MEP DRAWING CHECKLIST

Project Number M4914 Project Name DIAMOND SQUARE


Team leader PHAN THANH CANH Date JULY 14, 2021
MEP Manager HỒ ĐỨC ANH Department Electrical

MM: MEP Manager TL: MEP Team Leader

Organization: MM/TL
Title block is according to standards
¡
Title block font size and type according to standards ¡

Standard information (logo, address, general notes, north sign) is according to ¡

Project information (project name, client name, client address, client logo) are correct ¡
with standard font size and type

Drawing specific information (drawing title, engineers names, date) are correct with ¡
standard font size and type

Drawing font size and type according to standard ¡

Drawing electronic path shown on the drawings ¡

All drawings are signed and stamped

Content: MM/TL
Mechanical systems
System title drawing is provided
¡
System list of drawings, legend and symbol and notes drawing is provided ¡

General notes are suited to the specific project ¡

All symbols are referenced in the symbols and legend drawing ¡

All essential information such as ducts sizes, pipe sizes, equipment name are indicated ¡
on the drawings

Ducts and pipe sizes are checked, correct and match calculation notes ¡

Equipment size checked, correct and match calculation notes ¡

Standard equipment block is used


¡
Appropriate materials used ¡

Text overlapping is checked ¡

Date: July 14, Page 1


MEP DRAWING CHECKLIST MF207 2021 of 4
For Internal Use Only Revision A
Standard line type is used for ducting and pipes ¡

Equipment, ducts, and pipes Horizontal and Vertical clearances are adequate and ¡
accommodate constructability

Equipment essential information (capacity, type, location) are provided ¡

Standard equipment table list is used ¡

Inspection access is coordinated to all necessary equipment


¡
System schematics are shown ¡

Standard Details are used appropriately ¡

No significant design issues noted ¡

Significant design issues noted (comments provided on the drawings) ¡

Date: July 14, Page 2


MEP DRAWING CHECKLIST MF207 2021 of 4
For Internal Use Only Revision A
Electrical
System title drawing is provided ¡

System list of drawings, legend and symbol and notes drawing is provided ¡

General notes are suited to the specific project


¡
All symbols are referenced in the symbols and legend drawing ¡

All essential information such as cable sizes, loop name and number, equipment name ¡
are indicated on the drawings

Cable sizes are checked, correct and match calculation notes ¡

Panels size checked, correct and match calculation notes ¡


Not give of the panel size in this stage, just provide schematic of the panel loads to match spreadsheet.
Standard equipment block is used ¡

Appropriate materials used ¡


N/A
Text overlapping is checked
Re- check again ¡
Standard line type is used for electrical systems ¡

Horizontal and Vertical clearances are adequate and accommodate constructability ¡


Re-check again and need to coordinate with other disciplines during the construction phase.
Standard equipment table list is used ¡
Provided in the general note drawing
Inspection access is coordinated to all necessary equipment ¡
Not included in this stage.
System schematics are shown ¡

Standard Details are used appropriately ¡

No significant design issues noted ¡

Significant design issues noted (comments provided on the drawings) ¡


Process in during the execution of design drawings.

Warring: Transformer 2000kVA, the investor requires an additional 65% of the load on the first floor, so it is not
allowed to expand the load in the future so transformer has overload capacity

CHECKER

Signature: Date:

Date: July 14, Page 3


MEP DRAWING CHECKLIST MF207 2021 of 4
For Internal Use Only Revision A
Comments:

Date: July 14, Page 4


MEP DRAWING CHECKLIST MF207 2021 of 4
For Internal Use Only Revision A

You might also like