You are on page 1of 1

THE BADGER INDUSTRIAL SERVICES SRL

GENERAL ARRANGEMENT CHECKLIST

N/A CHKD ACTIVITY TO CHECK


Title
Drawing and sheet number
Drawing format
North arrow
Revision number and reason for issue
Scale
Presence of all required signatures
Key Plan
Reference drawing (Plot Plans, GA’s, etc)
Matchline shown with continuation drawing number
Steel grid reference
Equipment shown to the correct size and location
Pipe support identification
Equipment Nozzle schedule and nozzle data
Piping 2” and larger shown with line number and flow arrows
Location and identification of instruments
Dimensions
Fire walls and cladding
Primary Steelwork
Bulkheads
Escape route and main acces ways
Adequate location of nozzles on vessels for maintenance acces of
piping and instruments in line with the Process and Vessel
Sketches
Adequate accessibility of operation and maintenance and that
manholes, hatches, covers, drop-out, laydown and handling areas
etc., have been provided
Adequate clearance between piping and steelwork, doors,
windows, HVAC ducts, equipment, cable trays, control consoles
and fire fighting equipment
Stress isometrics have been drawn for all critical lines and
comments
(if any) from stress engineer have been incorporated
Sections correctly cross-referenced to plans
Special piping items are correctly labeled
Hook-up spools are correctly indicated and limits dimensioned
The following items are cross referenced with the piping
standard drawings. Process vents and drains, instrument
connections, utility hose stations, sample points
Compatibility with latest issue of other discipline drawings i.e.
Structure, Electrical, Instrumentation
IDC* comments investigated and incorporated when agreed
COMPANY comments investigated and included where agreed
Comments from “Master” drawing included
Completation of “Hold” list

*) IDC – Inter Discipline Check

Issue Page
Date: 1 of 1
This checklist to be stapled to check prints and shall become a part of the check print