ENGINEERING GUIDE FOR PROCESS PLANT
COMMISSIONING PLANNING
PROCEDURE FOR
BASIC PLANNING OF COMMISSIONING
@ Toyo ENGINEERING CORPORATION
TOKYO JAPAN
Fora acx0.019 5209roKvo B saraw
ENGINEERING GUIDE
TEG
eae cee PROCEDURE FOR BASIC PLANNING OF 14210-0098
issued] reB2801 | COMMISSIONING
CONTENTS
PAGR
1. GENERAL
1.1 Intent 2
1.2 Scope 2
2. PROCEDURE FOR BASIC PLANNING OF COMMISSIONING
2.1 Timing of Planning 2
2.2 Responsibility of Planning 2
2.3. Refeience Document z
24 Constitution of Basic Commissioning Plan 2
History P(W/A)ronvo BD sean
Toxo Everemne Corr.
ISSUED
ENGINEERING GUIDE TEG
PROCEDURE FOR BASIC PLANNING OF ete
COMMISSIONING PAGE 2 OF 3
FEB.28,01
L
ud
12
2A
23
GENERAL
Intent
The manual establish the standard of basic commissioning plan, which to be made based on the Jah Tnstrw
issued by Process Systems Engineering Department.
Scope
‘This manual applies tothe basic planning of commissioning for every job.
PROCEDURE FOR BASIC PLANNING OF COMMISSIONING
‘Timing of planning
As soon as after the job instruction is issued by Process Systems Engineering Department, basic commissioning
plan to be made based on the job instruction
Responsibility of planning
‘Basic commissioning plan to be made by x000000xx, then it should be approved by group leader (GL).
Reference Document
+ Process Systems Engineering Department Job Instruction
+ The Contract,
Constitution of Basie Commissioning Plan
() General
Mention the summary. No ced to indicate details,
@) Contractual matters
+ Contract Style
*+ Contract Terms - Period of Stabilized Operation, Period of Performance Guaranty Operation, etc.
) Consideration for Risk management and Risk Measurement
+ Handling of non-experience process
+ Capability of client’s member
+ Protection for freezing
(4) Consideration for Schedule
* Period of pre-commissioning
* Period of commissioning
* Condition of feed supply
*+ Condition of the timing of utility supply (power, water, etc.)
+ Climate condition
(8) Organization at office for the work associated with commissioning.
+ Define the activities.
+ Establish the policy of work execution (newly plant, copy plant)ronvo DB savan
ENGINEERING GUIDE TEG
‘Tove Evanammc Conr. PROCEDURE FOR BASIC PLANNING OF 1-4210-009E
tssueD | FEB28,01 COMMISSIONING PAGE 3 OF 3
6)
”
®
‘+ System for preparation the document for commissioning,
~ Assign a person in charge.
- Consider out-sourcing
‘Handling of the preparation work for com:
Department.
joning by corresponding Process Systems Engineering.
* Definite the split of work after discuss with construction division
- Planning for Piping Pressure Test
- Planning for Flushing
- Planning for preparation of Distributed Control System (DCS) graphics.
‘Commissioning organization at construction site.
+ Scope of assistance from Process System Engineering Department for preparation work for
commissioning.
+ Commissioning execution plan.
+ Commissioning execution style (carry out or supervise).
- Commissioning organization (consider the combined team with non-Japanese).
- Relationship with client’s operation team,
- Support system (by construction team).
~ Licenser’s supervisor (participate or not),
~ Requirement of vendor’s supervisor.
~ Training for client’s operation members.
Cost management.
Commissioning work to be carried out effectively with minimum number of persons, and try to reduce the
cost.roKvo BD sxean
‘Toyo EcINEERING Corr,
Issuep | _ FEB:
ENGINEERING GUIDE
PROCEDURE FOR BASIC PLANNING OF
COMMISSIONING