This inspection test record documents an inspection of the structural jacket for an offshore oil platform. It checks that the primary framing, elevation truss, conductor guide, stairways, shock cell, shear fender, rigging platform, cap plate, leg diaphragm, flooding system, cathodic protection, and lifting equipment were all fabricated and installed according to design drawings and specifications. Upon verification and acceptance, this ensures the structural jacket was properly constructed for its intended use.
This inspection test record documents an inspection of the structural jacket for an offshore oil platform. It checks that the primary framing, elevation truss, conductor guide, stairways, shock cell, shear fender, rigging platform, cap plate, leg diaphragm, flooding system, cathodic protection, and lifting equipment were all fabricated and installed according to design drawings and specifications. Upon verification and acceptance, this ensures the structural jacket was properly constructed for its intended use.
This inspection test record documents an inspection of the structural jacket for an offshore oil platform. It checks that the primary framing, elevation truss, conductor guide, stairways, shock cell, shear fender, rigging platform, cap plate, leg diaphragm, flooding system, cathodic protection, and lifting equipment were all fabricated and installed according to design drawings and specifications. Upon verification and acceptance, this ensures the structural jacket was properly constructed for its intended use.
Project No. Project Title Facilities INFORMATION Area No Ref Drawing System Inspection Date Sub System Location
INSPECTION / TEST OK N/A P/L No.
1 Primary framing fabricated as per IFC drawing 2 Elevation truss fabricated as per IFC drawing 3 Conductor guide fabricated as per IFC drawing. 4 Stairways installed as per IFC drawings. 5 Shock cell and shear fender installed as per IFC drawings. 6 Rigging platform installed as per AFC drawings. 7 Cap plate and leg diaphragm closure installed as per IFC drawings 8 Flooding system test and functional as per specification 9 Flooding system test and functional as per specification 10 Ensure that Cathodic Protection (ANODE) are installed as IFC per drawing & specification 11 Lifting pad eyes and Trunion installed as per IFC drawings COMMENT(S) AND ADDITIONAL INFORMATION