Elec. Gas
2
Area Vol. ft / Lights Lights Proc. Proc. Vent. Exhst Infil. SWH
2 3 2 2 2 2
Building Type/Zone ft ft person Wft Wft W/ft W/ft cfm cfm ACH gal/h
Corridor_NW_Flr_4 6,100 85,422 1000.0 1.36 1.0 0.0 0.0 305.0 0.0 0.02 0.0
Dining_Flr_5 7,500 105,027 100.0 2.58 0.9 1.0 0.0 1500.0 0.0 0.34 0.0
NurseSat_Flr_5 11,200 156,840 140.0 2.12 1.2 1.0 0.0 1600.0 0.0 0.28 0.0
Kitchen_Flr_5 10,000 140,036 200.0 1.42 1.2 7.5 28.3 750.0 5300.0 0.33 150.0
Office1_Flr_5 750 10,506 142.9 2.40 1.1 1.0 0.0 105.0 0.0 0.52 0.0
Office2_Mult5_Flr_5 750 10,503 142.9 2.40 1.1 1.0 0.0 105.0 0.0 0.37 0.0
Office3_Flr_5 750 10,503 142.9 2.40 1.1 1.0 0.0 105.0 0.0 0.52 0.0
Office4_Mult6_Flr_5 150 2,101 142.9 2.40 1.1 1.0 0.0 20.0 0.0 0.49 0.0
Corridor_Flr_5 5,400 75,620 1000.0 1.36 1.0 0.0 0.0 270.0 0.0 0.29 0.0
Large Hotel 122,116 1,242,549
Basement 21,300 170,443 400.0 0.70 1.0 0.5 0.0 1065.0 0.0 0.00 0.0
Retail_1_Flr_1 722 9,385 66.7 3.54 1.5 1.0 0.0 216.6 0.0 0.56 0.0
Retail_2_Flr_1 836 10,868 66.7 3.54 1.5 1.0 0.0 250.8 0.0 0.09 0.0
Mech_Flr_1 1,768 22,983 0.0 0.80 1.5 0.5 0.0 88.4 0.0 0.11 0.0
Storage_Flr_1 1,020 13,260 500.0 0.37 0.9 0.3 0.0 153.0 0.0 0.11 0.0
Laundry_Flr_1 840 10,920 250.0 1.14 0.6 5.7 49.8 50.4 500.0 0.30 156.6
Cafe_Flr_1 2,033 26,428 15.0 1.46 1.3 0.5 0.0 2710.5 0.0 0.50 0.0
Lobby_Flr_1 14,081 183,056 33.3 1.88 1.1 0.8 0.0 8449.6 0.0 0.10 0.0
Room_1_Flr_3 420 4,200 280.0 1.77 1.1 0.6 0.0 30.0 0.0 0.37 1.3
Room_2_Flr_3 420 4,200 280.0 1.77 1.1 0.6 0.0 30.0 0.0 0.37 1.3
Room_3_Mult19_Flr_3 264 2,640 176.0 1.77 1.1 0.6 0.0 30.0 0.0 0.16 23.8
Room_4_Mult19_Flr_3 264 2,640 176.0 1.77 1.1 0.6 0.0 30.0 0.0 0.16 23.8
Room_5_Flr_3 420 4,200 280.0 1.77 1.1 0.6 0.0 30.0 0.0 0.37 1.3
Room_6_Flr_3 420 4,200 280.0 1.77 1.1 0.6 0.0 30.0 0.0 0.37 1.3
Corridor_Flr_3 4,191 41,915 1000.0 1.22 0.5 0.0 0.0 209.6 0.0 0.04 0.0
Room_1_Flr_6 420 4,200 280.0 1.77 1.1 0.6 0.0 30.0 0.0 0.72 1.3
Room_2_Flr_6 420 4,200 280.0 1.77 1.1 0.6 0.0 30.0 0.0 0.72 1.3
Room_3_Mult9_Flr_6 264 2,640 176.0 1.77 1.1 0.6 0.0 30.0 0.0 1.28 11.3
Banquet_Flr_6 3,570 35,699 15.0 2.56 1.3 6.3 0.0 4759.9 0.0 0.46 0.0
Dining_Flr_6 3,570 35,699 15.0 2.56 1.3 6.3 0.0 4759.9 0.0 0.46 0.0
Kitchen_Flr_6 1,112 11,120 200.0 1.56 1.2 47.2 149.9 83.4 4000.0 0.66 133.0
Corridor_Flr_6 4,436 44,361 1000.0 1.22 0.5 0.0 0.0 221.8 0.0 0.48 0.0
Large Office 498,588 6,291,164
Basement 38,353 306,899 400.0 0.70 1.0 0.4 0.0 1917.6 0.0 0.00 0.0
Perimeter_bot_ZN_3 3,374 30,371 200.0 1.50 1.0 0.7 0.0 337.4 0.0 0.25 0.0
Perimeter_bot_ZN_2 2,174 19,572 200.0 1.50 1.0 0.7 0.0 217.4 0.0 0.26 0.0
Perimeter_bot_ZN_1 3,374 30,371 200.0 1.50 1.0 0.7 0.0 337.4 0.0 0.25 0.0
Perimeter_bot_ZN_4 2,174 19,572 200.0 1.50 1.0 0.7 0.0 217.4 0.0 0.26 0.0
Core_bottom 27,258 245,391 200.0 1.50 1.0 0.7 0.0 2725.8 0.0 0.00 21.3
Perimeter_mid_ZN_3 3,374 30,371 200.0 1.50 1.0 0.7 0.0 337.4 0.0 0.25 0.0
Perimeter_mid_ZN_2 2,174 19,572 200.0 1.50 1.0 0.7 0.0 217.4 0.0 0.26 0.0
Perimeter_mid_ZN_1 3,374 30,371 200.0 1.50 1.0 0.7 0.0 337.4 0.0 0.25 0.0
Perimeter_mid_ZN_4 2,174 19,572 200.0 1.50 1.0 0.7 0.0 217.4 0.0 0.26 0.0
Core_mid 27,258 245,391 200.0 1.50 1.0 0.7 0.0 2725.8 0.0 0.00 21.3
Perimeter_top_ZN_3 3,374 30,371 200.0 1.50 1.0 0.7 0.0 337.4 0.0 0.65 0.0
Perimeter_top_ZN_2 2,174 19,572 200.0 1.50 1.0 0.7 0.0 217.4 0.0 0.66 0.0
Perimeter_top_ZN_1 3,374 30,371 200.0 1.50 1.0 0.7 0.0 337.4 0.0 0.65 0.0
Perimeter_top_ZN_4 2,174 19,572 200.0 1.50 1.0 0.7 0.0 217.4 0.0 0.66 0.0
Core_top 27,258 245,391 200.0 1.50 1.0 0.7 0.0 2725.8 0.0 0.40 21.3
Groundfloor_plenum 38,353 153,412 0.0 0.00 0.0 0.0 0.0 0.0 0.0 0.07 0.0
Midfloor_plenum 38,353 153,412 0.0 0.00 0.0 0.0 0.0 0.0 0.0 0.07 0.0
Topfloor_plenum 38,353 153,412 0.0 0.00 0.0 0.0 0.0 0.0 0.0 0.97 0.0
Medium Office 53,628 697,161
Perimeter_bot_ZN_3 2,232 20,086 200.0 1.57 1.0 0.7 0.0 223.2 0.0 0.26 0.0
Perimeter_bot_ZN_2 1,413 12,716 200.0 1.57 1.0 0.7 0.0 141.3 0.0 0.28 0.0
Perimeter_bot_ZN_1 2,232 20,086 200.0 1.57 1.0 0.7 0.0 223.2 0.0 0.26 0.0

53
1989 2004 Elec. Gas
2
Area Vol. ft / Lights Lights Proc. Proc. Vent. Exhst Infil. SWH
2 3 2 2 2 2
Building Type/Zone ft ft person Wft Wft W/ft W/ft cfm cfm ACH gal/h
Perimeter_bot_ZN_4 1,413 12,715 200.0 1.57 1.0 0.7 0.0 141.3 0.0 0.28 0.0
Core_bottom 10,587 95,280 200.0 1.57 1.0 0.7 0.0 1058.7 0.0 0.00 9.9
Perimeter_mid_ZN_3 2,232 20,086 200.0 1.57 1.0 0.7 0.0 223.2 0.0 0.26 0.0
Perimeter_mid_ZN_2 1,413 12,716 200.0 1.57 1.0 0.7 0.0 141.3 0.0 0.28 0.0
Perimeter_mid_ZN_1 2,232 20,086 200.0 1.57 1.0 0.7 0.0 223.2 0.0 0.26 0.0
Perimeter_mid_ZN_4 1,413 12,715 200.0 1.57 1.0 0.7 0.0 141.3 0.0 0.28 0.0
Core_mid 10,587 95,280 200.0 1.57 1.0 0.7 0.0 1058.7 0.0 0.00 9.9
Perimeter_top_ZN_3 2,232 20,086 200.0 1.57 1.0 0.7 0.0 223.2 0.0 0.66 0.0
Perimeter_top_ZN_2 1,413 12,716 200.0 1.57 1.0 0.7 0.0 141.3 0.0 0.67 0.0
Perimeter_top_ZN_1 2,232 20,086 200.0 1.57 1.0 0.7 0.0 223.2 0.0 0.66 0.0
Perimeter_top_ZN_4 1,413 12,715 200.0 1.57 1.0 0.7 0.0 141.3 0.0 0.67 0.0
Core_top 10,587 95,280 200.0 1.57 1.0 0.7 0.0 1058.7 0.0 0.40 9.9
Firstfloor_plenum 17,876 71,504 0.0 0.00 0.0 0.0 0.0 0.0 0.0 0.11 0.0
Midfloor_plenum 17,876 71,504 0.0 0.00 0.0 0.0 0.0 0.0 0.0 0.11 0.0
Topfloor_plenum 17,876 71,504 0.0 0.00 0.0 0.0 0.0 0.0 0.0 1.00 0.0
Midrise Apartment 33,741 337,378
G SW APARTMENT 950 9,498 380.0 0.36 0.4 0.5 0.0 90.0 0.0 0.24 3.5
G NW APARTMENT 950 9,498 380.0 0.36 0.4 0.5 0.0 90.0 0.0 0.24 3.5
OFFICE 950 9,498 474.9 2.04 1.0 1.2 0.0 40.0 0.0 0.24 0.0
G NE APARTMENT 950 9,498 380.0 0.36 0.4 0.5 0.0 90.0 0.0 0.24 3.5
G N1 APARTMENT 950 9,498 380.0 0.36 0.4 0.5 0.0 90.0 0.0 0.14 3.5
G N2 APARTMENT 950 9,498 380.0 0.36 0.4 0.5 0.0 90.0 0.0 0.14 3.5
G S1 APARTMENT 950 9,498 380.0 0.36 0.4 0.5 0.0 90.0 0.0 0.14 3.5
G S2 APARTMENT 950 9,498 380.0 0.36 0.4 0.5 0.0 90.0 0.0 0.14 3.5
M SW APARTMENT 950 9,498 380.0 0.36 0.4 0.5 0.0 90.0 0.0 0.24 3.5
M NW APARTMENT 950 9,498 380.0 0.36 0.4 0.5 0.0 90.0 0.0 0.24 3.5
M SE APARTMENT 950 9,498 380.0 0.36 0.4 0.5 0.0 90.0 0.0 0.24 3.5
M NE APARTMENT 950 9,498 380.0 0.36 0.4 0.5 0.0 90.0 0.0 0.24 3.5
M N1 APARTMENT 950 9,498 380.0 0.36 0.4 0.5 0.0 90.0 0.0 0.14 3.5
M N2 APARTMENT 950 9,498 380.0 0.36 0.4 0.5 0.0 90.0 0.0 0.14 3.5
M S1 APARTMENT 950 9,498 380.0 0.36 0.4 0.5 0.0 90.0 0.0 0.14 3.5
M S2 APARTMENT 950 9,498 380.0 0.36 0.4 0.5 0.0 90.0 0.0 0.14 3.5
T SW APARTMENT 950 9,498 380.0 0.36 0.4 0.5 0.0 90.0 0.0 0.59 3.5
T NW APARTMENT 950 9,498 380.0 0.36 0.4 0.5 0.0 90.0 0.0 0.59 3.5
T SE APARTMENT 950 9,498 380.0 0.36 0.4 0.5 0.0 90.0 0.0 0.59 3.5
T NE APARTMENT 950 9,498 380.0 0.36 0.4 0.5 0.0 90.0 0.0 0.59 3.5
T N1 APARTMENT 950 9,498 380.0 0.36 0.4 0.5 0.0 90.0 0.0 0.50 3.5
T N2 APARTMENT 950 9,498 380.0 0.36 0.4 0.5 0.0 90.0 0.0 0.50 3.5
T S1 APARTMENT 950 9,498 380.0 0.36 0.4 0.5 0.0 90.0 0.0 0.50 3.5
T S2 APARTMENT 950 9,498 380.0 0.36 0.4 0.5 0.0 90.0 0.0 0.50 3.5
T CORRIDOR 836 8,359 0.0 0.92 0.5 0.0 0.0 41.8 0.0 0.40 0.0
G CORRIDOR 836 8,359 0.0 0.92 0.5 0.0 0.0 41.8 0.0 0.05 0.0
M CORRIDOR 836 8,359 0.0 0.92 0.5 0.0 0.0 41.8 0.0 0.05 0.0
Outpatient Health Care 40,946 421,380
Floor 1 Anesthesia 108 1,080 0.0 3.0 2.0 0.0 129.6 144.0 0.30 1.0
Floor 1 Bio Haz 56 560 0.0 0.9 0.1 0.0 8.4 0.0 0.00 0.0
Floor 1 Caf 420 4,200 10.8 0.9 1.0 0.0 780.4 0.0 0.17 0.0
Floor 1 Clean 126 1,260 53.8 1.2 2.0 0.0 37.8 0.0 0.00 0.0
Floor 1 Clean Work 165 1,650 53.8 1.2 2.0 0.0 49.5 0.0 0.00 0.0
Floor 1 Dictation 126 1,260 215.3 1.1 1.1 0.0 11.7 0.0 0.00 0.0
Floor 1 Dressing Room 45 450 215.3 1.1 1.1 0.0 4.2 0.0 0.71 0.0
Floor 1 Electrical Room 98 980 0.0 1.5 5.0 0.0 4.9 0.0 0.25 0.0
Floor 1 Elevator Pump Room 91 910 0.0 1.5 5.0 0.0 4.5 0.0 0.78 0.0
Floor 1 Humid 54 540 215.3 1.1 1.1 0.0 5.0 0.0 0.00 0.0
Floor 1 IT Hall 140 1,400 0.0 1.0 0.4 0.0 7.0 0.0 0.00 0.0
Floor 1 IT Room 112 1,120 215.3 1.1 1.1 0.0 10.4 0.0 0.00 0.0

54
1989 2004 Elec. Gas
2
Area Vol. ft / Lights Lights Proc. Proc. Vent. Exhst Infil. SWH
2 3 2 2 2 2
Building Type/Zone ft ft person Wft Wft W/ft W/ft cfm cfm ACH gal/h
Floor 1 Lobby 622 6,220 35.9 1.3 1.1 0.0 260.0 0.0 0.13 0.0
Floor 1 Lobby Hall 240 2,400 0.0 1.0 0.4 0.0 12.0 0.0 0.00 0.0
Floor 1 Lobby Toilet 54 540 0.0 0.9 0.4 0.0 108.0 90.0 0.40 0.0
Floor 1 Locker Room 660 6,600 71.8 0.8 3.0 0.0 138.0 0.0 0.12 0.0
Floor 1 Locker Room Hall 496 4,960 0.0 1.0 0.4 0.0 24.8 0.0 0.00 0.0
Floor 1 Lounge 360 3,600 71.8 0.8 3.0 0.0 75.3 0.0 0.00 0.0
Floor 1 Med Gas 56 560 0.0 0.9 0.1 0.0 8.4 0.0 0.96 0.0
Floor 1 MRI Control Room 168 1,680 53.8 0.4 10.0 0.0 50.4 168.0 0.11 1.0
Floor 1 MRI Hall 147 1,470 0.0 1.0 0.4 0.0 7.3 0.0 0.00 0.0
Floor 1 MRI Room 440 4,400 53.8 0.4 10.0 0.0 132.0 440.0 0.00 1.0
Floor 1 MRI Toilet 54 540 0.0 0.9 0.4 0.0 108.0 90.0 0.40 0.0
Floor 1 Nourishment 182 1,820 53.8 1.0 2.0 0.0 67.6 0.0 0.00 0.0
Floor 1 Nurse Hall 496 4,960 0.0 1.0 0.4 0.0 24.8 0.0 0.00 0.0
Floor 1 Nurse Janitor 54 540 0.0 0.9 0.1 0.0 8.1 0.0 0.00 0.0
Floor 1 Nurse Station 261 2,610 53.8 1.0 2.0 0.0 97.0 0.0 0.00 0.0
Floor 1 Nurse Toilet 54 540 0.0 0.9 0.4 0.0 108.0 90.0 0.00 0.0
Floor 1 Office 483 4,830 215.3 1.1 1.1 0.0 44.9 0.0 0.00 0.0
Floor 1 Operating Room 1 460 4,600 53.8 2.2 4.0 7.0 230.0 0.0 0.33 6.0
Floor 1 Operating Room 2 480 4,800 53.8 2.2 4.0 7.0 240.0 0.0 0.18 6.0
Floor 1 Operating Room 3 476 4,760 53.8 2.2 4.0 7.0 238.0 0.0 0.00 6.0
Floor 1 PACU 108 1,080 53.8 0.8 3.0 0.0 36.0 0.0 0.00 1.0
Floor 1 Pre-Op Hall 528 5,280 0.0 1.0 0.4 0.0 26.4 0.0 0.00 0.0
Floor 1 Pre-Op Room 1 189 1,890 107.6 0.7 2.0 0.0 63.0 0.0 0.08 1.0
Floor 1 Pre-Op Room 2 338 3,380 107.6 0.7 2.0 0.0 112.7 0.0 0.00 1.0
Floor 1 Pre-Op Toilet 54 540 0.0 0.9 0.4 0.0 108.0 90.0 0.40 0.0
Floor 1 Procedure Room 285 2,850 53.8 2.7 3.0 0.0 142.5 0.0 0.24 1.0
Floor 1 Reception 509 5,090 35.9 1.3 1.1 0.0 212.8 0.0 0.09 0.0
Floor 1 Reception Hall 128 1,280 0.0 1.0 0.4 0.0 6.4 0.0 0.00 0.0
Floor 1 Recovery Room 540 5,400 53.8 0.8 3.0 0.0 180.0 0.0 0.30 1.0
Floor 1 Scheduling 119 1,190 215.3 1.1 1.1 0.0 11.1 0.0 0.21 0.0
Floor 1 Scrub 84 840 0.0 1.0 0.4 0.0 4.2 0.0 0.00 0.0
Floor 1 Soil 126 1,260 53.8 1.2 2.0 0.0 189.0 210.0 0.00 0.0
Floor 1 Soil Hold 56 560 53.8 1.2 2.0 0.0 84.0 93.3 0.00 0.0
Floor 1 Soil Work 180 1,800 53.8 1.2 2.0 0.0 270.0 300.0 0.00 0.0
Floor 1 Step Down 300 3,000 53.8 0.8 3.0 0.0 100.0 0.0 0.44 1.0
Floor 1 Sterile Hall 616 6,160 0.0 1.0 0.4 0.0 30.8 0.0 0.05 0.0
Floor 1 Sterile Storage 396 3,960 0.0 0.9 0.1 0.0 59.4 0.0 0.00 0.0
Floor 1 Storage 920 9,200 0.0 0.9 0.1 0.0 138.0 0.0 0.24 0.0
Floor 1 Sub-Sterile 196 1,960 0.0 1.0 0.4 0.0 9.8 0.0 0.26 0.0
Floor 1 Utility Hall 256 2,560 0.0 1.0 0.4 0.0 12.8 0.0 0.22 0.0
Floor 1 Utility Janitor 42 420 0.0 0.9 0.1 0.0 6.3 0.0 0.00 0.0
Floor 1 Utility Room 360 3,600 0.0 0.9 0.1 0.0 54.0 0.0 0.18 0.0
Floor 1 Vestibule 72 720 0.0 1.0 0.4 0.0 3.6 0.0 0.40 0.0
Floor 2 Conference 336 3,360 21.5 1.3 1.0 0.0 312.2 0.0 0.43 0.0
Floor 2 Conference Toilet 64 640 0.0 0.9 0.4 0.0 128.0 106.7 0.00 0.0
Floor 2 Dictation 70 700 215.3 1.1 1.1 0.0 6.5 0.0 0.00 0.0
Floor 2 Exam 1 360 3,600 53.8 1.5 1.1 0.0 108.0 0.0 0.42 0.0
Floor 2 Exam 2 540 5,400 53.8 1.5 1.1 0.0 162.0 0.0 0.12 0.0
Floor 2 Exam 3 720 7,200 53.8 1.5 1.1 0.0 216.0 0.0 0.12 0.0
Floor 2 Exam 4 84 840 53.8 1.5 1.1 0.0 25.2 0.0 0.30 0.0
Floor 2 Exam 5 350 3,500 53.8 1.5 1.1 0.0 105.0 0.0 0.26 0.0
Floor 2 Exam 6 225 2,250 53.8 1.5 1.1 0.0 67.5 0.0 0.24 0.0
Floor 2 Exam 7 792 7,920 53.8 1.5 1.1 0.0 237.6 0.0 0.11 0.0
Floor 2 Exam 8 270 2,700 53.8 1.5 1.1 0.0 81.0 0.0 0.24 0.0
Floor 2 Exam 9 396 3,960 53.8 1.5 1.1 0.0 118.8 0.0 0.11 0.0
Floor 2 Exam Hall 1 180 1,800 0.0 1.0 0.4 0.0 9.0 0.0 0.12 0.0

55
1989 2004 Elec. Gas
2
Area Vol. ft / Lights Lights Proc. Proc. Vent. Exhst Infil. SWH
2 3 2 2 2 2
Building Type/Zone ft ft person Wft Wft W/ft W/ft cfm cfm ACH gal/h
Floor 2 Exam Hall 2 180 1,800 0.0 1.0 0.4 0.0 9.0 0.0 0.12 0.0
Floor 2 Exam Hall 3 180 1,800 0.0 1.0 0.4 0.0 9.0 0.0 0.12 0.0
Floor 2 Exam Hall 4 198 1,980 0.0 1.0 0.4 0.0 9.9 0.0 0.11 0.0
Floor 2 Exam Hall 5 198 1,980 0.0 1.0 0.4 0.0 9.9 0.0 0.11 0.0
Floor 2 Exam Hall 6 198 1,980 0.0 1.0 0.4 0.0 9.9 0.0 0.11 0.0
Floor 2 Janitor 63 630 0.0 0.9 0.1 0.0 9.4 0.0 0.91 0.0
Floor 2 Lounge 80 800 71.8 0.8 3.0 0.0 16.7 0.0 0.00 0.0
Floor 2 Nurse Station 1 150 1,500 53.8 1.0 2.0 0.0 55.7 0.0 0.00 0.0
Floor 2 Nurse Station 2 180 1,800 53.8 1.0 2.0 0.0 66.9 0.0 0.00 0.0
Floor 2 Office 560 5,600 215.3 1.1 1.1 0.0 52.0 0.0 0.26 0.0
Floor 2 Office Hall 444 4,440 0.0 1.0 0.4 0.0 22.2 0.0 0.00 0.0
Floor 2 Reception 984 9,840 35.9 1.3 1.1 0.0 411.4 0.0 0.18 0.0
Floor 2 Reception Hall 564 5,640 0.0 1.0 0.4 0.0 28.2 0.0 0.60 0.0
Floor 2 Reception Toilet 126 1,260 0.0 0.9 0.4 0.0 252.0 210.0 0.00 0.0
Floor 2 Scheduling 1 324 3,240 215.3 1.1 1.1 0.0 30.1 0.0 0.00 0.0
Floor 2 Scheduling 2 342 3,420 215.3 1.1 1.1 0.0 31.8 0.0 0.00 0.0
Floor 2 Storage 1 56 560 0.0 0.9 0.1 0.0 8.4 0.0 0.00 0.0
Floor 2 Storage 2 120 1,200 0.0 0.9 0.1 0.0 18.0 0.0 0.00 0.0
Floor 2 Storage 3 144 1,440 0.0 0.9 0.1 0.0 21.6 0.0 0.00 0.0
Floor 2 Utility 126 1,260 0.0 0.9 0.1 0.0 18.9 0.0 0.26 0.0
Floor 2 Work 1,690 16,900 215.3 1.1 1.1 0.0 157.0 0.0 0.05 0.0
Floor 2 Work Hall 834 8,340 0.0 1.0 0.4 0.0 41.7 0.0 0.03 0.0
Floor 2 Work Toilet 54 540 0.0 0.9 0.4 0.0 108.0 0.0 0.40 0.0
Floor 2 X-Ray 900 9,000 53.8 0.4 10.0 0.0 270.0 0.0 0.00 1.0
Floor 3 Dressing Room 42 420 215.3 1.1 1.1 0.0 3.9 0.0 0.00 0.0
Floor 3 Elevator Hall 370 3,700 0.0 1.0 0.4 0.0 18.5 0.0 0.04 0.0
Floor 3 Humid 108 1,080 215.3 1.1 1.1 0.0 10.0 0.0 0.00 0.0
Floor 3 Janitor 63 630 0.0 0.9 0.1 0.0 9.4 0.0 0.91 0.0
Floor 3 Locker 120 1,200 71.8 0.8 3.0 0.0 25.1 0.0 0.00 0.0
Floor 3 Lounge 759 7,590 71.8 0.8 3.0 0.0 158.7 0.0 0.11 0.0
Floor 3 Lounge Toilet 192 1,920 0.0 0.9 0.4 0.0 384.0 320.0 0.22 0.0
Floor 3 Mechanical 350 3,500 0.0 1.5 5.0 0.0 17.5 0.0 0.26 0.0
Floor 3 Mechanical Hall 300 3,000 0.0 1.0 0.4 0.0 15.0 0.0 0.00 0.0
Floor 3 Office 3,036 30,360 215.3 1.1 1.1 0.0 282.1 0.0 0.09 0.0
Floor 3 Office Hall 834 8,340 0.0 1.0 0.4 0.0 41.7 0.0 0.03 0.0
Floor 3 Office Toilet 54 540 0.0 0.9 0.4 0.0 108.0 90.0 0.40 0.0
Floor 3 Physical Therapy 1 1,300 13,000 53.8 0.9 1.5 0.0 362.3 0.0 0.23 1.0
Floor 3 Physical Therapy 2 592 5,920 53.8 0.9 1.5 0.0 165.0 0.0 0.00 1.0
Floor 3 Physical Therapy Toilet 84 840 0.0 0.9 0.4 0.0 168.0 140.0 0.00 0.0
Floor 3 Storage 1 108 1,080 0.0 0.9 0.1 0.0 16.2 0.0 0.00 0.0
Floor 3 Storage 2 84 840 0.0 0.9 0.1 0.0 12.6 0.0 0.00 0.0
Floor 3 Treatment 476 4,760 53.8 1.5 1.1 0.0 142.8 0.0 0.00 0.0
Floor 3 Undeveloped 1 2,268 22,680 215.3 1.1 1.1 0.0 340.2 0.0 0.11 0.0
Floor 3 Undeveloped 2 1,152 11,520 215.3 1.1 1.1 0.0 172.8 0.0 0.17 0.0
Floor 3 Utility 216 2,160 0.0 0.9 0.1 0.0 32.4 0.0 0.00 0.0
Floor 3 Work 574 5,740 215.3 1.1 1.1 0.0 53.3 0.0 0.26 0.0
NE Stair 168 5,040 0.0 1.0 0.4 0.0 8.4 0.0 0.74 0.0
NW Elevator 140 4,200 0.0 1.0 0.4 0.0 7.0 0.0 0.69 0.0
NW Stair 192 5,760 0.0 1.0 0.4 0.0 9.6 0.0 0.74 0.0
SW Stair 96 2,880 0.0 1.0 0.4 0.0 4.8 0.0 0.74 0.0
Retail 24,692 494,171
Back_Space 4,089 81,836 300.0 1.17 0.8 0.8 0.0 613.4 0.0 0.37 0.0
Core_Retail 17,227 344,775 66.7 3.37 1.7 0.3 0.0 5168.2 0.0 0.22 0.0
Point_of_Sale 1,623 32,487 66.7 3.37 1.7 2.0 0.0 487.0 0.0 0.40 0.0
Front_Retail 1,623 32,487 66.7 3.37 1.7 0.3 0.0 487.0 0.0 0.40 0.0
Front_Entry 129 2,585 66.7 3.37 1.1 0.0 0.0 0.0 0.0 0.54 0.0

