You are on page 1of 17

DistrictProfileMadurai

MADURAIDISTRICTFACTFILE

YearofFormation 1823
DistrictHeadQuarters Madurai
BusinessHeadQuarters Madurai
No.OfVillagePanchayats 431
No.OfRevenueVillages 670
No.OfRevenueDivisions 2
No.OfRevenueTaluks 7
No.OfBlocks 13

REVENUEDIVISION

No.ofDivisions Revenue NameofTaluk Nameof


DivisionsName Office Panchayatunion
2 Madurai MaduraiSouth Thirupparankundram
MaduraiNorth MaduraiSouth
MaduraiWest
Melur Melur
Kottampatti
Vadipatti Vadipatti
Alanganallur
Usilampatti Thirumangalam Thirumangalam
Kallikudi
Peraiyur T.Kallupatti
Sedapatti
Usilampatti Usilampatti
Chellampatti

ADMINISTRATION&LOCALBODIES

TotalNo.ofPanchayatunions 13
TotalNo.ofVillagePanchayat 431
TotalNo.ofSmallhamlets 1692
TotalNo.ofMunicipalities 3
TotalNo.ofRevenueVillage 670
TotalNo.ofRevenueFirkas 51
TotalNo.ofTalukoffices 7

EDUCATIONALINSTITUTIONS

No.ofArts&ScienceColleges 7
No.ofEngineeringColleges 7
No.ofIndustrialTrainingInstitutions 5
No.ofTeacherTrainingInstitutes 4
No.ofPolytechnics 10
No.ofPrimarySchools 1034
No.ofMiddleSchools 218
No.ofHighSchools 94
No.ofHigherSecondarySchools 109
No.ofMatriculationHighSchools 89
No.ofMatriculationHigherSecondarySchools 71

LISTOFENGINEERINGCOLLEGESINMADURAI

ThiagarajaEngineeringCollege Thirupparankundram
SacsEngineeringCollege Madurai
P.T.R.EngineeringCollege Madurai
K.L.N.EngineeringCollege Pottapalayam
PandianSaraswathiYadavEnggCollege Madurai
RajaEngineeringCollege Madurai
VikramEngineeringCollege Madurai

LISTOFPOLYTECHNICSINMADURAI

TamilnaduWomenPolytechnic Madurai
TamilnaduMenPolytechnic Madurai
K.L.N.Polytechnic Madurai
M.A.V.M.M.Polytechnic Madurai
LathaMadavanPolytechnic Kidaripatti
RamuseethaPolytechni Melur
RukmaniShanmugamPolytechnic Silaiman
DhanapandianPolytechnic Thoppur
RajaPolytechnic Varichiyur
ArulmiguKallalagarPolytechnic Melur

LISTOFI.T.IINMADURAI

GovernmentI.T.I.forMen&Women K.Pudur
DanbascoITI Jawaharpuram
VenkateswaraI.T.I. Uthangudi
YipaI.T.I. Thirunagar
LayolaI.T.I. Gnanaolivupuram

REGISTRATIONWITHEMPLOYMENTOFFICE,MADURAI

8TH 4169Candidates
SSLC 67859Candidates
HSC 54238Candidates
BAGraduates 8947Candidates
B.ScGraduates 8838Candidates
B.ComGraduates 6420Candidates
Diploma&Engineering 83620Candidates
TELECOMMUNICATIONS
TelephoneExchange 150
Telephoneconnectionsinuse 2,71,633

BroadBandconnectivity/InternetServiceProviders
1.BSNL 3Mbps
2.AIRTEL 256Kbps
3.SIFY 256Kbps
4.TATAINDICOM 64Kbps

HEALTHCAREUNITS
GovernmentHospital 2
TalukHeadQuartersHospital 7
NonTalukHospital 11
PrimaryHealthCentre 50
HealthSubCentre 252

PRIVATEHOSPITALS
ChristianMissionHospital
E.S.I.Hospital
AppolloHospital
MeenakshiMissionHospital
VadamalayanHospital
JawaharHospital
T.V.S.Hospital

