Project Name: ( 3B + G + M + 3 TYP+ PH + ROOF ) HOTEL BUILDING , A

SECONDARY PUMP HEAD CALCULATION


PIPE FLOW FLOW LENGTH EQV.
SEC DESCRIPTION PIPE DIA
DIA RATE RATE in LENGTH

NO PIPE / FITTING MM Inches L/S GPM (US) Meter Feet in Feet

1 Straight pipe 200 8 55.89 885.87 3.31 10.86 10.86


Through Tee - 3Nos 200 8 55.89 39.00

2 Straight pipe 200 8 55.89 442.96 0.60 1.97 1.97


Branch Tee 200 8 55.89 40.00

Straight pipe 150 6 27.946 442.95 1.00 3.28 3.28


Elbow 90 150 6 27.946 16.00

Gate valve 150 6 27.946 7.00


Strainer 150 6 27.946 110.00
Flexible 150 6 27.946 7.00

3 Straight pipe 150 6 27.946 442.95 1.00 3.28 3.28

Flexible 150 6 27.946 7.00


NRV 150 6 27.946 60.00
Gate valve 150 6 27.946 7.00

BV 150 6 27.946 60.00


Branch Tee 150 6 27.946 30.00

4 Straight pipe 200 8 27.95 442.95 0.66 2.17 2.17


Through Tee 200 8 55.89 13.00

5 Straight pipe 200 8 55.89 885.87 0.66 2.17 2.17

Through Tee 200 8 55.89 13.00

SUB TOTAL-1

PAGE : 1 OF 16
Project Name: ( 3B + G + M + 3 TYP+ PH + ROOF ) HOTEL BUILDING , A
SECONDARY PUMP HEAD CALCULATION
PIPE FLOW FLOW LENGTH EQV.
SEC DESCRIPTION PIPE DIA
DIA RATE RATE in LENGTH

NO PIPE / FITTING MM Inches L/S GPM (US) Meter Feet in Feet

6 Straight pipe 200 8 55.89 885.87 2.70 8.86 8.86


Through Tee 200 8 55.89 13.00

7 Straight pipe 200 8 55.73 883.26 1.71 5.61 5.61


Tee branch 200 8 55.73 40.00

8 Straight pipe 150 6 45.39 719.37 2.32 7.61 7.61

Elbow 90-2 Nos 150 6 45.39 32.00


Through Tee 150 6 45.39 10.00

9 Straight pipe 150 6 42.88 679.60 4.00 13.12 13.12


Through Tee 150 6 42.88 10.00

10 Straight pipe 150 6 36.68 581.44 4.00 13.12 13.12


Through Tee 150 6 36.68 10.00

11 Straight pipe 150 6 30.88 489.41 4.00 13.12 13.12

Through Tee 150 6 30.88 10.00

12 Straight pipe 150 6 25.07 397.38 0.80 2.62 2.62

Straight pipe 125 5 25.07 397.38 10.10 33.14 33.14


Elbow 90-2 Nos 125 5 25.07 26.00

Branch Tee 125 5 25.07 25.00

13 Straight pipe 125 5 19.64 311.27 4.62 15.16 15.16

Elbow 90 125 5 19.64 13.00


Through Tee 125 5 19.64 8.20

PAGE : 2 OF 16
Project Name: ( 3B + G + M + 3 TYP+ PH + ROOF ) HOTEL BUILDING , A
SECONDARY PUMP HEAD CALCULATION
PIPE FLOW FLOW LENGTH EQV.
SEC DESCRIPTION PIPE DIA
DIA RATE RATE in LENGTH

NO PIPE / FITTING MM Inches L/S GPM (US) Meter Feet in Feet

14 Straight pipe 125 5 16.57 262.70 0.60 1.97 1.97

Straight pipe 100 4 16.57 262.70 3.40 11.15 11.15


Branch Tee 100 4 16.57 25.00

15 Straight pipe 100 4 2.22 35.16 0.50 1.64 1.64


Reducer 100 4 2.22 35.19 10.00

Straight pipe 50 2 2.22 35.16 15.00 49.21 49.21


Elbow 90-3 Nos 50 2 2.22 15.00

Through Tee 50 2 2.22 3.30

SUB TOTAL-2

PAGE : 3 OF 16
Project Name: ( 3B + G + M + 3 TYP+ PH + ROOF ) HOTEL BUILDING , A
SECONDARY PUMP HEAD CALCULATION
PIPE FLOW FLOW LENGTH EQV.
SEC DESCRIPTION PIPE DIA
DIA RATE RATE in LENGTH