56
1989 2004 Elec. Gas
2
Area Vol. ft / Lights Lights Proc. Proc. Vent. Exhst Infil. SWH
2 3 2 2 2 2
Building Type/Zone ft ft person Wft Wft W/ft W/ft cfm cfm ACH gal/h
Primary Education 73,959 970,588
CORNER_CLASS_1_POD_1_Z
N_1_FLR_1 1,066 13,985 43.1 2.00 1.4 1.4 0.0 371.3 0.0 0.49 0.0
MULT_CLASS_1_POD_1_ZN_1
_FLR_1 5,134 67,380 43.1 2.00 1.4 1.4 0.0 1788.8 0.0 0.39 0.0
CORRIDOR_POD_1_ZN_1_FL
R_1 2,067 27,122 107.6 2.00 0.5 0.4 0.0 206.7 0.0 0.29 0.0
CORNER_CLASS_2_POD_1_Z
N_1_FLR_1 1,066 13,985 43.1 2.00 1.4 1.4 0.0 371.3 0.0 0.49 0.0
MULT_CLASS_2_POD_1_ZN_1
_FLR_1 5,134 67,380 43.1 2.00 1.4 1.4 0.0 1788.8 0.0 0.39 0.0
CORNER_CLASS_1_POD_2_Z
N_1_FLR_1 1,066 13,985 43.1 2.00 1.4 1.4 0.0 371.3 0.0 0.49 0.0
MULT_CLASS_1_POD_2_ZN_1
_FLR_1 5,134 67,380 43.1 2.00 1.4 1.4 0.0 1788.8 0.0 0.39 0.0
CORRIDOR_POD_2_ZN_1_FL
R_1 2,067 27,122 107.6 0.90 0.5 0.4 0.0 206.7 0.0 0.29 0.0
CORNER_CLASS_2_POD_2_Z
N_1_FLR_1 1,066 13,985 43.1 2.00 1.4 1.4 0.0 371.3 0.0 0.49 0.0
MULT_CLASS_2_POD_2_ZN_1
_FLR_1 5,134 67,380 43.1 2.00 1.4 1.4 0.0 1788.8 0.0 0.39 0.0
CORNER_CLASS_1_POD_3_Z
N_1_FLR_1 1,066 13,985 43.1 2.00 1.4 1.4 0.0 371.3 0.0 0.49 0.0
MULT_CLASS_1_POD_3_ZN_1
_FLR_1 5,134 67,380 43.1 2.00 1.4 1.4 0.0 1788.8 0.0 0.39 0.0
CORRIDOR_POD_3_ZN_1_FL
R_1 2,067 27,122 107.6 0.90 0.5 0.4 0.0 206.7 0.0 0.29 0.0
CORNER_CLASS_2_POD_3_Z
N_1_FLR_1 1,066 13,985 43.1 2.00 1.4 1.4 0.0 371.3 0.0 0.49 0.0
MULT_CLASS_2_POD_3_ZN_1
_FLR_1 3,391 44,496 43.1 2.00 1.4 0.7 0.0 1181.3 0.0 0.39 0.0
COMPUTER_CLASS_ZN_1_FL
R_1 1,744 22,884 35.8 2.00 1.4 1.9 0.0 729.7 0.0 0.39 0.0
MAIN_CORRIDOR_ZN_1_FLR_
1 5,877 77,127 0.0 1.04 0.5 0.4 0.0 587.7 0.0 0.29 0.0
LOBBY_ZN_1_FLR_1 1,841 24,155 0.0 1.14 1.3 0.4 0.0 184.1 0.0 0.39 0.0
MECH_ZN_1_FLR_1 2,713 35,597 1076.4 0.77 1.5 0.9 0.0 135.6 0.0 0.27 0.0
BATH_ZN_1_FLR_1 2,045 26,839 1076.4 0.90 0.9 0.4 0.0 600.0 600.0 0.33 56.5
OFFICES_ZN_1_FLR_1 4,747 62,295 215.3 1.89 1.1 1.0 0.0 441.0 0.0 0.38 0.0
GYM_ZN_1_FLR_1 3,843 50,429 35.8 1.07 1.4 0.5 0.0 2144.1 0.0 0.32 0.0
KITCHEN_ZN_1_FLR_1 1,808 23,731 71.8 1.60 1.2 17.7 88.7 377.8 3300.0 0.32 100.0
CAFETERIA_ZN_1_FLR_1 3,391 44,496 15.0 1.40 1.4 2.4 0.0 4520.8 0.0 0.40 0.0
LIBRARY_MEDIA_CENTER_Z
N_1_FLR_1 4,295 56,362 46.8 2.11 1.3 1.4 0.0 1375.9 0.0 0.38 0.0
Secondary Education 210,886 3,362,522
CORNER_CLASS_1_POD_1_Z
N_1_FLR_1 1,066 13,985 43.1 2.00 1.4 0.9 0.0 371.3 0.0 0.22 0.0
CORNER_CLASS_1_POD_1_Z
N_1_FLR_2 1,066 13,985 43.1 2.00 1.4 0.9 0.0 371.3 0.0 0.49 0.0
MULT_CLASS_1_POD_1_ZN_1
_FLR_1 5,134 67,380 43.1 2.00 1.4 0.9 0.0 1788.8 0.0 0.12 0.0
MULT_CLASS_1_POD_1_ZN_1
_FLR_2 5,134 67,380 43.1 2.00 1.4 0.9 0.0 1788.8 0.0 0.39 0.0
CORRIDOR_POD_1_ZN_1_FL
R_1 3,444 45,203 107.6 0.86 0.5 0.4 0.0 344.4 0.0 0.02 0.0
CORRIDOR_POD_1_ZN_1_FL
R_2 3,444 45,203 107.6 0.86 0.5 0.4 0.0 344.4 0.0 0.29 0.0
CORNER_CLASS_2_POD_1_Z
N_1_FLR_1 1,066 13,985 43.1 2.00 1.4 0.9 0.0 371.3 0.0 0.22 0.0
CORNER_CLASS_2_POD_1_Z 1,066 13,985 43.1 2.00 1.4 0.9 0.0 371.3 0.0 0.49 0.0

57
1989 2004 Elec. Gas
2
Area Vol. ft / Lights Lights Proc. Proc. Vent. Exhst Infil. SWH
2 3 2 2 2 2
Building Type/Zone ft ft person Wft Wft W/ft W/ft cfm cfm ACH gal/h
N_1_FLR_2
MULT_CLASS_2_POD_1_ZN_1
_FLR_1 5,134 67,380 43.1 2.00 1.4 0.9 0.0 1788.8 0.0 0.12 0.0
MULT_CLASS_2_POD_1_ZN_1
_FLR_2 5,134 67,380 43.1 2.00 1.4 0.9 0.0 1788.8 0.0 0.39 0.0
CORNER_CLASS_1_POD_2_Z
N_1_FLR_1 1,066 13,985 43.1 2.00 1.4 0.9 0.0 371.3 0.0 0.22 0.0
CORNER_CLASS_1_POD_2_Z
N_1_FLR_2 1,066 13,985 43.1 2.00 1.4 0.9 0.0 371.3 0.0 0.49 0.0
MULT_CLASS_1_POD_2_ZN_1
_FLR_1 5,134 67,380 43.1 2.00 1.4 0.9 0.0 1788.8 0.0 0.12 0.0
MULT_CLASS_1_POD_2_ZN_1
_FLR_2 5,134 67,380 43.1 2.00 1.4 0.9 0.0 1788.8 0.0 0.39 0.0
CORRIDOR_POD_2_ZN_1_FL
R_1 3,444 45,203 107.6 0.86 0.5 0.4 0.0 344.4 0.0 0.02 0.0
CORRIDOR_POD_2_ZN_1_FL
R_2 3,444 45,203 107.6 0.86 0.5 0.4 0.0 344.4 0.0 0.29 0.0
CORNER_CLASS_2_POD_2_Z
N_1_FLR_1 1,066 13,985 43.1 2.00 1.4 0.9 0.0 371.3 0.0 0.22 0.0
CORNER_CLASS_2_POD_2_Z
N_1_FLR_2 1,066 13,985 43.1 2.00 1.4 0.9 0.0 371.3 0.0 0.49 0.0
MULT_CLASS_2_POD_2_ZN_1
_FLR_1 5,134 67,380 43.1 2.00 1.4 0.9 0.0 1788.8 0.0 0.12 0.0
MULT_CLASS_2_POD_2_ZN_1
_FLR_2 5,134 67,380 43.1 2.00 1.4 0.9 0.0 1788.8 0.0 0.39 0.0
CORNER_CLASS_1_POD_3_Z
N_1_FLR_1 1,066 13,985 43.1 2.00 1.4 0.9 0.0 371.3 0.0 0.22 0.0
CORNER_CLASS_1_POD_3_Z
N_1_FLR_2 1,066 13,985 43.1 2.00 1.4 0.9 0.0 371.3 0.0 0.49 0.0
MULT_CLASS_1_POD_3_ZN_1
_FLR_1 5,134 67,380 43.1 2.00 1.4 0.9 0.0 1788.8 0.0 0.12 0.0
MULT_CLASS_1_POD_3_ZN_1
_FLR_2 5,134 67,380 43.1 2.00 1.4 1.9 0.0 1788.8 0.0 0.39 0.0
CORRIDOR_POD_3_ZN_1_FL
R_1 3,444 45,203 107.6 0.86 0.5 0.4 0.0 344.4 0.0 0.02 0.0
CORRIDOR_POD_3_ZN_1_FL
R_2 3,444 45,203 107.6 0.86 0.5 0.4 0.0 344.4 0.0 0.29 0.0
CORNER_CLASS_2_POD_3_Z
N_1_FLR_1 1,066 13,985 43.1 2.00 1.4 0.9 0.0 371.3 0.0 0.22 0.0
CORNER_CLASS_2_POD_3_Z
N_1_FLR_2 1,066 13,985 43.1 2.00 1.4 0.9 0.0 371.3 0.0 0.49 0.0
MULT_CLASS_2_POD_3_ZN_1
_FLR_1 5,134 67,380 43.1 2.00 1.4 0.9 0.0 1788.8 0.0 0.12 0.0
MULT_CLASS_2_POD_3_ZN_1
_FLR_2 5,134 67,380 43.1 2.00 1.4 1.9 0.0 1788.8 0.0 0.39 0.0
MAIN_CORRIDOR_ZN_1_FLR_
1 12,271 161,035 0.0 1.00 0.5 0.4 0.0 1227.1 0.0 0.05 0.0
MAIN_CORRIDOR_ZN_1_FLR_
2 12,271 161,035 0.0 1.00 0.5 0.4 0.0 1227.1 0.0 0.32 0.0
LOBBY_ZN_1_FLR_1 2,260 29,664 0.0 1.12 1.3 0.4 0.0 226.0 0.0 0.08 0.0
LOBBY_ZN_1_FLR_2 2,260 29,664 0.0 1.12 1.3 0.4 0.0 226.0 0.0 0.35 0.0
BATHROOMS_ZN_1_FLR_1 2,260 29,664 107.6 0.89 0.9 0.4 0.0 600.0 0.0 0.15 52.2
BATHROOMS_ZN_1_FLR_2 2,260 29,664 107.6 0.89 0.9 0.4 0.0 600.0 0.0 0.42 52.2
OFFICES_ZN_1_FLR_1 5,726 75,150 215.3 1.87 1.1 1.0 0.0 532.0 0.0 0.11 0.0
OFFICES_ZN_1_FLR_2 5,726 75,150 215.3 1.87 1.1 1.0 0.0 532.0 0.0 0.38 0.0
GYM_ZN_1_FLR_1 21,269 558,254 10.8 1.06 1.4 0.5 0.0 39520.0 0.0 0.14 189.5
AUX_GYM_ZN_1_FLR_1 13,433 352,582 35.8 1.10 1.4 0.5 0.0 7495.5 0.0 0.20 0.0
AUDITORIUM_ZN_1_FLR_1 10,635 279,127 10.8 1.12 0.9 0.5 0.0 14820.0 0.0 0.21 0.0
KITCHEN_ZN_1_FLR_1 2,325 30,512 71.8 1.56 1.2 20.7 104.0 485.8 4000.0 0.05 133.0
LIBRARY_MEDIA_CENTER_Z 9,042 118,657 46.8 0.00 1.3 0.9 0.0 2896.6 0.0 0.35 0.0

58
1989 2004 Elec. Gas
2
Area Vol. ft / Lights Lights Proc. Proc. Vent. Exhst Infil. SWH
2 3 2 2 2 2
Building Type/Zone ft ft person Wft Wft W/ft W/ft cfm cfm ACH gal/h
N_1_FLR_2
CAFETERIA_ZN_1_FLR_1 6,717 88,145 15.0 1.34 1.4 1.8 0.0 8955.6 0.0 0.09 0.0
MECH_ZN_1_FLR_1 3,681 48,310 1076.4 0.75 1.5 0.4 0.0 184.1 0.0 0.00 0.0
MECH_ZN_1_FLR_2 3,681 48,310 1076.4 0.75 1.5 0.4 0.0 184.1 0.0 0.00 0.0
Full Service Restaurant 5,502 55,035
Dining 4,001 40,025 15.0 2.54 2.1 5.6 0.0 5335.3 0.0 0.52 0.0
Kitchen 1,501 15,009 200.0 1.52 1.2 35.0 111.3 112.5 4000.0 0.63 133.0
Attic 5,502 30,239 0.0 0.00 0.0 0.0 0.0 0.0 0.0 1.00 0.0
Supermarket 45,002 900,272
Office 956 19,131 200.0 1.98 1.1 0.8 0.0 95.6 0.0 0.41 0.0
DryStorage 6,694 133,914 300.0 1.11 0.8 0.8 0.0 1004.1 0.0 0.32 0.0
Deli 2,419 48,390 125.0 2.78 1.7 5.0 2.5 725.7 0.0 0.29 5.0
Sales 25,025 500,642 125.0 2.78 1.7 0.5 0.0 7507.6 0.0 0.20 0.0
Produce 7,657 153,181 125.0 2.78 1.7 0.5 0.0 2297.1 0.0 0.27 0.0
Bakery 2,250 45,014 125.0 2.78 1.7 5.0 2.5 675.0 2500.0 0.34 5.0
Small Hotel 43,202 410,418
REARSTAIRSFLR1 216 2,377 0.0 0.92 0.6 0.0 0.0 0.0 0.0 0.58 0.0
CORRIDORFLR1 1,620 17,820 0.0 0.88 0.5 0.0 0.0 0.0 0.0 0.07 0.0
REARSTORAGEFLR1 216 2,377 0.0 0.46 0.8 0.0 0.0 81.0 0.0 0.58 0.0
FRONTLOUNGEFLR1 1,755 19,307 33.2 1.31 1.1 1.4 0.0 0.0 0.0 0.19 0.0
RESTROOMFLR1 351 3,861 351.0 1.10 0.9 1.0 0.0 794.1 0.0 0.13 0.0
MEETINGROOMFLR1 864 9,505 20.1 2.13 1.3 1.2 0.0 0.0 400.0 0.13 0.0
MECHANICALROOMFLR1 351 3,861 0.0 0.96 1.5 0.0 0.0 858.5 0.0 0.13 0.0
GUESTROOM101 351 3,861 234.0 1.92 1.1 1.3 0.0 17.6 0.0 0.13 1.8
GUESTROOM102 351 3,861 234.0 1.92 1.1 1.3 0.0 30.0 0.0 0.13 1.8
GUESTROOM103 351 3,861 234.0 1.92 1.1 1.3 0.0 30.0 0.0 0.13 1.8
GUESTROOM104 351 3,861 234.0 1.92 1.1 1.3 0.0 30.0 0.0 0.13 1.8
GUESTROOM105 351 3,861 234.0 1.92 1.1 1.3 0.0 30.0 0.0 0.13 1.8
EMPLOYEELOUNGEFLR1 351 3,861 31.9 1.65 1.2 7.2 0.0 30.0 0.0 0.13 0.0
LAUNDRYROOMFLR1 1,053 11,583 95.7 1.04 0.6 2.0 17.1 165.3 0.0 0.13 67.5
ELEVATORCOREFLR1 162 1,782 0.0 0.00 0.0 11.9 0.0 275.1 0.0 0.13 0.0
EXERCISECENTERFLR1 351 3,861 31.9 1.37 0.9 1.1 0.0 162.0 0.0 0.13 0.0
FRONTOFFICEFLR1 1,404 15,444 140.4 2.01 1.1 1.2 0.0 220.3 0.0 0.13 0.0
FRONTSTAIRSFLR1 216 2,376 0.0 0.92 0.6 0.0 0.0 200.1 0.0 0.58 0.0
FRONTSTORAGEFLR1 135 1,485 0.0 0.53 0.8 0.0 0.0 0.0 0.0 0.13 0.0
REARSTAIRSFLR2 216 1,944 0.0 0.82 0.6 0.0 0.0 0.0 0.0 0.58 0.0
CORRIDORFLR2 1,350 12,150 0.0 0.86 0.5 0.0 0.0 0.0 0.0 0.06 0.0
REARSTORAGEFLR2 216 1,945 0.0 0.41 0.8 0.0 0.0 67.5 0.0 0.58 0.0
GUESTROOM201 351 3,159 234.0 1.74 1.1 1.3 0.0 0.0 0.0 0.41 1.8
GUESTROOM202_205 1,404 12,637 234.0 1.74 1.1 1.3 0.0 30.0 0.0 0.13 7.0
GUESTROOM206_208 1,134 10,207 252.0 1.74 1.1 1.3 0.0 120.0 0.0 0.13 5.3
GUESTROOM209_212 1,404 12,637 234.0 1.74 1.1 1.3 0.0 90.0 0.0 0.13 7.0
GUESTROOM213 351 3,159 234.0 1.74 1.1 1.3 0.0 120.0 0.0 0.13 1.8
GUESTROOM214 351 3,159 234.0 1.74 1.1 1.3 0.0 30.0 0.0 0.13 1.8
GUESTROOM215_218 1,404 12,636 234.0 1.74 1.1 1.3 0.0 30.0 0.0 0.13 7.0
ELEVATORCOREFLR2 162 1,458 0.0 0.00 0.0 0.0 0.0 120.0 0.0 0.13 0.0
GUESTROOM219 351 3,159 234.0 1.74 1.1 1.3 0.0 0.0 0.0 0.13 1.8
GUESTROOM220_223 1,404 12,636 234.0 1.74 1.1 1.3 0.0 30.0 0.0 0.13 7.0
GUESTROOM224 351 3,159 234.0 1.74 1.1 1.3 0.0 120.0 0.0 0.13 1.8
FRONTSTORAGEFLR2 135 1,215 0.0 0.45 0.8 0.0 0.0 30.0 0.0 0.13 0.0
FRONTSTAIRSFLR2 216 1,944 0.0 0.82 0.6 0.0 0.0 0.0 0.0 0.58 0.0
REARSTAIRSFLR3 216 1,944 0.0 0.82 0.6 0.0 0.0 0.0 0.0 0.58 0.0
CORRIDORFLR3 1,350 12,150 0.0 0.86 0.5 0.0 0.0 0.0 0.0 0.06 0.0
REARSTORAGEFLR3 216 1,945 0.0 0.41 0.8 0.0 0.0 67.5 0.0 0.58 0.0
GUESTROOM301 351 3,159 234.0 1.74 1.1 1.3 0.0 0.0 0.0 0.41 1.8
GUESTROOM302_305 1,404 12,637 234.0 1.74 1.1 1.3 0.0 30.0 0.0 0.13 7.0

59
1989 2004 Elec. Gas
2
Area Vol. ft / Lights Lights Proc. Proc. Vent. Exhst Infil. SWH
2 3 2 2 2 2
Building Type/Zone ft ft person Wft Wft W/ft W/ft cfm cfm ACH gal/h
GUESTROOM306_308 1,134 10,207 252.0 1.74 1.1 1.3 0.0 120.0 0.0 0.13 5.3
GUESTROOM309_312 1,404 12,637 234.0 1.74 1.1 1.3 0.0 90.0 0.0 0.13 7.0
GUESTROOM313 351 3,159 234.0 1.74 1.1 1.3 0.0 120.0 0.0 0.13 1.8
GUESTROOM314 351 3,159 234.0 1.74 1.1 1.3 0.0 30.0 0.0 0.13 1.8
GUESTROOM315_318 1,404 12,636 234.0 1.74 1.1 1.3 0.0 30.0 0.0 0.13 7.0
ELEVATORCOREFLR3 162 1,458 0.0 0.00 0.0 0.0 0.0 120.0 0.0 0.13 0.0
GUESTROOM319 351 3,159 234.0 1.74 1.1 1.3 0.0 0.0 0.0 0.13 1.8
GUESTROOM320_323 1,404 12,636 234.0 1.74 1.1 1.3 0.0 30.0 0.0 0.13 7.0
GUESTROOM324 351 3,159 234.0 1.74 1.1 1.3 0.0 120.0 0.0 0.13 1.8
FRONTSTORAGEFLR3 135 1,215 0.0 0.45 0.8 0.0 0.0 30.0 0.0 0.13 0.0
FRONTSTAIRSFLR3 216 1,944 0.0 0.82 0.6 0.0 0.0 0.0 0.0 0.58 0.0
REARSTAIRSFLR4 216 1,944 0.0 0.41 0.6 0.0 0.0 0.0 0.0 0.98 0.0
CORRIDORFLR4 1,350 12,150 0.0 0.86 0.5 0.0 0.0 0.0 0.0 0.45 0.0
REARSTORAGEFLR4 216 1,945 0.0 0.41 0.8 0.0 0.0 67.5 0.0 0.98 0.0
GUESTROOM401 351 3,159 234.0 1.74 1.1 1.3 0.0 0.0 0.0 0.80 1.8
GUESTROOM402_405 1,404 12,637 234.0 1.74 1.1 1.3 0.0 30.0 0.0 0.53 7.0
GUESTROOM406_408 1,134 10,207 252.0 1.74 1.1 1.3 0.0 120.0 0.0 0.53 5.3
GUESTROOM409_412 1,404 12,637 234.0 1.74 1.1 1.3 0.0 90.0 0.0 0.53 7.0
GUESTROOM413 351 3,159 234.0 1.74 1.1 1.3 0.0 120.0 0.0 0.53 1.8
GUESTROOM414 351 3,159 234.0 1.74 1.1 1.3 0.0 30.0 0.0 0.53 1.8
GUESTROOM415_418 1,404 12,636 234.0 1.74 1.1 1.3 0.0 30.0 0.0 0.53 7.0
ELEVATORCOREFLR4 162 1,458 0.0 0.00 0.0 0.0 0.0 120.0 0.0 0.53 0.0
GUESTROOM419 351 3,159 234.0 1.74 1.1 1.3 0.0 0.0 0.0 0.53 1.8
GUESTROOM420_423 1,404 12,636 234.0 1.74 1.1 1.3 0.0 30.0 0.0 0.53 7.0
GUESTROOM424 351 3,159 234.0 1.74 1.1 1.3 0.0 120.0 0.0 0.53 1.8
FRONTSTORAGEFLR4 135 1,215 0.0 0.45 0.8 0.0 0.0 30.0 0.0 0.53 0.0
FRONTSTAIRSFLR4 216 1,944 0.0 0.82 0.6 0.0 0.0 0.0 0.0 0.98 0.0
Small Office 5,502 55,056
Core_ZN 1,611 16,120 200.0 1.81 1.0 0.8 0.0 161.1 0.0 0.00 3.0
Perimeter_ZN_1 1,221 12,220 200.0 1.81 1.0 0.8 0.0 122.1 0.0 0.62 0.0
Perimeter_ZN_2 724 7,249 200.0 1.81 1.0 0.8 0.0 72.4 0.0 0.66 0.0
Perimeter_ZN_3 1,221 12,220 200.0 1.81 1.0 0.8 0.0 122.1 0.0 0.62 0.0
Perimeter_ZN_4 724 7,249 200.0 1.81 1.0 0.8 0.0 72.4 0.0 0.66 0.0
Attic 6,114 25,433 0.0 0.00 0.0 0.0 0.0 0.0 0.0 1.00 0.0
Strip Mall 22,500 382,500
LGStore1 3,750 63,750 66.7 5.60 2.2 0.4 0.0 1125.0 0.0 0.38 0.0
SMStore1 1,875 31,875 66.7 5.60 2.2 0.4 0.0 562.5 0.0 0.31 0.0
SMStore2 1,875 31,875 66.7 3.30 1.7 0.4 0.0 562.5 0.0 0.31 0.0
SMStore3 1,875 31,875 66.7 3.30 1.7 0.4 0.0 562.5 0.0 0.31 0.0
SMStore4 1,875 31,875 66.7 3.30 1.7 0.4 0.0 562.5 0.0 0.31 0.0
LGStore2 3,750 63,750 66.7 2.70 1.3 0.4 0.0 1125.0 0.0 0.31 0.0
SMStore5 1,875 31,875 66.7 2.70 1.3 0.4 0.0 562.5 0.0 0.31 0.0
SMStore6 1,875 31,875 66.7 2.70 1.3 0.4 0.0 562.5 0.0 0.31 0.0
SMStore7 1,875 31,875 66.7 2.70 1.3 0.4 0.0 562.5 0.0 0.31 0.0
SMStore8 1,875 31,875 66.7 2.70 1.3 0.4 0.0 562.5 0.0 0.45 0.0
Warehouse 52,045 1,385,797
Office 2,550 35,695 510.0 2.02 1.1 0.8 0.0 100.0 0.0 0.16 0.0
FineStorage 14,999 384,244 0.0 1.08 1.4 0.0 0.0 749.9 0.0 0.22 0.0
BulkStorage 34,497 965,859 0.0 0.31 0.9 0.2 0.0 80001.0 0.0 0.19 0.0

