Professional Documents
Culture Documents
Resume Sign in
CAREER SUMMARY:
I have more than fourteen years of experience in Oil and Gas Industry with specialization in
Onshore/Offshore and deep water Pipeline Mechanical Designs and Engineering Procurement support and
Project Management activities.
Currently, I am working as Executive (Pipeline) Engineer with PETRONAS Carigali Sdn. Bhd. Sarawak Oil,
Malaysia.
Areas I have worked include but not limited to the following: Mechanical Designs of Onshore/Offshore
Pipelines (Wall thickness calculations, On-bottom stability Analysis, Free Span Analysis, Thermal
https://www.postjobfree.com/resume/acvi1e/eng-pipeline-activities-gas-miri-sarawak 1/13
9/16/2017 Project Engineering, Project Management, EPCM, EPCIC, FEED, Detail Eng resume in Miri, Sarawak, Malaysia - July 2016
Expansion Analysis, Pipeline and Riser Stress Analysis. Cathodic Protection Design, Lateral Buckling
Screening Analysis, Buckle Arrestor Designs), etc. Project Cost Estimate and scope of work definition, Oil
Pipeline License (OPL) packages. Engineering Requisitions for Purchase Order (PO), Technical Bid
evaluations and Vendor data reviews, etc.
Also, I have worked for Non-metallic pipes (NMP) Materials Selections, Engineering, Procurement,
Construction and Installations (EPCIC) activities.
Work Experiences:
PETRONAS Carigali Sdn. Bhd. (PCSB) Sarawak Oil, Malaysia
Project: - Pipeline Rehabilitations Projects (April 2014 Till date)
Pipelines Rehabilitations Project activities involve the replacement of PETRONAS Carigali Sdn. Bhd.
Sarawak Oils highly corroded and/or ageing existing intra fields pipelines with low cost and innovative
alternative to carbon steel pipeline technologies, thus prolonging their services lives, guaranteeing systems
integrity and at guaranteed return on investments.
Project: In-Field Liner (IFL) Engineering, Procurement, Construction, Installation and Commissioning
(EPCIC) Project at West Lutong.
Position: - Project Execution Engineer (July 2014 November, 2014)
In-Field Liner (IFL) Pipeline Installations involves replacing the existing intra field pipelines with non-metallic
pipes utilizing PETRONAS patented IFL technology by pulling the IFL through existing corroded pipelines. It
also involves topsides modifications to accommodate corrosion monitoring coupon holders and other
ancillary fittings.
Some of the activities carried out by me in the projects under review are listed below:
Reviewing contractor mechanical designs and analyses reports respectively.
Reviewing of contractors detailed Piping and Pipeline drawings for Construction
Participating in Design Reviews, HAZOPS, HAZIDS, Constructability Reviews and Construction Risk
assessments respectively.
Responding to contractors technical queries relating to Piping and Pipeline Designs.
Execution Engineer for IFL Pipeline Installations and topsides modifications activities.
Mark-up of construction drawings for As-built drawings productions.
Project: Non-Metallic Pipe (NMP) Engineering, Procurement, Construction, Installation and Commissioning
(EPCIC) Project.
Position: - Lead, Non-Metallic Pipeline (NMP) team (August 2014 Till date)
https://www.postjobfree.com/resume/acvi1e/eng-pipeline-activities-gas-miri-sarawak 2/13
9/16/2017 Project Engineering, Project Management, EPCM, EPCIC, FEED, Detail Eng resume in Miri, Sarawak, Malaysia - July 2016
The Non-metallic Pipe (NMP) Project involves replacing the existing intra field pipelines with innovative and
low cost Non-Metallic Pipeline technology.
Activities carried out by me in the projects under review are listed below:
Conducting materials options study (MOS) to select the most appropriate and cost effective non-metallic
pipe materials.
Reviewing of Contractors Engineering drawings, Mechanical designs and analyses.
Resolution of contractors technical queries and clarifications requests.
Project scope of work definition, cost estimates and Project Execution Plan production for Project execution.
Engagement meetings with vendors, partners and Government authorities etc.
Technical and Commercial proposals evaluations and negotiations for Contract award.
Design, Engineering, procurement, construction and execution of platforms topsides piping modifications,
etc.
https://www.postjobfree.com/resume/acvi1e/eng-pipeline-activities-gas-miri-sarawak 3/13
9/16/2017 Project Engineering, Project Management, EPCM, EPCIC, FEED, Detail Eng resume in Miri, Sarawak, Malaysia - July 2016
points for scale inhibition close to the pumps and pig launcher installation. The project also involves the
modification of the offshore section of the 24-inch OD Ubit Pipeline close to the SSM for the discharge of the
produced water.
