You are on page 1of 13

9/16/2017 Project Engineering, Project Management, EPCM, EPCIC, FEED, Detail Eng resume in Miri, Sarawak, Malaysia - July

ume in Miri, Sarawak, Malaysia - July 2016

Resume Sign in

Project Engineering, Project Management, EPCM, EPCIC, FEED, Detail


Eng
Location:
Miri, Sarawak, Malaysia
Posted:
July 01, 2016

Contact this candidate


Map data 2017 Google, ZENRIN

Qualification: B. Eng. Mechanical/Production Engineering, Nnamdi Azikiwe University, Awka. 2000.


Second Class Honours, Lower Division.
MNIMechE, MNSE, MPIPE, COREN, MASME.
Nationality: Nigerian
Date of Birth: December 11th 1971
Marital Status: Married
Languages: English and Igbo
Telephone: +60-176282171
E-Mail: acvi1e@r.postjobfree.com
Contact Address: Lot 2366, Taman Bayshore,
Piasau, 98000, Miri
Sarawak, Malaysia.

CAREER SUMMARY:

I have more than fourteen years of experience in Oil and Gas Industry with specialization in
Onshore/Offshore and deep water Pipeline Mechanical Designs and Engineering Procurement support and
Project Management activities.

Currently, I am working as Executive (Pipeline) Engineer with PETRONAS Carigali Sdn. Bhd. Sarawak Oil,
Malaysia.
Areas I have worked include but not limited to the following: Mechanical Designs of Onshore/Offshore
Pipelines (Wall thickness calculations, On-bottom stability Analysis, Free Span Analysis, Thermal
https://www.postjobfree.com/resume/acvi1e/eng-pipeline-activities-gas-miri-sarawak 1/13
9/16/2017 Project Engineering, Project Management, EPCM, EPCIC, FEED, Detail Eng resume in Miri, Sarawak, Malaysia - July 2016

Expansion Analysis, Pipeline and Riser Stress Analysis. Cathodic Protection Design, Lateral Buckling
Screening Analysis, Buckle Arrestor Designs), etc. Project Cost Estimate and scope of work definition, Oil
Pipeline License (OPL) packages. Engineering Requisitions for Purchase Order (PO), Technical Bid
evaluations and Vendor data reviews, etc.
Also, I have worked for Non-metallic pipes (NMP) Materials Selections, Engineering, Procurement,
Construction and Installations (EPCIC) activities.

Work Experiences:
PETRONAS Carigali Sdn. Bhd. (PCSB) Sarawak Oil, Malaysia
Project: - Pipeline Rehabilitations Projects (April 2014 Till date)
Pipelines Rehabilitations Project activities involve the replacement of PETRONAS Carigali Sdn. Bhd.
Sarawak Oils highly corroded and/or ageing existing intra fields pipelines with low cost and innovative
alternative to carbon steel pipeline technologies, thus prolonging their services lives, guaranteeing systems
integrity and at guaranteed return on investments.

Project: In-Field Liner (IFL) Engineering, Procurement, Construction, Installation and Commissioning
(EPCIC) Project at West Lutong.
Position: - Project Execution Engineer (July 2014 November, 2014)
In-Field Liner (IFL) Pipeline Installations involves replacing the existing intra field pipelines with non-metallic
pipes utilizing PETRONAS patented IFL technology by pulling the IFL through existing corroded pipelines. It
also involves topsides modifications to accommodate corrosion monitoring coupon holders and other
ancillary fittings.

Some of the activities carried out by me in the projects under review are listed below:
Reviewing contractor mechanical designs and analyses reports respectively.
Reviewing of contractors detailed Piping and Pipeline drawings for Construction
Participating in Design Reviews, HAZOPS, HAZIDS, Constructability Reviews and Construction Risk
assessments respectively.
Responding to contractors technical queries relating to Piping and Pipeline Designs.
Execution Engineer for IFL Pipeline Installations and topsides modifications activities.
Mark-up of construction drawings for As-built drawings productions.

Project: Non-Metallic Pipe (NMP) Engineering, Procurement, Construction, Installation and Commissioning
(EPCIC) Project.

