R=D/4=0.4/4=0.1m
Discharge Q= /4 x D2 x V
a) Bar Screen
Provide spacing =40mm c/c with angle 45o
Rectangular or circular bars of size =10 x 50 x10 mm
Peak flow= 2 x Avg Flow= 2 x 100= 200 ltr/day
= 0.02m3/day
b) Grit Chamber
Horizontal velocity 0.2 m/ sec (keeping to settle down the heavy particles)
Detention time = 1 min
Length= Velocity x Detention time = 0.2 x 60 = 12m
Volume to accumulate = Discharge x Detention time = 0.091 x 60
C/s= 5.46 /12 = 0.45 m2