FINANCIALINSTITUTIONS
NationalizedBankBranches 140
ScheduledBankBranches 43
CooperativeBankBranches 27
LanddevelopmentBankBranches 8
TIIC 1
Nabard 1
NSIC 1
KVIC 1

ROADTRANSPORT
Madurai Districtis having 145km route of National High ways 45A,Band
114kmrouteofStateHighwaysandRuralHighWaysroads.
The National Highway Authority has undertaken the work of widening all
theNationalHighwaysinthisDistrict
It will provide better infrastructure for transportation of goods and
movementofcontainerstothenearestTuticorinFort.
RAILWAYTRANSPORT
MaduraiDistrictishavingTrainroutestothedistanceof82.95km
Broad gauge, running between Madurai to Vadipatti, Silaiman and
Kallikudi.
Further Meter gauge route of 40km is available between Madurai to
Usilampatti.
MaduraiiswellconnectedwithnearbyDistrictsthroughrailwaylines.
Recently Railways have taken efforts to convert meter gauge to Broad
gaugelinebetweenMaduraitoVadipatti,whichconnectsnearbyDindigul
District.

TrainRoutesandStations:
Broadgaugelines 82Kms
Metergaugelines 40kms
RailwayJunction 1
RailwayStation 9

AIRPORT
MaduraiDistrictiswellconnectedinAirroutewithimportantdestinations.
OneAirportisavailableinthisDistrict,whichislocatedatPerungudi15
kmsawayfromMadurai.
TheGovernmentofIndiahavetakeneffortstomodernizetheMadurai
AirportandhaveplanstomakeittotheInternationalStandardsinorderto
promotetourism.

ELECTRICITY
MaduraiDistrictisgettingElectricityfromTamilnaduElectricityBoardas
well as from a Private Electricity Company, namely Madurai Power
Corporation,Samayanallur,Madurai.
TheproductioncapacityofElectricitygenerationis105MW.
MaximumrequirementofElectricity 241MVA
AveragerequirementofElectricity 226MVA

IRRIGATION
Madurai is getting water for Agricultural usage from Vaigai River and
PeriyarRiver.
TheAgriculturewaterisbeingreleasedfrom1Reservoirs,namelyviz.,
1. SathaiyarDam
There are 22 Nos. of system tanks, 6433 no. of PWD large tanks, 7183
Nos.ofsmalltanksavailableinthisDistrict.
Thenetareairrigatedis68365hectres.
ThereisanotherReservoiratViraganoorofMaduraiDistrictintheVaigai
RivertostoreexcesswaterreleasedfromVaigaiDam.

RAINFALL
MaduraiDistrictisgettingrainfallduringSouthWestMonsoon,NorthWest
MonsoonandWinderSeasons.
DetailsofAverageRainfall
Minimum 211.4mm
Maximum 363.2mm
ThewaterreceivedduringthismonsoonisbeingstoredinSmalland
Largetanksponds.
MINERALS
In Madurai District, Melurtk and Madurai Northtk are having enormous
wealthofGranites.
AlloverMaduraiDistrictlotofMineralssuchasSand,lime,BlueMetal&
Quartsareavailable.
More enterprises have come up in this District, using this mineral wealth
andprovidingmoreemployment.
Thereareabout42GranitequarriesinMaduraiDistrict

AGRICULTURE

Thecultivateareaisabout1,64,389Hectre,
DetailsofAgricultureproduceareasfollows:

Sl.No Details Area(Hec)


1. Landsuitableforcultivation 121897
2. Dryland 17009
3. OtherDryland 94400
4. Cultivatedlands 374173
5. TotalAreaoflandforcultivation 123929
6. Morethancultivatedlands 2032

ProcurementTarget
1.Paddy 2,37,300MT
2.Grains 45,500MT
3.Creals 6,400MT
4.Cotton 25,700MT
5.Sugarcane 70,000MT
6.OilSeeds 20,800MT
HANDLOOM/SERICULTURE
Madurai District is having large no. of hand looms and power looms for
weavingofsilkandpolyestersarees.
More no. of Spinning Enterprises and few no.of Dying Enterprises are
functioningwithpermissionofTNPCBinthisDistrict.
Mulberryleavesarebeingcultivatedinsomeoftheareasforproductionof
cocoons.
Hence, there is scope for establishing Silk Reeling Center for
manufacturingofSilkyarn,inthisDistrict.
INDUSTRIALSCENARIO

