You are on page 1of 1
out cock. All existing locomotives should also be modified with the above modification. For immediate implementation of the modification, the sources available in the current CLW Vendor Directory for the additional BP cut out cock vent is furnished below, as per CLW drawing no 0/2/65/364 (copy enclosed). 1. Mis Banglore Valves Mis S.K. Engg Mis Matriashis Enterprise Mis Recon Engg Co. Pvt. Ltd. Mis Cavico Industries M/s Makali Industries Ws S. N. (Mechanical) Enterprise Pvt, Ltd, DLW is requested to provide drawing of 1-1/4" additional BP cut out cock with vent with sealing arrangement and develop the vendors immediately. Rest of the instructions issued vide modification sheet under reference including the special instructions mentioned in Para 9.0 of the modification sheet holds good. NOOhON Encl. As above, Copy to: 1. EDME (Tr), Railway Board, Rail Bhawan, New Dehi- 110001- For kind information. 2. CME, DMW, Patiala: It is requested to advise cut in S. No. and date of implementation with loco no. to this office. 3. CME, DLW, Varanasi: It is requested to advise cut in S. No. and date of implementation with loco no. to this office. 4, All CWM/ POH Workshops and Sr. DME (Ds!)/ Diesel Sheds as per distribution list: compliance of the above modification with loco no. to be advised to this office.

You might also like