Usari Idoho Pipeline Project involves Detailed Pipeline Engineering Design of 20 km of 24-inch OD Crude
Oil Pipeline from Usari FA to Idoho BP Platforms. Engineering Procurement support activities including
vendor data reviews for the linepipes, IRHFA, Induction bends and the pipeline associated flanges and
fittings including Anodes and Concrete Mattresses, etc.
Production Uplift Project comprises the detailed Design for the replacement of different sections of the
Pipelines; 24-inch OD Idoho BP Riser and Edop SSM Pipeline spool, 10.75-inch OD Edop QP Gas Riser
and spools and 10.75-inch OD Ekpe OP Oil Riser, spools and 500m pipeline. Engineering Procurement
Support activities including vendor data reviews for the procurement of the linepipes, IRHFAs, Induction
Bends and the pipelines associated flanges and fittings and components were also carried out on the
Project.
Some of the activities carried out by me in the projects under review are listed below:
Pipeline Design Basis Reports
Wall thickness calculations for the Pipelines and Risers
On-Bottom Stability Analyses
Cathodic Protection Calculations
Integrated Riser and Hanger Flange Assemblies Specifications
Monolithic Insulating Joint Specification
Pipeline Material Take-Offs (MTO)
Production of Oil Pipeline License (OPL) Reports
Monel Cladded pipes Specification
Various datasheets (Line pipes, Induction Bends, IRHFAs, MBJ, Monolithic Isolating Joints, Electrical
Isolating kits, Anodes, Concrete Mattresses, Monel sheet, Paddle blanks, Spacers), etc.
Production and reviews of various Pipeline Design Analyses and Reports
Pipeline items Engineering Requisitions, Engineering Procurement Support activities including Vendor data
reviews
Checking and marking-up General Arrangements, Pipeline Alignment Sheets, Pipeline Schematics
Drawings, etc.
https://www.postjobfree.com/resume/acvi1e/eng-pipeline-activities-gas-miri-sarawak 4/13
9/16/2017 Project Engineering, Project Management, EPCM, EPCIC, FEED, Detail Eng resume in Miri, Sarawak, Malaysia - July 2016
https://www.postjobfree.com/resume/acvi1e/eng-pipeline-activities-gas-miri-sarawak 5/13
9/16/2017 Project Engineering, Project Management, EPCM, EPCIC, FEED, Detail Eng resume in Miri, Sarawak, Malaysia - July 2016
Critical Crude Pipeline Segments Replacement Project involves installation of two 20 km long 24-inch
pipelines (Ubit SSM QIT and Idoho BP - QIT) and a 16km long Asabo MP Usari FA Pipeline and the
associated risers.
QGFE Shore Approach Detailed Design Project deals with the installation of a shore approach section of
24-in Idoho BP QIT pipeline and the two QGFE pipelines (16-in OSO RX - QIT fuel gas pipeline and 12-in
QIT OSO RX Gas Export pipeline) in a single mobilization and single trench. Both pipelines have same
landfall sections at QIT. This was due to a detour of the CCPSRP pipelines out their right of way (ROW) in
the shore approach section.
EDOP Pipeline Emergency Repair involves sectional repair of the 24-in EDOP pipeline by replacing a
segment between EDOP SSM and QIT and the abandonment of existing redundant pipeline segment.
CCPSRP 24-in EDOP Shore crossing involves the engineering detailed design of a 3 km segment of the
24-in EDOP pipeline between the shore approach section and QIT and the abandonment of existing
redundant pipeline segment.
EKPE ASABO Pipeline Replacement Project involves replacement of the existing 19.3 km long 16-inch
pipelines (Ekpe OP Asabo MP) and the associated risers, decommissioning of the existing pipeline and
risers and their abandonment.
UBIT GP - IDOHO BP and UTUE FWS Conversion Projects involve the determination of maximum
operating pressures and remaining strength of corroded existing pipelines at which the Pipelines can be
safely operated without the possibility of Pipelines failure.
Some of the activities carried out by me in the projects under review are listed below:
Wall thickness calculations for the Pipelines, Risers and Pipeline Jumper.
Production of Oil Pipeline License (OPL) Reports for the Critical Crude Segment Pipelines.
Pipeline On-bottom Stability Analysis.
Pipeline free span Analysis.
Pipeline Thermal Expansion Analysis.
Preparation of documents for Pipeline OPL Packages.
Preparation of Technical Specifications and datasheets for various pipeline flanges and fittings.
Checking and marking-up drawings.
Pipeline crossing Analysis.
Pipeline Cathodic Protection Design and Report preparation.
Pipeline Material Take-off (MTO)
Requisition for Quotation (RFQ) packages for vendors for Bid.
