2 Plot plan shows entire facility as per project scope, including any future expansions.
3 Plant North, True North, Wind Direction and Wind Rose Shown.
5 Separate gates are provided for Personnel movement and Material Movement.
10 Units / Areas are given proper area codes e.g. PA01, PA02, UA01 etc.
11 Location of new facility w.r.t. existing facility is given in terms of distance or co-ordinates.
12 Distances between units/buldings/equipments are given and are as per relevant standard. E.g. OISD
13 Buildings / Shelters inside the plant are shown as blocks with outlines.
16 True geo-graphical co-ordinates (UTM) of the datum point are defined in notes or at the datum point.
19 Road and shoulder widths are as per project specification or relevant national standard.
20 Gridlines for co-ordinates are shown wherever applicable, along with Northing and Easting Values.
21 Relaton of plant grade levels w.r.t. datum level e.g. mean sea level is given.
23 Main roads and auxilary roads are located with centre line and co-ordinates.
Major storm water drain trenches, Underground Corrodors for piping and cables are shown with
24
dimensions, grids.
25 Piperacks and Sleepers are correctly dimensioned with grid numbers.
26 Grade levels for all areas are given as per Civil Grading Drawings.
28 Sterile zone radius is shown for flare stack and no equipment is present within the sterile zone.
29 Access roads around process units and tank farms are adequate.
Flare stack, Pig Receiver and launcher, Metering stations are provided with separate fencing if requires as
30 per project specification.
DATE: DD/MM/YYYY
nates.
ard.
Easting Values.
e shown with
terile zone.
fencing if requires as
CLIENT:
REV.:
DOCUMENT NO.:
1 The drawing border conforms to the Project specifications or Company standards, as applicable.
Drafting conventions e.g. font types/sizes, text styles, line types, coordinate/dimension styles, layer
2
structure, etc. are as per the Project specifications or Company CAD standards, as applicable.
3 Drawing title, drawing number and revision number in the title block are as per the TDR.
5 Revision block contains initials of the originator, checker and approver (both Discipline & Project).
6 Drawing scale is stated in the title block and graphic scale (bar scale) is shown.
7 The drawing scale conforms to the Project specifications or Company standards, as applicable.
8 All general notes are checked and the units for dimensions, coordinates & levels are given in the notes.
9 Legend for applicable symbols is shown (e.g. new/existing facilities, scope cloud, etc.)
12 Revision clouds, along with revision number triangles are marked properly, if applicable.
13 Hold clouds, if applicable, are properly marked and the list of Holds is indicated.
DATE: DD/MM/YYYY
s applicable.
ion styles, layer
pplicable.
TDR.
applicable.
c.)
able.
SIGN DATE REMARKS
ved (Model Manager)
PROJECT NAME:
CLIENT:
REV.:
DOCUMENT NO.:
4 Title Block : Project Code, Project Number and Area Code Specified.
12 Drawing : Equipment name and nozzle number along with nozzle size and rating specified.
19 Drawing : Line number with Fluid, Size, Spec, Number, Insulation, Heat Tracing etc. marked on drawing.
48 MTO : Calculation of Length of pipes and number of fittings is correct as per drawing.
DATE: DD/MM/YYYY
ecified.
marked on drawing.
g.
CLIENT:
REV.:
DOCUMENT NO.:
1 The drawing border conforms to the Project specifications or Company standards, as applicable.
Drafting conventions e.g. font types/sizes, text styles, line types, coordinate/dimension styles, layer
2
structure, etc. are as per the Project specifications or Company CAD standards, as applicable.
3 Drawing title, drawing number and revision number in the title block are as per the TDR.
5 Revision block contains initials of the originator, checker and approver (both Discipline & Project).
6 Drawing scale is stated in the title block and graphic scale (bar scale) is shown.
7 The drawing scale conforms to the Project specifications or Company standards, as applicable.
8 All general notes are checked and the units for dimensions, coordinates & levels are given in the notes.
9 Legend for applicable symbols is shown (e.g. new/existing facilities, scope cloud, etc.)
Reference drawing numbers and titles are listed and checked. List shall includeoverall plot plan and key
10 plot plan as aminimum.
12 Revision clouds, along with revision number triangles are marked properly, if applicable.
13 Hold clouds, if applicable, are properly marked and the list of Holds is indicated.
14 Key plan is shown and the applicable area/unit of the plot plan is highlighted.
Match line co-ordinates and drawing limits are clearly marked and are consistent with the Key Plan
16 drawing. Continuation drawing numbers are correctlywritten.
DATE: DD/MM/YYYY
s applicable.
ion styles, layer
pplicable.
TDR.
applicable.
c.)
able.