Train Detention particulars Observations

GLP stopped after passing starter Checked &


Train. No 17612 AWB- RU detained at NKDO on noticed coach no SC SLR 98723 Hand brake
17/8/19 for 10”. slightly apply condition, Same released.
14.58 hrs Train left Spot.
Reported for while passing NKDO points man
observed smoke coming from SC SLR 98723 next Detention-10 Minutes
to T.E

BPC particulars: 136818 issued on 16-08-19 at NED


round trip.

Coach details :
SC SLR 98723.
POH- TPYS-01.02.18
IOH-NED-21.11.18
Rd- 09/19.

Root cause Analysis Action taken:


14.12 hrs arrived GTL Power change. 1. Advised to Sr DOM/GTL lr
14:34 hrs left GTL . No.G/M/C&W/RS/8 for information &
14.48 hrs Train while passing NKDO necessary action.
(Nakkanadoddi) Points men noticed Smoke
coming from front SLR.
At GTL shunting staff not released front SLR hand
brakes.
Responsible: Shunting staff.
Train Detention particulars Observations
1. At RC ODS Loco Nos. 16474/11124 /GY .LP given
Train. No PMAK detained at RC/MRC/MALM on message that leading loco load meter not responding due
17.08.19 . to power cut off indication. LP checked the loco with the
guidance of SSE/Dsl/GY. Air flow indicator shoot up & BP
Reported for: Outgoing LP after taking charge at RC is 4.7 kg/cm2 in loco. C&W staff released the formation.
•RC Air flow indicator not showing Zero. 2.ODS power detached at MRC and attached.
•MRC full formation not moving/hard pulling. (12679/12630/ KZJ/ WDG4).At MRC LP unable to start the
•MALM 34 wagon pistons not releasing . formation. SSE/C&W/RC and CLI/RC While conducting air
brake failure test on trailing loco 12630 it is found that
BPC details :-001393 dt 10/8/19 at BPA ,Premium loco air brakes is failed and the same was rectified.
valid up to 22/8/19. 3. At MALM once again power interception planed by
PRC/GTL 12679/12630/ KZJ/ WDG4 Locos were detached
and loco Nos11120, 16602 attached. Further no problem
noticed by LP on formation.It clearly indicates that due to
loco problems the formation was not releasing.

Root cause Analysis Action taken


Loco problem.
•Detention was shown on C&W account .
Responsible: Nil
•As per CRSE/SC message 19/8/48 dt 18.08.19 the
detention to be reclassified into Loco account.

•Lr.No.G/M/C&W/RS/8 dt: 19.08.19 the case has


been reclassified into Loco account.
Train Detention particulars Observations
Out going Guard from RU reported that Brake van
Train. No RMD detained at RU on 18-8-19
brakes not applying due link pin missing .
Reported for : Out going Guard from RU reported
that Brake van brakes not applying.
BPC Particulars : LDH/FZR/NR dt 9/8 premium valid
up to 21/8 Link pin
Wagon Details: missing
CR BVZC 85019260232.
POH: JMPW- 24-7-18
ROH- Nil
Rd- 7/2020

Root cause Analysis Action taken

1. During rake examination of link pins and bulb 1. Link pin provided at RU and brake van brake
cotter to be ensure . tested and given working condition.
2. Avoidable failure 2. Advised to Sr DME/C&W/LDH vide lr
No.G/M/C&W/RS/8 to counsel the
Responsible: maintenance staff.
Bad workmanship by LDH (LUDHIANA JN) depot.
Train Detention particulars Observations
• On 26/7/19 wagon no ECRBOXNHL 22101324397
Train. No B-182 detained at SUPP on 18-8-19 detached due to Air leakage through COAC .
Reported for : Attached spare wagon BP leaking
through COAC vent hole. •On 27.07.19 C&W staff replaced the COAC and
given fit .But no Loco or Air compressor to test the
BPC Particulars: air leakage.
50000132585 Issued on 13.07.19 at
BIA/R/SECR, CC rake -8851, 100% •on 18.08.19 spare wagon planned to attach to
Train No B-182 After attaching Air leakage
Wagon Details: through COAC observed ,so detached wagon
NF BVZC 85059260025, attached.
POH:KGPW- 03.05.19 • New COAC replaced on 19-8-19.
Rd-06/21

Root cause Analysis Action taken


• Advised JE/KDP to ask loco for checking of air
Whenever replacing of Cut off angle cock at out leakages.
station no source of Air compressor or loco to test
the leakages.

