You are on page 1of 1

INSPECTION TEST RECORD (ITR) - A

JACKET PRE-LOADOUT ST08-A


Project No.
Project Title
Facilities
INFORMATION
Area No Ref Drawing
System Inspection Date
Sub System Location

INSPECTION / TEST OK N/A P/L No.


GENERAL
• Fabricator to ensure that the structural details of the WDDP-A jacket is in
accordance with the company structural standards unless noted otherwise.
o Structural details
o Handrails
o Grating Flooring
o Stair Platforms
• All surface cut areas, rough edges and protrusions along the jacket are to be
ground smooth.

• FABRICATOR is to ensure that all internal and external handrail/prism fitting to not impede or
interfere with proposed access points to equipment and control units.
• Check if the identification markings are clearly painted at the top elevation of the
jacket for offshore identification:
o Legs B3 and B4
o Legs C3 and C4
1 • Check all grating welds/clips are firmly secured.
• Inspect the upending padeyes-based on the information provided by the
CONTRACTOR.
o Location
o Details (as per technical design provided by the CONTRACTOR)
• Compare padeyes to the shackle sizes that are provided.
• Identify the position, where the topside hinged ladder would land.
• Check all shackles actual pin diameter/holes size.
• Compare weight control reports provided by the FABRICATION with the design
calculations provided by the CONTRACTOR.
• Check for the adequate protection against damage of the paint from rigging, tie
down and during installation.

• Inspect the cathodic anode clash with CONTRACTOR’s rigging and installation aids.

• Check additional marking/paint at EL(-)25394 at Leg A1& B1 and marking at EL(-)


64673 at leg A3 and B3 as per section 2.4.10 for jacket upending.
• Check marking on pile sleeve.