Nos. EmploymentGenerated
Micro, Small & Medium 12577 37800
Enterprises
LargeEnterprises 9 8,343

INDUSTRIALESTATEINMADURAIDISTRICT

InMaduraiDistrictThreeIndustrialEstatesarelocatedatthefollowing
places.
1.SIDCOIndustrialEstate,K.Pudur,Madurai
2.SIDCOIndustrialEstate,Kappalur,Madurai
3.SIDCOIndustrialEstate,Uraganpatti,Madurai
4.MaduraiCo.op.Indl.Estate,Kappalur,Madurai

1. SIDCOIndustrialEstate,K.Pudur,Madurai
TotalExtendofland 56,054acres
No.ofworksheds 74sheds
51Sheds UnderLeasebasiscumsalebasis
13Sheds Outrightpurchasescheme
10Tinysheds Underfullcostbasis

2. SIDCOIndustrialEstate,Kappalur,Madurai
TotalExtendofland 136Acres
Developedplots 148(invarioussize)
Allottedto133entrepreneurs
Extendoffurtherland 122.749Acresallottedto
1. IndianOilCorporationLtd
2. HindustanPetroleumCorpn.Ltd
3. BharathPetroleumCorpn.Ltd
ForsettingupoftheirdepotsandLPGbottlingplants

3. SIDCOIndustrialEstate,Uraganpatti,Madurai.
ItisaprivateIndustrialEstateownedbyMaduraiHosieryIndustrial
Association.
Extendofland 69acres

No.ofworksheds 147Nos.(Theworkshedswereoccupiedby
themembersofMaduraiDistrictHosiery
IndustrialAssociationandtheyareengaged
inmanufacturingofHosieryproducts.)
4. AutomobileCooperativeIndustrialEstate,Kappalur,Madurai
ThisisanIndustrialCooperativeEstateforwardedbyownersof
AutomobileServiceCentreinordertointegratetheservices.
Extendofland 23.90Acres
No.ofdevelopedplots 201Nos
No.ofmembersinthesociety 209
PaidupShareCapitalAmt Rs.22.70Lakhs
StateGovt.Participation Rs.20.00lakhs
Costofplot Rs.7,100percent

MEDIUM&MAJORENTERPRISESINMADURAIDISTRICT

Sl. Block Name&Addressofthe Product Capital No.of


No unit Manufac Invest persons
tured Ment(Rs employed
inlakhs)
1. Alanganallur TheNationalCoop Sugar 2860.15 443
SugarMillsLtd,
B.Mettupatti,
Alanganallur
2. T.Kallupatti NIL NIL NIL NIL
3. Sedapatty NIL NIL NIL NIL
4. Kottampatty NIL NIL NIL NIL
5. Vadipatti KothariPetrochemicals Calcium 1058.60 127
International,Nagiri Sennoside
chlorpromazine
tolbutamide&
Brucine
6 Chellampatty NIL NIL NIL NIL
7 Melur TVSSrichakra Tyres&Tubes 12792.71 1138
Ltd,Vellaripatti
E.I.Dupant Sythetic 1825.95 30
Ltd,Therukkutheru Monofialment
nylon&indl&
Engg.Finishes
8 Kallikudi NIL NIL NIL NIL
9 Thirumangalam TheMetalPowder Nonferrousmetal 10015.00 669
Compamy,Maravankulam powder
10 Usilampatty NIL NIL NIL NIL
11 Thirupparan SreeMangayakarasi Cotton&Polyester 1009.84 244
kundram MillsPvt yarn
Ltd,Puliyankulam,
12 Madurai(East) NIL NIL NIL NIL
13 Madurai(West) NIL NIL NIL NIL
1 MaduraiCorpn. FennerIndiaLtd, V&FANbelt,Oil 2196.84 296
Kochadai seals,Conveyor
belt

2 Madurai T.V.SundaramIyengar& Automobileworks 4838.37 501


Corporation SonsLtd,Madurai

3 MaduraiCorpn MaduraiDt.Co.opMilk Milk&Milk 1072.31 380


ProducersUnionLtd, products
Madurai

TEXTILETESTING&DEVELOPMENTCENTRE
ItisajointventureprogrammeofTextileCommitteeandMadurai
SpinnersAssociationTrust,establishedunderPublicprivatepartnership
scheme.

