DRAWING CHECK SHEET
deepika
2017-04-19
JOB DETAILS 17:59+04:00
Job Title: FEED CCTV FACILITIES AND SDH & INTEGRATION OF SDH FACILITIES Job No.: 5686
DRAWING DETAILS
Drawing Title: TYPICAL ELECTRICAL INSTALLATION DETAILS
Drawing Number: 5686-GG-GEN-16-21-011, 14 SHEETS
Revision: A Date: 10/Nov/16
Originator: ATHER Checker: D
Approver: NNR
CHECK DETAILS (For Partial Check Only)
Prepared By: Date: 10/Nov/16
Checked By:
Check Description:
DRAWING CHECKLIST
NA Originator Checker Approver
Is Drawing clear, concise and legible? Not Required
Is Drawing fit for purpose? Not Required
Are all titles, drawing numbers, references and formats Not Required
correct?
Are parts lists and material take-off are correct? Not Required
Is Drawing produced to the highest appropriate drawing Not Required
standards?
Are the titles, drawing numbers and revision descriptions Not Required
consistent with the document register?
Are drawings to scale and correctly dimensioned? Not Required
Consistent with calculations, model and CTR's? Not Required
Checked against all related drawings for fits etc.? Not Required
Are all sections, details, item numbers correctly noted on Not Required
drawing?
Fits into the whole picture correctly giving all necessary details
without any repetition?
Comments marked
No comments
Initials:
Date:
CHECKER NOTES
AMENDMENTS (Initials Required for Amendments Only)
To be verified: Yes: No:
Originator Checker Approver
Initials:
Date:
Note: Drawing Check Sheet is to be completed for all drawings
-ET-352-00 6HFRev. 01, 26-Oct-16