NO PIPE / FITTING MM Inches L/S GPM (US) Meter Feet in Feet

16 Straight pipe 50 2 0.410 6.50 0.35 1.15 1.15


Straight pipe 25 1 0.41 6.48 29.30 96.13 96.13

Elbow 90-2 Nos 25 1 0.41 5.20


Through Tee 25 1 0.41 1.70

17 Straight pipe 25 1 0.29 4.57 4.06 13.32 13.32


Branch Tee 25 1 0.29 5.00

18 Straight pipe 25 1 0.05 0.75 0.30 0.98 0.98


Straight pipe 15 0.6 0.05 0.75 25.60 83.99 83.99

Elbow 90-3 Nos 15 0.6 0.05 6.00


Gate valve 15 0.6 0.05 0.90

Strainer 15 0.6 0.05 4.00


Gate valve 15 0.6 0.05 0.90
Flexible 15 0.6 0.05 0.90

19 FCU B3-DAC-4

Straight pipe 15 0.6 0.05 0.75 25.60 83.99 83.99


Flexible 15 0.6 0.05 0.90
Elbow 90-3 Nos 15 0.6 0.05 6.00

Gate valve 15 0.6 0.05 0.90


Through Tee 15 0.6 0.05 4.00

CS 15 0.6 0.05 18.00


Gate valve 15 0.6 0.05 0.90
Straight pipe 25 1 0.05 0.75 0.30 0.98 0.98

Branch Tee 25 1 0.05 5.00

20 Straight pipe 25 1 0.29 4.57 3.81 12.50 12.50

PAGE : 4 OF 16
Project Name: ( 3B + G + M + 3 TYP+ PH + ROOF ) HOTEL BUILDING , A
SECONDARY PUMP HEAD CALCULATION
PIPE FLOW FLOW LENGTH EQV.
SEC DESCRIPTION PIPE DIA
DIA RATE RATE in LENGTH

NO PIPE / FITTING MM Inches L/S GPM (US) Meter Feet in Feet

Through Tee 25 1 0.29 5.00

21 Straight pipe 25 1 0.41 6.48 29.30 96.13 96.13

Elbow 90-2 Nos 25 1 0.41 5.20


Straight pipe 50 2 0.41 6.48 0.35 1.15 1.15
Through Tee 50 2 0.41 3.30

SUB TOTAL-3

PAGE : 5 OF 16
Project Name: ( 3B + G + M + 3 TYP+ PH + ROOF ) HOTEL BUILDING , A
SECONDARY PUMP HEAD CALCULATION
PIPE FLOW FLOW LENGTH EQV.
SEC DESCRIPTION PIPE DIA
DIA RATE RATE in LENGTH