Position: - Lead, Non-Metallic Pipeline (NMP) team (August 2014 Till date)

https://www.postjobfree.com/resume/acvi1e/eng-pipeline-activities-gas-miri-sarawak 2/13
9/16/2017 Project Engineering, Project Management, EPCM, EPCIC, FEED, Detail Eng resume in Miri, Sarawak, Malaysia - July 2016

The Non-metallic Pipe (NMP) Project involves replacing the existing intra field pipelines with innovative and
low cost Non-Metallic Pipeline technology.

Activities carried out by me in the projects under review are listed below:
Conducting materials options study (MOS) to select the most appropriate and cost effective non-metallic
pipe materials.
Reviewing of Contractors Engineering drawings, Mechanical designs and analyses.
Resolution of contractors technical queries and clarifications requests.
Project scope of work definition, cost estimates and Project Execution Plan production for Project execution.
Engagement meetings with vendors, partners and Government authorities etc.
Technical and Commercial proposals evaluations and negotiations for Contract award.
Design, Engineering, procurement, construction and execution of platforms topsides piping modifications,
etc.

Previous Work Experiences:


DELTAAFRIK ENGINEERING LIMITED (A Deltatek & Worleyparsons E&C Company)
Project: - EXXONMOBIL Engineering, Procurement and Construction Management (EPCM-1)
Positions: - Supervising/Lead, Pipeline Engineer (April 2011 March 2014)
Description of Projects and Responsibilities:
The following projects were executed under the EPCM 1 Project:
1. Satellite Fields Development Phase 2 Project (SFD2)
2. QIT Produced Water Discharge Upgrade Project
3. Usari Idoho Pipeline Project
4. Production Uplift Project
Satellite Fields Development Phase 2 Project consists of the installation of four new wellhead platforms
(Ufan, Ibot, Ifure and Idoho North) together with installation of the associated FWS sub sea pipelines to
enable well stream production fluids to be processed at the existing Yoho YP, Idoho BP, Ubit GY and Ubit
GP platforms.
It also includes the Brownfield modifications that are necessary to enable the existing oil & gas processing
facilities at Yoho, Idoho and Ubit to accept production from the four new wellhead platforms, and to export
HP gas to the WHPs for gas injection & gas-lift purposes. The SFD2 Project also involved Engineering
Procurement Support including Vendor data reviews for the procurement of all the linepipes, IRHFAs,
Induction Bends and associated flanges and fittings including Anodes and Concrete Mattresses.
Qua Iboa Terminal (QIT) Produced Water Discharge Upgrade Project involves installation of a 1.3 km
distance onshore pipeline from the pump header inside QIT to the Ubit pipeline tie-in point to the
abandoned 24-inch OD Ubit SSM QIT Pipeline close to the QIT fence, provision of chemical injection

https://www.postjobfree.com/resume/acvi1e/eng-pipeline-activities-gas-miri-sarawak 3/13
9/16/2017 Project Engineering, Project Management, EPCM, EPCIC, FEED, Detail Eng resume in Miri, Sarawak, Malaysia - July 2016

points for scale inhibition close to the pumps and pig launcher installation. The project also involves the
modification of the offshore section of the 24-inch OD Ubit Pipeline close to the SSM for the discharge of the
produced water.
Usari Idoho Pipeline Project involves Detailed Pipeline Engineering Design of 20 km of 24-inch OD Crude
Oil Pipeline from Usari FA to Idoho BP Platforms. Engineering Procurement support activities including
vendor data reviews for the linepipes, IRHFA, Induction bends and the pipeline associated flanges and
fittings including Anodes and Concrete Mattresses, etc.
Production Uplift Project comprises the detailed Design for the replacement of different sections of the
Pipelines; 24-inch OD Idoho BP Riser and Edop SSM Pipeline spool, 10.75-inch OD Edop QP Gas Riser
and spools and 10.75-inch OD Ekpe OP Oil Riser, spools and 500m pipeline. Engineering Procurement
Support activities including vendor data reviews for the procurement of the linepipes, IRHFAs, Induction
Bends and the pipelines associated flanges and fittings and components were also carried out on the
Project.
Some of the activities carried out by me in the projects under review are listed below:
Pipeline Design Basis Reports
Wall thickness calculations for the Pipelines and Risers
On-Bottom Stability Analyses
Cathodic Protection Calculations
Integrated Riser and Hanger Flange Assemblies Specifications
Monolithic Insulating Joint Specification
Pipeline Material Take-Offs (MTO)
Production of Oil Pipeline License (OPL) Reports
Monel Cladded pipes Specification
Various datasheets (Line pipes, Induction Bends, IRHFAs, MBJ, Monolithic Isolating Joints, Electrical
Isolating kits, Anodes, Concrete Mattresses, Monel sheet, Paddle blanks, Spacers), etc.
Production and reviews of various Pipeline Design Analyses and Reports
Pipeline items Engineering Requisitions, Engineering Procurement Support activities including Vendor data
reviews
Checking and marking-up General Arrangements, Pipeline Alignment Sheets, Pipeline Schematics
Drawings, etc.