Responsible: Nil
Train Detention particulars Observations
LC gates no 117 Eng Gateman Between MNPL-
Train. No JSWT wagon detached at VNM due to VNM.
Roller bearing failure on 20-8-19
Reported for Smoke while passing LC gate no 117
Roller bearing
BPC particulars: 50000140013 Issued at GY on smoke
14.08.19, CC Penna 19, 59+1 100% BKm-5210.

Wagon details :
SC BOXN 25079560231
POH: - KGPW 20.09.17
ROH- GY 19.01.19
Rd- 04/22 YB: 2011

Root cause Analysis Action taken:


1. Improper maintenance by KGPW 1. Advised to CWM/KGPW vide lr
2. May be due to insufficient Grease. No.G/M/C&W/RS/8 for information and
3. Cage / backing ring may be defective. necessary action.
4. Unavoidable failure 2. Advised to CWM/RYPS vide lr
No.G/M/C&W/RS/8 for investigation and to
Responsible: give feed back.
Wheel sent to RYPS for further investigation. 3. Wheel change will be done by C&W staff GY
Train Detention particulars Observations

Train. No 11027 CSTM-MAS detained at NKDO on While rolling into YG station on duty P/MAN/YG
17/8/19 for 10”. informed Brake binding in CH No:S2 14260 GLP
released the Brake binding and train left at 14:38
Reported for While rolling into YG station on duty
P/MAN/YG informed Brake binding in CH No:S2 14260. Detention- 12” .
BPC particulars:241341 issued 18-08-19 at CSMT/CR

Coach details :
CR CN 14260
POH-MTN 24.02.18
IOH - WB 10.12.18
Rd-09/19

Root cause Analysis Action taken:


No brake binding symptoms checked at RC and 1. Advised to Sr DOM/GTL lr
GTL No.G/M/C&W/RS/8 for information &
necessary action.
Responsible: Nil
2. Control message given to CSTM ( PM depot)
Feed back:
Checked at CSTM - no brake binding .
Train Detention particulars Observations
•Train No. JSWT taken over DHNE at 00.00 hrs.
Train. No JSWT weighment not recorded at GTLW Without weighment.
on 21-8-19
•Passed Weigh Bridge at GTL W at 13.50 hrs and
Reported for: VDI to JSWT weighment rake train arrived BLL at 14.00 hrs.
passed on EIMWB at 13:50 hrs weighment •Commercial control informed at 15.30 hrs that
reading are erratic. EIMWB is showing Erratic reading.

BPC particulars: Nil •SSE/C&W/GTL left by road and arrived GTL W at


16.00 hrs. Kept under break down at 16.10 hrs
Wagon details : Nil
• Train left BLL at 16.40 hrs
•Total detention: - 170 min.

Root cause Analysis Action taken:


1. Advised to Essae company /Bangolore- vide
EIMWB is showing Erratic reading. lr No.G/M/C&W/Store/EIMWB /GTLW for
information and depute service engineer .
Responsible: OEM (Essae company)
.
Train Detention particulars Observations

Train. No JSWT wagon detached at PLU due to Roller LP stopped and noticed EM pad is burning due to
bearing failure on 22-8-19 hot axle
Reported for passing Bet GY-PLU Section at km
420/30 Gate Man noticed smoke on 2nd wagon from
TE
BPC particulars:
50000 139166 issued at COA/BZA on 10.08.19,
premium , valid up to 21-8-19.
Invalid Traffic Control .NO 22/38 @ GY
Wagon details : NR BOXN 25069960430 EM pad burning
POH-JMPW 29.06.16. ( due to hot axle)
ROH-NMP 05.02.18
Rd -2/21

Root cause Analysis Action taken:


1. Improper maintenance by JMPW 1. Advised to CWM/JMPW vide lr
2. May be due to insufficient Grease. No.G/M/C&W/RS/8 for information &
3. Cage / backing ring may be defective. necessary action.
4. Unavoidable failure 2. Advised to CWM/RYPS vide lr
No.G/M/C&W/RS/8 for investigation & to give
Responsible: feed back.
Wheel sent to RYPS for further investigation. 3. Wheel change will be done by C&W staff GY