TostrengthenTextileIndustriesparticularlyintheareaoftechnologyand
qualityimprovementwithobjectiveofmakingtheIndianTextileProduct
globallycompetitive.

Thecentreislocatedat153,SIDCOatKappalurIndustrialEstate,
Madurai625008

TheLand&BuildingprovidedbyMaduraiSpinnersAssociationTrusthave
investedRs.1croreinland&building.

TheCentreatMaduraiisuniquecateringtotheneedsofthelocaltextile
industryonspinning,weaving,processing,knitwearandgarmentsinarea
oftesting,training,designdevelopment,QualityControlandmachinery
maintenanceunderoneroof.

ITPARK

GovernmentofTamilnaduhaveproposedtosetup2nos.ofTIDALParkin
MaduraiDistrict.

ProcurementoflandforestablishingtheTIDALParkiscompletedin
IlanthaikulamVillagewithanareaof23AcresandVadapalanchiand
KinnimangalamVillagewithanareaof217Acresand40Acres
respectively.

TheGovernmenthaveentrustedtheworktoELCOT,Chennaifortaking
effectivestepsinimplementingtheprojectsuccessfully.TheHonorable
ChiefMinisterofTamilnaduisgoingtolaythefoundationstoneon
24.03.2008atMadurai.

Thisprojectwillprovidemoreemploymentopportunityforeducatedun
employedyouthandruralpeoplewillalsobenefitoutoftheproject.

INDUSTRIALCLUSTERDEVELOPMENTSCHEME
TheprimaryobjectiveoftheClusterDevelopmentSchemeistoimprove
internationalcompetitivenessofthedomesticindustry
TheschemeaimstoimpuretheIndustrialclusterswithhighgrowth
potential.
ThefollowinginfrastructurearecoveredunderCDP
1. CommonExcellentInfrastructureFacility
2. CommonTestingFacility
3. StrengtheningofR&DInstitutions
DistrictIndustriesCenterwillactasimplementingagencyforidentification
andmonitoringIndustrialClusters
In Madurai District 3 Clusters had been identified namely viz.,
1. CPS Milling Cluster
2. Madurai Rubber Cluster
3. Paper Machine Toys Cluster

CPSMillingCluster:
CPSMillingClusterprojecthadbeensanctionedfortheprojectcostofRs.39.96
crorebyGovernmentofIndiafortheestablishmentofphysicalinfrastructureI,II
andIIIBankcontributionRs.3.99CroreandtheAssociationMember
ContributionisRs.6.0Corers.Now,theconstructionworkisinatrooflevel.The
projectisunderimpletionstageandexpectedtobecompletedbeforeDecember
2008. Theremaining2clustersunderprogressanddetailsofprojectcostisas
follows.
Government of India under IIUS 2003, sanctioned the project. The
projecthasbeenimplementeduptotheexpenditureofRs.23.62Corers
out of the total above expenditure. Government of India has disbursed
grantofRs.17.91Corers.SPVcontributedanamountofRs.3.42Corers
and State Bank of India Madurai has released an amount of Rs. 2.28
Corers.
Theprojectwillbecompletedandwillbeputintocommercialusewith
effectfrom01.01.2009

RubberCluster:
After submission of diagnostic study report by ITCOT, the stakeholders
formed special purpose vehicle under title name of M/s. Rubber Park
Maduraiforestablishingtheclusterdevelopmentproject.
They have established one Raw Material bank at Virattipathu. This raw
material depot will cater to the needs of Rubber Industry. Initially the
stakeholdersinvestedRs.5.00lakhsinthisdepotandturnoverexpected
isaround25corers.Nolandisidentifiedtillnow.Equitynotyetmobilized
fortheRubberParksofar.
Rubber Cluster: Raw Material Depot Formed in association with
MADITSSIA.
Stakeholders:5Lakhs.

