A force of 2.40 N acted over a distance of 1.5 m, doing 3.60 J of work. A force of -0.600 N acted over 1.5 m, doing -0.900 J of work. Subtracting the two amounts of work gives a total work of 2.70 J.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
68 views1 page
Work Calculations and Results
A force of 2.40 N acted over a distance of 1.5 m, doing 3.60 J of work. A force of -0.600 N acted over 1.5 m, doing -0.900 J of work. Subtracting the two amounts of work gives a total work of 2.70 J.