You are on page 1of 3

REQUEST FOR INSPECTION & TEST

Project Karbala Refinery Project Request No. IONE-IN-C-IN-SI-2143

Area/Unit 1F08 ITP Reference/Item No. IONE-AA00-ITP-IN-0001 Rev_2/10

Discipline INSTRUMENT Subcon. Name IN(PKG#C1)

IONE-1F08-DW-IN-1201 Rev_1
IONE-1F08-DW-IN-1201 Rev_1A
IONE-AA08-PID-0031-077 Rev_3
IONE-AA00-DW-IN-4007 Rev_2
Ref. Dwg. No. IONE-AA00-DS-IN-IE4501 Rev_4 Request Date 29-Jun-2021

□ We would like to have your presence for inspection / test according to the following schedule.
The under noted work is completed.

(Except as noted)

□ This is to inform you that the following inspection/test will be carried out at the schedule time
mentioned below:

Inspection Item Location Date & Time

Inspection for installation of Temperature Indicator


& Level Indicator as per attached highlighted 1F08 30-Jun-2021, 08:00 AM
drawing.

08-TI-0502L
1.
08-LI-0544L
2.

3.

4.

5.

6.

7.

8.

9.

10.

Attachments : ■ Yes, □ No

Remarks;

CONSTRUCTION HDGSK JV QC EMPLOYER

Name J.CHOWDHARY FEROZ ALAM

Position INST.SUPERVISOR QA/QC.INST.INSPECTOR

Signature

Date / / / / / /

Form No. : ITRF-RFI-01


INSPECTION REPORT FOR
FIELD INSTRUMENT INSTALLATION

Project Karbala Refinery Project Report No. IONE-QA-C-IN-SI-1412(2/4)

Unit No. 07 Subsystem No. U07-P08-303

Area No. 1G07


IONE-AA00-DS-IN-IE4502 Rev_2 Date 14/Feb/2021
IONE-1G07-DW-IN-4005 Rev_4

IONE-AA07-PID-0031-060 Rev_3
Dwg. No.

Check Items and Result

A Complete and free from damage


B Instrument identification
C Flow direction and accessibility for maintenance
D Condition of stanchion and support
E Open hole plugged
F Visibility of displays with proper orientation
G Instrument installation orientation as per hook-up for above/below tapping points
H Sunshade (if required)

Tag No. A B C D E F G H

07-TE-0198

Test Equipment

Model No.

Serial No.

Range

Validity Period

CONSTRUCTION HDGSK JV QC EMPLOYER

Name J.CHOWDHARY FEROZ ALAM

Position INST.SUPERVISOR QA/QC INST.INSPECTOR

Signature

Date

Form No. : ITRF-IN-09


INSPECTION REPORT FOR
FIELD INSTRUMENT INSTALLATION

Project Karbala Refinery Project Report No. IONE-QA-C-IN-SI-2143

Unit No. 08 Subsystem No. U08-AMW-101

Area No. 1F08 Date 30-Jun-2021

IONE-1F08-DW-IN-1201 Rev_1
IONE-1F08-DW-IN-1201 Rev_1A
IONE-AA08-PID-0031-077 Rev_3
IONE-AA00-DW-IN-4007 Rev_2
Dwg. No. IONE-AA00-DS-IN-IE4501 Rev_4

Check Items and Result

A Complete and free from damage


B Instrument identification
C Flow direction and accessibility for maintenance
D Condition of stanchion and support
E Open hole plugged
F Visibility of displays with proper orientation
G Instrument installation orientation as per hook-up for above/below tapping points
H Sunshade (if required)

Tag No. A B C D E F G H

08-TI-0502L

08-LI-0544L

Test Equipment

Model No.

Serial No.

Range

Validity Period

CONSTRUCTION HDGSK JV QC EMPLOYER

Name J.CHOWDHARY FEROZ ALAM

Position INST.SUPERVISOR QA/QC INST.INSPECTOR

Signature

Date

Form No. : ITRF-IN-09