Configure the New Order type for Refurbishment Process
After providing the value in the respective fields. Save the data Refurbishment Order processing indicator- check the order type which have created fopr refurbishment processing and save.
Configure the number range for new order type.
First create the group for Refurbishment Order Select the Element and press the F2 or select Element button and then select the group in which you want to assign the new element. And press save button Now assign the Order type in maintenance plant. Save Set the planning indicator for Order Type
Settlement rule :Define Time and Distribution rule
For Refurbishment Order type System is not allowing you set the indicator for default notification. Default control key for Order Type. Define the Maintenance activity type Assigning the Maintenance Activity to the Order type. Maintenance Activity type for Order type. Assign cost parameter and Result Analysis key. Settings for changes docs, collective Pur.Req. Indicator, Operation No. Interval. Goods movement documentation for Order. Material Availability Check. Priority for Order type Default current date for basic date in maintenance Order.