Professional Documents
Culture Documents
Cape Cod Rails To Trails
Cape Cod Rails To Trails
1 June 2017
SUBJECT: Camp Edwards Letter of Intent for Rail Services in Response to Proposed
Cape Cod Rails to Trails Project
Camp Edwards is the largest Army National Guard Training Site in New England
and is designed to support up to brigade-sized training and operations. Rail operations
are essential to mobilizing and demobilizing Soldiers and units in support of training
events, contingency operations and times of war.
Our need to provide strategic mobility access and training will directly impact
proposed plans to connect the Shining Sea Bikeway from Falmouth to Sandwich. The
course of action to complete a rails-to-trails project by removing 6.25 miles of track will
directly impact our readiness as an installation.
If there are any questions or concerns, the point of contact for this memorandum
is Lieutenant Colonel Shawn C. Cody. Deputy Garrison Commander, Camp Edwards
and can be reached by phone at (508) 968-5834 or by email at
shawn.c.cody.mil@mail.mil.
Patrick E. Keefe
Colonel, U.S. Army
Commanding
Enclosure
Proposed Site Map
-2-
cc:
The Adjutant General, Massachusetts National Guard
Commander, Massachusetts Army National Guard
Director, Joint Base Cape Cod
Commander, 102d Intelligence Wing
Commander, Air Station Cape Cod
Commander, Base Cape Cod
-3-
Remove
Modernize
Rail Line