Project: - TOTAL IKIKE Field Development Project


Position: - Lead Pipeline Engineer (August 2010 April 2011)
Description of Project and Responsibilities:
IKIKE Field Development Project is a FEED/Basic Engineering Project that involves laying two news
pipelines (about 14.5km, 12-inch Multiphase Production Export Pipeline from IKD1 to AMD2, and 14 km,

https://www.postjobfree.com/resume/acvi1e/eng-pipeline-activities-gas-miri-sarawak 4/13
9/16/2017 Project Engineering, Project Management, EPCM, EPCIC, FEED, Detail Eng resume in Miri, Sarawak, Malaysia - July 2016

12-inch Water Injection Pipeline from AMD3 to IKD1) in IKIKE Field.


Some of the activities carried out by me in the project under review are listed below:
Wall thickness calculations for the Pipelines and Risers.
Production of Oil Pipeline License (OPL) Reports and Permit drawings.
Pipeline On-bottom Stability Analysis.
Pipeline free span Analysis.
Pipeline Thermal Expansion Analysis.
Project Particular Specifications and datasheets for various pipeline flanges and fittings.
Pipeline crossing Analysis.
Pipeline Cathodic Protection Design and Report preparation.
Pipeline Material Take-off (MTO)
Pipeline Route Review and Route Selection Reports.
Pipeline Installation, Pigging, Commissioning Specifications.
Corrosion and Insulation Design Report.
Pipeline and Pipeline items Datasheets.
Co-coordinating team members and attending to other discipline issues.
Checking and marking-up drawings all Route Maps, Approaches, General Arrangements, Expansion Spools
and Pipeline Alignment Sheets Drawings, etc.

Project: EXXONMOBIL Major Integrity Projects (MIPS) EPCM 1


Position: Principal Pipeline Engineer (April 2007 October 2010)
Description of Project and Responsibilities:
The following projects were executed under the MIPS EPCM 1 Project:
1. EDOP QP 24-in Pipeline Segment Replacement Project
2. Critical Crude Pipeline Segments Replacement Project
3. QIT Gas Flare Elimination (QGFE) Shore Approach Detailed Design Project
4. EDOP Pipeline Emergency Repair Project
5. CCPSRP 24-in EDOP Shore crossing Project
6. EKPE ASABO Pipeline Replacement Project
7. UBIT GP - IDOHO BP and UTUE FWS Conversion Project
EDOP QP 24-in Pipeline Segment Replacement Project involves the replacement of a 20 km segment of
the pipeline from Edop QP to Edop Subsea manifold, the associated riser at Edop QP and the re-
instatement of a 10-inch pipeline jumper at Etim-Inim crossing.

https://www.postjobfree.com/resume/acvi1e/eng-pipeline-activities-gas-miri-sarawak 5/13
9/16/2017 Project Engineering, Project Management, EPCM, EPCIC, FEED, Detail Eng resume in Miri, Sarawak, Malaysia - July 2016

