This project plan outlines the tasks for installing 70,000 DR. BATTERY devices in Telkomsel over a 5 month period from October to February. The plan includes tasks for initial planning and presentations, work analysis, production of goods, installation, inspection and checking, and management/controlling of the project.
This project plan outlines the tasks for installing 70,000 DR. BATTERY devices in Telkomsel over a 5 month period from October to February. The plan includes tasks for initial planning and presentations, work analysis, production of goods, installation, inspection and checking, and management/controlling of the project.
This project plan outlines the tasks for installing 70,000 DR. BATTERY devices in Telkomsel over a 5 month period from October to February. The plan includes tasks for initial planning and presentations, work analysis, production of goods, installation, inspection and checking, and management/controlling of the project.
PROJECT PLANNING For installation of 70.000 DR. BATTERY devices in Telkomsel
October November December January February
TASK Planning Activities with may presentation to Committee 1 TASK Work Analysis 2 TASK Production of Goods 3 TASK Installation Process 4 TASK Inspection and Checking 5 TASK Management and Controlling 6 `