1. Heat and mass balance, block flow diagram or Process flow diagram will be required from client
to confirm no of equipment included.
2. Plant operation via DCS, PLC or only manual plant?
3. Will this project required separate new dedicated utility or it has to share existing utility.
4. Do client want to include safety study i.e. HAZOP study and Dust cloud explosion.
5. Preferred vendor list from client.