Critical Crude Pipeline Segments Replacement Project involves installation of two 20 km long 24-inch
pipelines (Ubit SSM QIT and Idoho BP - QIT) and a 16km long Asabo MP Usari FA Pipeline and the
associated risers.
QGFE Shore Approach Detailed Design Project deals with the installation of a shore approach section of
24-in Idoho BP QIT pipeline and the two QGFE pipelines (16-in OSO RX - QIT fuel gas pipeline and 12-in
QIT OSO RX Gas Export pipeline) in a single mobilization and single trench. Both pipelines have same
landfall sections at QIT. This was due to a detour of the CCPSRP pipelines out their right of way (ROW) in
the shore approach section.
EDOP Pipeline Emergency Repair involves sectional repair of the 24-in EDOP pipeline by replacing a
segment between EDOP SSM and QIT and the abandonment of existing redundant pipeline segment.
CCPSRP 24-in EDOP Shore crossing involves the engineering detailed design of a 3 km segment of the
24-in EDOP pipeline between the shore approach section and QIT and the abandonment of existing
redundant pipeline segment.
EKPE ASABO Pipeline Replacement Project involves replacement of the existing 19.3 km long 16-inch
pipelines (Ekpe OP Asabo MP) and the associated risers, decommissioning of the existing pipeline and
risers and their abandonment.
UBIT GP - IDOHO BP and UTUE FWS Conversion Projects involve the determination of maximum
operating pressures and remaining strength of corroded existing pipelines at which the Pipelines can be
safely operated without the possibility of Pipelines failure.
Some of the activities carried out by me in the projects under review are listed below:
Wall thickness calculations for the Pipelines, Risers and Pipeline Jumper.
Production of Oil Pipeline License (OPL) Reports for the Critical Crude Segment Pipelines.
Pipeline On-bottom Stability Analysis.
Pipeline free span Analysis.
Pipeline Thermal Expansion Analysis.
Preparation of documents for Pipeline OPL Packages.
Preparation of Technical Specifications and datasheets for various pipeline flanges and fittings.
Checking and marking-up drawings.
Pipeline crossing Analysis.
Pipeline Cathodic Protection Design and Report preparation.
Pipeline Material Take-off (MTO)
Requisition for Quotation (RFQ) packages for vendors for Bid.
Deliverable item list (DIL) for Purchase Order (PO) packages.
Sub-contractor Scope of Work for Pipeline Installations.
Vendor Documents reviews for various Pipeline items

https://www.postjobfree.com/resume/acvi1e/eng-pipeline-activities-gas-miri-sarawak 6/13
9/16/2017 Project Engineering, Project Management, EPCM, EPCIC, FEED, Detail Eng resume in Miri, Sarawak, Malaysia - July 2016

Project: OSO Condensate Pipeline for EXXONMOBIL


Position: Senior Pipeline Engineer (December 2006 April 2007)
Description of Project and Responsibilities:
The Project was a Detailed Engineering Design to replace 10-in OSO-RB to RR, 12-in OSO-RD to RR and
16-in OSO-RH to RR condensate production pipelines through installation of three new corrosion resistant
alloy (CRA) material pipelines and abandonment of the existing ones.
Some of the activities carried out by me in the projects under review are listed below:
Wall thickness verification and calculation for the 10/12/16-in Condensate Pipelines.
On-bottom stability analyses of the pipelines using AGA L2.
Production of Specifications for Induction Bends,
Production of Pipeline Design Basis Report.
Running of Pipeline Span Analysis and Report.
Pipeline Expansion Analysis and Report preparation.
Pipeline Cathodic Protection Design and Report preparation.
Projects: - ETIM ASASA Fields Development Project for EXXONMOBIL
Project Title: - Pipeline Engineer (July December 2006)
Description of Project and Responsibilities:
ETIM ASASA Development Project is a Detailed Engineering Design project designed to transport
compressed associated gas via new pipeline network from the EDOP gas compression platform for injection
into the ETIM and ASASA reservoirs and also a new multiphase pipeline from ETIM D to ETIM production
platform.
The five pipelines in this project are listed below:
16-in Gas Pipeline from Edop QI platform to Etim LP platform.
12-in Gas Pipeline from Etim LP platform to Etim LC platform.
10-in Gas Pipeline from Etim LC platform to Asasa VB platform.
8-in Gas Pipeline from Etim LP platform to Etim LA platform
14-in Multiphase Pipeline from ETIM LD platform to ETIM LP platform.
Deliverables issued and activities carried out during the project are listed below:
Preparation of Pipeline Design Basis Report.
Production of Pipeline and Induction Bends Wall thicknesses calculations for the Pipelines.
On-bottom stability analyses for the gas and multiphase pipelines.
Preparation of Specifications for Induction Bends, Swivel, Misalignment and Hanger Flanges.
Preparation of Datasheets for Induction Bends, Swivel, Misalignment and Hanger Flanges.