60
Table A-2 Reference Building Zone Internal Loads (SI units)
1989 2004 Elec. Gas
2
Area Vol. m / Lights Lights Proc. Proc. Vent. Exhst Infil. SWH
2 3 2 2 2 2
Building Type/Zone m m person Wm Wm W/m W/m L/s L/s ACH L/h
Quick Service Restaurant 232 708
Dining 116 354 1.39 15.45 22.60 129.1 0.0 833.6 0.0 0.64 0.0
Kitchen 116 354 18.58 16.64 12.91 301.3 1291.7 50.0 1557.4 0.64 151.4
Attic 232 262 1.00 0.0
Hospital 22,422 88,864
Basement 3,739 9,120 37.16 7.53 11.84 8.1 0.0 1006.2 0.0 0.00 0.0
ER_Exam1_Mult4_Flr_1 28 119 4.65 41.35 29.05 16.1 0.0 66.1 0.0 0.24 3.8
ER_Exam2_Flr_1 28 119 4.65 41.35 29.05 43.0 0.0 66.1 0.0 0.42 3.8
ER_Exam3_Mult4_Flr_1 28 119 4.65 41.35 29.05 16.1 0.0 66.1 0.0 0.18 3.8
ER_Exam4_Flr_1 28 119 4.65 41.35 29.05 43.0 0.0 66.1 0.0 0.42 3.8
ER_Exam5_Mult4_Flr_1 28 119 4.65 41.35 29.05 21.5 0.0 66.1 0.0 0.24 3.8
Office1_Mult4_Flr_1 14 60 13.27 25.78 11.84 11.8 0.0 10.5 0.0 0.24 0.0
Lobby_Flr_1 1,475 6,295 13.01 13.91 15.82 1.1 0.0 1133.9 0.0 0.07 0.0
Corridor_Flr_1 569 2,429 92.90 14.59 10.76 0.0 0.0 142.3 0.0 0.04 0.0
ER_NurseStat_Flr_1 1,236 5,274 14.86 22.63 12.05 14.6 0.0 2930.0 0.0 0.02 0.0
OR1_Flr_2 56 238 18.58 104.94 23.67 43.0 0.0 198.3 0.0 0.30 7.6
OR2_Mult5_Flr_2 56 238 18.58 104.94 23.67 43.0 0.0 198.3 0.0 0.12 7.6
OR3_Flr_2 56 238 18.58 104.94 23.67 43.0 0.0 198.3 0.0 0.18 7.6
OR4_Flr_2 223 952 18.58 84.88 23.67 43.0 0.0 793.1 0.0 0.00 22.7
IC_PatRoom1_Mult5_Flr_2 21 89 18.58 41.35 8.61 32.3 0.0 49.6 0.0 0.24 0.0
IC_PatRoom2_Flr_2 28 119 18.58 41.35 8.61 32.3 0.0 66.1 0.0 0.42 0.0
IC_PatRoom3_Mult6_Flr_2 21 89 18.58 41.35 8.61 32.3 0.0 49.6 0.0 0.24 0.0
ICU_Flr_2 618 2,638 4.65 41.35 8.61 32.3 0.0 1465.4 0.0 0.09 0.0
ICU_NurseSat_Flr_2 669 2,855 18.58 23.34 10.76 21.5 0.0 359.9 0.0 0.00 0.0
Corridor_Flr_2 569 2,429 92.90 14.59 10.76 0.0 0.0 142.3 0.0 0.04 0.0
OR_NurseSat_Flr_2 1,013 4,322 13.01 22.84 12.70 11.2 0.0 778.6 0.0 0.05 0.0
PatRoom1_Mult10_Flr_3 21 89 18.58 23.56 7.53 21.5 0.0 49.6 0.0 0.24 3.8
PatRoom2_Flr_3 35 149 18.58 23.56 7.53 21.5 0.0 82.6 0.0 0.38 3.8
PatRoom3_Mult10_Flr_3 20 86 18.58 23.56 7.53 21.5 0.0 47.9 0.0 0.24 3.8
PatRoom4_Flr_3 35 149 18.58 23.56 7.53 21.5 0.0 82.6 0.0 0.38 3.8
PatRoom5_Mult10_Flr_3 21 89 18.58 23.56 7.53 21.5 0.0 49.6 0.0 0.24 3.8
PhysTherapy_Flr_3 488 2,082 18.58 26.93 9.68 16.4 0.0 210.0 0.0 0.00 3.8
PatRoom6_Flr_3 28 119 18.58 23.56 7.53 21.5 0.0 66.1 0.0 0.42 3.8
PatRoom7_Mult10_Flr_3 20 86 18.58 23.56 7.53 21.5 0.0 47.9 0.0 0.24 3.8
PatRoom8_Flr_3 28 119 18.58 23.56 7.53 21.5 0.0 66.1 0.0 0.42 3.8
NurseSat_Lobby_Flr_3 906 3,866 13.01 22.96 12.70 11.2 0.0 696.4 0.0 0.00 0.0
Lab_Flr_3 265 1,130 18.58 22.65 15.06 43.0 0.0 142.5 0.0 0.00 7.6
Corridor_SE_Flr_3 567 2,419 92.90 14.60 10.76 0.0 0.0 141.7 0.0 0.02 0.0
Corridor_NW_Flr_3 567 2,419 92.90 14.60 10.76 0.0 0.0 141.7 0.0 0.02 0.0
PatRoom1_Mult10_Flr_4 21 89 18.58 23.56 7.53 21.5 0.0 49.6 0.0 0.24 3.8
PatRoom2_Flr_4 35 149 18.58 23.56 7.53 21.5 0.0 82.6 0.0 0.38 3.8
PatRoom3_Mult10_Flr_4 20 86 18.58 23.56 7.53 21.5 0.0 47.9 0.0 0.24 3.8
PatRoom4_Flr_4 35 149 18.58 23.56 7.53 21.5 0.0 82.6 0.0 0.38 3.8
PatRoom5_Mult10_Flr_4 21 89 18.58 23.56 7.53 21.5 0.0 49.6 0.0 0.24 3.8
Radiology_Flr_4 488 2,082 18.58 23.82 4.30 53.1 0.0 210.0 0.0 0.00 3.8
PatRoom6_Flr_4 28 119 18.58 23.56 7.53 21.5 0.0 66.1 0.0 0.42 3.8
PatRoom7_Mult10_Flr_4 20 86 18.58 23.56 7.53 21.5 0.0 47.9 0.0 0.24 3.8
PatRoom8_Flr_4 28 119 18.58 23.56 7.53 21.5 0.0 66.1 0.0 0.42 3.8
NurseSat_Lobby_Flr_4 906 3,866 13.01 22.96 12.70 11.2 0.0 696.4 0.0 0.00 0.0
Lab_Flr_4 265 1,130 18.58 22.65 15.06 43.0 0.0 142.5 0.0 0.00 7.6
Corridor_SE_Flr_4 567 2,419 92.90 14.60 10.76 0.0 0.0 141.7 0.0 0.02 0.0
Corridor_NW_Flr_4 567 2,419 92.90 14.60 10.76 0.0 0.0 141.7 0.0 0.02 0.0
Dining_Flr_5 697 2,974 9.29 27.72 9.68 10.8 0.0 750.0 0.0 0.34 0.0
NurseSat_Flr_5 1,041 4,441 13.01 22.81 12.70 11.2 0.0 800.0 0.0 0.28 0.0
Kitchen_Flr_5 929 3,965 18.58 15.29 12.91 80.7 304.8 400.0 2501.3 0.33 567.8
Office1_Flr_5 70 298 13.27 25.78 11.84 10.8 0.0 52.5 0.0 0.52 0.0
Office2_Mult5_Flr_5 70 297 13.27 25.78 11.84 10.8 0.0 52.5 0.0 0.37 0.0
Office3_Flr_5 70 297 13.27 25.78 11.84 10.8 0.0 52.5 0.0 0.52 0.0
Office4_Mult6_Flr_5 14 60 13.94 25.78 11.84 10.8 0.0 10.0 0.0 0.49 0.0

61
1989 2004 Elec. Gas
2
Area Vol. m / Lights Lights Proc. Proc. Vent. Exhst Infil. SWH
2 3 2 2 2 2
Building Type/Zone m m person Wm Wm W/m W/m L/s L/s ACH L/h
Corridor_Flr_5 502 2,141 92.90 14.60 10.76 0.0 0.0 125.4 0.0 0.29 0.0
Large Hotel 11,345 35,185
Basement 1,979 4,826 37.16 7.53 10.76 5.4 0.0 502.6 0.0 0.00 0.0
Retail_1_Flr_1 67 266 6.19 38.09 16.14 10.8 0.0 102.2 0.0 0.56 0.0
Retail_2_Flr_1 78 308 6.19 38.09 16.14 10.8 0.0 118.4 0.0 0.09 0.0
Mech_Flr_1 164 651 0.00 8.60 16.14 5.4 0.0 41.7 0.0 0.11 0.0
Storage_Flr_1 95 375 46.45 3.96 9.68 2.7 0.0 72.2 0.0 0.11 0.0
Laundry_Flr_1 78 309 23.23 12.23 6.46 61.7 535.9 23.8 236.0 0.30 592.8
Cafe_Flr_1 189 748 1.39 15.74 13.99 5.4 0.0 1279.1 0.0 0.50 0.0
Lobby_Flr_1 1,308 5,184 3.10 20.28 11.84 8.1 0.0 3987.4 0.0 0.10 0.0
Room_1_Flr_3 39 119 26.01 19.09 11.84 6.8 0.0 14.2 0.0 0.37 4.7
Room_2_Flr_3 39 119 26.01 19.09 11.84 6.8 0.0 14.2 0.0 0.37 4.7
Room_3_Mult19_Flr_3 25 75 16.35 19.09 11.84 10.5 0.0 14.2 0.0 0.16 89.9
Room_4_Mult19_Flr_3 25 75 16.35 19.09 11.84 10.5 0.0 14.2 0.0 0.16 89.9
Room_5_Flr_3 39 119 26.01 19.09 11.84 6.8 0.0 14.2 0.0 0.37 4.7
Room_6_Flr_3 39 119 26.01 19.09 11.84 6.8 0.0 14.2 0.0 0.37 4.7
Corridor_Flr_3 389 1,187 92.90 13.11 5.38 0.0 0.0 98.9 0.0 0.04 0.0
Room_1_Flr_6 39 119 26.01 19.09 11.84 6.8 0.0 14.2 0.0 0.72 4.7
Room_2_Flr_6 39 119 26.01 19.09 11.84 6.8 0.0 14.2 0.0 0.72 4.7
Room_3_Mult9_Flr_6 25 75 16.35 19.09 11.84 10.5 0.0 14.2 0.0 1.28 42.6
Banquet_Flr_6 332 1,011 1.39 27.55 13.99 67.8 0.0 2246.2 0.0 0.46 0.0
Dining_Flr_6 332 1,011 1.39 27.55 13.99 67.8 0.0 2246.2 0.0 0.46 0.0
Kitchen_Flr_6 103 315 18.58 16.83 12.91 508.0 1612.8 39.4 1887.8 0.66 503.5
Corridor_Flr_6 412 1,256 92.90 13.08 5.38 0.0 0.0 104.7 0.0 0.48 0.0
Large Office 46,320 178,146
Basement 3,563 8,690 37.16 7.53 10.76 10.76 0.0 958.8 0.0 0.15 0.0
Perimeter_bot_ZN_3 313 860 18.58 16.14 10.76 10.76 0.0 168.7 0.0 0.30 0.0
Perimeter_bot_ZN_2 202 554 18.58 16.14 10.76 10.76 0.0 108.7 0.0 0.30 0.0
Perimeter_bot_ZN_1 313 860 18.58 16.14 10.76 10.76 0.0 168.7 0.0 0.30 0.0
Perimeter_bot_ZN_4 202 554 18.58 16.14 10.76 10.76 0.0 108.7 0.0 0.30 0.0
Core_bottom 2,532 6,949 18.58 16.14 10.76 10.76 0.0 1362.9 0.0 0.15 80.6
Perimeter_mid_ZN_3 313 860 18.58 16.14 10.76 10.76 0.0 168.7 0.0 0.30 0.0
Perimeter_mid_ZN_2 202 554 18.58 16.14 10.76 10.76 0.0 108.7 0.0 0.30 0.0
Perimeter_mid_ZN_1 313 860 18.58 16.14 10.76 10.76 0.0 168.7 0.0 0.30 0.0
Perimeter_mid_ZN_4 202 554 18.58 16.14 10.76 10.76 0.0 108.7 0.0 0.30 0.0
Core_mid 2,532 6,949 18.58 16.14 10.76 10.76 0.0 1362.9 0.0 0.15 80.6
Perimeter_top_ZN_3 313 860 18.58 16.14 10.76 10.76 0.0 168.7 0.0 0.30 0.0
Perimeter_top_ZN_2 202 554 18.58 16.14 10.76 10.76 0.0 108.7 0.0 0.30 0.0
Perimeter_top_ZN_1 313 860 18.58 16.14 10.76 10.76 0.0 168.7 0.0 0.30 0.0
Perimeter_top_ZN_4 202 554 18.58 16.14 10.76 10.76 0.0 108.7 0.0 0.30 0.0
Core_top 2,532 6,949 18.58 16.14 10.76 10.76 0.0 1362.9 0.0 0.15 80.6
Groundfloor_plenum 3,563 4,344 0.00 0.0
Midfloor_plenum 3,563 4,344 0.00 0.0
Topfloor_plenum 3,563 4,344 0.00 0.0
Medium Office 4,982 19,741
Perimeter_bot_ZN_3 207 569 18.58 16.89 10.76 10.76 0.0 111.6 0.0 0.26 0.0
Perimeter_bot_ZN_2 131 360 18.58 16.89 10.76 10.76 0.0 70.6 0.0 0.28 0.0
Perimeter_bot_ZN_1 207 569 18.58 16.89 10.76 10.76 0.0 111.6 0.0 0.26 0.0
Perimeter_bot_ZN_4 131 360 18.58 16.89 10.76 10.76 0.0 70.6 0.0 0.28 0.0
Core_bottom 984 2,698 18.58 16.89 10.76 10.76 0.0 529.3 0.0 0.00 37.5
Perimeter_mid_ZN_3 207 569 18.58 16.89 10.76 10.76 0.0 111.6 0.0 0.26 0.0
Perimeter_mid_ZN_2 131 360 18.58 16.89 10.76 10.76 0.0 70.6 0.0 0.28 0.0
Perimeter_mid_ZN_1 207 569 18.58 16.89 10.76 10.76 0.0 111.6 0.0 0.26 0.0
Perimeter_mid_ZN_4 131 360 18.58 16.89 10.76 10.76 0.0 70.6 0.0 0.28 0.0
Core_mid 984 2,698 18.58 16.89 10.76 10.76 0.0 529.3 0.0 0.00 37.5
Perimeter_top_ZN_3 207 569 18.58 16.89 10.76 10.76 0.0 111.6 0.0 0.66 0.0
Perimeter_top_ZN_2 131 360 18.58 16.89 10.76 10.76 0.0 70.6 0.0 0.67 0.0

62
1989 2004 Elec. Gas
2
Area Vol. m / Lights Lights Proc. Proc. Vent. Exhst Infil. SWH
2 3 2 2 2 2
Building Type/Zone m m person Wm Wm W/m W/m L/s L/s ACH L/h
Perimeter_top_ZN_1 207 569 18.58 16.89 10.76 10.76 0.0 111.6 0.0 0.66 0.0
Perimeter_top_ZN_4 131 360 18.58 16.89 10.76 10.76 0.0 70.6 0.0 0.67 0.0
Core_top 984 2,698 18.58 16.89 10.76 10.76 0.0 529.3 0.0 0.40 37.5
Firstfloor_plenum 1,661 2,025 0.11 0.0
Midfloor_plenum 1,661 2,025 0.11 0.0
Topfloor_plenum 1,661 2,025 1.00 0.0
Midrise Apartment 3,135 9,553
G SW APARTMENT 88 269 35.30 3.87 3.88 5.4 0.0 42.5 0.0 0.24 13.2
G NW APARTMENT 88 269 35.30 3.87 3.88 5.4 0.0 42.5 0.0 0.24 13.2
OFFICE 88 269 44.12 21.99 10.76 12.9 0.0 18.9 0.0 0.24 0.0
G NE APARTMENT 88 269 35.30 3.87 3.88 5.4 0.0 42.5 0.0 0.24 13.2
G N1 APARTMENT 88 269 35.30 3.87 3.88 5.4 0.0 42.5 0.0 0.14 13.2
G N2 APARTMENT 88 269 35.30 3.87 3.88 5.4 0.0 42.5 0.0 0.14 13.2
G S1 APARTMENT 88 269 35.30 3.87 3.88 5.4 0.0 42.5 0.0 0.14 13.2
G S2 APARTMENT 88 269 35.30 3.87 3.88 5.4 0.0 42.5 0.0 0.14 13.2
M SW APARTMENT 88 269 35.30 3.87 3.88 5.4 0.0 42.5 0.0 0.24 13.2
M NW APARTMENT 88 269 35.30 3.87 3.88 5.4 0.0 42.5 0.0 0.24 13.2
M SE APARTMENT 88 269 35.30 3.87 3.88 5.4 0.0 42.5 0.0 0.24 13.2
M NE APARTMENT 88 269 35.30 3.87 3.88 5.4 0.0 42.5 0.0 0.24 13.2
M N1 APARTMENT 88 269 35.30 3.87 3.88 5.4 0.0 42.5 0.0 0.14 13.2
M N2 APARTMENT 88 269 35.30 3.87 3.88 5.4 0.0 42.5 0.0 0.14 13.2
M S1 APARTMENT 88 269 35.30 3.87 3.88 5.4 0.0 42.5 0.0 0.14 13.2
M S2 APARTMENT 88 269 35.30 3.87 3.88 5.4 0.0 42.5 0.0 0.14 13.2
T SW APARTMENT 88 269 35.30 3.87 3.88 5.4 0.0 42.5 0.0 0.59 13.2
T NW APARTMENT 88 269 35.30 3.87 3.88 5.4 0.0 42.5 0.0 0.59 13.2
T SE APARTMENT 88 269 35.30 3.87 3.88 5.4 0.0 42.5 0.0 0.59 13.2
T NE APARTMENT 88 269 35.30 3.87 3.88 5.4 0.0 42.5 0.0 0.59 13.2
T N1 APARTMENT 88 269 35.30 3.87 3.88 5.4 0.0 42.5 0.0 0.50 13.2
T N2 APARTMENT 88 269 35.30 3.87 3.88 5.4 0.0 42.5 0.0 0.50 13.2
T S1 APARTMENT 88 269 35.30 3.87 3.88 5.4 0.0 42.5 0.0 0.50 13.2
T S2 APARTMENT 88 269 35.30 3.87 3.88 5.4 0.0 42.5 0.0 0.50 13.2
T CORRIDOR 78 237 0.00 9.91 5.38 0.0 0.0 19.7 0.0 0.40 0.0
G CORRIDOR 78 237 0.00 9.91 5.38 0.0 0.0 19.7 0.0 0.05 0.0
M CORRIDOR 78 237 0.00 9.91 5.38 0.0 0.0 19.7 0.0 0.05 0.0
Outpatient Health Care 3,804 11,932
Floor 1 Anesthesia 10 31 0.00 32.29 21.5 0.0 61.2 68.0 0.30 3.8
Floor 1 Bio Haz 5 16 0.00 9.69 1.1 0.0 4.0 0.0 0.00 0.0
Floor 1 Caf 39 119 1.00 9.69 10.8 0.0 368.3 0.0 0.17 0.0
Floor 1 Clean 12 36 5.00 12.92 21.5 0.0 17.8 0.0 0.00 0.0
Floor 1 Clean Work 15 47 5.00 12.92 21.5 0.0 23.4 0.0 0.00 0.0
Floor 1 Dictation 12 36 20.00 11.84 11.8 0.0 5.5 0.0 0.00 0.0
Floor 1 Dressing Room 4 13 20.00 11.84 11.8 0.0 2.0 0.0 0.71 0.0
Floor 1 Electrical Room 9 28 0.00 16.15 53.8 0.0 2.3 0.0 0.25 0.0
Floor 1 Elevator Pump Room 8 26 0.00 16.15 53.8 0.0 2.1 0.0 0.78 0.0
Floor 1 Humid 5 15 20.00 11.84 11.8 0.0 2.4 0.0 0.00 0.0
Floor 1 IT Hall 13 40 0.00 10.76 4.3 0.0 3.3 0.0 0.00 0.0
Floor 1 IT Room 10 32 20.00 11.84 11.8 0.0 4.9 0.0 0.00 0.0
Floor 1 Lobby 58 176 3.33 13.99 11.8 0.0 122.7 0.0 0.13 0.0
Floor 1 Lobby Hall 22 68 0.00 10.76 4.3 0.0 5.7 0.0 0.00 0.0
Floor 1 Lobby Toilet 5 15 0.00 9.69 4.3 0.0 51.0 42.5 0.40 0.0
Floor 1 Locker Room 61 187 6.67 8.61 32.3 0.0 65.1 0.0 0.12 0.0
Floor 1 Locker Room Hall 46 140 0.00 10.76 4.3 0.0 11.7 0.0 0.00 0.0
Floor 1 Lounge 33 102 6.67 8.61 32.3 0.0 35.5 0.0 0.00 0.0
Floor 1 Med Gas 5 16 0.00 9.69 1.1 0.0 4.0 0.0 0.96 0.0
Floor 1 MRI Control Room 16 48 5.00 4.31 107.6 0.0 23.8 79.3 0.11 3.8
Floor 1 MRI Hall 14 42 0.00 10.76 4.3 0.0 3.5 0.0 0.00 0.0

63
1989 2004 Elec. Gas
2
Area Vol. m / Lights Lights Proc. Proc. Vent. Exhst Infil. SWH
2 3 2 2 2 2
Building Type/Zone m m person Wm Wm W/m W/m L/s L/s ACH L/h
Floor 1 MRI Room 41 125 5.00 4.31 107.6 0.0 62.3 207.7 0.00 3.8
Floor 1 MRI Toilet 5 15 0.00 9.69 4.3 0.0 51.0 42.5 0.40 0.0
Floor 1 Nourishment 17 52 5.00 10.76 21.5 0.0 31.9 0.0 0.00 0.0
Floor 1 Nurse Hall 46 140 0.00 10.76 4.3 0.0 11.7 0.0 0.00 0.0
Floor 1 Nurse Janitor 5 15 0.00 9.69 1.1 0.0 3.8 0.0 0.00 0.0
Floor 1 Nurse Station 24 74 5.00 10.76 21.5 0.0 45.8 0.0 0.00 0.0
Floor 1 Nurse Toilet 5 15 0.00 9.69 4.3 0.0 51.0 42.5 0.00 0.0
Floor 1 Office 45 137 20.00 11.84 11.8 0.0 21.2 0.0 0.00 0.0
Floor 1 Operating Room 1 43 130 5.00 23.68 43.1 75.3 108.5 0.0 0.33 22.7
Floor 1 Operating Room 2 45 136 5.00 23.68 43.1 75.3 113.3 0.0 0.18 22.7
Floor 1 Operating Room 3 44 135 5.00 23.68 43.1 75.3 112.3 0.0 0.00 22.7
Floor 1 PACU 10 31 5.00 8.61 32.3 0.0 17.0 0.0 0.00 3.8
Floor 1 Pre-Op Hall 49 150 0.00 10.76 4.3 0.0 12.5 0.0 0.00 0.0
Floor 1 Pre-Op Room 1 18 54 10.00 7.53 21.5 0.0 29.7 0.0 0.08 3.8
Floor 1 Pre-Op Room 2 31 96 10.00 7.53 21.5 0.0 53.2 0.0 0.00 3.8
Floor 1 Pre-Op Toilet 5 15 0.00 9.69 4.3 0.0 51.0 42.5 0.40 0.0
Floor 1 Procedure Room 26 81 5.00 29.06 32.3 0.0 67.2 0.0 0.24 3.8
Floor 1 Reception 47 144 3.33 13.99 11.8 0.0 100.4 0.0 0.09 0.0
Floor 1 Reception Hall 12 36 0.00 10.76 4.3 0.0 3.0 0.0 0.00 0.0
Floor 1 Recovery Room 50 153 5.00 8.61 32.3 0.0 84.9 0.0 0.30 3.8
Floor 1 Scheduling 11 34 20.00 11.84 11.8 0.0 5.2 0.0 0.21 0.0
Floor 1 Scrub 8 24 0.00 10.76 4.3 0.0 2.0 0.0 0.00 0.0
Floor 1 Soil 12 36 5.00 12.92 21.5 0.0 89.2 99.1 0.00 0.0
Floor 1 Soil Hold 5 16 5.00 12.92 21.5 0.0 39.6 44.0 0.00 0.0
Floor 1 Soil Work 17 51 5.00 12.92 21.5 0.0 127.4 141.6 0.00 0.0
Floor 1 Step Down 28 85 5.00 8.61 32.3 0.0 47.2 0.0 0.44 3.8
Floor 1 Sterile Hall 57 174 0.00 10.76 4.3 0.0 14.5 0.0 0.05 0.0
Floor 1 Sterile Storage 37 112 0.00 9.69 1.1 0.0 28.0 0.0 0.00 0.0
Floor 1 Storage 85 261 0.00 9.69 1.1 0.0 65.1 0.0 0.24 0.0
Floor 1 Sub-Sterile 18 56 0.00 10.76 4.3 0.0 4.6 0.0 0.26 0.0
Floor 1 Utility Hall 24 72 0.00 10.76 4.3 0.0 6.0 0.0 0.22 0.0
Floor 1 Utility Janitor 4 12 0.00 9.69 1.1 0.0 3.0 0.0 0.00 0.0
Floor 1 Utility Room 33 102 0.00 9.69 1.1 0.0 25.5 0.0 0.18 0.0
Floor 1 Vestibule 7 20 0.00 10.76 4.3 0.0 1.7 0.0 0.40 0.0
Floor 2 Conference 31 95 2.00 13.99 10.8 0.0 147.3 0.0 0.43 0.0
Floor 2 Conference Toilet 6 18 0.00 9.69 4.3 0.0 60.4 50.3 0.00 0.0
Floor 2 Dictation 7 20 20.00 11.84 11.8 0.0 3.1 0.0 0.00 0.0
Floor 2 Exam 1 33 102 5.00 16.15 11.8 0.0 51.0 0.0 0.42 0.0
Floor 2 Exam 2 50 153 5.00 16.15 11.8 0.0 76.4 0.0 0.12 0.0
Floor 2 Exam 3 67 204 5.00 16.15 11.8 0.0 101.9 0.0 0.12 0.0
Floor 2 Exam 4 8 24 5.00 16.15 11.8 0.0 11.9 0.0 0.30 0.0
Floor 2 Exam 5 33 99 5.00 16.15 11.8 0.0 49.5 0.0 0.26 0.0
Floor 2 Exam 6 21 64 5.00 16.15 11.8 0.0 31.9 0.0 0.24 0.0
Floor 2 Exam 7 74 224 5.00 16.15 11.8 0.0 112.1 0.0 0.11 0.0
Floor 2 Exam 8 25 76 5.00 16.15 11.8 0.0 38.2 0.0 0.24 0.0
Floor 2 Exam 9 37 112 5.00 16.15 11.8 0.0 56.1 0.0 0.11 0.0
Floor 2 Exam Hall 1 17 51 0.00 10.76 4.3 0.0 4.2 0.0 0.12 0.0
Floor 2 Exam Hall 2 17 51 0.00 10.76 4.3 0.0 4.2 0.0 0.12 0.0
Floor 2 Exam Hall 3 17 51 0.00 10.76 4.3 0.0 4.2 0.0 0.12 0.0
Floor 2 Exam Hall 4 18 56 0.00 10.76 4.3 0.0 4.7 0.0 0.11 0.0
Floor 2 Exam Hall 5 18 56 0.00 10.76 4.3 0.0 4.7 0.0 0.11 0.0
Floor 2 Exam Hall 6 18 56 0.00 10.76 4.3 0.0 4.7 0.0 0.11 0.0
Floor 2 Janitor 6 18 0.00 9.69 1.1 0.0 4.5 0.0 0.91 0.0
Floor 2 Lounge 7 23 6.67 8.61 32.3 0.0 7.9 0.0 0.00 0.0
Floor 2 Nurse Station 1 14 42 5.00 10.76 21.5 0.0 26.3 0.0 0.00 0.0
Floor 2 Nurse Station 2 17 51 5.00 10.76 21.5 0.0 31.6 0.0 0.00 0.0

