Ministries/Departments in the central or state governments. Requirements of funds for individual project(s) for Digital
India will be worked out by respective nodal ministries/departments but according to government estimate it will cost
Rs 113,000 crore. To implement this the government is planning to strengthen National Informatics Center (NIC) by
restructuring it to support all central government departments and state governments. Positions of chief information
officers (CIO) would be created in at least 10 key ministries
9 ACTION
Broadband Highways
Laying of national optical fibre network (NOFN) in all 2.5 lakh gram panchayats in the country will happen in a phased
manner.
Universal Access to Mobile connectivity
Ensuring mobile access in around 44,000 uncovered villages in the country and government is taking steps to ensure
that all villages are covered through mobile connectivity by 2018.
Public Internet access
To expand the coverage of common services center (CSC) from 1.35 lakhs to 1.5 lakhs, i.e. one in every panchayat.
e-Governance
Business process re-engineeering will be undertaken to improve processes and service delivery. Services will be
integrated with UIDAI, payment gateway and mobile platform.
e-Kranti
e-Kranti focuses on electronic delivery of services whether it is education, health, agriculture, justice and financial
inclusion.
Global Information
The focus will be on online hosting of data and proactive engagement through social media and web based platforms
like MyGov.
Electronics Manufacturing
Focus is on set tob boxes, VSAT, mobile, consumer electronics, medical electronics, smart energy meters, smart cards
and micro ATMs.
IT Training for Jobs
The government is planning to train one crore students from small towns and villages for IT sector.
Early Harvest Programmes
The government is planning to deploy Aadhaar Enabled Biometric Attendance System in all central government offices
located at Delhi. A web based application software system will enable online recording of attendance and its viewing
by the concerned stakeholders.
Vision of Digital India
Centered on 3 Key Areas
Coverage: Remaining
uncovered villages (~
42,300 villages) Ongoing Programme
Universal Access to
Timeline: FY 2014-18 Increased network
mobile
connectivity Cost: Rs 16,000 Cr penetration &
Nodal Dept: DoT coverage of gaps
Pillar 3. Public Internet Access Programme National Rural Internet Mission
Coverage: Cities with pop > 1 Mill., tourist centres Digital Cities
Public wifi hotspots Nodal Agency: DoT/ MoUD Completed by
Dec 2015
National Portal for Lost Nodal Agency: DeitY/ DoWCD In place by Oct
& Found children 2014
DIGITAL INDIA
CIO
DeitY Line Ministries
MINISTER
(Communications &
IT)
Electronic Manufacturing
Target Net Zero Imports
Electronic Delivery of Public Internet Access Technology for Jobs E-Governance: Reforming
Services - eKranti Programme Government through
Technology
Information for All
Estimated Costs and Impacts
Overall Costs of Digital India
~ Rs 100,000 Cr in ongoing schemes (only DeitY, DOT & not incl. those in other line
Ministries)
~ Rs 13,000 Cr for new schemes & activities
Impact of Digital India by 2019
Broadband in 2.5 lakh villages, universal phone connectivity
Net Zero Imports by 2020
400,000 Public Internet Access Points
Wi-fi in 2.5 lakh schools, all universities; Public wi-fi hotspots for
citizens
Digital Inclusion: 1.7 Cr trained for IT, Telecom and Electronics Jobs
Job creation: Direct 1.7 Cr. and Indirect at least 8.5 Cr.