https://www.postjobfree.com/resume/acvi1e/eng-pipeline-activities-gas-miri-sarawak 7/13
9/16/2017 Project Engineering, Project Management, EPCM, EPCIC, FEED, Detail Eng resume in Miri, Sarawak, Malaysia - July 2016

On-bottom stability Analyses using AGA L2.


Production of Pipeline Expansion analysis and Report.
Calculation of permissible Pipeline Span and preparation of Span Analysis Report.
Running of Pipeline and Riser Stress analysis using Auto PIPE.
Production of Preliminary Pipeline bulk MTO
Project: OSO RE-Restoration Project for EXXONMOBIL
Position: Pipeline Engineer (July September 2006)
Description of Project and Responsibilities:
The OSO RE Restoration Detailed Design Project was to design a 16-in CRA Pipeline between OSO RE
wellhead platform and OSO RR riser platform.
Deliverables issued and activities carried out during the project are listed below:
Preparation of Pipeline Design Basis Report.
Production of Pipeline and Induction Bends Wall thicknesses calculations for the Pipelines.
On-bottom stability analyses for the gas and multiphase pipelines.
Preparation of Specifications for Induction Bends, Swivel, Misalignment and Hanger Flanges.
Preparation of Datasheets for Induction Bends, Swivel, Misalignment and Hanger Flanges.
On-bottom stability Analyses using AGA L2.
Production of Pipeline Expansion analysis and Report.
Calculation of permissible Pipeline Span and preparation of Span Analysis Report.
Running of Pipeline and Riser Stress analysis using Auto PIPE.
Production of Preliminary Pipeline bulk MTO
Project: - East Area Gas Utilization and Produced Water Disposal (EAGU) for Chevron Nigeria Limited.
Position: Pipeline Engineer (July December 2006)
Description of Project and Responsibilities:
This was Front Engineering Design (FEED) comprising one Gas pipeline and two multiphase pipelines. The
Design was to lay a pipeline that will transport production fluid from IDAMA /JOKKA fields through a new
12-in multi-phase pipeline and the extension of the existing 8-in multiphase pipeline from CNL DP to
Robertkiri GCWIP. The gas is to be collected, compressed, conditioned and sent to the Soku Gas facility,
operated by SPDC through a new 10-in Gas pipeline, from where it will be sent to the Nigerian LNG Plant at
Bonny. The project also involves a Water re-injection by a 6-in flow line from Robertkiri GCWIP to Robertkiri
well-7.
Some of the activities carried out by me in the projects under review are listed below:
Preparation of Pipeline Design Basis Report.
Production of Pipeline and Induction Bends Wall thicknesses calculations for the Pipelines.
https://www.postjobfree.com/resume/acvi1e/eng-pipeline-activities-gas-miri-sarawak 8/13
9/16/2017 Project Engineering, Project Management, EPCM, EPCIC, FEED, Detail Eng resume in Miri, Sarawak, Malaysia - July 2016

On-bottom stability analyses for the gas and multiphase pipelines.


Preparation of Specifications for Induction Bends, Swivel, Misalignment and Hanger Flanges.
Preparation of Datasheets for Induction Bends, Swivel, Misalignment and Hanger Flanges.
On-bottom stability Analyses using AGA L1 & L2.
Production of Pipeline Expansion analysis and Report.
Calculation of permissible Pipeline Span and preparation of Span Analysis Report.
Running of Pipeline and Riser Stress analysis using Auto PIPE.
Production of Preliminary Pipeline bulk MTO
Preparation of Pipeline Crossing Report.
Checking and back checking of Designers drawings.
Preparation of Sub-contractor Scope of Work for Pipeline Installations.
Attending Project weekly meetings attending to discipline related issues on the project.
NATIONAL ENGINEERING & TECHNICAL COMPANY LIMITED, (NETCO), Lagos, Nigeria.
Project: BONGA Northwest for SHELL Nigeria Exploration and Production Company Limited (SNEPCO).
Position: Lead, Pipeline Engineer (April July 2006)
Description of Project and Responsibilities:
Production PIP and water injection flow lines Wall Thickness Design including Internal pressure (burst)
design, Collapse, Buckling and Buckle propagation designs, combined load and maximum allowable
bending strains during reeling Designs,
Production of flow lines and umbilical Alignments sheets.
Free spanning analysis of flow lines.
On-bottom stability analysis.
Coordinating and attending to other discipline issues as related to the Project and discipline.