64
1989 2004 Elec. Gas
2
Area Vol. m / Lights Lights Proc. Proc. Vent. Exhst Infil. SWH
2 3 2 2 2 2
Building Type/Zone m m person Wm Wm W/m W/m L/s L/s ACH L/h
Floor 2 Office 52 159 20.00 11.84 11.8 0.0 24.6 0.0 0.26 0.0
Floor 2 Office Hall 41 126 0.00 10.76 4.3 0.0 10.5 0.0 0.00 0.0
Floor 2 Reception 91 279 3.33 13.99 11.8 0.0 194.1 0.0 0.18 0.0
Floor 2 Reception Hall 52 160 0.00 10.76 4.3 0.0 13.3 0.0 0.60 0.0
Floor 2 Reception Toilet 12 36 0.00 9.69 4.3 0.0 118.9 99.1 0.00 0.0
Floor 2 Scheduling 1 30 92 20.00 11.84 11.8 0.0 14.2 0.0 0.00 0.0
Floor 2 Scheduling 2 32 97 20.00 11.84 11.8 0.0 15.0 0.0 0.00 0.0
Floor 2 Storage 1 5 16 0.00 9.69 1.1 0.0 4.0 0.0 0.00 0.0
Floor 2 Storage 2 11 34 0.00 9.69 1.1 0.0 8.5 0.0 0.00 0.0
Floor 2 Storage 3 13 41 0.00 9.69 1.1 0.0 10.2 0.0 0.00 0.0
Floor 2 Utility 12 36 0.00 9.69 1.1 0.0 8.9 0.0 0.26 0.0
Floor 2 Work 157 479 20.00 11.84 11.8 0.0 74.1 0.0 0.05 0.0
Floor 2 Work Hall 77 236 0.00 10.76 4.3 0.0 19.7 0.0 0.03 0.0
Floor 2 Work Toilet 5 15 0.00 9.69 4.3 0.0 51.0 42.5 0.40 0.0
Floor 2 X-Ray 84 255 5.00 4.31 107.6 0.0 127.4 0.0 0.00 3.8
Floor 3 Dressing Room 4 12 20.00 11.84 11.8 0.0 1.8 0.0 0.00 0.0
Floor 3 Elevator Hall 34 105 0.00 10.76 4.3 0.0 8.7 0.0 0.04 0.0
Floor 3 Humid 10 31 20.00 11.84 11.8 0.0 4.7 0.0 0.00 0.0
Floor 3 Janitor 6 18 0.00 9.69 1.1 0.0 4.5 0.0 0.91 0.0
Floor 3 Locker 11 34 6.67 8.61 32.3 0.0 11.8 0.0 0.00 0.0
Floor 3 Lounge 71 215 6.67 8.61 32.3 0.0 74.9 0.0 0.11 0.0
Floor 3 Lounge Toilet 18 54 0.00 9.69 4.3 0.0 181.2 151.0 0.22 0.0
Floor 3 Mechanical 33 99 0.00 16.15 53.8 0.0 8.3 0.0 0.26 0.0
Floor 3 Mechanical Hall 28 85 0.00 10.76 4.3 0.0 7.1 0.0 0.00 0.0
Floor 3 Office 282 860 20.00 11.84 11.8 0.0 133.1 0.0 0.09 0.0
Floor 3 Office Hall 77 236 0.00 10.76 4.3 0.0 19.7 0.0 0.03 0.0
Floor 3 Office Toilet 5 15 0.00 9.69 4.3 0.0 51.0 42.5 0.40 0.0
Floor 3 Physical Therapy 1 121 368 5.00 9.69 16.2 0.0 171.0 0.0 0.23 3.8
Floor 3 Physical Therapy 2 55 168 5.00 9.69 16.2 0.0 77.9 0.0 0.00 3.8
Floor 3 Physical Therapy Toilet 8 24 0.00 9.69 4.3 0.0 79.3 66.1 0.00 0.0
Floor 3 Storage 1 10 31 0.00 9.69 1.1 0.0 7.6 0.0 0.00 0.0
Floor 3 Storage 2 8 24 0.00 9.69 1.1 0.0 5.9 0.0 0.00 0.0
Floor 3 Treatment 44 135 5.00 16.15 11.8 0.0 67.4 0.0 0.00 0.0
Floor 3 Undeveloped 1 211 642 20.00 11.84 11.8 0.0 160.5 0.0 0.11 0.0
Floor 3 Undeveloped 2 107 326 20.00 11.84 11.8 0.0 81.5 0.0 0.17 0.0
Floor 3 Utility 20 61 0.00 9.69 1.1 0.0 15.3 0.0 0.00 0.0
Floor 3 Work 53 163 20.00 11.84 11.8 0.0 25.2 0.0 0.26 0.0
NE Stair 16 143 0.00 10.76 4.3 0.0 4.0 0.0 0.74 0.0
NW Elevator 13 119 0.00 10.76 4.3 0.0 3.3 0.0 0.69 0.0
NW Stair 18 163 0.00 10.76 4.3 0.0 4.5 0.0 0.74 0.0
SW Stair 9 82 0.00 10.76 4.3 0.0 2.3 0.0 0.74 0.0
Retail 2,294 13,993
Back_Space 380 2,317 27.87 12.55 8.61 8.1 0.0 284.9 0.0 0.37 0.0
Core_Retail 1,600 9,763 6.19 36.25 18.29 3.2 0.0 2400.7 0.0 0.22 0.0
Point_of_Sale 151 920 6.19 36.25 18.29 21.5 0.0 226.2 0.0 0.40 0.0
Front_Retail 151 920 6.19 36.25 18.29 3.2 0.0 226.2 0.0 0.40 0.0
Front_Entry 12 73 6.19 36.25 11.84 0.0 0.0 0.0 0.0 0.54 0.0
Primary Education 6,871 27,484
CORNER_CLASS_1_POD_1_ZN
_1_FLR_1 99 396 4.00 21.52 15.06 15.0 0.0 198.0 0.0 0.49 0.0
MULT_CLASS_1_POD_1_ZN_1_
FLR_1 477 1,908 4.00 21.52 15.06 15.0 0.0 954.0 0.0 0.39 0.0
CORRIDOR_POD_1_ZN_1_FLR_
1 192 768 10.00 21.52 5.38 4.0 0.0 96.0 0.0 0.29 0.0
CORNER_CLASS_2_POD_1_ZN
_1_FLR_1 99 396 4.00 21.52 15.06 15.0 0.0 198.0 0.0 0.49 0.0

65
1989 2004 Elec. Gas
2
Area Vol. m / Lights Lights Proc. Proc. Vent. Exhst Infil. SWH
2 3 2 2 2 2
Building Type/Zone m m person Wm Wm W/m W/m L/s L/s ACH L/h
MULT_CLASS_2_POD_1_ZN_1_
FLR_1 477 1,908 4.00 21.52 15.06 15.0 0.0 954.0 0.0 0.39 0.0
CORNER_CLASS_1_POD_2_ZN
_1_FLR_1 99 396 4.00 21.52 15.06 15.0 0.0 198.0 0.0 0.49 0.0
MULT_CLASS_1_POD_2_ZN_1_
FLR_1 477 1,908 4.00 21.52 15.06 15.0 0.0 954.0 0.0 0.39 0.0
CORRIDOR_POD_2_ZN_1_FLR_
1 192 768 10.00 9.69 5.38 4.0 0.0 96.0 0.0 0.29 0.0
CORNER_CLASS_2_POD_2_ZN
_1_FLR_1 99 396 4.00 21.52 15.06 15.0 0.0 198.0 0.0 0.49 0.0
MULT_CLASS_2_POD_2_ZN_1_
FLR_1 477 1,908 4.00 21.52 15.06 15.0 0.0 954.0 0.0 0.39 0.0
CORNER_CLASS_1_POD_3_ZN
_1_FLR_1 99 396 4.00 21.52 15.06 15.0 0.0 198.0 0.0 0.49 0.0
MULT_CLASS_1_POD_3_ZN_1_
FLR_1 477 1,908 4.00 21.52 15.06 15.0 0.0 954.0 0.0 0.39 0.0
CORRIDOR_POD_3_ZN_1_FLR_
1 192 768 10.00 9.69 5.38 4.0 0.0 96.0 0.0 0.29 0.0
CORNER_CLASS_2_POD_3_ZN
_1_FLR_1 99 396 4.00 21.52 15.06 15.0 0.0 198.0 0.0 0.49 0.0
MULT_CLASS_2_POD_3_ZN_1_
FLR_1 315 1,260 4.00 21.52 15.06 8.1 0.0 630.0 0.0 0.39 0.0
COMPUTER_CLASS_ZN_1_FLR
_1 162 648 3.33 21.52 15.06 20.0 0.0 389.2 0.0 0.39 0.0
MAIN_CORRIDOR_ZN_1_FLR_1 546 2,184 0.00 11.14 5.38 4.0 0.0 273.0 0.0 0.29 0.0
LOBBY_ZN_1_FLR_1 171 684 0.00 12.26 13.99 4.0 0.0 85.5 0.0 0.39 0.0
MECH_ZN_1_FLR_1 252 1,008 100.00 8.26 16.14 10.0 0.0 63.0 0.0 0.27 0.0
BATH_ZN_1_FLR_1 190 760 100.00 9.70 9.68 4.0 0.0 300.0 283.2 0.33 4.00
OFFICES_ZN_1_FLR_1 441 1,764 20.00 20.33 11.84 10.8 0.0 220.5 0.0 0.38 0.0
GYM_ZN_1_FLR_1 357 1,428 3.33 11.47 15.06 5.0 0.0 1072.1 0.0 0.32 0.0
KITCHEN_ZN_1_FLR_1 168 672 6.67 17.20 12.91 190.5 954.1 201.5 1557.4 0.32 4.00
CAFETERIA_ZN_1_FLR_1 315 1,260 1.39 15.05 15.06 25.4 0.0 2260.4 0.0 0.40 0.0
LIBRARY_MEDIA_CENTER_ZN_
1_FLR_1 399 1,596 4.35 22.75 13.99 15.0 0.0 733.8 0.0 0.38 0.0
Secondary Education 19,592 95,216
CORNER_CLASS_1_POD_1_ZN
_1_FLR_1 99 396 4.00 21.52 15.06 10.0 0.0 198.0 0.0 0.22 0.0
CORNER_CLASS_1_POD_1_ZN
_1_FLR_2 99 396 4.00 21.52 15.06 10.0 0.0 198.0 0.0 0.49 0.0
MULT_CLASS_1_POD_1_ZN_1_
FLR_1 477 1,908 4.00 21.52 15.06 10.0 0.0 954.0 0.0 0.12 0.0
MULT_CLASS_1_POD_1_ZN_1_
FLR_2 477 1,908 4.00 21.52 15.06 10.0 0.0 954.0 0.0 0.39 0.0
CORRIDOR_POD_1_ZN_1_FLR
_1 320 1,280 10.00 9.25 5.38 4.0 0.0 160.0 0.0 0.02 0.0
CORRIDOR_POD_1_ZN_1_FLR
_2 320 1,280 10.00 9.25 5.38 4.0 0.0 160.0 0.0 0.29 0.0
CORNER_CLASS_2_POD_1_ZN
_1_FLR_1 99 396 4.00 21.52 15.06 10.0 0.0 198.0 0.0 0.22 0.0
CORNER_CLASS_2_POD_1_ZN
_1_FLR_2 99 396 4.00 21.52 15.06 10.0 0.0 198.0 0.0 0.49 0.0
MULT_CLASS_2_POD_1_ZN_1_
FLR_1 477 1,908 4.00 21.52 15.06 10.0 0.0 954.0 0.0 0.12 0.0
MULT_CLASS_2_POD_1_ZN_1_
FLR_2 477 1,908 4.00 21.52 15.06 10.0 0.0 954.0 0.0 0.39 0.0
CORNER_CLASS_1_POD_2_ZN
_1_FLR_1 99 396 4.00 21.52 15.06 10.0 0.0 198.0 0.0 0.22 0.0
CORNER_CLASS_1_POD_2_ZN
_1_FLR_2 99 396 4.00 21.52 15.06 10.0 0.0 198.0 0.0 0.49 0.0
MULT_CLASS_1_POD_2_ZN_1_ 477 1,908 4.00 21.52 15.06 10.0 0.0 954.0 0.0 0.12 0.0

66
1989 2004 Elec. Gas
2
Area Vol. m / Lights Lights Proc. Proc. Vent. Exhst Infil. SWH
2 3 2 2 2 2
Building Type/Zone m m person Wm Wm W/m W/m L/s L/s ACH L/h
FLR_1
MULT_CLASS_1_POD_2_ZN_1_
FLR_2 477 1,908 4.00 21.52 15.06 10.0 0.0 954.0 0.0 0.39 0.0
CORRIDOR_POD_2_ZN_1_FLR
_1 320 1,280 10.00 9.25 5.38 4.0 0.0 160.0 0.0 0.02 0.0
CORRIDOR_POD_2_ZN_1_FLR
_2 320 1,280 10.00 9.25 5.38 4.0 0.0 160.0 0.0 0.29 0.0
CORNER_CLASS_2_POD_2_ZN
_1_FLR_1 99 396 4.00 21.52 15.06 10.0 0.0 198.0 0.0 0.22 0.0
CORNER_CLASS_2_POD_2_ZN
_1_FLR_2 99 396 4.00 21.52 15.06 10.0 0.0 198.0 0.0 0.49 0.0
MULT_CLASS_2_POD_2_ZN_1_
FLR_1 477 1,908 4.00 21.52 15.06 10.0 0.0 954.0 0.0 0.12 0.0
MULT_CLASS_2_POD_2_ZN_1_
FLR_2 477 1,908 4.00 21.52 15.06 10.0 0.0 954.0 0.0 0.39 0.0
CORNER_CLASS_1_POD_3_ZN
_1_FLR_1 99 396 4.00 21.52 15.06 10.0 0.0 198.0 0.0 0.22 0.0
CORNER_CLASS_1_POD_3_ZN
_1_FLR_2 99 396 4.00 21.52 15.06 10.0 0.0 198.0 0.0 0.49 0.0
MULT_CLASS_1_POD_3_ZN_1_
FLR_1 477 1,908 4.00 21.52 15.06 10.0 0.0 954.0 0.0 0.12 0.0
MULT_CLASS_1_POD_3_ZN_1_
FLR_2 477 1,908 4.00 21.52 15.06 20.0 0.0 954.0 0.0 0.39 0.0
CORRIDOR_POD_3_ZN_1_FLR
_1 320 1,280 10.00 9.25 5.38 4.0 0.0 160.0 0.0 0.02 0.0
CORRIDOR_POD_3_ZN_1_FLR
_2 320 1,280 10.00 9.25 5.38 4.0 0.0 160.0 0.0 0.29 0.0
CORNER_CLASS_2_POD_3_ZN
_1_FLR_1 99 396 4.00 21.52 15.06 10.0 0.0 198.0 0.0 0.22 0.0
CORNER_CLASS_2_POD_3_ZN
_1_FLR_2 99 396 4.00 21.52 15.06 10.0 0.0 198.0 0.0 0.49 0.0
MULT_CLASS_2_POD_3_ZN_1_
FLR_1 477 1,908 4.00 21.52 15.06 10.0 0.0 954.0 0.0 0.12 0.0
MULT_CLASS_2_POD_3_ZN_1_
FLR_2 477 1,908 4.00 21.52 15.06 20.0 0.0 954.0 0.0 0.39 0.0
MAIN_CORRIDOR_ZN_1_FLR_1 1,140 4,560 0.00 10.74 5.38 4.0 0.0 570.0 0.0 0.05 0.0
MAIN_CORRIDOR_ZN_1_FLR_2 1,140 4,560 0.00 10.74 5.38 4.0 0.0 570.0 0.0 0.32 0.0
LOBBY_ZN_1_FLR_1 210 840 0.00 12.00 13.99 4.0 0.0 105.0 0.0 0.08 0.0
LOBBY_ZN_1_FLR_2 210 840 0.00 12.00 13.99 4.0 0.0 105.0 0.0 0.35 0.0
BATHROOMS_ZN_1_FLR_1 210 840 10.00 9.60 9.68 4.0 0.0 300.0 0.0 0.15 4.00
BATHROOMS_ZN_1_FLR_2 210 840 10.00 9.60 9.68 4.0 0.0 300.0 0.0 0.42 4.00
OFFICES_ZN_1_FLR_1 532 2,128 20.00 20.09 11.84 10.8 0.0 266.0 0.0 0.11 0.0
OFFICES_ZN_1_FLR_2 532 2,128 20.00 20.09 11.84 10.8 0.0 266.0 0.0 0.38 0.0
GYM_ZN_1_FLR_1 1,976 15,808 1.00 11.38 15.06 5.0 0.0 19760.0 0.0 0.14 717.2
AUX_GYM_ZN_1_FLR_1 1,248 9,984 3.33 11.81 15.06 5.0 0.0 3747.7 0.0 0.20 0.0
AUDITORIUM_ZN_1_FLR_1 988 7,904 1.00 12.08 9.68 5.0 0.0 7904.0 0.0 0.21 0.0
KITCHEN_ZN_1_FLR_1 216 864 6.67 16.76 12.91 222.2 1119.0 259.1 1887.8 0.05 4.00
LIBRARY_MEDIA_CENTER_ZN_
1_FLR_2 840 3,360 4.35 0.00 13.99 10.0 0.0 1544.8 0.0 0.35 0.0
CAFETERIA_ZN_1_FLR_1 624 2,496 1.39 14.38 15.06 19.3 0.0 4477.8 0.0 0.09 0.0
MECH_ZN_1_FLR_1 342 1,368 100.00 8.05 16.14 4.0 0.0 85.5 0.0 0.00 0.0
MECH_ZN_1_FLR_2 342 1,368 100.00 8.05 16.14 4.0 0.0 85.5 0.0 0.00 0.0
Full Service Restaurant 511 1,558
Dining 372 1,133 1.39 27.38 22.60 60.3 0.0 2667.7 0.0 0.52 0.0
Kitchen 139 425 18.58 16.37 12.91 376.6 1197.9 60.0 1887.8 0.63 503.5
Attic 511 856 1.00
Supermarket 4,181 25,493
Office 89 542 18.58 21.36 11.84 8.1 0.0 47.8 0.0 0.41 0.0

67
1989 2004 Elec. Gas
2
Area Vol. m / Lights Lights Proc. Proc. Vent. Exhst Infil. SWH
2 3 2 2 2 2
Building Type/Zone m m person Wm Wm W/m W/m L/s L/s ACH L/h
Dry Storage 622 3,792 27.87 11.90 8.61 8.1 0.0 466.4 0.0 0.32 0.0
Deli 225 1,370 11.61 29.94 18.29 53.8 26.9 337.1 0.0 0.29 18.9
Sales 2,325 14,177 11.61 29.94 18.29 5.4 0.0 3487.4 0.0 0.20 0.0
Produce 711 4,338 11.61 29.94 18.29 5.4 0.0 1067.0 0.0 0.27 0.0
Bakery 209 1,275 11.61 29.94 18.29 53.8 26.9 313.6 1179.9 0.34 18.9
Small Hotel 4,014 11,622
REARSTAIRSFLR1 20 67 9.95 6.46 0.0 0.0 0.0 0.0 0.58 0.0
CORRIDORFLR1 151 505 9.50 5.38 0.0 0.0 37.6 0.0 0.07 0.0
REARSTORAGEFLR1 20 67 4.98 8.61 0.0 0.0 0.0 0.0 0.58 0.0
FRONTLOUNGEFLR1 163 547 3.08 14.15 11.84 15.4 0.0 423.5 0.0 0.19 0.0
RESTROOMFLR1 33 109 32.61 11.82 9.68 10.8 0.0 0.0 200.0 0.13 0.0
MEETINGROOMFLR1 80 269 1.87 22.91 13.99 12.9 0.0 429.3 0.0 0.13 0.0
MECHANICALROOMFLR1 33 109 10.34 16.14 0.0 0.0 8.2 0.0 0.13 0.0
GUESTROOM101 33 109 21.74 20.68 11.84 14.3 0.0 14.2 0.0 0.13 0.2
GUESTROOM102 33 109 21.74 20.68 11.84 14.3 0.0 14.2 0.0 0.13 0.2
GUESTROOM103 33 109 21.74 20.68 11.84 14.3 0.0 14.2 0.0 0.13 0.2
GUESTROOM104 33 109 21.74 20.68 11.84 14.3 0.0 14.2 0.0 0.13 0.2
GUESTROOM105 33 109 21.74 20.68 11.84 14.3 0.0 14.2 0.0 0.13 0.2
EMPLOYEELOUNGEFLR1 33 109 2.96 17.73 12.91 77.2 0.0 88.1 0.0 0.13 0.0
LAUNDRYROOMFLR1 98 328 8.89 11.18 6.46 21.9 184.2 143.1 0.0 0.13 2.6
ELEVATORCOREFLR1 15 50 0.00 0.00 128.4 0.0 75.3 0.0 0.13 0.0
EXERCISECENTERFLR1 33 109 2.96 14.77 9.68 11.5 0.0 110.2 0.0 0.13 0.0
FRONTOFFICEFLR1 130 437 13.04 21.67 11.84 12.9 0.0 100.0 0.0 0.13 0.0
FRONTSTAIRSFLR1 20 67 9.95 6.46 0.0 0.0 0.0 0.0 0.58 0.0
FRONTSTORAGEFLR1 13 42 5.75 8.61 0.0 0.0 0.0 0.0 0.13 0.0
REARSTAIRSFLR2 20 55 8.77 6.46 0.0 0.0 0.0 0.0 0.58 0.0
CORRIDORFLR2 125 344 9.22 5.38 0.0 0.0 31.4 0.0 0.06 0.0
REARSTORAGEFLR2 20 55 4.39 8.61 0.0 0.0 0.0 0.0 0.58 0.0
GUESTROOM201 33 89 21.74 18.77 11.84 14.3 0.0 14.2 0.0 0.41 0.2
GUESTROOM202_205 130 358 21.74 18.77 11.84 14.3 0.0 56.6 0.0 0.13 0.2
GUESTROOM206_208 105 289 23.41 18.77 11.84 14.3 0.0 42.5 0.0 0.13 0.2
GUESTROOM209_212 130 358 21.74 18.77 11.84 14.3 0.0 56.6 0.0 0.13 0.2
GUESTROOM213 33 89 21.74 18.77 11.84 14.3 0.0 14.2 0.0 0.13 0.2
GUESTROOM214 33 89 21.74 18.77 11.84 14.3 0.0 14.2 0.0 0.13 0.2
GUESTROOM215_218 130 358 21.74 18.77 11.84 14.3 0.0 56.6 0.0 0.13 0.2
ELEVATORCOREFLR2 15 41 0.00 0.00 0.0 0.0 0.0 0.0 0.13 0.0
GUESTROOM219 33 89 21.74 18.77 11.84 14.3 0.0 14.2 0.0 0.13 0.2
GUESTROOM220_223 130 358 21.74 18.77 11.84 14.3 0.0 56.6 0.0 0.13 0.2
GUESTROOM224 33 89 21.74 18.77 11.84 14.3 0.0 14.2 0.0 0.13 0.2
FRONTSTORAGEFLR2 13 34 4.89 8.61 0.0 0.0 0.0 0.0 0.13 0.0
FRONTSTAIRSFLR2 20 55 8.77 6.46 0.0 0.0 0.0 0.0 0.58 0.0
REARSTAIRSFLR3 20 55 8.77 6.46 0.0 0.0 0.0 0.0 0.58 0.0
CORRIDORFLR3 125 344 9.22 5.38 0.0 0.0 31.4 0.0 0.06 0.0
REARSTORAGEFLR3 20 55 4.39 8.61 0.0 0.0 0.0 0.0 0.58 0.0
GUESTROOM301 33 89 21.74 18.77 11.84 14.3 0.0 14.2 0.0 0.41 0.2
GUESTROOM302_305 130 358 21.74 18.77 11.84 14.3 0.0 56.6 0.0 0.13 0.2
GUESTROOM306_308 105 289 23.41 18.77 11.84 14.3 0.0 42.5 0.0 0.13 0.2
GUESTROOM309_312 130 358 21.74 18.77 11.84 14.3 0.0 56.6 0.0 0.13 0.2
GUESTROOM313 33 89 21.74 18.77 11.84 14.3 0.0 14.2 0.0 0.13 0.2
GUESTROOM314 33 89 21.74 18.77 11.84 14.3 0.0 14.2 0.0 0.13 0.2
GUESTROOM315_318 130 358 21.74 18.77 11.84 14.3 0.0 56.6 0.0 0.13 0.2
ELEVATORCOREFLR3 15 41 0.00 0.00 0.0 0.0 0.0 0.0 0.13 0.0
GUESTROOM319 33 89 21.74 18.77 11.84 14.3 0.0 14.2 0.0 0.13 0.2
GUESTROOM320_323 130 358 21.74 18.77 11.84 14.3 0.0 56.6 0.0 0.13 0.2
GUESTROOM324 33 89 21.74 18.77 11.84 14.3 0.0 14.2 0.0 0.13 0.2
FRONTSTORAGEFLR3 13 34 4.89 8.61 0.0 0.0 0.0 0.0 0.13 0.0