PaperMachineCluster:
To organize group of artisans to take up activities for sustainable
developmentatVilacheri.
To upgrade the skills through training and appropriate designs and
technologytoproduceitemsaccordingtomarketneed.
To provide adequate infrastructure supports for improved policy and
productivity.
Toprovideincreasedmarketingavenue
The1stPhasewascompletedforRs.2.37lakhstowardsSkilltrainingand
Managementtraining.
Theproposalfordesigntrainingunder2nd phasesisinthepipelineatan
estimatedcostofRs.2.63lakhs.FurtherPoombukarhassanctionedand
allotted a sum of Rs.2.00 Lakhs as a first Installment for conducting 2nd
phase of training. The training institution of SIPPO has taken steps for
preparationofcandidatesforemploymenttraining.
AUTOMOBILEINDUSTRIES
SinceMaduraiisaBusinessCenterandhavinglargeAutomobile
componentmanufacturingindustries,thereisaneedforsettingupof
largescaleindustryinthisautomobilesectoratKappalur.
MaduraiDistrictishavingthefollowinginfrastructurefacilities
1.AutomobilePopulation:Lakhsofautomobilesareavailablein
andaroundMaduraiDistrict.
2.AutoComponentsManufacturers:Therearemorethan300
nosofautomobilesparepartsdealersinMaduraiDistrict.
3.RubberComponents:Therearemorethan65nosofrubber
componentsmanufacturersinandMaduraiDistrict.
4.BodyBuildingunits:Therearemorethan40bodybuildingunits
inMaduraiforautomobiles.
5.AutoDealers:Therearenearly10nos.forcardealersin
Maduraicityitself
6.AutomobileRawMaterials:Rawmaterialssuchaspaint,Iron
steel,tinsheets,RubbersheetsareavailableinMadurai.

AutoComponentsManufacturers:
There are various Auto components required for automobiles ie. IC
Engine, forged press metal components, Radiator, Chasis, Wheels,
Springs,Silencersetc.Therearemorethan300Nos.ofautomobilespare
partsdealersinMadurai.
Besides,thefollowinglargescaleunitsarealsofunctioninginMadurai
areadoingautopartsmanufacturingbusiness.
1.SundaramFastners,Kariapatti
2.SriChakkraTyres
3.T.V.S.AutomobilesServiceStation
4.HiTechAroys(ExportUnit)
5.MadrasSuspension

RubberComponentsManufacturers:
Therearemorethan85nos.ofrubbercomponentsmanufacturingunitsin
andaroundtheMaduraicity.
In addition to this one Rubber Bush kit unit is functioning at Madurai
namely Manick Rubbers. We have a proposal to set up a rubber
componentmanufacturing cluster here. The diagnostic study report is
ready. When the Rubber component Cluster comes up one Rubber
componentparkmayalsobeestablishedinMadurai.

BodyBuildingUnits:
There are more than 40 bodybuilding units functioning in Madurai, for
automobile four wheelers such as Bus, Lorry, and Van etc. Further more
than 50 nos. of workshops are functioning for auto rickshaws and 3
wheelertransportvehiclesetc.
SomeofthereputedBodybuildersarefurnishedbelow:
T.V.S.
S.R.V.
Linga
Vinayagaetc.
Tyre Rebutton units such as Stanes, L.G.B. and T.V.S. are also in
Madurai.
Morethan10nos.ofV.Belt,FanBeltunitsarefunctioningapartfromthe
following.
Fenner
T.V.S.