Project: BONGA SOUTHWEST/APARO PFRI for SHELL Nigeria Exploration and Production Company
Limited (SNEPCO).
Position: Lead, Pipeline Engineer (January April 2006)
Description of Project and Responsibilities:
Production PIP, Gas Lift, Water Injection Flow lines and Gas Export Design Basis Report.
Production PIP, Gas Lift, Water Injection Flow lines and Risers and Gas Export Pipeline Wall Thickness
Design including Internal pressure (burst) design, Collapse, Buckling and Buckle propagation designs,
combined load and maximum allowable bending strains during reeling Designs, etc.
Flow lines and Gas Export On-bottom stability Analysis.
Flow lines Free span Analysis.
https://www.postjobfree.com/resume/acvi1e/eng-pipeline-activities-gas-miri-sarawak 9/13
9/16/2017 Project Engineering, Project Management, EPCM, EPCIC, FEED, Detail Eng resume in Miri, Sarawak, Malaysia - July 2016

Thermal Expansion Analysis.


Buckle Arrestors Design based on API PR 1111.
Coordinating and attending to other discipline issues as related to the Project and discipline.
Project: Ogbainbiri Front End Engineering (OB-OB FEED) for AGIP Nigeria Limited.
Position: Pipeline Designer/Engineer (February November 2005)
Description of Project and Responsibilities:
The FEED Project involves 18-in oil one 12-in gas pipelines of approximately 157 kilometers pipeline from
Tuomo to Ogbainbiri, Nigeria.
Some of the activities carried out in the project under review are listed below:
Highway and Railway crossing design using API RP 1102.
Pipeline and Induction Bend Wall thickness calculation
Preparation of Pipeline Alignment Sheets Drawings from Tuomo to Ogbainbiri.
Production of Main Crossing Detailed Drawings.
Production of Typical Crossings, Right of way (R.O.W), and Warning Signals Drawings, etc.
Production of Ground Profile Drawings for the 12-in Oil and 18-in Gas Pipelines.
Wall thickness and Induction Bends design using ANSI/ASME B31.8 and BS 8010.
Production of Specifications for Barred Tees and Induction Bends for the Pipelines.

Project: Eastern Gas Gathering System (EGGS II) for Shell Petroleum Development Company (SPDC).
Position: Pipeline Designer/Engineer (April November 2004)
Description of Project and Responsibilities:
The project involves the installation of 36-in Gas Pipeline of approximately 60 km from Gbaran to Ubie.
I involved the preparation and production of the following deliverables among others:
Pipeline close-out Report
Pipeline Stability Analysis Report
Typical Pipeline Crossing Drawings
Production of Gbaran/Ubie Pipeline Alignment Sheets
Preparation of discipline Design Procedures
Collating and filing of correspondences and documents from other disciplines and the client.
Position: Pipeline Designer/Engineer (September December 2003)
Pipeline input to Bid packages for various Pipeline projects.
Pipeline in-house training (Onshore/Offshore Pipeline Mechanical Designs)
On-bottom Stability Analysis training
https://www.postjobfree.com/resume/acvi1e/eng-pipeline-activities-gas-miri-sarawak 10/13
9/16/2017 Project Engineering, Project Management, EPCM, EPCIC, FEED, Detail Eng resume in Miri, Sarawak, Malaysia - July 2016

