Professional Documents
Culture Documents
04 LoadControl 2004 PDF
04 LoadControl 2004 PDF
LC Updates load status using resource measurements & estimations provided by AC and
PS
Continuously feeds cell load information to the other RRM functions, e.g. PS and AC
SHO LC in RNC consists of MS specific part and cell specific part. The UE specific part is
the controlling entity between the cell specific entities (LC, AC and PS)
parameters
when changed Load change info
AC
Load status request 3 Load change
estimations
BS
parameters
Radio Resource PS
Indication Period
LC measurements
Load status
Load change
2 estimations
CCH load
measurement measurements estimations
period
Scheduling period
NRT load 3
RL measurement
reporting period
1
Throughput
based threshold
Wideband power level
(coverage)
Wideband power
Itotal
based threshold
i=0
i=0.5
i=1
R
j =1
j
DL =
R max Max. allowed throughtput of the cell
The uplink load of the cell can be estimated by using the sum of the load factors of the users
connected to this cell.
N
UL = (1 + i ) load j
j =1
Ptx _ total
DL =
Ptx _ BTS ,max
The uplink load can be estimated with Prx_noise, the background and receiver noise and Prx_total,
the total received power, according to this formula:
Prx _ noise 1
UL = 1 = 1
Prx _ total NR
The BTS reports PrxTotal and PtxTotal of each cell to the RNC by sending RADIO
RESOURCE INDICATION message periodically (RRIndicationPeriod)
LC updates cell load status for each cell based on RADIO RESOURCE INDICATION
Denying call admission (AC) and throttling back NRT traffic (PS) are the overload
actions
Overloaded Area
total received power
Prx Total [dBm]
load factor
14 NOKIA 31/10/2002 RANPAR Version 1.0
UL Preventive Thresholds
Preventive threshold = PrxTarget
Prx Target is relative to the system noise, it gives an upper threshold for the noise rise
Target threshold defines the optimal operating point of the cell load, up to which PS &
AC can operate normally and is calculated from the UL loading () value:
PrxTarget
range: 0...30 dB, step 0.1 dB
default: 4 dB
PrxOffset
range: 0...6 dB, step 0.1 dB
default: 1 dB
Overloaded Area
total received power
Ptx Total [dBm]
load factor
17 NOKIA 31/10/2002 RANPAR Version 1.0
DL Preventive Thresholds
Preventive threshold = PtxTarget
Target threshold defines the optimal operating point of the cell load, up to which PS &
AC can operate normally
If cell load exceeds these limits then AC & PS move to PREVENTIVE STATE function
New RT RABs are blocked, and PS can't schedule more NRT bit rates in the cell
PtxTarget
range: -10...50 dBm, step 0.1 dB
default: 40 dBm
Default value depends on the cell max TX power: in case the cell max power is 43 dBm,
the PtxTarget should be 40 dBm (3 dB below max)
PtxOffset
range: 0...6 dB, step 0.1 dB
default: 1 dB
(1 ) NoFrames
Prx/Ptx 1
Prx _ total =
(1 2 )NoFrames y k
k =NoFrames +1
1 8
Prx _ total = yk
6 k =3
(1 ) NoFrames
1
Ptx _ total =
(1 2 )NoFrames y k
k =NoFrames +1
The parameter defines the number of frames used for long term averaging at the BS of
the short term (frame based) averages of Prx/PtxTotal measurements
range: 10...200 frames, step 1 frame
default: 20 frames (during one RRI period when RRI=200 ms)
In case the measured values are fluctuating very much, the averaging period could be
made longer to get better PS performance
Prx/PtxAlpha
Defines the type of measurement filter used for the total received wideband power
(PrxTotal) in a cell. If the value is 0, pure sliding window mean filter is used and if the
value is 0.5, sliding window median filter is used. If the value is between 0 - 0.5,
trimmed mean filter is used
range: 0... 0.5, step 0.05
default: 0
24 NOKIA 31/10/2002 RANPAR Version 1.0
Radio Resource Indication Period
BTS Measurements
RRI Period
The parameter defines the reporting period of the RADIO RESOURCE INDICATION
messages, which are used for cell based load measurements.
range: 0...2000 ms, step 100 ms
default: 200ms
The BTS informs the RNC about the current load at the radio interface from the radio
resource point of view and the load of every RACH in each cell.
For that purpose the BTS sends periodically a Radio Resource Indication message to the
RNC
The parameter defines the reporting period of the PRACHs in a BTS. The BTS may
report load figures to the RNC in every Nth (N=1-20) NBAP Radio Resource Indication
message. Value 0 of the parameter means that the BTS does not report the load
information for RACH.
These measurement reports are used as an input for defining initial power for PS and AC
Bigger value decreases Iub signalling load, smaller value increases accuracy
Value 0 = OFF
4. Which LC parameter gives the upper limit for the noise rise? What is its default value?