NO PIPE / FITTING MM Inches L/S GPM (US) Meter Feet in Feet

22 Straight pipe 50 2 2.22 35.16 15.00 49.21 49.21


Elbow 90-3 Nos 50 2 2.22 15.00

Straight pipe 100 4 2.22 35.16 0.50 1.64 1.64


Tee Branch 100 4 2.22 21.00

23 Straight pipe 100 4 16.57 262.70 3.40 11.15 11.15


Straight pipe 125 5 16.57 262.64 0.60 1.97 1.97

Through Tee 125 5 16.57 8.20

24 Straight pipe 125 5 19.64 311.27 4.44 14.57 14.57

Elbow 90 125 5 19.64 13.00


Tee Branch 125 5 19.64 25.00

25 Straight pipe 125 5 25.07 397.38 10.10 33.14 33.14


Elbow 90-2 Nos 125 5 25.07 26.00

Straight pipe 150 6 25.07 397.38 0.80 2.62 2.62


Through Tee 150 6 25.07 10.00

26 Straight pipe 150 6 30.88 489.41 4.00 13.12 13.12


Through Tee 150 6 30.88 10.00

27 Straight pipe 150 6 36.68 581.44 4.00 13.12 13.12

Through Tee 150 6 36.68 10.00

28 Straight pipe 150 6 42.88 679.60 4.00 13.12 13.12

Through Tee 150 6 42.88 10.00

29 Straight pipe 150 6 45.39 719.37 2.05 6.73 6.73

PAGE : 6 OF 16
Project Name: ( 3B + G + M + 3 TYP+ PH + ROOF ) HOTEL BUILDING , A
SECONDARY PUMP HEAD CALCULATION
PIPE FLOW FLOW LENGTH EQV.
SEC DESCRIPTION PIPE DIA
DIA RATE RATE in LENGTH

NO PIPE / FITTING MM Inches L/S GPM (US) Meter Feet in Feet

Elbow 90 150 6 45.39 16.00

Branch Tee 150 6 45.39 30.00

SUB TOTAL-4

PAGE : 7 OF 16
Project Name: ( 3B + G + M + 3 TYP+ PH + ROOF ) HOTEL BUILDING , A
SECONDARY PUMP HEAD CALCULATION
PIPE FLOW FLOW LENGTH EQV.
SEC DESCRIPTION PIPE DIA
DIA RATE RATE in LENGTH

NO PIPE / FITTING MM Inches L/S GPM (US) Meter Feet in Feet

30 Straight pipe 200 8 55.73 883.26 2.88 9.45 9.45


Through Tee 200 8 55.73 13.00

Elbow 90-2 Nos 200 8 55.73 40.00

31 Straight pipe 200 8 55.89 885.91 2.20 7.22 7.22

Through Tee 200 8 55.89 13.00

SUB TOTAL-5

SUB TOTAL-1
SUB TOTAL-2
SUB TOTAL-3
SUB TOTAL-4
SUB TOTAL-5

TOTAL
SAFETY MARGIN 15%
GRAND TOTAL

Total Pump Head is 28 ft of water

PAGE : 8 OF 16
YP+ PH + ROOF ) HOTEL BUILDING , AL WAKRA
PUMP HEAD CALCULATION

FRICTION FRICTION TOTAL


LOSS in (Ft. LOSS in (Ft. HEAD
of water / of water / in (Ft. of
100 Ft.) Ft.) water)

1.20 0.01 0.13


1.20 0.01 0.47

0.35 0.00 0.01


0.35 0.00 0.14

1.35 0.01 0.04


1.35 0.01 0.22

1.35 0.01 0.09


1.35 0.01 1.49
1.35 0.01 0.09

1.35 0.01 0.04

1.35 0.01 0.09


1.35 0.01 0.81
1.35 0.01 0.09

1.35 0.01 0.81


1.35 0.01 0.81

1.20 0.01 0.03


1.20 0.01 0.16

1.28 0.01 0.03

1.28 0.01 0.17

B TOTAL-1 5.72

PAGE : 9 OF 16
YP+ PH + ROOF ) HOTEL BUILDING , AL WAKRA
PUMP HEAD CALCULATION

FRICTION FRICTION TOTAL


LOSS in (Ft. LOSS in (Ft. HEAD
of water / of water / in (Ft. of
100 Ft.) Ft.) water)

1.28 0.01 0.11


1.28 0.01 0.17

1.18 0.01 0.07


1.18 0.01 0.47

3.20 0.03 0.24

3.20 0.03 1.02


3.20 0.03 0.32

3.18 0.03 0.42


3.18 0.03 0.32

2.20 0.02 0.29


2.20 0.02 0.22

1.80 0.02 0.24

1.80 0.02 0.18

1.20 0.01 0.03

2.70 0.03 0.89


2.70 0.03 0.70

2.70 0.03 1.35

1.70 0.02 0.26

1.70 0.02 0.22


1.70 0.02 0.28

PAGE : 10 OF 16
YP+ PH + ROOF ) HOTEL BUILDING , AL WAKRA
PUMP HEAD CALCULATION

FRICTION FRICTION TOTAL


LOSS in (Ft. LOSS in (Ft. HEAD
of water / of water / in (Ft. of
100 Ft.) Ft.) water)

