You are on page 1of 9
Se RT wa eS acer Tits srs ify Yes [i0% Ae tm: oon Sree Conte Stele COCs) Clecle \t- a Von PT PLN (Persero} JASA MANAJEMEN KONSTRUKS! Ji Samet No.1 Cana Bare Semarang $0232 Telepon_: 0248310060 (Hunting & Sluan), Facsimile: (02) 8317241, No. Your ref. tachment Subject Mes 1001 aie, /2vaMKra014 ADHLEPCIPLNIQC.G”32014 fone (1)set PLTUSINTANG @x7™MW) Result of Review Dear Project Manager In regard to the processing of QAIQC document submited with your above eters please be well informed of the result of cur review on your submited QA/OC March 26%, 2013 PP ADH KARYA (Persero) EPC Division East ulin 5. Raya Pasar Minggu Km. 18 Sahar 12510 - Indonesia. ‘Socument a read belo Na | Document No Document Tie Rev | Status Fis epecton Ad Text PTF 1. | psorerequociaco: | ‘Distinselconma Semipcs) | 0 | c neal Kindly make proper use ofthe approved document meanwhile do the revision as aivsed in the comment sheet, whenever upgrading the approval stats refering slvays teach respective contrac pein ‘Thank you very mich fr your kind atention ni cooperton : Smaser PT PLN (Persero) JASA MANAJEMEN KONSTRUKSI ‘ccROUT [DATE REVIEW FOR APPROVAL OF DRAWING / DOCUMENT es DRAWING / DOCUMENT NUMBER mae | DRAWING / DOCUMENT TITLE PUN eV. ‘CONTRACTOR Rev._| STATUS FIELD INSPECTION AND TEST PLAN FOR DISTRIBUTED CONTROL SYSTEM INSTALLATION PLTU SINTANG (3x7 MW) PSG-7-FITP-CA/OC&C- a1 covavent comments oer CONTRACTOR RESPONSE | General Comments, |) Title of the respective document shall be revised to read | a8 shown in above Document Tile Box; whereas Document Number shall also be differed from that belongs to Shop ITP. +b) This Field ITP shall ONLY be processed after, and the | content be correspondingly to, the following document aot | PLN approval b.1. Shop ITP for Distributed Control System, and, 2. Shop Test Procedure for Distributed Control System €) And based upon which substance and content ofthe approved documents mentioned inb) above the Fiel ITP would be then prepared correspendingly a PT PLN (Persero) JASA MANAJEMEN KONSTRUKSI ELD WSPECTON AND TEST PLAN FOR psc-ranP-ow/aciBe- raonociec: |g | peommayaccss | 0 DISTRIBUTED CONTROL SYSTEM NSTALLAION PLTUSINTANG fx MW) coma a commen nae contmcton nsronse 4) For review reference the Contractor shall include A3-sized, ‘sony of approved Construction Drawinats) with the submission | of up next revision | | Important Comments | €@) The revision should also involve inclusion of the folowing ec. Narative Process 22. P&ID 2.3. Logie Diagram 1). Fleld ITP for DCS Installation should also consist of 14, Routine Test comprising: = Visual check = Alignment Panel = Name Plate = Layout Check Page 2/9 PT PLN (Persero) JASA MANAJEMEN KONSTRUKSI PSG-7-FTP-A/aC-1&c- a 0 | psezHmamacwce: | 0 FIELD INSPECTION AND TEST PLAN FOR DISTRIBUTED CONTROL SYSTEM INSTALLATION. PLTU SINTANG (37 MW) PIN COMMENTS comMENT iy ‘CONTRACTOR RESPONSE 12, £3, 14, 15. = Dimensional Check = Review of Document Performance and Acceptance Test for All System & Equipment (Direct to equipment. Environment of Central Control Room, consisting of = Humidity = Temperature + Safety Grounding Test Test on Power Supply Page 3/2 Astachment To ce Project Subject ‘References Des Sit, ADHL-EPCPLNIQC-Gi332/1114 Sokara, February 10", 2013 + Feld IP for Bag House Installation rev.0(A4 x3 Sheets) + Feld ITP fo instrument Insallation re.0 (A4 x 4 Sheets) General Manager PT.PLN (Persero) Unit Induk Pembangkit IX JI. Haji Misar Coloksume Kin. 39 ‘Banjrbare 70733 Kalimantan Selatan ‘Me. Seah Darwin Sircgar 1. Project Supervisor PLTU Sintang 3x7 MW - PT. PLN 2 Kepala Divist Konstuksi &IFP IB (KDIV KON IB) PT. PLN 5, Project Team Leader - PT, PLN Enjinising 4 Tim QA/QC - PT. PLN (Peer) asa Mansjemen Konsiuks - Kantor Indu PLTU SINTANG 317 MW (Contract No, 0108 P/041/WKE.2011) Submission of Feld ITP for Bag House dan Instrument Installation rev. 0 Herewith we would like to submit Field ITP for Bag house dan Instrument Installation rev. 0s stashed, We require your approval reganting above mates pursuant to Contrast Book Il Part 4, Techricsl Requirement, Sub section 43.2.3. Submission and Approval ‘Thank you for your kind stention in this lotr & cooperation, Sincerely yours, PT ADHIKARYA (Perro) Th Projet Manager Pr aan sper) PE Dn: Bn a PT. ADH KARVA PERSERO) oameiNa.—|~iproxostravrencovaral svsrewpoesy [R20 sor ATPaMacatco1 INSTALLATION: Fags Ener” Pea omen “LAN Pew) PROUETNANE =: PTUSWTANG (3X7) prouernme 80 Jos user sas Locaron :SNTANG KALMANTANBARAT-NOOKESA omnagey TT parm n |eemtnrmine |i [BREF | WF. aA AT HiR RA ORD COMERAENT Os ms or neon mvawraoon Tn) a TORT] [ogo a ‘ey OME DESCRPON ——|PREPD-| ‘WL ABPD FTUSINTANG OFT) PLTU SINTANG (3X7MW) SINTANG, KALIMANTAN BARAT SITE INSPECTION AND TEST PLAN 2 aa z PT. PLN (PERSERO) eee eT REGRET 8 2UG PLTU SINTANG (@x7MW) KALIMANTAN BARAT FIELD INSPECTION AND TEST PLAN DISTRIBUTED CONTROL SYSTEM (DES) INSTALLATION pare | SGNATURE SCALE SHEET OF ~ pwane, E REV a

You might also like