68
1989 2004 Elec. Gas
2
Area Vol. m / Lights Lights Proc. Proc. Vent. Exhst Infil. SWH
2 3 2 2 2 2
Building Type/Zone m m person Wm Wm W/m W/m L/s L/s ACH L/h
FRONTSTAIRSFLR3 20 55 8.77 6.46 0.0 0.0 0.0 0.0 0.58 0.0
REARSTAIRSFLR4 20 55 4.39 6.46 0.0 0.0 0.0 0.0 0.98 0.0
CORRIDORFLR4 125 344 9.22 5.38 0.0 0.0 31.4 0.0 0.45 0.0
REARSTORAGEFLR4 20 55 4.39 8.61 0.0 0.0 0.0 0.0 0.98 0.0
GUESTROOM401 33 89 21.74 18.77 11.84 14.3 0.0 14.2 0.0 0.80 0.2
GUESTROOM402_405 130 358 21.74 18.77 11.84 14.3 0.0 56.6 0.0 0.53 0.2
GUESTROOM406_408 105 289 23.41 18.77 11.84 14.3 0.0 42.5 0.0 0.53 0.2
GUESTROOM409_412 130 358 21.74 18.77 11.84 14.3 0.0 56.6 0.0 0.53 0.2
GUESTROOM413 33 89 21.74 18.77 11.84 14.3 0.0 14.2 0.0 0.53 0.2
GUESTROOM414 33 89 21.74 18.77 11.84 14.3 0.0 14.2 0.0 0.53 0.2
GUESTROOM415_418 130 358 21.74 18.77 11.84 14.3 0.0 56.6 0.0 0.53 0.2
ELEVATORCOREFLR4 15 41 0.00 0.00 0.0 0.0 0.0 0.0 0.53 0.0
GUESTROOM419 33 89 21.74 18.77 11.84 14.3 0.0 14.2 0.0 0.53 0.2
GUESTROOM420_423 130 358 21.74 18.77 11.84 14.3 0.0 56.6 0.0 0.53 0.2
GUESTROOM424 33 89 21.74 18.77 11.84 14.3 0.0 14.2 0.0 0.53 0.2
FRONTSTORAGEFLR4 13 34 4.89 8.61 0.0 0.0 0.0 0.0 0.53 0.0
FRONTSTAIRSFLR4 20 55 8.77 6.46 0.0 0.0 0.0 0.0 0.98 0.0
Small Office 511 1,559
Core_ZN 150 456 18.58 19.48 10.76 10.76 0.0 80.5 0.0 0.00 11.4
Perimeter_ZN_1 113 346 18.58 19.48 10.76 10.76 0.0 61.1 0.0 0.62 0.0
Perimeter_ZN_2 67 205 18.58 19.48 10.76 10.76 0.0 36.2 0.0 0.66 0.0
Perimeter_ZN_3 113 346 18.58 19.48 10.76 10.76 0.0 61.1 0.0 0.62 0.0
Perimeter_ZN_4 67 205 18.58 19.48 10.76 10.76 0.0 36.2 0.0 0.66 0.0
Attic 568 720 0.00 0.00 0.0 0.0 0.0 0.0 1.00 0.0
Strip Mall 2,090 10,831
LGStore1 348 1,805 6.19 60.26 23.99 4.3 0.0 522.6 0.0 0.38 0.0
SMStore1 174 903 6.19 60.26 23.99 4.3 0.0 261.3 0.0 0.31 0.0
SMStore2 174 903 6.19 35.51 18.29 4.3 0.0 261.3 0.0 0.31 0.0
SMStore3 174 903 6.19 35.51 18.29 4.3 0.0 261.3 0.0 0.31 0.0
SMStore4 174 903 6.19 35.51 18.29 4.3 0.0 261.3 0.0 0.31 0.0
LGStore2 348 1,805 6.19 29.05 13.77 4.3 0.0 522.6 0.0 0.31 0.0
SMStore5 174 903 6.19 29.05 13.77 4.3 0.0 261.3 0.0 0.31 0.0
SMStore6 174 903 6.19 29.05 13.77 4.3 0.0 261.3 0.0 0.31 0.0
SMStore7 174 903 6.19 29.05 13.77 4.3 0.0 261.3 0.0 0.31 0.0
SMStore8 174 903 6.19 29.05 13.77 4.3 0.0 261.3 0.0 0.45 0.0
Warehouse 4,835 39,241
Office 237 1,011 47.38 21.69 11.84 8.1 0.0 50.0 0.0 0.16 0.0
Fine Storage 1,393 10,881 0.00 11.64 15.06 0.0 0.0 348.4 0.0 0.22 0.0
Bulk Storage 3,205 27,350 0.00 3.34 9.68 2.6 0.0 37758.1 0.0 0.19 0.0

69
Appendix B Schedules
Table B-1 Quick Service Restaurant Hourly Operation Schedules
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ALWAYS_ON All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ACTIVITY_SCH All 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
AIR_VELO_SCH All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
BLDG_EQUIP_SCH Weekday 0.1 0.1 0.1 0.1 0.1 0.1 0.35 0.35 0.25 0.25 0.35 0.35 0.35 0.35 0.25 0.25 0.25 0.35 0.35 0.35 0.25 0.25 0.25 0.25
Sat 0.1 0.1 0.1 0.1 0.1 0.1 0.35 0.35 0.25 0.25 0.35 0.35 0.35 0.35 0.25 0.25 0.25 0.35 0.35 0.35 0.25 0.25 0.25 0.25
SummerDesign 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sun, Hol, Other 0.1 0.1 0.1 0.1 0.1 0.1 0.35 0.35 0.25 0.25 0.35 0.35 0.35 0.35 0.25 0.25 0.25 0.35 0.35 0.35 0.25 0.25 0.25 0.25
BLDG_LIGHT_SCH SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Weekday, Sat, Sun,
Hol, Other 0.45 0.15 0.15 0.15 0.15 0.45 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9
BLDG_OCC_SCH WD 0.05 0 0 0 0 0.05 0.1 0.4 0.4 0.3 0.2 0.5 0.8 0.7 0.4 0.2 0.25 0.5 0.55 0.55 0.55 0.5 0.35 0.2
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sat, Sun, Hol, Other 0.05 0 0 0 0 0.05 0.05 0.3 0.3 0.3 0.2 0.45 0.6 0.5 0.35 0.3 0.3 0.3 0.55 0.55 0.55 0.5 0.35 0.2
GAS_EQUIP_SCH SummerDesign 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Other 0.02 0.02 0.02 0.02 0.02 0.03 0.09 0.14 0.1 0.1 0.22 0.27 0.24 0.21 0.14 0.13 0.15 0.17 0.17 0.17 0.15 0.14 0.12 0.02
INFIL_HALF_ON_SCH WD, SummerDesign 1 1 1 1 1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
Sat, WinterDesign 1 1 1 1 1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
Sun, Hol, Other 1 1 1 1 1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
Kitchen_Exhaust_SCH All 1 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WORK_EFF_SCH All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CLOTHING_SCH All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
All 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Dual Zone Control Type Sched All 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
CLGSETP_KITCHEN_SCH WinterDesign 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
Other 26 30 30 30 30 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26
HTGSETP_KITCHEN_SCH SummerDesign 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6
WinterDesign 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
Other 19 15.6 15.6 15.6 15.6 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
CLGSETP_SCH WinterDesign 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
Other 24 30 30 30 30 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24
HTGSETP_SCH SummerDesign 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6
WinterDesign 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
Other 21 15.6 15.6 15.6 15.6 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
HVACOperationSchd All 1 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
MinOA_Sched All 1 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

70
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Kitchen_Case:1_WALKINFREEZER_
CaseCreditReduxSched All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.2 0.2 0.2
Kitchen_Case:1_WALKINFREEZER_
CaseDefrost2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Kitchen_Case:1_WALKINFREEZER_
CaseDripDown2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Kitchen_Case:1_WALKINFREEZER_
WalkInStockingSched Tue, Fri 0 0 0 0 725 417 290 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 125 117 90 0 0 0 0 0 0 0 0 0 0 0 0 125 117 90 0 0
Kitchen_Case:2_SELFCONTAINEDD
ISPLAYCASE_CaseStockingSched All 0 0 0 0 0 0 50 70 70 80 70 50 50 80 90 80 0 0 0 0 0 0 0 0
BLDG_SWH_SCH WD, SummerDesign 0.2 0 0 0 0 0 0.15 0.6 0.55 0.45 0.4 0.45 0.4 0.35 0.3 0.3 0.3 0.4 0.55 0.6 0.5 0.55 0.45 0.25
Sat, WinterDesign 0.2 0 0 0 0 0 0.15 0.15 0.15 0.5 0.45 0.5 0.5 0.45 0.4 0.4 0.35 0.4 0.55 0.55 0.5 0.55 0.4 0.3
Sun, Hol, Other 0.25 0 0 0 0 0 0.15 0.15 0.15 0.15 0.5 0.5 0.4 0.4 0.3 0.3 0.3 0.4 0.5 0.5 0.4 0.5 0.4 0.2
Kitchen Water Equipment Hot Supply
Temp Sched All 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49
Kitchen Water Equipment Latent fract
sched All 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
Kitchen Water Equipment Sensible
fract sched All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
Kitchen Water Equipment Temp
Sched All 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49
PlantOnSched All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SWHSys1 Water Heater Ambient
Temperature Schedule Name All 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22
SWHSys1 Water Heater Setpoint
Temperature Schedule Name All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
SWHSys1-Loop-Temp-Schedule All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60

71
Table B-2 Hospital Hourly Operation Schedules
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ALWAYS_ON All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Kitchen_Exhaust_SCH WD 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0
SummerDesign 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0
WinterDesign 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0
Sats 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ADMIN_EQUIP_SCH WD 0.3 0.3 0.3 0.3 0.5 0.5 1 1 1 1 1 1 1 1 1 1 1 1 0.5 0.5 0.3 0.3 0.3 0.3
SummerDesign 0.3 0.3 0.3 0.3 0.5 0.5 1 1 1 1 1 1 1 1 1 1 1 1 0.5 0.5 0.3 0.3 0.3 0.3
WinterDesign 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3
Sat 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.5 0.5 0.8 0.8 0.8 0.8 0.8 0.8 0.5 0.5 0.5 0.5 0.5 0.3 0.3 0.3 0.3
Other 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.3 0.3 0.3 0.3 0.3 0.3 0.3
ADMIN_LIGHT_SCH WD 0.1 0.1 0.1 0.1 0.3 0.3 0.6 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.6 0.6 0.3 0.3 0.1 0.1
SummerDesign 0.1 0.1 0.1 0.1 0.3 0.3 0.6 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.6 0.6 0.3 0.3 0.1 0.1
WinterDesign 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.3 0.3 0.4 0.4 0.4 0.4 0.4 0.4 0.3 0.3 0.3 0.3 0.3 0.1 0.1 0.1 0.1
Sat 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.3 0.3 0.4 0.4 0.4 0.4 0.4 0.4 0.3 0.3 0.3 0.3 0.3 0.1 0.1 0.1 0.1
Other 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.05 0.05 0.05 0.05 0.05 0.05 0.05
ADMIN_OCC_SCH WD 0.05 0.05 0.05 0.05 0.2 0.2 0.5 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.5 0.5 0.2 0.2 0.05 0.05
SummerDesign 0.05 0.05 0.05 0.05 0.2 0.2 0.5 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.5 0.5 0.2 0.2 0.05 0.05
WinterDesign 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.2 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.2 0.2 0.2 0.2 0.2 0.05 0.05 0.05 0.05
Sat 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.2 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.2 0.2 0.2 0.2 0.2 0.05 0.05 0.05 0.05
Sun, Hol, Other 0 0 0 0 0 0 0 0 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0 0 0 0 0 0 0
BLDG_ELEVATORS WD, SummerDesign 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.5 0.75 1 1 1 0.75 1 1 1 1 1 0.52 0.52 0.52 0.28 0.2 0.2
Sat, WinterDesign 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.4 0.46 0.7 0.7 0.7 0.51 0.51 0.51 0.51 0.51 0.25 0.2 0.2 0.2 0.2 0.2 0.2
Other 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
BLDG_LIGHT_SCH WD 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.5 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.1
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sat 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.1 0.1 0.1 0.1 0.1 0.1
Other 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
CRITICAL_EQUIP_SCH WD 0.5 0.5 0.5 0.5 0.5 0.5 1 1 1 1 1 1 1 1 1 1 1 1 0.8 0.8 0.5 0.5 0.5 0.5
SummerDesign 0.5 0.5 0.5 0.5 0.5 0.5 1 1 1 1 1 1 1 1 1 1 1 1 0.8 0.8 0.5 0.5 0.5 0.5
WinterDesign 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3
Sat 0.5 0.5 0.5 0.5 0.5 0.5 1 1 1 1 1 1 1 1 1 1 1 1 0.8 0.8 0.5 0.5 0.5 0.5
Sun, Hol, Other 0.5 0.5 0.5 0.5 0.5 0.5 1 1 1 1 1 1 1 1 1 1 1 1 0.8 0.8 0.5 0.5 0.5 0.5
CRITICAL_LIGHT_SCH WD 0.5 0.5 0.5 0.5 0.7 0.7 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.7 0.7 0.7 0.7 0.5 0.5
SummerDesign 0.5 0.5 0.5 0.5 0.7 0.7 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.7 0.7 0.7 0.7 0.5 0.5
WinterDesign 0.5 0.5 0.5 0.5 0.7 0.7 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.7 0.7 0.7 0.7 0.5 0.5
Sat 0.5 0.5 0.5 0.5 0.7 0.7 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.7 0.7 0.7 0.7 0.5 0.5
Other 0.5 0.5 0.5 0.5 0.7 0.7 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.7 0.7 0.7 0.7 0.5 0.5
CRITICAL_OCC_SCH WD 0.4 0.4 0.4 0.4 0.65 0.65 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.65 0.65 0.65 0.65 0.4 0.4
SummerDesign 0.4 0.4 0.4 0.4 0.65 0.65 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.65 0.65 0.65 0.65 0.4 0.4
WinterDesign 0.4 0.4 0.4 0.4 0.65 0.65 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.65 0.65 0.65 0.65 0.4 0.4
Sat 0.4 0.4 0.4 0.4 0.65 0.65 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.65 0.65 0.65 0.65 0.4 0.4
Other 0.4 0.4 0.4 0.4 0.65 0.65 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.65 0.65 0.65 0.65 0.4 0.4

72
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
INFIL_QUARTER_ON_SCH WD 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
Sat 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
SummerDesign,
WinterDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Other 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
Kitchen_Elec_Equip_SCH Weekday 0.1 0.1 0.1 0.1 0.1 0.1 0.25 0.35 0.35 0.25 0.35 0.35 0.35 0.25 0.25 0.25 0.35 0.35 0.35 0.25 0.25 0.25 0.25 0.25
Sat 0.1 0.1 0.1 0.1 0.1 0.1 0.25 0.35 0.35 0.25 0.35 0.35 0.35 0.25 0.25 0.25 0.35 0.35 0.35 0.25 0.25 0.25 0.25 0.25
SummerDesign 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Other 0.1 0.1 0.1 0.1 0.1 0.1 0.25 0.35 0.35 0.25 0.35 0.35 0.35 0.25 0.25 0.25 0.35 0.35 0.35 0.25 0.25 0.25 0.25 0.25
Kitchen_Gas_Equip_SCH WD, Sat 0.02 0.02 0.02 0.02 0.02 0.05 0.1 0.15 0.2 0.15 0.25 0.25 0.25 0.2 0.15 0.2 0.3 0.3 0.3 0.2 0.2 0.15 0.1 0.05
SummerDesign 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Other 0.02 0.02 0.02 0.02 0.02 0.05 0.1 0.15 0.2 0.15 0.25 0.25 0.25 0.2 0.15 0.2 0.3 0.3 0.3 0.2 0.2 0.15 0.1 0.05
WORK_EFF_SCH All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CLOTHING_SCH All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
All 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ACTIVITY_SCH All 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
AIR_VELO_SCH All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
ADMIN_CLGSETP_SCH WD 25 25 25 25 25 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 25 25 25 25 25 25
SummerDesign 25 25 25 25 25 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 25 25 25 25 25 25
WinterDesign 25 25 25 25 25 25 25 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 25 25 25 25 25 25 25 25 25
Sats 25 25 25 25 25 25 25 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 25 25 25 25 25 25 25 25 25
Other 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25
ADMIN_HTGSETP_SCH WD 18.3 18.3 18.3 18.3 18.3 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 18.3 18.3 18.3 18.3 18.3 18.3
SummerDesign 18.3 18.3 18.3 18.3 18.3 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 18.3 18.3 18.3 18.3 18.3 18.3
WinterDesign 18.3 18.3 18.3 18.3 18.3 18.3 18.3 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3
Sats 18.3 18.3 18.3 18.3 18.3 18.3 18.3 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3
Other 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3
Kitchen_CLGSETP_SCH WD 30 30 30 30 30 26 26 26 26 26 26 26 26 26 26 26 26 26 30 30 30 30 30 30
SummerDesign 30 30 30 30 30 26 26 26 26 26 26 26 26 26 26 26 26 26 30 30 30 30 30 30
WinterDesign 30 30 30 30 30 30 30 26 26 26 26 26 26 26 26 30 30 30 30 30 30 30 30 30
Sats 30 30 30 30 30 30 30 26 26 26 26 26 26 26 26 30 30 30 30 30 30 30 30 30
Other 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
Kitchen_HTGSETP_SCH WD 15.6 15.6 15.6 15.6 15.6 19 19 19 19 19 19 19 19 19 19 19 19 19 15.6 15.6 15.6 15.6 15.6 15.6
SummerDesign 15.6 15.6 15.6 15.6 15.6 19 19 19 19 19 19 19 19 19 19 19 19 19 15.6 15.6 15.6 15.6 15.6 15.6
WinterDesign 15.6 15.6 15.6 15.6 15.6 15.6 15.6 19 19 19 19 19 19 19 19 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6
Sats 15.6 15.6 15.6 15.6 15.6 15.6 15.6 19 19 19 19 19 19 19 19 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6
Other 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6
CRITICAL_CLGSETP_SCH All 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2
CRITICAL_HTGSETP_SCH All 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1
OR_CLGSETP_SCH All 22.2 22.2 22.2 22.2 22.2 22.2 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 22.2 22.2 22.2 22.2 22.2 22.2 22.2
OR_HTGSETP_SCH All 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3
Dual Zone Control Type Sched All 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
MaxRelHumSetSch All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60

73
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
MinRelHumSetSch All 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40
CAV_SAT_SCH All 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1
Heating-Supply-Air-Temp-Sch All 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16
Seasonal-Reset-Supply-Air-Temp-
Sch All 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1
HVACOperationSchd All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
CAV_OAminFracSchedule All 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33
VAV_OAminFracSchedule All 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
CW-Loop-Temp-Schedule All 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7
HW-Loop-Temp-Schedule All 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2
PlantOnSched All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Kitchen_Flr_5_Case:1_WALKINFRE
EZER_CaseCreditReduxSched All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.2 0.2 0.2
Kitchen_Flr_5_Case:1_WALKINFRE
EZER_CaseDefrost2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Kitchen_Flr_5_Case:1_WALKINFRE
EZER_CaseDripDown2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Kitchen_Flr_5_Case:1_WALKINFRE
EZER_WalkInStockingSched Tue, Fri 0 0 0 0 725 417 290 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 125 117 90 0 0 0 0 0 0 0 0 0 0 0 0 125 117 90 0 0
Kitchen_Flr_5_Case:2_SELFCONT
AINEDDISPLAYCASE_CaseStockin
gSched All 0 0 0 0 0 0 50 70 70 80 70 50 50 80 90 80 0 0 0 0 0 0 0 0
BLDG_SWH_EXTD_SCH WD, SummerDesign 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.5 0.58 0.66 0.78 0.82 0.71 0.82 0.78 0.74 0.63 0.41 0.35 0.35 0.35 0.3 0.3 0.3
Other 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.4 0.5 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.5 0.3 0.3 0.3 0.3 0.3 0.3
BLDG_SWH_SCH WD, SummerDesign 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.17 0.58 0.66 0.78 0.82 0.71 0.82 0.78 0.74 0.63 0.41 0.18 0.18 0.18 0.1 0.01 0.01
Sat, WinterDesign 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.2 0.28 0.3 0.3 0.24 0.24 0.23 0.23 0.23 0.1 0.01 0.01 0.01 0.01 0.01 0.01
Sun, Hol, Other 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
Water Equipment Hot Supply Temp
Sched All 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49
Water Equipment Latent fract sched All 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
Water Equipment Sensible fract
sched All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
Water Equipment Temp Sched All 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49
SWHSys1 Water Heater Ambient
Temperature Schedule Name All 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22
SWHSys1 Water Heater Setpoint
Temperature Schedule Name All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
SWHSys1-Loop-Temp-Schedule All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60

74
Table B-3 Large Hotel Hourly Operation Schedules
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ALWAYS_ON All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ACTIVITY_SCH All 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
AIR_VELO_SCH All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
BLDG_ELEVATORS All 0.05 0.05 0.05 0.05 0.1 0.2 0.4 0.5 0.5 0.35 0.15 0.15 0.15 0.15 0.15 0.15 0.35 0.5 0.5 0.4 0.4 0.3 0.2 0.1
BLDG_EQUIP_SCH WD 0.3 0.25 0.2 0.2 0.2 0.3 0.5 0.6 0.5 0.5 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.7 0.9 0.95 0.9 0.7 0.4
Sat 0.3 0.3 0.2 0.2 0.2 0.2 0.4 0.4 0.5 0.5 0.4 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.7 0.8 0.8 0.8 0.7 0.4
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sun, Hol, Other 0.4 0.4 0.3 0.3 0.3 0.3 0.4 0.5 0.5 0.4 0.4 0.4 0.4 0.3 0.3 0.3 0.3 0.3 0.6 0.8 0.9 0.7 0.6 0.4
BLDG_LIGHT_SCH WD 0.2 0.15 0.1 0.1 0.1 0.2 0.4 0.5 0.4 0.4 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.6 0.8 0.9 0.8 0.6 0.3
Sat 0.2 0.2 0.1 0.1 0.1 0.1 0.3 0.3 0.4 0.4 0.3 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.6 0.7 0.7 0.7 0.6 0.3
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sun, Hol, Other 0.3 0.3 0.2 0.2 0.2 0.2 0.3 0.4 0.4 0.3 0.3 0.3 0.3 0.2 0.2 0.2 0.2 0.2 0.5 0.7 0.8 0.6 0.5 0.3
BLDG_OCC_SCH WD 0.9 0.9 0.9 0.9 0.9 0.9 0.7 0.4 0.4 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.5 0.5 0.5 0.7 0.7 0.8 0.9 0.9
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Sat 0.9 0.9 0.9 0.9 0.9 0.9 0.7 0.5 0.5 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.5 0.6 0.6 0.6 0.7 0.7 0.7
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sun, Hol, Other 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.5 0.5 0.5 0.3 0.3 0.2 0.2 0.2 0.3 0.4 0.4 0.6 0.6 0.8 0.8 0.8
CLOTHING_SCH All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
All 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
GuestRoom_Eqp_Sch WD 0.2 0.2 0.2 0.2 0.2 0.2 0.62 0.9 0.43 0.43 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.51 0.51 0.49 0.66 0.7 0.35 0.2
Sat, Sun, Hol 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.62 0.9 0.62 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.43 0.51 0.49 0.66 0.7 0.35 0.2
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SummerDesign,
CustomDay1,
CustomDay2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
GuestRoom_Ltg_Sch_Base WD 0.22 0.17 0.11 0.11 0.11 0.22 0.44 0.56 0.44 0.44 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.67 0.89 1 0.89 0.67 0.33
Sat, Sun, Hol 0.26 0.26 0.11 0.11 0.11 0.11 0.41 0.41 0.56 0.56 0.41 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.85 1 1 1 0.85 0.41
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SummerDesign,
CustomDay1,
CustomDay2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
GuestRoom_Occ_Sch WD 0.65 0.65 0.65 0.65 0.65 0.65 0.5 0.28 0.28 0.13 0.13 0.13 0.13 0.13 0.13 0.2 0.35 0.35 0.35 0.5 0.5 0.58 0.65 0.65
Sat, Sun, Hol 0.65 0.65 0.65 0.65 0.65 0.65 0.5 0.34 0.34 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.34 0.35 0.65 0.65 0.5 0.5 0.5
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SummerDesign,
CustomDay1,
CustomDay2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
INFIL_QUARTER_ON_SCH All 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
Kitchen_Elec_Equip_SCH Weekday 0.1 0.1 0.1 0.1 0.1 0.1 0.25 0.35 0.35 0.25 0.35 0.35 0.35 0.25 0.25 0.25 0.35 0.35 0.35 0.25 0.25 0.25 0.25 0.25
Sat 0.1 0.1 0.1 0.1 0.1 0.1 0.25 0.35 0.35 0.25 0.35 0.35 0.35 0.25 0.25 0.25 0.35 0.35 0.35 0.25 0.25 0.25 0.25 0.25
SummerDesign 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sun, Hol, Other 0.1 0.1 0.1 0.1 0.1 0.1 0.25 0.35 0.35 0.25 0.35 0.35 0.35 0.25 0.25 0.25 0.35 0.35 0.35 0.25 0.25 0.25 0.25 0.25

75
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Kitchen_Gas_Equip_SCH WD, Sat 0.02 0.02 0.02 0.02 0.02 0.05 0.1 0.15 0.2 0.15 0.25 0.25 0.25 0.2 0.15 0.2 0.3 0.3 0.3 0.2 0.2 0.15 0.1 0.05
SummerDesign 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sun, Hol, Other 0.02 0.02 0.02 0.02 0.02 0.05 0.1 0.15 0.2 0.15 0.25 0.25 0.25 0.2 0.15 0.2 0.3 0.3 0.3 0.2 0.2 0.15 0.1 0.05
LaundryRoom_Eqp_Elec_Sch WD, Sat, Sun, Hol 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SummerDesign,
CustomDay1,
CustomDay2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
LaundryRoom_Eqp_Gas_Sch WD, Sat, Sun, Hol 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SummerDesign,
CustomDay1,
CustomDay2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Lobby_Occ_Sch WD 0.1 0.1 0.1 0.1 0.1 0.3 0.7 0.7 0.7 0.7 0.2 0.2 0.2 0.2 0.2 0.2 0.4 0.4 0.2 0.2 0.2 0.2 0.1 0.1
Sat, Sun, Hol 0.1 0.1 0.1 0.1 0.1 0.1 0.3 0.7 0.7 0.7 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SummerDesign,
CustomDay1,
CustomDay2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WORK_EFF_SCH All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Kitchen_Exhaust_SCH All 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
CLGSETP_SCH All 30 30 30 30 30 30 30 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24
HTGSETP_SCH All 16 16 16 16 16 16 16 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
Corr_CLGSETP_SCH All 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
Corr_HTGSETP_SCH All 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16
Guest_CLGSETP_SCH All 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24
Guest_HTGSETP_SCH All 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
Kitchen_CLGSETP_SCH All 30 30 30 30 30 30 30 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26
Kitchen_HTGSETP_SCH All 16 16 16 16 16 16 16 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
Dual Zone Control Type Sched All 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
HVACOperationSchd All 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
MinOA_Sched All 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Seasonal-Reset-Supply-Air-Temp-Sch All 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13
CW-Loop-Temp-Schedule All 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7
HW-Loop-Temp-Schedule All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
PlantOnSched All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Kitchen_Flr_6_Case:1_WALKINFREEZER_
CaseCreditReduxSched All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.2 0.2 0.2
Kitchen_Flr_6_Case:1_WALKINFREEZER_
CaseDefrost2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Kitchen_Flr_6_Case:1_WALKINFREEZER_
CaseDripDown2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Kitchen_Flr_6_Case:1_WALKINFREEZER_
WalkInStockingSched Tue, Fri 0 0 0 0 725 417 290 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 125 117 90 0 0 0 0 0 0 0 0 0 0 0 0 125 117 90 0 0
Kitchen_Flr_6_Case:2_SELFCONTAINEDD
ISPLAYCASE_CaseStockingSched All 0 0 0 0 0 0 50 70 70 80 70 50 50 80 90 80 0 0 0 0 0 0 0 0