1.30 0.01 0.03

3.25 0.03 0.36


3.25 0.03 0.81

0.13 0.00 0.00


0.13 0.00 0.01

2.40 0.02 1.18


2.40 0.02 0.36

2.40 0.02 0.16

B TOTAL-2 10.72

PAGE : 11 OF 16
YP+ PH + ROOF ) HOTEL BUILDING , AL WAKRA
PUMP HEAD CALCULATION

FRICTION FRICTION TOTAL


LOSS in (Ft. LOSS in (Ft. HEAD
of water / of water / in (Ft. of
100 Ft.) Ft.) water)

0.12 0.00 0.00


0.12 0.00 0.12

0.12 0.00 0.01


0.12 0.00 0.00

1.60 0.02 0.21


1.60 0.02 0.08

0.10 0.00 0.00


0.10 0.00 0.08

0.10 0.00 0.01


0.10 0.00 0.00

0.10 0.00 0.00


0.10 0.00 0.00
0.10 0.00 0.00

0.00

0.10 0.00 0.08


0.10 0.00 0.00
0.10 0.00 0.01

0.10 0.00 0.00


0.10 0.00 0.00

0.10 0.00 0.02


0.10 0.00 0.00
0.10 0.00 0.00

1.60 0.02 0.08

1.60 0.02 0.20

PAGE : 12 OF 16
YP+ PH + ROOF ) HOTEL BUILDING , AL WAKRA
PUMP HEAD CALCULATION

FRICTION FRICTION TOTAL


LOSS in (Ft. LOSS in (Ft. HEAD
of water / of water / in (Ft. of
100 Ft.) Ft.) water)

1.60 0.02 0.08

0.12 0.00 0.12

0.12 0.00 0.01


0.12 0.00 0.00
0.12 0.00 0.00

B TOTAL-3 1.12

PAGE : 13 OF 16
YP+ PH + ROOF ) HOTEL BUILDING , AL WAKRA
PUMP HEAD CALCULATION

FRICTION FRICTION TOTAL


LOSS in (Ft. LOSS in (Ft. HEAD
of water / of water / in (Ft. of
100 Ft.) Ft.) water)

2.40 0.02 1.18


2.40 0.02 0.36

0.13 0.00 0.00


0.13 0.00 0.05

3.25 0.03 0.36


1.25 0.01 0.02

1.25 0.01 0.10

1.70 0.02 0.25

1.70 0.02 0.22


1.70 0.02 0.85

2.70 0.03 0.89


2.70 0.03 0.70

1.15 0.01 0.03


1.15 0.01 0.23

1.80 0.02 0.24


1.80 0.02 0.18

2.20 0.02 0.29

2.20 0.02 0.22

3.18 0.03 0.42

3.18 0.03 0.32

3.20 0.03 0.22

PAGE : 14 OF 16
YP+ PH + ROOF ) HOTEL BUILDING , AL WAKRA
PUMP HEAD CALCULATION

FRICTION FRICTION TOTAL


LOSS in (Ft. LOSS in (Ft. HEAD
of water / of water / in (Ft. of
100 Ft.) Ft.) water)

3.20 0.03 0.51

3.20 0.03 0.96

B TOTAL-4 8.61

PAGE : 15 OF 16
YP+ PH + ROOF ) HOTEL BUILDING , AL WAKRA
PUMP HEAD CALCULATION

FRICTION FRICTION TOTAL


LOSS in (Ft. LOSS in (Ft. HEAD
of water / of water / in (Ft. of
100 Ft.) Ft.) water)

1.18 0.01 0.11


1.18 0.01 0.15

1.18 0.01 0.94

1.20 0.01 0.09

1.20 0.01 0.16

B TOTAL-5 1.45

B TOTAL-1 5.72
B TOTAL-2 10.72
B TOTAL-3 1.12
B TOTAL-4 8.61
B TOTAL-5 1.45

TOTAL 27.62
AFETY MARGIN 15%
AND TOTAL 27.62

p Head is 28 ft of water