AutoDealers:
Therearenearly10nos.ofCardealersinMaduraicityitself.Someof
themareasfollows:
i).A.R.A.S.
ii).A.B.T.
iii).T.V.S
iv).Solaimalai
v).AnaimalaiAgencies
vi).Susee
vii).S.G.J.etc.
TheyaredealingwithdifferenttypesofcarssuchasAmbassadar,Tata
Sumo,Hyundai,andMartuietc.
PROPOSEDESTATES
SIDCO,MaduraihasproposedtosetupNewIndustrialEstateatKappalur
inadditiontotheexistingIndustrialEstates.
The proposed Estate will be located at S.No. 65 of Uchapatti Village
behind Thanapandian Polytechnic & PTR Engineering College to the
extendof117AcresandThoppurVillagebelongstoTNHBnearMissorier
Mill,NHtoAustinpattyVillage.
The proposal has already been recommended for Govt. approval &
BudgetallocationforsettingupofIndustrialEstates.
SIDCO, Madurai has proposed to set up one Industrial Estate at
S.No.27,28,30,35,36ofSedapattiVillage,Peraiyurtk,

INDUSTRIALPARK
SIPCOT, Chennai has proposed to set up Industrial Park at
Valayankulam, Solanguruni, Nallur & Eliarpathi villages of MaduraiSouth
Tk.
The proposed Industrial Park will be located in the above location to the
extendof900acres.
The Revenue Department has taken effective steps for procurement of
land in the above villages through Special Thasildhars as per order No.
175,Ind(SIPCOT.FA)Dept,Dated.02.07.07
Landprocurementworkforthisprojectwascommencedfrom05.07.07.
AnytypeofGeneralIndustrycanbestarted
Development of infrastructure facilities like Road, Water supply and
drainagesystem
60% of total land for industrial purpose, 40% for development of
infrastructurefacilities.
TEXTITLEPARK
Textile Committee, GOI, has proposed to establish the Textile Park at
Vadipatti to the total extend area of 112 Acres with project cost of
Rs.87.86Corerasannouncedon31.12.07.
This park will promote the formation of Handloom & Power loom
Association&Clustersformation.
TextileCommitteewillprovidesubsidyofRs.35.00Corer
ThisparkwillattractentrepreneurstoinvestinTextilesectortothetuneof
Rs.410corers.
ItisexpectedthatturnoverofRs.900corerswillbeachievedduetothis
park.
Direct employment to 4000 persons and indirect employment 3000
personswillbeprovided.

INDUSTRIALCOOPERATIVESOCIETY
IndustrialCooperativeSocietiesareregisteredbytheRegisterofIndustrial
Cooperatives/Industries Commissioner and Director of Industries &
Commerce, Chennai5 under the provisions of Tamilnadu Cooperative
SocietiesAct,1983.
TherearetwotypesofsocietiesnamelyServiceandProductionSociety.
InMaduraiDistrict,thereare18IndustrialCooperativesocietiesinvarious
types
1.CooperativeIndustrialEstate 1No
2.PrintersServiceIndl.Coop.Society 1No
3.AutoDriversIndl.Coop.society 6Nos
4.CoirWorkersIndl.Coop.Society 5Nos
5.LabourContractserviceIndl.Coop.Society 3Nos
6.SmallScaleServiceIndl.Coop.Society 1No
7.SpecialTypeHerbalIndl.Coop.Society 1No
The societies are governed by the Elected or nominated Board of
Directors within the members and it helps to improve the economic
conditionofthepoormembersofthesociety.
ThustheIndustrialCooperativessocietiesplayavitalrole.

REGIONALTESTINGLABATMADURAI

RTLFunctionssince1969atMadurai
ThefollowingTestingfacilitiesareavailable
1.MetalandAlloys
2.MineralsandOres
3.Fuels(CoalandCoke)andotherpetroleumproducts
4.ChemicalandAlliedproducts
5.Fertilizers,Insecticidesandpesticides
6.FoodandFoodProducts
7.Fats,SoapandOil
8.Water(Allpurposes)
9.Paints,Varnishesandalliedproducts
10.AlltypesofBuildingmaterials
11.CementandRefractoriness
12.Electroplatingsolutionsetc
13.Matchesanditsrawmaterials
14.PVCandotherkindsofpipes
15.Rubbermaterialsandproductsetc.