76
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Kitchen_SWH_SCH WD, SummerDesign 0.2 0.15 0.15 0.15 0.2 0.25 0.5 0.6 0.55 0.45 0.4 0.45 0.4 0.35 0.3 0.3 0.3 0.4 0.55 0.6 0.5 0.55 0.45 0.25
Sat, WinterDesign 0.2 0.15 0.15 0.15 0.2 0.25 0.4 0.5 0.5 0.5 0.45 0.5 0.5 0.45 0.4 0.4 0.35 0.4 0.55 0.55 0.5 0.55 0.4 0.3
Sun, Hol, Other 0.25 0.2 0.2 0.2 0.2 0.3 0.5 0.5 0.5 0.55 0.5 0.5 0.4 0.4 0.3 0.3 0.3 0.4 0.5 0.5 0.4 0.5 0.4 0.2
GuestRoom_SWH_Sch WD 0.2 0.15 0.15 0.15 0.2 0.35 0.6 0.8 0.55 0.4 0.3 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.55 0.4 0.4 0.6 0.45 0.25
Other 0.2 0.15 0.15 0.15 0.2 0.25 0.35 0.6 0.8 0.55 0.4 0.3 0.2 0.2 0.2 0.2 0.2 0.25 0.3 0.4 0.4 0.4 0.6 0.35
LaundryRoom_SWH_Sch All 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0
Water Equipment Latent fract sched All 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
Water Equipment Sensible fract sched All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
Guest Room Water Equipment Hot Supply
Temp Sched All 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3
Guest Room Water Equipment Temp Sched All 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3
Kitchen Water Equipment Hot Supply Temp
Sched All 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49
Kitchen Water Equipment Temp Sched All 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49
Laundry Water Equipment Hot Supply Temp
Sched All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
Laundry Water Equipment Temp Sched All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
SWHSys1 Water Heater Ambient
Temperature Schedule Name All 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22
SWHSys1 Water Heater Setpoint
Temperature Schedule Name All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
SWHSys1-Loop-Temp-Schedule All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60

77
Table B-4 Large Office Hourly Operation Schedules
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ALWAYS_ON All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
BLDG_ELEVATORS All 0.05 0.05 0.05 0.05 0.1 0.2 0.4 0.5 0.5 0.35 0.15 0.15 0.15 0.15 0.15 0.15 0.35 0.5 0.5 0.4 0.4 0.3 0.2 0.1
INFIL_QUARTER_ON_SCH WD, SummerDesign 1 1 1 1 1 1 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 1 1
Sat, WinterDesign 1 1 1 1 1 1 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 1 1 1 1 1 1
Sun, Hol, Other 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
BLDG_OCC_SCH SummerDesign 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0.05 0.05
WD 0 0 0 0 0 0 0.1 0.2 0.95 0.95 0.95 0.95 0.5 0.95 0.95 0.95 0.95 0.7 0.4 0.4 0.1 0.1 0.05 0.05
Sat 0 0 0 0 0 0 0.1 0.1 0.5 0.5 0.5 0.5 0.5 0.5 0.1 0.1 0.1 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
BLDG_LIGHT_SCH WD 0.05 0.05 0.05 0.05 0.05 0.1 0.1 0.3 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.7 0.5 0.5 0.3 0.3 0.1 0.05
Sat 0.05 0.05 0.05 0.05 0.05 0.05 0.1 0.1 0.5 0.5 0.5 0.5 0.5 0.5 0.15 0.15 0.15 0.05 0.05 0.05 0.05 0.05 0.05 0.05
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Other 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
BLDG_EQUIP_SCH WD 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.9 0.9 0.9 0.9 0.8 0.9 0.9 0.9 0.9 0.8 0.6 0.6 0.5 0.5 0.4 0.4
Sat 0.3 0.3 0.3 0.3 0.3 0.3 0.4 0.4 0.5 0.5 0.5 0.5 0.5 0.5 0.35 0.35 0.35 0.3 0.3 0.3 0.3 0.3 0.3 0.3
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Other 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3
ACTIVITY_SCH All 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
WORK_EFF_SCH All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
AIR_VELO_SCH All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
CLOTHING_SCH All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
All 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
CLGSETP_SCH WD, SummerDesign 26.7 26.7 26.7 26.7 26.7 26.7 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 26.7 26.7
Sat 26.7 26.7 26.7 26.7 26.7 26.7 24 24 24 24 24 24 24 24 24 24 24 24 26.7 26.7 26.7 26.7 26.7 26.7
WinterDesign 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7
Other 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7
HTGSETP_SCH WD 15.6 15.6 15.6 15.6 15.6 15.6 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 15.6 15.6
SummerDesign 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6
Sat 15.6 15.6 15.6 15.6 15.6 15.6 21 21 21 21 21 21 21 21 21 21 21 21 15.6 15.6 15.6 15.6 15.6 15.6
WinterDesign 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
Other 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6
Seasonal-Reset-Supply-Air-Temp-Sch All 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8
MinOA_MotorizedDamper_Sched WD, SummerDesign 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0
Sat, WinterDesign 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Dual Zone Control Type Sched All 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
HVACOperationSchd WD, SummerDesign 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0
Sat, WinterDesign 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CW-Loop-Temp-Schedule All 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7
HW-Loop-Temp-Schedule All 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2

78
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
BLDG_SWH_SCH WD, SummerDesign 0.05 0.05 0.05 0.05 0.05 0.08 0.07 0.19 0.35 0.38 0.39 0.47 0.57 0.54 0.34 0.33 0.44 0.26 0.21 0.15 0.17 0.08 0.05 0.05
Sat, WinterDesign 0.05 0.05 0.05 0.05 0.05 0.08 0.07 0.11 0.15 0.21 0.19 0.23 0.2 0.19 0.15 0.13 0.14 0.07 0.07 0.07 0.07 0.09 0.05 0.05
Other 0.04 0.04 0.04 0.04 0.04 0.07 0.04 0.04 0.04 0.04 0.04 0.06 0.06 0.09 0.06 0.04 0.04 0.04 0.04 0.04 0.04 0.07 0.04 0.04
Water Equipment Latent fract sched All 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
Water Equipment Sensible fract sched All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
SWHSys1 Water Heater Ambient
Temperature Schedule Name All 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22
Water Equipment Temp Sched All 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3
Water Equipment Hot Supply Temp
Sched All 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3
SWHSys1 Water Heater Setpoint
Temperature Schedule Name All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
SWHSys1-Loop-Temp-Schedule All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60

79
Table B-5 Medium Office Hourly Operation Schedules
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ALWAYS_ON All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ACTIVITY_SCH All 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
AIR_VELO_SCH All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
BLDG_ELEVATORS WD, SummerDesign 0 0 0 0 0 0 0 0.35 0.69 0.43 0.37 0.43 0.58 0.48 0.37 0.37 0.46 0.62 0.12 0.04 0.04 0 0 0
Sat, WinterDesign 0 0 0 0 0 0 0 0.16 0.14 0.21 0.18 0.25 0.21 0.13 0.08 0.04 0.05 0.06 0 0 0 0 0 0
Sun, Hol, Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
BLDG_OCC_SCH SummerDesign 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0.05 0.05
WD 0 0 0 0 0 0 0.1 0.2 0.95 0.95 0.95 0.95 0.5 0.95 0.95 0.95 0.95 0.7 0.4 0.4 0.1 0.1 0.05 0.05
Sat 0 0 0 0 0 0 0.1 0.1 0.5 0.5 0.5 0.5 0.5 0.5 0.1 0.1 0.1 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
BLDG_LIGHT_SCH WD 0.05 0.05 0.05 0.05 0.05 0.1 0.1 0.3 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.7 0.5 0.5 0.3 0.3 0.1 0.05
Sat 0.05 0.05 0.05 0.05 0.05 0.05 0.1 0.1 0.5 0.5 0.5 0.5 0.5 0.5 0.15 0.15 0.15 0.05 0.05 0.05 0.05 0.05 0.05 0.05
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Other 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
BLDG_EQUIP_SCH WD 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.9 0.9 0.9 0.9 0.8 0.9 0.9 0.9 0.9 0.8 0.6 0.6 0.5 0.5 0.4 0.4
Sat 0.3 0.3 0.3 0.3 0.3 0.3 0.4 0.4 0.5 0.5 0.5 0.5 0.5 0.5 0.35 0.35 0.35 0.3 0.3 0.3 0.3 0.3 0.3 0.3
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Other 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3
CLOTHING_SCH All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
All 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
INFIL_QUARTER_ON_SCH WD, SummerDesign 1 1 1 1 1 1 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 1 1
Sat, WinterDesign 1 1 1 1 1 1 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 1 1 1 1 1 1
Sun, Hol, Other 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WORK_EFF_SCH All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Dual Zone Control Type
Sched All 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
CLGSETP_SCH WD, SummerDesign 26.7 26.7 26.7 26.7 26.7 26.7 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 26.7 26.7
Sat 26.7 26.7 26.7 26.7 26.7 26.7 24 24 24 24 24 24 24 24 24 24 24 24 26.7 26.7 26.7 26.7 26.7 26.7
WinterDesign 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7
Other 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7
HTGSETP_SCH WD 15.6 15.6 15.6 15.6 15.6 15.6 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 15.6 15.6
SummerDesign 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6
Sat 15.6 15.6 15.6 15.6 15.6 15.6 21 21 21 21 21 21 21 21 21 21 21 21 15.6 15.6 15.6 15.6 15.6 15.6
WinterDesign 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
Other 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6
HVACOperationSchd WD, SummerDesign 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0
Sat, WinterDesign 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
MinOA_MotorizedDamper_S
ched WD, SummerDesign 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0
Sat, WinterDesign 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0

80
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Seasonal-Reset-Supply-Air-
Temp-Sch All 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8
BLDG_SWH_SCH WD, SummerDesign 0.05 0.05 0.05 0.05 0.05 0.08 0.07 0.19 0.35 0.38 0.39 0.47 0.57 0.54 0.34 0.33 0.44 0.26 0.21 0.15 0.17 0.08 0.05 0.05
Sat, WinterDesign 0.05 0.05 0.05 0.05 0.05 0.08 0.07 0.11 0.15 0.21 0.19 0.23 0.2 0.19 0.15 0.13 0.14 0.07 0.07 0.07 0.07 0.09 0.05 0.05
Sun, Hol, Other 0.04 0.04 0.04 0.04 0.04 0.07 0.04 0.04 0.04 0.04 0.04 0.06 0.06 0.09 0.06 0.04 0.04 0.04 0.04 0.04 0.04 0.07 0.04 0.04
Water Equipment Latent
fract sched All 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
Water Equipment Sensible
fract sched All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
Water Equipment Hot Supply
Temp Sched All 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3
Water Equipment Temp
Sched All 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3
SWHSys1 Water Heater
Ambient Temperature
Schedule Name All 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22
SWHSys1 Water Heater
Setpoint Temperature
Schedule Name All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
SWHSys1-Loop-Temp-
Schedule All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
ALWAYS_ON All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ACTIVITY_SCH All 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
AIR_VELO_SCH All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
BLDG_ELEVATORS WD, SummerDesign 0 0 0 0 0 0 0 0.35 0.69 0.43 0.37 0.43 0.58 0.48 0.37 0.37 0.46 0.62 0.12 0.04 0.04 0 0 0
Sat, WinterDesign 0 0 0 0 0 0 0 0.16 0.14 0.21 0.18 0.25 0.21 0.13 0.08 0.04 0.05 0.06 0 0 0 0 0 0
Sun, Hol, Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
BLDG_OCC_SCH SummerDesign 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0.05 0.05
WD 0 0 0 0 0 0 0.1 0.2 0.95 0.95 0.95 0.95 0.5 0.95 0.95 0.95 0.95 0.7 0.4 0.4 0.1 0.1 0.05 0.05
Sat 0 0 0 0 0 0 0.1 0.1 0.5 0.5 0.5 0.5 0.5 0.5 0.1 0.1 0.1 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
BLDG_LIGHT_SCH WD 0.05 0.05 0.05 0.05 0.05 0.1 0.1 0.3 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.7 0.5 0.5 0.3 0.3 0.1 0.05
Sat 0.05 0.05 0.05 0.05 0.05 0.05 0.1 0.1 0.5 0.5 0.5 0.5 0.5 0.5 0.15 0.15 0.15 0.05 0.05 0.05 0.05 0.05 0.05 0.05
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Other 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
BLDG_EQUIP_SCH WD 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.9 0.9 0.9 0.9 0.8 0.9 0.9 0.9 0.9 0.8 0.6 0.6 0.5 0.5 0.4 0.4
Sat 0.3 0.3 0.3 0.3 0.3 0.3 0.4 0.4 0.5 0.5 0.5 0.5 0.5 0.5 0.35 0.35 0.35 0.3 0.3 0.3 0.3 0.3 0.3 0.3
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Other 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3
CLOTHING_SCH All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
All 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
INFIL_QUARTER_ON_SCH WD, SummerDesign 1 1 1 1 1 1 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 1 1
Sat, WinterDesign 1 1 1 1 1 1 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 1 1 1 1 1 1
Sun, Hol, Other 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

81
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
WORK_EFF_SCH All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Dual Zone Control Type
Sched All 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
CLGSETP_SCH WD, SummerDesign 26.7 26.7 26.7 26.7 26.7 26.7 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 26.7 26.7
Sat 26.7 26.7 26.7 26.7 26.7 26.7 24 24 24 24 24 24 24 24 24 24 24 24 26.7 26.7 26.7 26.7 26.7 26.7
WinterDesign 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7
Other 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7

82
Table B-6 Midrise Apartment Hourly Operation Schedules
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ALWAYS_ON All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
BLDG_ELEVATORS All 0.05 0.05 0.05 0.05 0.1 0.2 0.4 0.5 0.5 0.35 0.15 0.15 0.15 0.15 0.15 0.15 0.35 0.5 0.5 0.4 0.4 0.3 0.2 0.1
INFIL_SCH All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
OFFICE_INFIL_SCH WD 1 1 1 1 1 1 1 1 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 1 1 1 1 1 1 1
Other 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
APT_OCC_SCH All 1 1 1 1 1 1 1 0.85 0.39 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.3 0.52 0.87 0.87 0.87 1 1 1
WD, SummerDesign,
OFF_OCC_SCH WinterDesign 0 0 0 0 0 0 0 0 1 1 1 1 0.5 1 1 1 1 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APT_LIGHT_SCH All 0.07 0.07 0.07 0.07 0.19 0.39 0.44 0.39 0.17 0.12 0.12 0.12 0.12 0.12 0.12 0.21 0.44 0.62 0.83 0.99 1 0.69 0.38 0.16
OFF_LIGHT_SCH WD, SummerDesign 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.9 0.9 0.9 0.9 0.8 0.9 0.9 0.9 0.9 0.18 0.18 0.18 0.18 0.18 0.18 0.18
Other 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
COR_LIGHT_SCH All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
APT_EQP_SCH All 0.45 0.41 0.39 0.38 0.38 0.43 0.54 0.65 0.66 0.67 0.69 0.7 0.69 0.66 0.65 0.68 0.8 1 1 0.93 0.89 0.85 0.71 0.58
OFF_EQP_SCH WD, SummerDesign 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.5 1 1 1 1 0.94 1 1 1 1 0.5 0.33 0.33 0.33 0.33 0.33 0.33
Other 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33
ACTIVITY_SCH All 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
WORK_EFF_SCH All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
AIR_VELO_SCH All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
CLOTHING_SCH All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
All 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
UnitHeater_ClgSP_Sch All 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40
UnitHeater_HtgSP_Sch All 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6
APT_CLGSETP_SCH All 23.9 23.9 23.9 23.9 23.9 23.9 23.9 23.9 23.9 23.9 23.9 23.9 23.9 23.9 23.9 23.9 23.9 23.9 23.9 23.9 23.9 23.9 23.9 23.9
APT_HTGSETP_SCH All 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1
OFF_HTGSETP_SCH WD, WinterDesign 15.6 15.6 15.6 15.6 15.6 15.6 15.6 18.3 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 18.3 15.6 15.6 15.6 15.6 15.6 15.6
Other 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6
OFF_CLGSETP_SCH WD, SummerDesign 29.4 29.4 29.4 29.4 29.4 29.4 29.4 26.7 23.9 23.9 23.9 23.9 23.9 23.9 23.9 23.9 23.9 26.7 29.4 29.4 29.4 29.4 29.4 29.4
Other 29.4 29.4 29.4 29.4 29.4 29.4 29.4 29.4 29.4 29.4 29.4 29.4 29.4 29.4 29.4 29.4 29.4 29.4 29.4 29.4 29.4 29.4 29.4 29.4
Dual Zone Control Type Sched All 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
Apt_Operation All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
WD, SummerDesign,
Office_Operation WinterDesign 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
MinOA_Sched All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Apartment Water Equipment
Latent fract sched All 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
Apartment Water Equipment
Sensible fract sched All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
Apartment Water Equipment
Temp Sched All 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3
Apartment Water Equipment Hot
Supply Temp Sched All 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3
SWHSys1 Water Heater Setpoint All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60

83
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Temperature Schedule Name
SWHSys1 Water Heater Ambient
Temperature Schedule Name All 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22
SWHSys1-Loop-Temp-Schedule All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
APT_DHW_SCH All 0.08 0.04 0.01 0.01 0.04 0.27 0.94 1 0.96 0.84 0.76 0.61 0.53 0.47 0.41 0.47 0.55 0.73 0.86 0.82 0.75 0.61 0.53 0.29

84
Table B-7 Outpatient Health Care Hourly Operation Schedules
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ALWAYS_ON All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
BLDG_ELEVATORS WD, SummerDesign 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.5 0.75 1 1 1 0.75 1 1 1 1 1 0.52 0.52 0.52 0.28 0.05 0.05
Sat 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.4 0.46 0.7 0.7 0.7 0.51 0.51 0.51 0.51 0.51 0.25 0.05 0.05 0.05 0.05 0.05 0.05
Other 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
BLDG_EQUIP_SCH WD, SummerDesign 0.3 0.3 0.3 0.3 0.5 0.5 1 1 1 1 1 1 1 1 1 1 1 1 0.5 0.5 0.3 0.3 0.3 0.3
Sat 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.5 0.5 0.8 0.8 0.8 0.8 0.8 0.8 0.5 0.5 0.5 0.5 0.5 0.3 0.3 0.3 0.3
Other 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.3 0.3 0.3 0.3 0.3 0.3 0.3
BLDG_LIGHT_SCH WD, SummerDesign 0.1 0.1 0.1 0.1 0.3 0.3 0.6 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.6 0.6 0.3 0.3 0.1 0.1
Sat 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.3 0.3 0.4 0.4 0.4 0.4 0.4 0.4 0.3 0.3 0.3 0.3 0.3 0.1 0.1 0.1 0.1
Other 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.05 0.05 0.05 0.05 0.05 0.05 0.05
BLDG_OCC_SCH WD, SummerDesign 0.05 0.05 0.05 0.05 0.2 0.2 0.5 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.5 0.5 0.2 0.2 0.05 0.05
Sat 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.2 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.2 0.2 0.2 0.2 0.2 0.05 0.05 0.05 0.05
Other 0 0 0 0 0 0 0 0 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0 0 0 0 0 0 0
CLOTHING_SCH All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
All 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WORK_EFF_SCH All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
AIR_VELO_SCH All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
ACTIVITY_SCH All 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
SummerDesign,
INFIL_SCH WinterDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Other 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
WD, Sat,
RADIOLOGY_EQUIP_SCH SummerDesign 0.01 0.01 0.01 0.01 0.01 0.01 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.01 0.01 0.01 0.01 0.01 0.01
Other 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
OR_CLGSETP_SCH All 22.2 22.2 22.2 22.2 22.2 22.2 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 22.2 22.2 22.2 22.2 22.2 22.2 22.2
OR_HTGSETP_SCH All 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3
CLGSETP_SCH WD, SummerDesign 25 25 25 25 25 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 25 25 25 25 25 25
Sat, WinterDesign 25 25 25 25 25 25 25 22.2 22.2 22.2 22.2 22.2 22.2 22.2 22.2 25 25 25 25 25 25 25 25 25
Other 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25
HTGSETP_SCH WD, SummerDesign 18.3 18.3 18.3 18.3 18.3 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 18.3 18.3 18.3 18.3 18.3 18.3
Sat, WinterDesign 18.3 18.3 18.3 18.3 18.3 18.3 18.3 21.1 21.1 21.1 21.1 21.1 21.1 21.1 21.1 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3
Other 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3 18.3
Dual Zone Control Type
Sched All 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
MaxRelHumSetSch All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
MinRelHumSetSch All 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40

AHU-1_MinOAFracSchedule All 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33
AHU-1_Fan_Sch WD, Sat 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0
SummerDesign,
WinterDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

85
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
AHU-2_Fan_Sch WD, Sat 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0
SummerDesign,
WinterDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VAV_SAT_SCH All 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8
CAV_SAT_SCH All 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1
HW-Loop-Temp-Schedule All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
PlantOnSched All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
CW-Loop-Temp-Schedule All 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7
HeatSys1 Loop Setpoint
Sched All 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2 82.2
BLDG_SWH_SCH WD, SummerDesign 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.17 0.58 0.66 0.78 0.82 0.71 0.82 0.78 0.74 0.63 0.41 0.18 0.18 0.18 0.1 0.01 0.01
Sat 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.2 0.28 0.3 0.3 0.24 0.24 0.23 0.23 0.23 0.1 0.01 0.01 0.01 0.01 0.01 0.01
Other 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
Water Equipment Latent
fract sched All 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
Water Equipment Sensible
fract sched All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
Water Equipment Hot Supply
Temp Sched All 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3
Water Equipment Temp
Sched All 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3
SWHSys1 Water Heater
Ambient Temperature
Schedule Name All 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22
SWHSys1 Water Heater
Setpoint Temperature
Schedule Name All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
SWHSys1-Loop-Temp-
Schedule All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60

86
Table B-8 Primary School Hourly Operation Schedules
Through
Schedule (Date) Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ALWAYS_ON 12/31 All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
BLDG_EQUIP_SCH 6/30 WD, SummerDesign 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.35 0.35 0.35 0.35 0.35 0.35 0.35
Other 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35
9/1 WD, SummerDesign 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.25 0.25 0.25 0.25 0.25 0.25 0.25
Other 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
12/31 WD, SummerDesign 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.35 0.35 0.35 0.35 0.35 0.35 0.35
Other 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35
BLDG_LIGHT_SCH 6/30 WD, SummerDesign 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.18 0.18 0.18
Other 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
9/1 WD, SummerDesign 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.18 0.18 0.18 0.18
Other 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
12/31 WD, SummerDesign 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.18 0.18 0.18
Other 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
BLDG_OCC_SCH 6/30 WD, SummerDesign 0 0 0 0 0 0 0 0 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.15 0.15 0.15 0.15 0.15 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9/1 WD, SummerDesign 0 0 0 0 0 0 0 0 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12/31 WD, SummerDesign 0 0 0 0 0 0 0 0 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.15 0.15 0.15 0.15 0.15 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
BLDG_OCC_SCH_Cafeteria 6/30 WD, SummerDesign 0 0 0 0 0 0 0 0.15 0.15 0.05 0.05 0.95 0.95 0.15 0.15 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9/1 WD, SummerDesign 0 0 0 0 0 0 0 0 0 0.25 0.25 0.25 0.25 0.25 0.25 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12/31 WD, SummerDesign 0 0 0 0 0 0 0 0.15 0.15 0.05 0.05 0.95 0.95 0.15 0.15 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
BLDG_OCC_SCH_Gym 6/30 WD, SummerDesign 0 0 0 0 0 0 0 0 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.95 0.95 0.95 0.95 0.95 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9/1 WD, SummerDesign 0 0 0 0 0 0 0 0 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12/31 WD, SummerDesign 0 0 0 0 0 0 0 0 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.95 0.95 0.95 0.95 0.95 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
BLDG_OCC_SCH_Offices 6/30 WD, SummerDesign 0 0 0 0 0 0 0 0 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.15 0.15 0.15 0.15 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9/1 WD, SummerDesign 0 0 0 0 0 0 0 0 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12/31 WD, SummerDesign 0 0 0 0 0 0 0 0 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.15 0.15 0.15 0.15 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
KITCHEN_ELEC_EQUIP_SCH 6/30 WD, SummerDesign 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.15 0.15 0.25 0.25 0.25 0.15 0.15 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
Other 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
9/1 WD, SummerDesign 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.13 0.13 0.2 0.2 0.2 0.13 0.13 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
Other 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
12/31 WD, SummerDesign 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.15 0.15 0.25 0.25 0.25 0.15 0.15 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1

87
Through
Schedule (Date) Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Other 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
KITCHEN_GAS_EQUIP_SCH 6/30 WD, SummerDesign 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.15 0.15 0.2 0.2 0.2 0.1 0.1 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
Other 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
9/1 WD, SummerDesign 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.1 0.1 0.15 0.15 0.15 0.1 0.1 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
Other 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
12/31 WD, SummerDesign 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.15 0.15 0.2 0.2 0.2 0.1 0.1 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
Other 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
Kitchen_Exhaust_SCH 12/31 WD, SummerDesign 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
INFIL_SCH 12/31 All 1 1 1 1 1 1 1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 1 1 1
WORK_EFF_SCH 12/31 All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CLOTHING_SCH 04/30 All 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
09/30 All 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6
12/31 All 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
ACTIVITY_SCH 12/31 All 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
AIR_VELO_SCH 12/31 All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
CLGSETP_SCH 6/30 SummerDesign 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24
WE, Hol,
WinterDesign 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27
Other 27 27 27 27 27 27 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 27 27 27
9/1 SummerDesign 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24
WE, Hol,
WinterDesign 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27
Other 27 27 27 27 27 27 27 24 24 24 24 24 24 24 24 24 24 24 27 27 27 27 27 27
12/31 SummerDesign 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24
WE, Hol,
WinterDesign 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27
Other 27 27 27 27 27 27 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 27 27 27
CLGSETP_SCH_BathCorrMechKitchen 12/31 SummerDesign 27 27 27 27 27 27 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 27 27 27
Other 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27
HTGSETP_SCH 6/30 WinterDesign 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
WE, Hol,
SummerDesign 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16
Other 16 16 16 16 16 16 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 16 16 16
9/1 WinterDesign 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
WE, Hol,
SummerDesign 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16
Other 16 16 16 16 16 16 16 21 21 21 21 21 21 21 21 21 21 21 16 16 16 16 16 16
12/31 WinterDesign 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
WE, Hol,
SummerDesign 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16
Other 16 16 16 16 16 16 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 16 16 16
HTGSETP_SCH_BathCorrMechKitchen 12/31 WinterDesign 16 16 16 16 16 16 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 16 16 16
Other 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16
HVACOperationSchd 12/31 WD, SummerDesign 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