e-Governance & eServices: Across government
India to be leader in IT use in services health, education, banking
Digitally empowered citizens public cloud, internet access
Challenges & Changes Needed
Program on this scale never conceived
Each Pillar/program has own challenges
Human Resource Issues
NIC - not equipped for a fraction of this task (obsolesce) - needs revamping & restructuring
DeitY needs program managers at least 4 more officers at senior levels
Ministries Need a Chief Information Officer / Chief Technology Officer
(CIO/CTO)
Could begin with CIOs 10 major Ministries
Can be anyone from within or outside government
To be patterned as AS & FAs dual reporting
Financial Resource Issues
Mostly structured around ongoing programs : Better focus, need some restructuring
Some others are process improvements or better utilisation of resources
A few new programs may be needed particularly in Electronics manufacturing and Skill
Development
Coordination Issues
Program covers many other departments
Need commitment and effort
Leadership and support critical for success
Faciliate of Equipments
Satellite Support Equipments
Telecommunication Support Equipments
Fixed l e and Wire less(P2P or Satellite Base)
Dish Antena UHF/VHF
Media Copper Cabels/Fibre Optics Cabels
Data Centre Support Equipments
Power Arrangement 24X7 for Above
Grid Power/Battery Base/Invertor/UPS
SMPS Po er Pla t DC Vltage V/ 4V/4 V/ V/ V
Solar PV Power(ongrid/offgrid)
DG Power
Infra Products in Digital India
Large
Computor Infra Systems
Large Telecom Infra Systems(Fixed & Wireless)
Large Fibre Optics Infra Systems
Quality Power Arrangement
Skill Staff Software and Hardware
Development Programme Partner
Building and Shelters
Committed to Go er e t of I dia Digital I dia i itiati e, DoT has a dated BSNL to
setup 25000 Wi-Fi Hotspots in rural exchanges of BSNL. The setting up of 25000 Wi-Fi
hotspots shall be funded from USO fund. Government shall provide full CAPEX and OPEX
support to the tune of 942 Crore for the project. The OPEX support of 100% shall be
provided by USOF for the 1st year and thereafter 75% support in the 2nd year, 50% support
in the 3rd year of operation shall be extended to BSNL. Under this project, 1 Wi-Fi Access
Point (AP) shall be setup initially in each rural exchange.
Sikhana to Padega Hi Follow NBC2016
Safety Main It Should be Remain
(Protect your Equipment for Surge Internal&External)
We are with you always
Security and Surveliance
Digital India SCOPE Working
Telecom & ICT field
Telepresence Services
RailTels Telepresence Service is an end-to-end, Full high-definition (FHD-1080p)
videoconferencing service that gives users a virtual, face-to-face meeting experience.
Data Center Services
Great hosti g ea s ha i g po er, co trol a d peace of i d. A d thats ho RailTel`s
customers feel when they trust our certified NOC team to manage their hosting needs and
challenges.
Rack and Space Collocation
RailTel facilitates co-location for equipment of telecom operators at its PoPs (Point of
Presence) mostly located at Railway stations. Railway route & buildings being in heart of the
city provide for high ARPU sites with maximum population coverage. RailTel also facilitates
roof top BTS sites & in building solution at Railway stations & other Railway buildings.
Tower Collocation
Wireless communications providers can now reduce capital expenditures and increase
coverage by teaming up with RailTel. Our existing nationwide network of MW towers and
other structures offers cellular, high speed data and other wireless communications
companies.
RailTel provides Tower colocation facilities to Telecom operators for mobile BTS
CCTV and Security Surveliances Systems
Digital India Technology Options
Equipment
SDH (Synchronous Digital Hierarchy)
DWDM (Dense Wave Digital
Multiplexing)
IP/MPLS (Multi Protocol Label
Switching)
OPGW
OPGW
24 F OPGW
24 F OPGW
Repeater
POWERGRID Tower with JB POWERGRID
S/S
S/S
SDH/ SDH/
OADE Tower Tower OADE
Approach Cable
U/G OFC U/G OFC
24 F 24 F
Shelter
City PoP
SDH Access Eqpt. DG set SDH Access Eqpt.
City PoP
Intracity Intracity
Internet
Others
Managed Services
Services
WiFi Services
Telecom Internet Leased Line
The Copper Clad Steel Grounding Conductor is made up of steel with the coating of 99.99% pure copper. These
conductors/ wires
or strands are equipped with the strength of steel with the conductivity and copper with the better corrosion
resistance property. The concentric copper cladding is metallurgic ally bonded to a steel core through a continuous,
solid cladding process using pressure rolling for primary bonding. The copper cladding
thickness remains constant surrounding steel. We use different steel grades for the steel core result in Dead Soft
Annealed, High strength and Extra High Strength Characteristics.
The Copper Clad Steel Wire yields a composite conductivity of 21%, 30% and 40% IACS, and available in Annealed
and Hard drawn. We are delivering products with varied conductivity and tensile strength as per the customer need.
Further, the wire can be processed to be silver plated or tinned copper clad steel wire.
Most Efficient JointProcess
DMC Insulator .
GI/FRP Mast .