INFORMATION REQUIRED FOR CHECKING

IFC
See Note 2

BASIC DRAWING INFORMATION

IFC
Title Block - Title, Project Number and Drawing Number
Designer / Checker Initials and Date
Revision Number and Date
Scale

CHECK LIST

IFC
Key Plan and Legend
North Arrow
Reference to Adjoining Drawings
Area Limits
Equipment Tag Numbers & Co-Oridinates
Tail dimensions
Check for pipe dimensioning only at points where line leaves GA or Module
Structural Tag Numbers
Show shoes anchors and guides
Safety Showers and Eye Wash Fountains
All Holds Noted
Line Number
Flow Arrows
Do not call out
Coordinates is Specialty
located onItems
the N.W. corner
steel centerline
(For Modules only)
Instrument Tag Numbers
Incoming and Outgoing Lines matched with
Tie-in References
Ensure all pipe support steel has a TOS elevation only. No B.O.P. callouts.
Ensure Shipped Loose Piping is identified
Indicate all Insulation breaks
Checker to verify with Structural Departmen
Ensure that cutting plane standard is followed (for pipe racks) and that all piping is properly
represented on the GA

NOTES:

1. Critical Dimensions are defined as those to piping connections (field welded or flanged) the location of which are essential
in order to ensure match up to the continuation. eg module to module.
2. Checker is only to check GA format as shown on GA sample drawings. See PEM 4209 Appendix 2.

You might also like