88
Through
Schedule (Date) Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
MinOA_Sched 12/31 WD, SummerDesign 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Seasonal-Reset-Supply-Air-Temp-Sch 12/31 All 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8
Dual Zone Control Type Sched 12/31 All 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
HW-Loop-Temp-Schedule 12/31 All 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67
PlantOnSched 12/31 All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Kitchen_ZN_1_FLR_1_Case:1_WALKIN
FREEZER_CaseCreditReduxSched 12/31 All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.2 0.2 0.2
Kitchen_ZN_1_FLR_1_Case:1_WALKIN
FREEZER_CaseDefrost2aDaySched 12/31 All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Kitchen_ZN_1_FLR_1_Case:1_WALKIN
FREEZER_CaseDripDown2aDaySched 12/31 All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Kitchen_ZN_1_FLR_1_Case:1_WALKIN
FREEZER_WalkInStockingSched 12/31 Tue, Fri 0 0 0 0 725 417 290 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 125 117 90 0 0 0 0 0 0 0 0 0 0 0 0 125 117 90 0 0
Kitchen_ZN_1_FLR_1_Case:2_SELFCO
NTAINEDDISPLAYCASE_CaseStocking
Sched 12/31 All 0 0 0 0 0 0 50 70 70 80 70 50 50 80 90 80 0 0 0 0 0 0 0 0
BLDG_SWH_SCH 6/30 WD, SummerDesign 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.1 0.34 0.6 0.63 0.72 0.79 0.83 0.61 0.65 0.1 0.1 0.19 0.25 0.22 0.22 0.12 0.09
Sat, WinterDesign 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.05 0.05 0.05 0.05 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
Other 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.05 0.05 0.05 0.05 0.05 0.05 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
9/1 WD, SummerDesign 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.19 0.25 0.22 0.22 0.12 0.09
Sat, WinterDesign 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.05 0.05 0.05 0.05 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
Other 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.05 0.05 0.05 0.05 0.05 0.05 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
12/31 WD, SummerDesign 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.1 0.34 0.6 0.63 0.72 0.79 0.83 0.61 0.65 0.1 0.1 0.19 0.25 0.22 0.22 0.12 0.09
Sat, WinterDesign 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.05 0.05 0.05 0.05 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
Other 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.05 0.05 0.05 0.05 0.05 0.05 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
SHW_default Latent fract sched 12/31 All 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
SHW_default Sensible fract sched 12/31 All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
SHW_Bath Hot Supply Temp Sched 12/31 All 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3
SHW_Bath Temp Sched 12/31 All 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3
SHW_Kitchen Hot Supply Temp Sched 12/31 All 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49
SHW_Kitchen Temp Sched 12/31 All 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49
SWHSys1 Water Heater Ambient
Temperature Schedule Name 12/31 All 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22
SWHSys1 Water Heater Setpoint
Temperature Schedule Name 12/31 All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
SWHSys1-Loop-Temp-Schedule 12/31 All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60

89
Table B-9 Retail Hourly Operation Schedules
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ALWAYS_ON All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
BLDG_EQUIP_SCH WD 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.4 0.7 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.8 0.8 0.7 0.4 0.2 0.2
Sat 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.3 0.5 0.8 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.7 0.5 0.5 0.3 0.15 0.15
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Other 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.3 0.3 0.6 0.6 0.8 0.8 0.8 0.8 0.8 0.6 0.4 0.15 0.15 0.15 0.15 0.15
BLDG_LIGHT_SCH WD 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.2 0.5 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.6 0.6 0.5 0.2 0.05 0.05
Sat 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.1 0.3 0.6 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.5 0.3 0.3 0.1 0.05 0.05
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Other 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.1 0.1 0.4 0.4 0.6 0.6 0.6 0.6 0.6 0.4 0.2 0.05 0.05 0.05 0.05 0.05
BLDG_OCC_SCH WD 0 0 0 0 0 0 0 0.1 0.2 0.5 0.5 0.7 0.7 0.7 0.7 0.8 0.7 0.5 0.5 0.3 0.3 0 0 0
SummerDesign,
WinterDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Sat 0 0 0 0 0 0 0 0.1 0.2 0.5 0.6 0.8 0.8 0.8 0.8 0.8 0.8 0.6 0.2 0.2 0.2 0.1 0 0
Other 0 0 0 0 0 0 0 0 0 0.1 0.2 0.2 0.4 0.4 0.4 0.4 0.4 0.2 0.1 0 0 0 0 0
INFIL_HALF_ON_SCH WD, SummerDesign 1 1 1 1 1 1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 1 1 1
Sat 1 1 1 1 1 1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 1 1
WinterDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Other 1 1 1 1 1 1 1 1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 1 1 1 1 1 1 1
INFIL_FRONT_SCH WD, SummerDesign 0.25 0.25 0.25 0.25 0.25 0.25 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0.25 0.25 0.25
Sat 0.25 0.25 0.25 0.25 0.25 0.25 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0.25 0.25
WinterDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Other 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 1 1 1 1 1 1 1 1 1 0.25 0.25 0.25 0.25 0.25 0.25 0.25
WORK_EFF_SCH All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ACTIVITY_SCH All 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
AIR_VELO_SCH All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
CLOTHING_SCH All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
All 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
CLGSETP_SCH WD, SummerDesign 30 30 30 30 30 30 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 30 30 30
Sat 30 30 30 30 30 30 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 30 30
WinterDesign 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
Sun, Hol, Other 30 30 30 30 30 30 30 30 24 24 24 24 24 24 24 24 24 24 24 30 30 30 30 30
Dual Zone Control Type Sched All 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
FRONT_ENTRY_COOLING All 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90 90
HTGSETP_SCH WD 15.6 15.6 15.6 15.6 15.6 15.6 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 15.6 15.6 15.6
SummerDesign 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6
WinterDesign 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
Sat 15.6 15.6 15.6 15.6 15.6 15.6 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 15.6 15.6
Sun, Hol, Other 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 21 21 21 21 21 21 21 21 21 21 21 15.6 15.6 15.6 15.6 15.6
HVACOperationSchd WD, SummerDesign 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0
Sat, WinterDesign 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0
Other 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0

90
Table B-10 Secondary School Hourly Operation Schedules
Schedule Through Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ALWAYS_ON 12/31 All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Kitchen_Exhaust_SCH 12/31 WD, SummerDesign 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
BLDG_ELEVATORS 12/31 WD, SummerDesign 0 0 0 0 0 0 0 0 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.15 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
BLDG_EQUIP_SCH 6/30 WD, SummerDesign 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.35 0.35 0.35 0.35 0.35 0.35 0.35
Other 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35
9/1 WD, SummerDesign 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.25 0.25 0.25 0.25 0.25 0.25 0.25
Other 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
12/31 WD, SummerDesign 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.35 0.35 0.35 0.35 0.35 0.35 0.35
Other 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35
BLDG_LIGHT_SCH 6/30 WD, SummerDesign 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.18 0.18 0.18
Other 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
9/1 WD, SummerDesign 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.18 0.18 0.18 0.18
Other 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
12/31 WD, SummerDesign 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.18 0.18 0.18
Other 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18
BLDG_OCC_SCH 6/30 WD, SummerDesign 0 0 0 0 0 0 0 0 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.15 0.15 0.15 0.15 0.15 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9/1 WD, SummerDesign 0 0 0 0 0 0 0 0 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12/31 WD, SummerDesign 0 0 0 0 0 0 0 0 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.15 0.15 0.15 0.15 0.15 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
BLDG_OCC_SCH_Auditorium 6/30 WD, SummerDesign 0 0 0 0 0 0 0 0 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.95 0.95 0.1 0.1 0.1 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9/1 WD, SummerDesign 0 0 0 0 0 0 0 0 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.35 0.35 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12/31 WD, SummerDesign 0 0 0 0 0 0 0 0 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.95 0.95 0.1 0.1 0.1 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
BLDG_OCC_SCH_Cafeteria 6/30 WD, SummerDesign 0 0 0 0 0 0 0 0.15 0.15 0.05 0.05 0.95 0.95 0.15 0.15 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9/1 WD, SummerDesign 0 0 0 0 0 0 0 0 0 0.25 0.25 0.25 0.25 0.25 0.25 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12/31 WD, SummerDesign 0 0 0 0 0 0 0 0.15 0.15 0.05 0.05 0.95 0.95 0.15 0.15 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
BLDG_OCC_SCH_Extend 6/30 WD, SummerDesign 0 0 0 0 0 0 0 0 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9/1 WD, SummerDesign 0 0 0 0 0 0 0 0 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12/31 WD, SummerDesign 0 0 0 0 0 0 0 0 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
BLDG_OCC_SCH_Gym 6/30 WD, SummerDesign 0 0 0 0 0 0 0 0 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.95 0.95 0.95 0.95 0.95 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

91
Schedule Through Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
9/1 WD, SummerDesign 0 0 0 0 0 0 0 0 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12/31 WD, SummerDesign 0 0 0 0 0 0 0 0 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.95 0.95 0.95 0.95 0.95 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
BLDG_OCC_SCH_Offices 6/30 WD, SummerDesign 0 0 0 0 0 0 0 0 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.15 0.15 0.15 0.15 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9/1 WD, SummerDesign 0 0 0 0 0 0 0 0 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12/31 WD, SummerDesign 0 0 0 0 0 0 0 0 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.15 0.15 0.15 0.15 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
KITCHEN_ELEC_EQUIP_SCH 6/30 WD, SummerDesign 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.15 0.15 0.25 0.25 0.25 0.15 0.15 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
Other 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
9/1 WD, SummerDesign 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.13 0.13 0.2 0.2 0.2 0.13 0.13 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
Other 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
12/31 WD, SummerDesign 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.15 0.15 0.25 0.25 0.25 0.15 0.15 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
Other 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
KITCHEN_GAS_EQUIP_SCH 6/30 WD, SummerDesign 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.15 0.15 0.2 0.2 0.2 0.1 0.1 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
Other 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
9/1 WD, SummerDesign 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.1 0.1 0.15 0.15 0.15 0.1 0.1 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
WE, WinterDesign, Hol, Other 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
12/31 WD, SummerDesign 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.15 0.15 0.2 0.2 0.2 0.1 0.1 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
WE, WinterDesign, Hol, Other 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
INFIL_SCH 12/31 All 1 1 1 1 1 1 1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 1 1 1
ACTIVITY_SCH 12/31 All 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
AIR_VELO_SCH 12/31 All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
CLOTHING_SCH 04/30 All 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
09/30 All 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6
12/31 All 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
WORK_EFF_SCH 12/31 All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CLGSETP_SCH 6/30 SummerDesign 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24
WE, Hol, WinterDesign 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27
Other 27 27 27 27 27 27 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 27 27 27
9/1 SummerDesign 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24
WE, Hol, WinterDesign 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27
Other 27 27 27 27 27 27 27 24 24 24 24 24 24 24 24 24 24 24 27 27 27 27 27 27
12/31 SummerDesign 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24
WE, Hol, WinterDesign 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27
Other 27 27 27 27 27 27 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 27 27 27
CLGSETP_SCH_BathCorrMechKitchen 12/31 SummerDesign 27 27 27 27 27 27 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 27 27 27
Other 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27
HTGSETP_SCH 6/30 WinterDesign 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
WE, Hol, SummerDesign 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16
Other 16 16 16 16 16 16 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 16 16 16
9/1 WinterDesign 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
WE, Hol, SummerDesign 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16
Other 16 16 16 16 16 16 16 21 21 21 21 21 21 21 21 21 21 21 16 16 16 16 16 16

92
Schedule Through Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
12/31 WinterDesign 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
WE, Hol, SummerDesign 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16
Other 16 16 16 16 16 16 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 16 16 16
HTGSETP_SCH_BathCorrMechKitchen 12/31 WinterDesign 16 16 16 16 16 16 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 16 16 16
Other 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16
HVACOperationSchd 12/31 WD, SummerDesign 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
MinOA_Sched 12/31 WD, SummerDesign 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Seasonal-Reset-Supply-Air-Temp-Sch 12/31 All 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8 12.8
Dual Zone Control Type Sched 12/31 All 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
CW-Loop-Temp-Schedule 12/31 All 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7 6.7
HW-Loop-Temp-Schedule 12/31 All 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67
PlantOnSched 12/31 All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Kitchen_ZN_1_FLR_1_Case:1_WALKINFR
EEZER_CaseCreditReduxSched 12/31 All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.2 0.2 0.2
Kitchen_ZN_1_FLR_1_Case:1_WALKINFR
EEZER_CaseDefrost2aDaySched 12/31 All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Kitchen_ZN_1_FLR_1_Case:1_WALKINFR
EEZER_CaseDripDown2aDaySched 12/31 All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Kitchen_ZN_1_FLR_1_Case:1_WALKINFR
EEZER_WalkInStockingSched 12/31 Tue, Fri 0 0 0 0 725 417 290 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 125 117 90 0 0 0 0 0 0 0 0 0 0 0 0 125 117 90 0 0
Kitchen_ZN_1_FLR_1_Case:2_SELFCONT
AINEDDISPLAYCASE_CaseStockingSched 12/31 All 0 0 0 0 0 0 50 70 70 80 70 50 50 80 90 80 0 0 0 0 0 0 0 0
BLDG_SWH_SCH 6/15 WD, SummerDesign 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.1 0.34 0.6 0.63 0.72 0.79 0.83 0.61 0.65 0.1 0.1 0.19 0.25 0.22 0.22 0.12 0.09
Sat, WinterDesign 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.05 0.05 0.05 0.05 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
Sun, Hol, Other 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.05 0.05 0.05 0.05 0.05 0.05 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
9/15 WD, SummerDesign 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.19 0.25 0.22 0.22 0.12 0.09
Sat, WinterDesign 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.05 0.05 0.05 0.05 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
Sun, Hol, Other 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.05 0.05 0.05 0.05 0.05 0.05 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
12/31 WD, SummerDesign 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.1 0.34 0.6 0.63 0.72 0.79 0.83 0.61 0.65 0.1 0.1 0.19 0.25 0.22 0.22 0.12 0.09
Sat, WinterDesign 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.05 0.05 0.05 0.05 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
Sun, Hol, Other 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.05 0.05 0.05 0.05 0.05 0.05 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
Showers_SWH_SCH 6/30 WD, SummerDesign 0 0 0 0 0 0 0 0.6 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 1 1 1 0 0 0 0 0
WE 0 0 0 0 0 0 0 0 0 0 0.4 0.14 0.14 0.14 0.14 0.14 0 0 0 0 0 0.8 0 0
WinterDesign, Hol, Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9/1 WD, SummerDesign 0 0 0 0 0 0 0 0 0.3 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0 0 0 0 0 0 0 0
WE, WinterDesign, Hol, Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
12/31 WD, SummerDesign 0 0 0 0 0 0 0 0.6 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 1 1 1 0 0 0 0 0
WE 0 0 0 0 0 0 0 0 0 0 0.4 0.14 0.14 0.14 0.14 0.14 0 0 0 0 0 0.8 0 0
WinterDesign, Hol, Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Latent fract sched 12/31 All 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
Sensible fract sched 12/31 All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
Hot Supply Temp Sched 12/31 All 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3
SHW_default Temp Sched 12/31 All 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3
Kitchen Hot Supply Temp Sched 12/31 All 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49

93
Schedule Through Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
SHW_Kitchen Temp Sched 12/31 All 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49
SWHSys1 Water Heater Ambient
Temperature Schedule Name 12/31 All 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22
SWHSys1 Water Heater Setpoint
Temperature Schedule Name 12/31 All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
SWHSys1-Loop-Temp-Schedule 12/31 All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60

94
Table B-11 Full Service Restaurant Hourly Operation Schedules
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ALWAYS_ON All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ACTIVITY_SCH All 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
AIR_VELO_SCH All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
BLDG_EQUIP_SCH Weekday 0.1 0.1 0.1 0.1 0.1 0.1 0.25 0.35 0.35 0.25 0.35 0.35 0.35 0.25 0.25 0.25 0.35 0.35 0.35 0.25 0.25 0.25 0.25 0.25
Sat 0.1 0.1 0.1 0.1 0.1 0.1 0.25 0.35 0.35 0.25 0.35 0.35 0.35 0.25 0.25 0.25 0.35 0.35 0.35 0.25 0.25 0.25 0.25 0.25
SummerDesign 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sun, Hol, Other 0.1 0.1 0.1 0.1 0.1 0.1 0.25 0.35 0.35 0.25 0.35 0.35 0.35 0.25 0.25 0.25 0.35 0.35 0.35 0.25 0.25 0.25 0.25 0.25
BLDG_LIGHT_SCH SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Weekday, Sat,
Sun, Hol, Other 0.45 0.15 0.15 0.15 0.15 0.45 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9
BLDG_OCC_SCH WD 0.05 0 0 0 0 0.05 0.1 0.4 0.4 0.4 0.2 0.5 0.8 0.7 0.4 0.2 0.25 0.5 0.8 0.8 0.8 0.5 0.35 0.2
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sat 0.05 0 0 0 0 0 0.05 0.5 0.5 0.4 0.2 0.45 0.5 0.5 0.35 0.3 0.3 0.3 0.7 0.9 0.7 0.65 0.55 0.35
Sun, Hol, Other 0.05 0 0 0 0 0 0.05 0.5 0.5 0.2 0.2 0.3 0.5 0.5 0.3 0.2 0.25 0.35 0.55 0.65 0.7 0.35 0.2 0.2
CLOTHING_SCH All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
All 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
GAS_EQUIP_SCH WD, Sat 0.02 0.02 0.02 0.02 0.02 0.05 0.1 0.15 0.2 0.15 0.25 0.25 0.25 0.2 0.15 0.2 0.3 0.3 0.3 0.2 0.2 0.15 0.1 0.05
SummerDesign 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sun, Hol, Other 0.02 0.02 0.02 0.02 0.02 0.05 0.1 0.15 0.2 0.15 0.25 0.25 0.25 0.2 0.15 0.2 0.3 0.3 0.3 0.2 0.2 0.15 0.1 0.05
Kitchen_Exhaust_SCH All 1 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WD,
INFIL_HALF_ON_SCH SummerDesign 1 1 1 1 1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
Sat, WinterDesign 1 1 1 1 1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
Sun, Hol, Other 1 1 1 1 1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
WORK_EFF_SCH All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Dual Zone Control Type Sched All 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
CLGSETP_KITCHEN_SCH WinterDesign 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
Other 26 30 30 30 30 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26
HTGSETP_KITCHEN_SCH SummerDesign 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6
WinterDesign 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
Other 19 15.6 15.6 15.6 15.6 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19 19
CLGSETP_SCH WinterDesign 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
Other 24 30 30 30 30 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24
HTGSETP_SCH SummerDesign 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6
WinterDesign 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
Other 21 15.6 15.6 15.6 15.6 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
HVACOperationSchd All 1 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
MinOA_Sched All 1 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

95
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Kitchen_Case:1_WALKINFREEZER_
CaseCreditReduxSched All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.2 0.2 0.2
Kitchen_Case:1_WALKINFREEZER_
CaseDefrost2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Kitchen_Case:1_WALKINFREEZER_
CaseDripDown2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Kitchen_Case:1_WALKINFREEZER_
WalkInStockingSched Tue, Fri 0 0 0 0 725 417 290 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 125 117 90 0 0 0 0 0 0 0 0 0 0 0 0 125 117 90 0 0
Kitchen_Case:2_SELFCONTAINEDDI
SPLAYCASE_CaseStockingSched All 0 0 0 0 0 0 50 70 70 80 70 50 50 80 90 80 0 0 0 0 0 0 0 0
WD,
BLDG_SWH_SCH SummerDesign 0.2 0 0 0 0 0 0.15 0.6 0.55 0.45 0.4 0.45 0.4 0.35 0.3 0.3 0.3 0.4 0.55 0.6 0.5 0.55 0.45 0.25
Sat, WinterDesign 0.2 0 0 0 0 0 0.15 0.15 0.15 0.5 0.45 0.5 0.5 0.45 0.4 0.4 0.35 0.4 0.55 0.55 0.5 0.55 0.4 0.3
Sun, Hol, Other 0.25 0 0 0 0 0 0.15 0.15 0.15 0.15 0.5 0.5 0.4 0.4 0.3 0.3 0.3 0.4 0.5 0.5 0.4 0.5 0.4 0.2
Kitchen Water Equipment Hot Supply
Temp Sched All 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49
Kitchen Water Equipment Latent fract
sched All 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
Kitchen Water Equipment Sensible
fract sched All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
Kitchen Water Equipment Temp
Sched All 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49
PlantOnSched All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SWHSys1 Water Heater Ambient
Temperature Schedule Name All 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22
SWHSys1 Water Heater Setpoint
Temperature Schedule Name All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
SWHSys1-Loop-Temp-Schedule All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60

96
Table B-12 Small Hotel Hourly Operation Schedules
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ALWAYS_ON All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ACTIVITY_SCH All 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
AIR_VELO_SCH All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
BLDG_ELEVATORS All 0.05 0.05 0.05 0.05 0.1 0.2 0.4 0.5 0.5 0.35 0.15 0.15 0.15 0.15 0.15 0.15 0.35 0.5 0.5 0.4 0.4 0.3 0.2 0.1
BLDG_EQUIP_SCH WD 0.3 0.25 0.2 0.2 0.2 0.3 0.5 0.6 0.5 0.5 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.7 0.9 0.95 0.9 0.7 0.4
Sat 0.3 0.3 0.2 0.2 0.2 0.2 0.4 0.4 0.5 0.5 0.4 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.7 0.8 0.8 0.8 0.7 0.4
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sun, Hol, Other 0.4 0.4 0.3 0.3 0.3 0.3 0.4 0.5 0.5 0.4 0.4 0.4 0.4 0.3 0.3 0.3 0.3 0.3 0.6 0.8 0.9 0.7 0.6 0.4
BLDG_LIGHT_SCH WD 0.2 0.15 0.1 0.1 0.1 0.2 0.4 0.5 0.4 0.4 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.6 0.8 0.9 0.8 0.6 0.3
Sat 0.2 0.2 0.1 0.1 0.1 0.1 0.3 0.3 0.4 0.4 0.3 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.6 0.7 0.7 0.7 0.6 0.3
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sun, Hol, Other 0.3 0.3 0.2 0.2 0.2 0.2 0.3 0.4 0.4 0.3 0.3 0.3 0.3 0.2 0.2 0.2 0.2 0.2 0.5 0.7 0.8 0.6 0.5 0.3
BLDG_OCC_SCH WD 0.9 0.9 0.9 0.9 0.9 0.9 0.7 0.4 0.4 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.5 0.5 0.5 0.7 0.7 0.8 0.9 0.9
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Sat 0.9 0.9 0.9 0.9 0.9 0.9 0.7 0.5 0.5 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.5 0.6 0.6 0.6 0.7 0.7 0.7
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sun, Hol, Other 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.5 0.5 0.5 0.3 0.3 0.2 0.2 0.2 0.3 0.4 0.4 0.6 0.6 0.8 0.8 0.8
CLOTHING_SCH All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
All 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Corridor_Ltg_Sch All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
EmployeeLounge_Eqp_Sch WD 0.11 0.11 0.11 0.11 0.11 0.19 0.19 0.25 1 1 0.86 0.86 1 0.86 0.86 0.86 0.86 0.86 0.25 0.19 0.11 0.11 0.11 0.11
Sat, Sun, Hol 0.11 0.11 0.11 0.11 0.11 0.19 0.19 0.25 1 1 0.86 0.86 1 0.86 0.86 0.86 0.86 0.86 0.25 0.19 0.11 0.11 0.11 0.11
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SummerDesign,
CustomDay1,
CustomDay2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
EmployeeLounge_Ltg_Sch WD 0.05 0.05 0.05 0.05 0.05 0.15 0.4 0.5 1 1 1 1 1 1 1 1 1 1 0.5 0.4 0.15 0.15 0.05 0.05
Sat, Sun, Hol 0.05 0.05 0.05 0.05 0.05 0.15 0.3 0.4 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.4 0.3 0.15 0.15 0.05 0.05
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SummerDesign,
CustomDay1,
CustomDay2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
EmployeeLounge_Occ_Sch WD 0 0 0 0 0 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.7 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0 0 0 0
Sat, Sun, Hol 0 0 0 0 0 0.05 0.05 0.05 0.1 0.1 0.1 0.1 0.2 0.1 0.1 0.1 0.1 0.1 0.05 0.05 0 0 0 0
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SummerDesign,
CustomDay1,
CustomDay2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ExerciseRoom_Eqp_Sch All 0 0 0 0 0 0 0.5 1 1 0.5 0.5 0.5 0 0.5 0.5 0.5 1 0.5 0.5 1 1 0.5 0.5 0
ExerciseRoom_Ltg_Sch_Base All 0 0 0 0 0 0 0.5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0.5 0
ExerciseRoom_Occ_Sch All 0 0 0 0 0 0 0.5 1 1 1 1 0.5 0 1 1 1 1 1 1 1 1 1 0.5 0

97
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
GuestRoom_Eqp_Sch WD 0.2 0.2 0.2 0.2 0.2 0.2 0.62 0.9 0.43 0.43 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.51 0.51 0.49 0.66 0.7 0.35 0.2
Sat, Sun, Hol 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.62 0.9 0.62 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.43 0.51 0.49 0.66 0.7 0.35 0.2
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SummerDesign,
CustomDay1,
CustomDay2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
GuestRoom_Ltg_Sch_Base WD 0.22 0.17 0.11 0.11 0.11 0.22 0.44 0.56 0.44 0.44 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.67 0.89 1 0.89 0.67 0.33
Sat, Sun, Hol 0.26 0.26 0.11 0.11 0.11 0.11 0.41 0.41 0.56 0.56 0.41 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.85 1 1 1 0.85 0.41
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SummerDesign,
CustomDay1,
CustomDay2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
GuestRoom_Occ_Sch WD 0.65 0.65 0.65 0.65 0.65 0.65 0.5 0.28 0.28 0.13 0.13 0.13 0.13 0.13 0.13 0.2 0.35 0.35 0.35 0.5 0.5 0.58 0.65 0.65
Sat, Sun, Hol 0.65 0.65 0.65 0.65 0.65 0.65 0.5 0.34 0.34 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.34 0.35 0.65 0.65 0.5 0.5 0.5
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SummerDesign,
CustomDay1,
CustomDay2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
INFIL_HALF_ON_SCH All 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
INFIL_SCH All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
LaundryRoom_Eqp_Elec_Sch WD, Sat, Sun, Hol 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SummerDesign,
CustomDay1,
CustomDay2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
LaundryRoom_Eqp_Gas_Sch WD, Sat, Sun, Hol 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Other 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
LaundryRoom_Ltg_Sch All 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0
LaundryRoom_Occ_Sch WD 0 0 0 0 0 0 0 0 0.09 0.09 0.18 0.18 0 0.18 0.18 0.18 0.09 0 0 0 0 0 0 0
Sat, Sun, Hol 0 0 0 0 0 0 0 0 0.09 0.09 0.18 0.18 0 0.18 0.18 0.18 0.09 0 0 0 0 0 0 0
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SummerDesign,
CustomDay1,
CustomDay2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
MeetingRoom_Eqp_Sch All 0 0 0 0 0 0 0 0.05 0.54 0.54 0.26 0.26 0.05 0.54 0.54 0.26 0.26 0.26 0.05 0.05 0 0 0 0
MeetingRoom_Ltg_Sch_Base WD, Sat, Sun, Hol 0 0 0 0 0 0.2 0.3 0.5 1 1 1 1 1 1 1 1 1 1 0.5 0.3 0.2 0.05 0 0
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SummerDesign,
CustomDay1,
CustomDay2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
MeetingRoom_Occ_Sch WD 0 0 0 0 0 0 0 0.05 0.5 0.5 0.2 0.2 0.05 0.5 0.5 0.2 0.2 0.2 0.05 0.05 0 0 0 0
Sat, Sun, Hol 0 0 0 0 0 0 0 0.05 0.5 0.5 0.2 0.2 0.05 0.5 0.5 0.2 0.2 0.2 0.05 0.05 0 0 0 0
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SummerDesign,
CustomDay1,
CustomDay2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Office_Eqp_Sch WD 0.33 0.33 0.33 0.33 0.33 0.38 0.38 0.43 0.43 0.43 1 1 0.94 1 1 1 1 0.75 0.63 0.63 0.48 0.48 0.33 0.33