OVERVIEWOFTHEINDUSTRIALSCENARIO

Nos. EmploymentGenerated
Micro,Small&Medium 12577 37800
Enterprises
LargeEnterprises 9 8,343
BLOCKWISEMAJORINDUSTRIESINMADURAIDISTRICT

Sl. Block Name&Address Product Capital No.of


No oftheunit Manufactured InvestMent persons
(Rsinlakhs) employed
1. Alanganallur TheNationalCo Sugar 2860.15 443
opSugarMills
Ltd,
B.Mettupatti,
Alanganallur
2. T.Kallupatti NIL NIL NIL NIL
3. Sedapatty NIL NIL NIL NIL
4. Kottampatty NIL NIL NIL NIL
5. Vadipatti Kothari Calcium 1058.60 127
Petrochemicals Sennoside
International, chlorpromazin
Nagiri etolbutamide
&Brucine
6 Chellampatty NIL NIL NIL NIL
7 Melur TVSSrichakra Tyres& 12792.71 1138
Ltd, Tubes
Vellaripatti
E.I.DupantLtd, Sythetic 1825.95 30
Therukkutheru Monofialment
nylon&indl&
Engg.
Finishes
8 Kallikudi NIL NIL NIL NIL
9 Thirumangalam TheMetal Nonferrous 10015.00 669
Powder metalpowder
Compamy,
Maravankulam
10 Usilampatty NIL NIL NIL NIL
11 Thirupparan Sree Cotton& 1009.84 244
kundram Mangayakarasi Polyester
MillsPvt yarn
Ltd,Puliyankulam,
12 Madurai(East) NIL NIL NIL NIL
13 Madurai(West) NIL NIL NIL NIL
1 MaduraiCorpn. FennerIndiaLtd, V&FANbelt, 2196.84 296
Kochadai Oilseals,
Conveyorbelt
2 Madurai T.V.Sundaram Automobile 4838.37 501
Corporation Iyengar&Sons works
Ltd,Madurai
3 MaduraiCorpn MaduraiDt. Milk&Milk 1072.31 380
Co.opMilk products
ProducersUnion
Ltd,Madurai
PROPOSEDLARGESCALEPROJECTSINTHENEXTFIVEYEARS

1.AutomobileCarManufactureIndustry
2.I.T.PARK
3.TextilePark
4. HandloomClusterProject

MAJORINDUSTRIALCLUSTEROFMADURAIDISTRICT
InMaduraiDistrict3Clustershadbeenidentifiednamelyviz.,
1.CPSMillingCluster
2.MaduraiRubberCluster
3.PaperMachineToysCluster

1.CPSMillingCluster:
CPSMillingClusterprojecthadbeensanctionedfortheprojectcostofRs.
39.96 corer by Government of India for the establishment of physical
infrastructure I, II and III Bank contribution Rs. 3.99 Corer and the
AssociationMemberContributionisRs.6.0Corers.Now,theconstruction
workisinatrooflevel.Theprojectisunderimpletionstageandexpected
tobecompletedbeforeDecember2008.

Government of India under IIUS 2003, sanctioned the project. The


projecthasbeenimplementeduptotheexpenditureofRs.23.62Corers
out of the total above expenditure. Government of India has disbursed
grantofRs.17.91Corers.SPVcontributedanamountofRs.3.42Corers
and State Bank of India, Madurai has released an amount of Rs. 2.28
Corers.

The project will be completed and will be put in to commercial use with
effectfrom01.01.2009

2.RubberCluster:
After submission of diagnostic study report by ITCOT, the stakeholders
formed special purpose vehicle under title name of M/s. Rubber Park
Maduraiforestablishingtheclusterdevelopmentproject.
They have established one Raw Material bank at Virattipathu. This raw
material depot will cater to the needs of Rubber Industry. Initially the
stakeholdersinvestedRs.5.00lakhsinthisdepotandturnoverexpected
isaround25corers.Nolandisidentifiedtillnow.Equitynotyetmobilized
fortheRubberParksofar.
Rubber Cluster: Raw Material Depot Formed in association with
MADITSSIA.Stakeholders:5Lakhs.