Deliverable item list (DIL) for Purchase Order (PO) packages.
Sub-contractor Scope of Work for Pipeline Installations.
Vendor Documents reviews for various Pipeline items
https://www.postjobfree.com/resume/acvi1e/eng-pipeline-activities-gas-miri-sarawak 6/13
9/16/2017 Project Engineering, Project Management, EPCM, EPCIC, FEED, Detail Eng resume in Miri, Sarawak, Malaysia - July 2016
https://www.postjobfree.com/resume/acvi1e/eng-pipeline-activities-gas-miri-sarawak 7/13
9/16/2017 Project Engineering, Project Management, EPCM, EPCIC, FEED, Detail Eng resume in Miri, Sarawak, Malaysia - July 2016
Project: BONGA SOUTHWEST/APARO PFRI for SHELL Nigeria Exploration and Production Company
Limited (SNEPCO).
Position: Lead, Pipeline Engineer (January April 2006)
Description of Project and Responsibilities:
Production PIP, Gas Lift, Water Injection Flow lines and Gas Export Design Basis Report.
Production PIP, Gas Lift, Water Injection Flow lines and Risers and Gas Export Pipeline Wall Thickness
Design including Internal pressure (burst) design, Collapse, Buckling and Buckle propagation designs,
combined load and maximum allowable bending strains during reeling Designs, etc.
Flow lines and Gas Export On-bottom stability Analysis.
Flow lines Free span Analysis.
https://www.postjobfree.com/resume/acvi1e/eng-pipeline-activities-gas-miri-sarawak 9/13
9/16/2017 Project Engineering, Project Management, EPCM, EPCIC, FEED, Detail Eng resume in Miri, Sarawak, Malaysia - July 2016
Project: Eastern Gas Gathering System (EGGS II) for Shell Petroleum Development Company (SPDC).
Position: Pipeline Designer/Engineer (April November 2004)
Description of Project and Responsibilities:
The project involves the installation of 36-in Gas Pipeline of approximately 60 km from Gbaran to Ubie.
I involved the preparation and production of the following deliverables among others:
Pipeline close-out Report
Pipeline Stability Analysis Report
Typical Pipeline Crossing Drawings
Production of Gbaran/Ubie Pipeline Alignment Sheets
Preparation of discipline Design Procedures
Collating and filing of correspondences and documents from other disciplines and the client.
Position: Pipeline Designer/Engineer (September December 2003)
Pipeline input to Bid packages for various Pipeline projects.
Pipeline in-house training (Onshore/Offshore Pipeline Mechanical Designs)
On-bottom Stability Analysis training
https://www.postjobfree.com/resume/acvi1e/eng-pipeline-activities-gas-miri-sarawak 10/13
9/16/2017 Project Engineering, Project Management, EPCM, EPCIC, FEED, Detail Eng resume in Miri, Sarawak, Malaysia - July 2016
Project: BONGA FPSO TOPSIDES FOR SHEEL Nigeria Exploration and Production Company Limited,
(SNEPCO).
Position: Piping Designer (March December 2002)
Description of Project and Responsibilities:
The project was a Detailed Engineering Design for the provision of Top sides Piping Support in the BONGA
FPSO Project. Some of the activities are listed below:
Determination of Support Locations and co-ordinates o pipes.
Modifying and plotting of Standard Pipe Support Drawings using Auto-CAD 2000.
https://www.postjobfree.com/resume/acvi1e/eng-pipeline-activities-gas-miri-sarawak 11/13
9/16/2017 Project Engineering, Project Management, EPCM, EPCIC, FEED, Detail Eng resume in Miri, Sarawak, Malaysia - July 2016
Similar Resumes
offshore crane operator cv - micheal manoj
India, tirunelveli, TN - crane operator, crane, rig, deck, drilling,...
Electrical Service
- odisha, eng, electrical, dt, english, working,...
Maintenance Power
India, TN - crane, batching, transformer, electrician,...
https://www.postjobfree.com/resume/acvi1e/eng-pipeline-activities-gas-miri-sarawak 12/13
9/16/2017 Project Engineering, Project Management, EPCM, EPCIC, FEED, Detail Eng resume in Miri, Sarawak, Malaysia - July 2016
Similar Skills
pipeline resumes in Miri, Sarawak, Malaysia
injection resumes in Miri, Sarawak, Malaysia
piping resumes in Miri, Sarawak, Malaysia
pipe resumes in Miri, Sarawak, Malaysia
pipeline resumes
injection resumes
piping resumes
https://www.postjobfree.com/resume/acvi1e/eng-pipeline-activities-gas-miri-sarawak 13/13