98
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sat, Sun, Hol 0.33 0.33 0.33 0.33 0.33 0.38 0.38 0.43 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.48 0.48 0.48 0.48 0.33 0.33
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SummerDesign,
CustomDay1,
CustomDay2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Office_Ltg_Sch_Base WD, Sat, Sun, Hol 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.61 0.9 0.9 0.9 0.9 0.8 0.9 0.9 0.9 0.9 0.61 0.5 0.5 0.5 0.5 0.5 0.5
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SummerDesign,
CustomDay1,
CustomDay2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Office_Occ_Sch WD 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.4 1 1 1 1 0.5 1 1 1 1 0.4 0.3 0.2 0.2 0.2 0.2 0.2
Sat, Sun, Hol 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.3 0.2 0.2 0.2 0.2 0.2 0.2
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SummerDesign,
CustomDay1,
CustomDay2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Storage_Ltg_Sch WD 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.2 0.2 0.2 0.2 0.1 0.1
Sat, Sun, Hol 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.2 0.2 0.2 0.2 0.1 0.1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SummerDesign,
CustomDay1,
CustomDay2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WORK_EFF_SCH All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ALWAYS_OFF All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CLGSETP_SCH All 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24
Dual Zone Control Type Sched All 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
HTGSETP_SCH All 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
HVACOperationSchd All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
MinOA_Sched All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
UnitHeater_ClgSP_Sch All 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40
UnitHeater_HtgSP_Sch All 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6
GuestRoom_SWH_Sch WD 0.2 0.15 0.15 0.15 0.2 0.35 0.6 0.8 0.55 0.4 0.3 0.2 0.2 0.2 0.2 0.2 0.2 0.3 0.55 0.4 0.4 0.6 0.45 0.25
Other 0.2 0.15 0.15 0.15 0.2 0.25 0.35 0.6 0.8 0.55 0.4 0.3 0.2 0.2 0.2 0.2 0.2 0.25 0.3 0.4 0.4 0.4 0.6 0.35
LaundryRoom_SWH_Sch All 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0
Water Equipment Latent fract sched All 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
Water Equipment Sensible fract sched All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
Water Equipment Hot Supply Temp
Sched All 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3
Water Equipment Temp Sched All 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3
Laundry Water Equipment Hot Supply
Temp Sched All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
Laundry Water Equipment Temp
Sched All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
SWHSys1 Water Heater Ambient
Temperature Schedule Name All 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22
SWHSys1 Water Heater Setpoint
Temperature Schedule Name All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
SWHSys1-Loop-Temp-Schedule All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60

99
Table B-13 Small Office Hourly Operation Schedules
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ALWAYS_ON All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
INFIL_QUARTER_ON_SCH WD, SummerDesign 1 1 1 1 1 1 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 1 1
Sat, WinterDesign 1 1 1 1 1 1 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 1 1 1 1 1 1
Sun, Hol, Other 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
BLDG_OCC_SCH SummerDesign 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0.05 0.05
WD 0 0 0 0 0 0 0.1 0.2 0.95 0.95 0.95 0.95 0.5 0.95 0.95 0.95 0.95 0.3 0.1 0.1 0.05 0.05 0.05 0.05
Sat 0 0 0 0 0 0 0.1 0.1 0.3 0.3 0.3 0.3 0.1 0.1 0.1 0.1 0.1 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
BLDG_LIGHT_SCH WD 0.05 0.05 0.05 0.05 0.05 0.1 0.1 0.3 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.5 0.3 0.3 0.2 0.2 0.1 0.05
Sat 0.05 0.05 0.05 0.05 0.05 0.05 0.1 0.1 0.3 0.3 0.3 0.3 0.15 0.15 0.15 0.15 0.15 0.05 0.05 0.05 0.05 0.05 0.05 0.05
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Other 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
BLDG_EQUIP_SCH WD 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.9 0.9 0.9 0.9 0.8 0.9 0.9 0.9 0.9 0.5 0.4 0.4 0.4 0.4 0.4 0.4
Sat 0.3 0.3 0.3 0.3 0.3 0.3 0.4 0.4 0.5 0.5 0.5 0.5 0.35 0.35 0.35 0.35 0.35 0.3 0.3 0.3 0.3 0.3 0.3 0.3
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Other 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3
ACTIVITY_SCH All 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
WORK_EFF_SCH All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
AIR_VELO_SCH All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
CLOTHING_SCH All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
All 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
CLGSETP_SCH WD, SummerDesign 26.7 26.7 26.7 26.7 26.7 26.7 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 26.7 26.7
Sat 26.7 26.7 26.7 26.7 26.7 26.7 24 24 24 24 24 24 24 24 24 24 24 24 26.7 26.7 26.7 26.7 26.7 26.7
Other 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7
HTGSETP_SCH WD 15.6 15.6 15.6 15.6 15.6 15.6 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 15.6 15.6
Sat 15.6 15.6 15.6 15.6 15.6 15.6 21 21 21 21 21 21 21 21 21 21 21 21 15.6 15.6 15.6 15.6 15.6 15.6
WinterDesign 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
Other 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6
MinOA_Sched WD, SummerDesign 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0
Sat, WinterDesign 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Dual Zone Control Type Sched All 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
HVACOperationSchd WD, SummerDesign 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0
Sat, WinterDesign 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
BLDG_SWH_SCH WD, SummerDesign 0.05 0.05 0.05 0.05 0.05 0.08 0.07 0.19 0.35 0.38 0.39 0.47 0.57 0.54 0.34 0.33 0.44 0.26 0.21 0.15 0.17 0.08 0.05 0.05
Sat, WinterDesign 0.05 0.05 0.05 0.05 0.05 0.08 0.07 0.11 0.15 0.21 0.19 0.23 0.2 0.19 0.15 0.13 0.14 0.07 0.07 0.07 0.07 0.09 0.05 0.05
Other 0.04 0.04 0.04 0.04 0.04 0.07 0.04 0.04 0.04 0.04 0.04 0.06 0.06 0.09 0.06 0.04 0.04 0.04 0.04 0.04 0.04 0.07 0.04 0.04
Water Equipment Latent fract
sched All 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05

100
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Water Equipment Sensible fract
sched All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
SWHSys1 Water Heater Ambient
Temperature Schedule Name All 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22
Water Equipment Temp Sched All 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3
Water Equipment Hot Supply
Temp Sched All 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3 43.3
SWHSys1 Water Heater Setpoint
Temperature Schedule Name All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
SWHSys1-Loop-Temp-Schedule All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60

101
Table B-14 Strip Mall Hourly Operation Schedules
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ALWAYS_ON All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
BLDG_EQUIP_SCH WD 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.4 0.7 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.8 0.8 0.7 0.4 0.2 0.2
Sat 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.3 0.5 0.8 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.7 0.5 0.5 0.3 0.15 0.15
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sun, Hol, Other 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.3 0.3 0.6 0.6 0.8 0.8 0.8 0.8 0.8 0.6 0.4 0.15 0.15 0.15 0.15 0.15
BLDG_LIGHT_SCH WD 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.2 0.5 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.6 0.6 0.5 0.2 0.05 0.05
Sat 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.1 0.3 0.6 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.5 0.3 0.3 0.1 0.05 0.05
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sun, Hol, Other 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.1 0.1 0.4 0.4 0.6 0.6 0.6 0.6 0.6 0.4 0.2 0.05 0.05 0.05 0.05 0.05
BLDG_OCC_SCH WD 0 0 0 0 0 0 0 0.1 0.2 0.5 0.5 0.7 0.7 0.7 0.7 0.8 0.7 0.5 0.5 0.3 0.3 0 0 0
SummerDesign,
WinterDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Sat 0 0 0 0 0 0 0 0.1 0.2 0.5 0.6 0.8 0.8 0.8 0.8 0.8 0.8 0.6 0.2 0.2 0.2 0.1 0 0
Other 0 0 0 0 0 0 0 0 0 0.1 0.2 0.2 0.4 0.4 0.4 0.4 0.4 0.2 0.1 0 0 0 0 0
INFIL_HALF_ON_SCH WD, SummerDesign 1 1 1 1 1 1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 1 1 1
Sat 1 1 1 1 1 1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 1 1
WinterDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Sun, Hol, Other 1 1 1 1 1 1 1 1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 1 1 1 1 1 1 1
CLOTHING_SCH All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
All 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ACTIVITY_SCH All 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
AIR_VELO_SCH All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
WORK_EFF_SCH All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CLGSETP_SCH WD, SummerDesign 30 30 30 30 30 30 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 30 30 30
Sat 30 30 30 30 30 30 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 30 30
WinterDesign 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
Sun, Hol, Other 30 30 30 30 30 30 30 30 24 24 24 24 24 24 24 24 24 24 24 30 30 30 30 30
Dual Zone Control Type Sched All 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
HTGSETP_SCH WD 15.6 15.6 15.6 15.6 15.6 15.6 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 15.6 15.6 15.6
SummerDesign 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6
WinterDesign 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
Sat 15.6 15.6 15.6 15.6 15.6 15.6 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 15.6 15.6
Other 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 21 21 21 21 21 21 21 21 21 21 21 15.6 15.6 15.6 15.6 15.6
HVACOperationSchd WD, SummerDesign 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0
Sat, WinterDesign 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0
Other 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0
MinOA_Sched WD, SummerDesign 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0
Sat, WinterDesign 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0
Other 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0

102
Table B-15 Supermarket Hourly Operation Schedules
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ALWAYS_ON All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign,
Deli_Exhaust_SCH SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Other 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0
BLDG_EQUIP_SCH WD 0.2 0.2 0.2 0.2 0.2 0.2 0.4 0.4 0.7 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.8 0.8 0.7 0.4 0.2 0.2
Sat 0.15 0.15 0.15 0.15 0.15 0.15 0.3 0.3 0.5 0.8 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.7 0.5 0.5 0.3 0.15 0.15
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sun, Hol, Other 0.15 0.15 0.15 0.15 0.15 0.15 0.3 0.3 0.3 0.3 0.6 0.6 0.8 0.8 0.8 0.8 0.8 0.6 0.4 0.4 0.4 0.4 0.15 0.15
BLDG_LIGHT_SCH WD 0.05 0.05 0.05 0.05 0.05 0.05 0.2 0.2 0.5 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.6 0.6 0.5 0.2 0.05 0.05
Sat 0.05 0.05 0.05 0.05 0.05 0.05 0.1 0.1 0.3 0.6 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.5 0.3 0.3 0.1 0.05 0.05
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sun, Hol, Other 0.05 0.05 0.05 0.05 0.05 0.05 0.1 0.1 0.1 0.1 0.4 0.4 0.6 0.6 0.6 0.6 0.6 0.4 0.2 0.2 0.2 0.2 0.05 0.05
BLDG_OCC_SCH WD 0 0 0 0 0 0 0.1 0.1 0.2 0.5 0.5 0.7 0.7 0.7 0.7 0.8 0.7 0.5 0.5 0.3 0.3 0.3 0 0
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Sat 0 0 0 0 0 0 0.1 0.1 0.2 0.5 0.6 0.8 0.8 0.8 0.8 0.8 0.8 0.6 0.2 0.2 0.2 0.1 0 0
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sun, Hol, Other 0 0 0 0 0 0 0.1 0.1 0.1 0.1 0.2 0.2 0.4 0.4 0.4 0.4 0.4 0.2 0.1 0.1 0.1 0.1 0 0
INFIL_HALF_ON_SCH WD, SummerDesign 1 1 1 1 1 1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 1 1
Sat 1 1 1 1 1 1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 1 1
WinterDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Sun, Hol, Other 1 1 1 1 1 1 1 1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 1 1 1 1 1 1 1
CLOTHING_SCH All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
All 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WORK_EFF_SCH All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ACTIVITY_SCH All 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
AIR_VELO_SCH All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
CLGSETP_SCH WinterDesign 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
Other 30 30 30 30 30 30 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 30 30
HTGSETP_SCH SummerDesign 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6
Other 15.6 15.6 15.6 15.6 15.6 15.6 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 15.6 15.6
HVACOperationSchd All 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0
MinOA_Sched All 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0
Dual Zone Control Type Sched All 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
Bakery_Case:1_WALKINFREEZER
_CaseCreditReduxSched All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.2 0.2 0.2
Bakery_Case:1_WALKINFREEZER
_CaseDefrost2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Bakery_Case:1_WALKINFREEZER
_CaseDripDown2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Bakery_Case:1_WALKINFREEZER
_WalkInStockingSched Tue, Fri 0 0 0 0 725 417 290 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

103
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Other 0 0 0 0 125 117 90 0 0 0 0 0 0 0 0 0 0 0 0 125 117 90 0 0
Deli_Case:1_
MULTIDECKDIARYANDDELICASE
_CaseCreditReduxSched All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.2 0.2 0.2
Deli_Case:1_
MULTIDECKDIARYANDDELICASE
_CaseDefrost2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Deli_Case:1_
MULTIDECKDIARYANDDELICASE
_CaseDripDown2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Deli_Case:1_
MULTIDECKDIARYANDDELICASE
_CaseStockingSched All 0 0 0 0 0 0 0 0 0 0 0 0 0 50 35 0 0 0 0 0 0 0 0 0
Deli_Case:2_WALKINFREEZER_C
aseCreditReduxSched All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.2 0.2 0.2
Deli_Case:2_WALKINFREEZER_C
aseDefrost2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Deli_Case:2_WALKINFREEZER_C
aseDripDown2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Deli_Case:2_WALKINFREEZER_W
alkInStockingSched Tue, Fri 0 0 0 0 725 417 290 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 125 117 90 0 0 0 0 0 0 0 0 0 0 0 0 125 117 90 0 0
Produce_Case:1_
MULTIDECKDIARYANDDELICASE_
CaseCreditReduxSched All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.2 0.2 0.2
Produce_Case:1_
MULTIDECKDIARYANDDELICASE_
CaseDefrost2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Produce_Case:1_
MULTIDECKDIARYANDDELICASE_
CaseDripDown2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Produce_Case:1_
MULTIDECKDIARYANDDELICASE_
CaseStockingSched All 0 0 0 0 0 0 0 0 0 0 0 0 0 50 35 0 0 0 0 0 0 0 0 0
Sales_Case:1_MEATDISPLAYCASE
_CaseDefrost2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sales_Case:1_MEATDISPLAYCASE
_CaseDripDown2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sales_Case:1_MEATDISPLAYCASE
_CaseStockingSched All 0 0 0 0 0 0 0 0 0 0 0 0 0 50 35 0 0 0 0 0 0 0 0 0
Sales_Case:2_
MULTIDECKDIARYANDDELICASE_
CaseCreditReduxSched All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.2 0.2 0.2
Sales_Case:2_
MULTIDECKDIARYANDDELICASE_
CaseDefrost2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sales_Case:2_
MULTIDECKDIARYANDDELICASE_
CaseDripDown2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

104
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sales_Case:2_
MULTIDECKDIARYANDDELICASE_
CaseStockingSched All 0 0 0 0 0 0 0 0 0 0 0 0 0 50 35 0 0 0 0 0 0 0 0 0
Sales_Case:3_GLASSDOORFROZE
NFOOD_CaseCreditReduxSched All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.2 0.2 0.2
Sales_Case:3_GLASSDOORFROZE
NFOOD_CaseDefrost2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sales_Case:3_GLASSDOORFROZE
NFOOD_CaseDripDown2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sales_Case:3_GLASSDOORFROZE
NFOOD_CaseStockingSched All 0 0 0 0 0 0 0 0 0 0 0 0 0 50 35 0 0 0 0 0 0 0 0 0
Sales_Case:4_OPENWELLICECRE
AMDISPLAYCASE_CaseCreditRedu
xSched All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.2 0.2 0.2
Sales_Case:4_OPENWELLICECRE
AMDISPLAYCASE_CaseDefrost2aD
aySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sales_Case:4_OPENWELLICECRE
AMDISPLAYCASE_CaseDripDown2
aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sales_Case:4_OPENWELLICECRE
AMDISPLAYCASE_CaseStockingSc
hed All 0 0 0 0 0 0 0 0 0 0 0 0 0 50 35 0 0 0 0 0 0 0 0 0
Sales_Case:5_WALKINFREEZER_C
aseCreditReduxSched All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.2 0.2 0.2
Sales_Case:5_WALKINFREEZER_C
aseDefrost2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sales_Case:5_WALKINFREEZER_C
aseDripDown2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sales_Case:5_WALKINFREEZER_
WalkInStockingSched Tue, Fri 0 0 0 0 725 417 290 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 125 117 90 0 0 0 0 0 0 0 0 0 0 0 0 125 117 90 0 0
Sales_Case:6_WALKINFREEZER_C
aseCreditReduxSched All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.2 0.2 0.2
Sales_Case:6_WALKINFREEZER_C
aseDefrost2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sales_Case:6_WALKINFREEZER_C
aseDripDown2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sales_Case:6_WALKINFREEZER_
WalkInStockingSched Tue, Fri 0 0 0 0 725 417 290 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 125 117 90 0 0 0 0 0 0 0 0 0 0 0 0 125 117 90 0 0
Sales_Case:7_WALKINFREEZER_C
aseCreditReduxSched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sales_Case:7_WALKINFREEZER_C
aseDefrost2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sales_Case:7_WALKINFREEZER_C
aseDripDown2aDaySched All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sales_Case:7_WALKINFREEZER_
WalkInStockingSched Tue, Fri 0 0 0 0 725 417 290 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Other 0 0 0 0 125 117 90 0 0 0 0 0 0 0 0 0 0 0 0 125 117 90 0 0
BLDG_SWH_SCH WD, SummerDesign 0.04 0.05 0.05 0.04 0.04 0.04 0.04 0.15 0.23 0.32 0.41 0.57 0.62 0.61 0.5 0.45 0.46 0.47 0.42 0.34 0.33 0.23 0.13 0.08

105
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sat, WinterDesign 0.11 0.1 0.08 0.06 0.06 0.06 0.07 0.2 0.24 0.27 0.42 0.54 0.59 0.6 0.49 0.48 0.47 0.46 0.44 0.36 0.29 0.22 0.16 0.13
Sun, Hol, Other 0.07 0.07 0.07 0.06 0.06 0.06 0.07 0.1 0.12 0.14 0.29 0.31 0.36 0.36 0.34 0.35 0.37 0.34 0.25 0.27 0.21 0.16 0.1 0.06
Water Equipment Latent fract sched All 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
Water Equipment Sensible fract
sched All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
Water Equipment Hot Supply Temp
Sched All 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49
Water Equipment Temp Sched All 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49
PlantOnSched All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
SWHSys1 Water Heater Ambient
Temperature Schedule Name All 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22
SWHSys1 Water Heater Setpoint
Temperature Schedule Name All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60
SWHSys1-Loop-Temp-Schedule All 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60

106
Table B-16 Warehouse Hourly Operation Schedules
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ALWAYS_ON All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ACTIVITY_SCH All 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
AIR_VELO_SCH All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
BLDG_EQUIP_SCH WD 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.5 0.8 0.9 0.9 0.9 0.8 0.9 0.9 0.9 0.9 0.4 0.1 0.1 0.1 0.1 0.1 0.1
Sat 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.4 0.4 0.4 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sun, Hol, Other 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
BLDG_LIGHT_SCH WD 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.4 0.7 0.9 0.9 0.9 0.8 0.9 0.9 0.9 0.9 0.3 0.1 0.1 0.1 0.1 0.1 0.1
Sat 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.24 0.24 0.24 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sun, Hol, Other 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
BLDG_OCC_SCH WD 0 0 0 0 0 0 0 0.15 0.7 0.9 0.9 0.9 0.5 0.85 0.85 0.85 0.2 0 0 0 0 0 0 0
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Sat 0 0 0 0 0 0 0 0 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0 0 0 0 0 0 0 0
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sun, Hol, Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CLOTHING_SCH All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
All 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WORK_EFF_SCH All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CLGSETP_FineStorage_SCH All 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7
CLGSETP_SCH WD, SummerDesign 30 30 30 30 30 30 30 24 24 24 24 24 24 24 24 24 24 30 30 30 30 30 30 30
Sat 30 30 30 30 30 30 30 30 24 24 24 24 24 24 24 24 30 30 30 30 30 30 30 30
Other 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
Dual Zone Control Type Sched All 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
HTGSETP_BulkStorage_SCH All 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2
HTGSETP_FineStorage_SCH All 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6
HTGSETP_SCH WD 15.5 15.5 15.5 15.5 15.5 15.5 21 21 21 21 21 21 21 21 21 21 21 15.5 15.5 15.5 15.5 15.5 15.5 15.5
WinterDesign 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
Sat 15.5 15.5 15.5 15.5 15.5 15.5 15.5 21 21 21 21 21 21 21 21 21 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5
Other 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5
HVACOperationSchd WD, SummerDesign 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0
Sat, WinterDesign 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
MinOA_Sched WD, SummerDesign 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0
Sat, WinterDesign 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ALWAYS_ON All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ACTIVITY_SCH All 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
AIR_VELO_SCH All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
BLDG_EQUIP_SCH WD 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.5 0.8 0.9 0.9 0.9 0.8 0.9 0.9 0.9 0.9 0.4 0.1 0.1 0.1 0.1 0.1 0.1
Sat 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.4 0.4 0.4 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1

107
Schedule Day of Week 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sun, Hol, Other 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
BLDG_LIGHT_SCH WD 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.4 0.7 0.9 0.9 0.9 0.8 0.9 0.9 0.9 0.9 0.3 0.1 0.1 0.1 0.1 0.1 0.1
Sat 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.24 0.24 0.24 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sun, Hol, Other 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
BLDG_OCC_SCH WD 0 0 0 0 0 0 0 0.15 0.7 0.9 0.9 0.9 0.5 0.85 0.85 0.85 0.2 0 0 0 0 0 0 0
SummerDesign 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Sat 0 0 0 0 0 0 0 0 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0 0 0 0 0 0 0 0
WinterDesign 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sun, Hol, Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CLOTHING_SCH All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
All 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
WORK_EFF_SCH All 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CLGSETP_FineStorage_SCH All 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7 26.7
CLGSETP_SCH WD, SummerDesign 30 30 30 30 30 30 30 24 24 24 24 24 24 24 24 24 24 30 30 30 30 30 30 30
Sat 30 30 30 30 30 30 30 30 24 24 24 24 24 24 24 24 30 30 30 30 30 30 30 30
Other 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
Dual Zone Control Type Sched All 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
HTGSETP_BulkStorage_SCH All 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2
HTGSETP_FineStorage_SCH All 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6 15.6
HTGSETP_SCH WD 15.5 15.5 15.5 15.5 15.5 15.5 21 21 21 21 21 21 21 21 21 21 21 15.5 15.5 15.5 15.5 15.5 15.5 15.5
WinterDesign 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
Sat 15.5 15.5 15.5 15.5 15.5 15.5 15.5 21 21 21 21 21 21 21 21 21 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5
Other 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5 15.5
HVACOperationSchd WD, SummerDesign 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0
Sat, WinterDesign 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
MinOA_Sched WD, SummerDesign 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0
Sat, WinterDesign 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ALWAYS_ON All 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ACTIVITY_SCH All 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120 120
AIR_VELO_SCH All 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2

108
Form Approved
REPORT DOCUMENTATION PAGE OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents
should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a
currently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ORGANIZATION.
1. REPORT DATE (DD-MM-YYYY) 2. REPORT TYPE 3. DATES COVERED (From - To)
February 2011 Technical Report
4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER
U.S. Department of Energy Commercial Reference Building Models DE-AC36-08GO28308
of the National Building Stock
5b. GRANT NUMBER

5c. PROGRAM ELEMENT NUMBER

6. AUTHOR(S) 5d. PROJECT NUMBER


Michael Deru, Kristin Field, Daniel Studer, Kyle Benne, Brent NREL/TP-5500-46861
Griffith, and Paul Torcellini (National Renewable Energy Laboratory)
5e. TASK NUMBER
Bing Liu, Mark Halverson, Dave Winiarski, and Michael Rosenberg
(Pacific Northwest National Laboratory) BEC7.1304
Mehry Yazdanian (Lawrence Berkeley National Laboratory) 5f. WORK UNIT NUMBER
Joe Huang (Formerly of Lawrence Berkeley National Laboratory)
Drury Crawley (Formerly of the U.S. Department of Energy)
7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION
National Renewable Energy Laboratory REPORT NUMBER
1617 Cole Blvd. NREL/TP-5500-46861
Golden, CO 80401-3393

9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR'S ACRONYM(S)


NREL

11. SPONSORING/MONITORING
AGENCY REPORT NUMBER

12. DISTRIBUTION AVAILABILITY STATEMENT


National Technical Information Service
U.S. Department of Commerce
5285 Port Royal Road
Springfield, VA 22161
13. SUPPLEMENTARY NOTES

14. ABSTRACT (Maximum 200 Words)


The U.S. Department of Energy (DOE) Building Technologies Program has set the aggressive goal of producing
marketable net-zero energy buildings by 2025. This goal will require collaboration between the DOE laboratories and
the building industry. We developed standard or reference energy models for the most common commercial
buildings to serve as starting points for energy efficiency research. These models represent fairly realistic buildings
and typical construction practices. Fifteen commercial building types and one multifamily residential building were
determined by consensus between DOE, the National Renewable Energy Laboratory, Pacific Northwest National
Laboratory, and Lawrence Berkeley National Laboratory, and represent approximately two-thirds of the commercial
building stock.
15. SUBJECT TERMS
net-zero energy; reference building; energy efficiency; energy simulation

16. SECURITY CLASSIFICATION OF: 17. LIMITATION 18. NUMBER 19a. NAME OF RESPONSIBLE PERSON
OF ABSTRACT OF PAGES
a. REPORT b. ABSTRACT c. THIS PAGE
Unclassified Unclassified Unclassified UL
19b. TELEPHONE NUMBER (Include area code)

Standard Form 298 (Rev. 8/98)


Prescribed by ANSI Std. Z39.18

F1147-E(10/2008)