3.PaperMachieCluster:
To organize group of artisans to take up activities for sustainable
developmentatVilacheri.
To upgrade the skills through training and appropriate designs and
technologytoproduceitemsaccordingtomarketneed.
To provide adequate infrastructure supports for improved policy and
productivity.
Toprovideincreasedmarketingavenue
The1stPhasewascompletedforRs.2.37lakhstowardsSkilltrainingand
Managementtraining.
Theproposalfordesigntrainingunder2ndphasesisinthepipelineatan
estimatedcostofRs.2.63lakhs.FurtherPoombukarhassanctionedand
allottedasumofRs.2.00LakhsasafirstInstallmentforconducting2nd
phaseoftraining.ThetraininginstitutionofSIPPOhastakenstepsfor
preparationofcandidatesforemploymenttraining.

EXPORTPOTENTIALOFTHEDISTRICT
1.ReadymadeGarments,TerryTowels
2.Granites
3.FoodProductsofMasalaPowder,Pickles,Appalam,Pappads.
4.AloeVeraGel
5. S.S.Utensils

OTHERPOTENTIALNONFORMSECTOR

FOODINDUSTRIES
ColdStorage(MaduraiiscommercialCenterforSoutherndistrict
andallthefruitskeptloadedinMadurai.
Appalam/Papadmanufacturing
JasmineCultivation&Extraction
FruitSquashes&Juices
DairyProducts(2Milkchillingplantsavailable)
TomatoKetchup,juices,pickles
Dalmilling(Millingclustertobecommencedshortly)

CHEMICALINDUSTRIES
AutoRubberComponents
Injection&BlowmoldedPlasticProducts
FRPProducts

MECHANICALENGINEERINGINDUSTRIES/OTHERS
Bolts,NutsShutters,springs,OilSealsforAutomobiles
Foundry(Ferrous&NonFerrous)
S.S.Utensils

TEXTILES
SpinningYarn,Powerlooms
ReadymadeGarments,TerryTowels
JuteBags,Leather&RexineBags

AUTOMOBILE
CarManufacturing
INDUSTRIALESTATE
InMaduraiDistrictThreeIndustrialEstatesarelocatedatthefollowingplaces.
1.SIDCOIndustrialEstate,K.Pudur,Madurai
2.SIDCOIndustrialEstate,Kappalur,Madurai
3.SIDCOIndustrialEstate,Uraganpatti,Madurai
4.MaduraiCo.op.Indl.Estate,Kappalur,Madurai

1.SIDCOIndustrialEstate,K.Pudur,Madurai
TotalExtendofland 56,054acres
No.Ofworksheds 74sheds
51Sheds UnderLeasebasiscumsalebasis
13Sheds Outrightpurchasescheme
10Tinysheds Underfullcostbasis

2.SIDCOIndustrialEstate,Kappalur,Madurai
TotalExtendofland 136Acres
Developedplots 148(invarioussize)
Allottedto133entrepreneurs
Extendoffurtherland 122.749Acresallottedto
1.IndianOilCorporationLtd
2. HindustanPetroleumCorpn.Ltd
3. BharathPetroleumCorpn.Ltd
ForsettingupoftheirdepotsandLPGbottlingplants

AutomobileCooperativeIndustrialEstate,Kappalur,Madurai
This is an Industrial Cooperative Estate forwarded by owners of
AutomobileServiceCenterinordertointegratetheservices.
Extendofland 23.90Acres
No.ofdevelopedplots 201Nos
No.ofmembersinthesociety 209
PaidupShareCapitalAmt Rs.22.70Lakhs
StateGovt.Participation Rs.20.00lakhs
Costofplot Rs.7,100percent

INVESTMENT&EMPLOYMENTDETAILSOFMICRO/SMALL/MEDIUM
ENTERPRISESINMADURAIDISTRICT

Year NumberofMSMEIssued Investment (RsinLakhs)


200708 549 2475.90 5031
01.04.08upto07/08 1213 4905 8801

You might also like