MEP DRAWING CHECKLIST

Project Number M4914 Project Name DIAMOND SQUARE


MEP Team leader NGUYỄN HOÀNG DUY Date 10/07/2021
MEP Manager HỒ ĐỨC ANH

MM: MEP Manager TL: MEP Team Leader

Organization: MM/TL
Title block is according to standards 
Title block font size and type according to standards 
Standard information (logo, address, general notes, north sign) is according to 
Project information (project name, client name, client address, client logo) are correct 
with standard font size and type
Drawing specific information (drawing title, engineers names, date) are correct with 
standard font size and type
Drawing font size and type according to standard 
Drawing electronic path shown on the drawings NEED TO CLARIFY 
All drawings are signed and stamped

Content: MM/TL
Mechanical systems
System title drawing is provided 
System list of drawings, legend and symbol and notes drawing is provided 
General notes are suited to the specific project 
All symbols are referenced in the symbols and legend drawing 
All essential information such as ducts sizes, pipe sizes, equipment name are indicated 
on the drawings RE-CHECK
Ducts and pipe sizes are checked, correct and match calculation notes 
Equipment size checked, correct and match calculation notes 
Standard equipment block is used 
Appropriate materials used N/A 
Text overlapping is checked RE-CHECK 
Standard line type is used for ducting and pipes 
Equipment, ducts and pipes Horizontal and Vertical clearances are adequate and 
accommodate constructability RE-CHECK

Equipment essential information (capacity, type, location) are provided EQUIP SCHEDULE 
Standard equipment table list is used 
Inspection access is coordinated to all necessary equipment NOT INCLUDE IN THIS STAGE 
System schematics are shown 
Standard Details are used appropriately 
No significant design issues noted 
Significant design issues noted (comments provided on the drawings) ALREADY PROVIDE ON
COMMENT DOCUMENT

Date: 15 Mar Page 1 of


MEP DRAWING CHECKLIST MF207 2017 2
For Internal Use Only Revision A
Electrical
System title drawing is provided 
System list of drawings, legend and symbol and notes drawing is provided 
General notes are suited to the specific project 
All symbols are referenced in the symbols and legend drawing 
All essential information such as cable sizes, loop name and number, equipment name 
are indicated on the drawings
cable sizes are checked, correct and match calculation notes 
panels size checked, correct and match calculation notes 
Standard equipment block is used 
Appropriate materials used 
Text overlapping is checked 
Standard line type is used for electrical systems 
Horizontal and Vertical clearances are adequate and accommodate constructability 
Standard equipment table list is used 
Inspection access is coordinated to all necessary equipment 
System schematics are shown 
Standard Details are used appropriately 
No significant design issues noted 
Significant design issues noted (comments provided on the drawings) 

CHECKER

Signature: Date:

Comments:

Date: 15 Mar Page 2 of


MEP DRAWING CHECKLIST MF207 2017 2
For Internal Use Only Revision A