Project: ERHA EPC1 FPSO FOR SAIPEM-SA/EXXON MOBIL


Position: Piping Engineer (February September 2003)
Description of Project and Responsibilities:
The project was a sub contract work from SAIPEM-SA for EXXON MOBIL. I was involved in the Piping
support for some Modules in ERHA Floating Production, Storage and Offloading (FPSO) facility. Some of
the activities are listed below:
Production of Pipe Support Index using Micro Soft Excel Software.
Production of Pipe Support Book.
Determination of Pipe Expansion Rates and Calculation of the Expansions of the Pipes on the Supports
points.
Determination of support locations, types and their co-ordinates.
Production of Standard and secondary Pipe Supports drawings

Project: BONGA FPSO TOPSIDES FOR SHEEL Nigeria Exploration and Production Company Limited,
(SNEPCO).
Position: Piping Designer (March December 2002)
Description of Project and Responsibilities:
The project was a Detailed Engineering Design for the provision of Top sides Piping Support in the BONGA
FPSO Project. Some of the activities are listed below:
Determination of Support Locations and co-ordinates o pipes.
Modifying and plotting of Standard Pipe Support Drawings using Auto-CAD 2000.

NIGERIAN NATIONAL PETROLEUM CORPORATION (NNPC), Ikoyi, Lagos


Project: Student Industrial Work Experience Scheme (SIWES).
Position: Piping Designer (December 1998 May 1999)
Calculation of Pipe wall thicknesses, expected time of arrival of crude products and monitoring of petroleum
products flow, etc.
TRAINING/COURSES ATTENDED:
Enhancing Corporate Value Course
Supervisory Skills Workshop
Offshore Deep water Technology Seminar
Communication and Business writing Course
Subsea Flow lines and Risers Systems Course
Basic Onshore Pipelines Course

https://www.postjobfree.com/resume/acvi1e/eng-pipeline-activities-gas-miri-sarawak 11/13
9/16/2017 Project Engineering, Project Management, EPCM, EPCIC, FEED, Detail Eng resume in Miri, Sarawak, Malaysia - July 2016

Basic Training on Piping and Stress Analysis


Plant layout and Plot plan Development
Basic Oil Pipelines Familiarization Course

SOFTWARE PROFICIENCY: Experienced in the use of the following soft wares:


Pipeline Engineering Tools (PET: DNV-OS-F101)
Fatigue Analysis of Free Spanning Pipelines (FAT Free)
Smart Plant Materials Requisition L_3
MICROSOFT OFFICE (Windows XP)
AUTOCADD (Version 2006)
AGA L2 (Version 2.0)
MathCAD (Version 14)
Auto PIPE (Version 08.05.01.11)

REFEREES: Available on request

Contact this candidate

Similar Resumes
offshore crane operator cv - micheal manoj
India, tirunelveli, TN - crane operator, crane, rig, deck, drilling,...

Crane Operator - Stage 3 & DOSH


Malaysia, Sarawak - practitioner, crane operator, crane, shell,
victor,...

Crane Operator(Onshore & Offshore),Lifing/Deck


Supervisor, Rigger
Australia, WA - crane, deck, crane operator, cert, drilling,...

Crane Operator Training


Saudi Arabia - crane, crane operator, deck, letter, stage, sun,...

Electrical Service
- odisha, eng, electrical, dt, english, working,...

Maintenance Power
India, TN - crane, batching, transformer, electrician,...

https://www.postjobfree.com/resume/acvi1e/eng-pipeline-activities-gas-miri-sarawak 12/13
9/16/2017 Project Engineering, Project Management, EPCM, EPCIC, FEED, Detail Eng resume in Miri, Sarawak, Malaysia - July 2016

Crane Operator Maintenance


India, Tirunelveli, TN - crane, cert, rigging, document, issue,...

Similar Skills
pipeline resumes in Miri, Sarawak, Malaysia
injection resumes in Miri, Sarawak, Malaysia
piping resumes in Miri, Sarawak, Malaysia
pipe resumes in Miri, Sarawak, Malaysia
pipeline resumes
injection resumes
piping resumes

PostJobFree Delete or Update my resume About Terms of Service FAQ Contact us

https://www.postjobfree.com/resume/acvi1e/eng-pipeline-activities-gas-miri-sarawak 13/13

You might also like