F-20
LARGE ONLINE DOUBLE
CONVERSION UPS
20kVA / 30kVA / 40kVA
Safety Introduction
Please keep the safety sheet properly. No allowance for operation is permitted before the reading of
all the safety and operation introductions. All the warnings and operation introductions included in the
Customer Manual shall be strictly followed.
Installation Safety
1. This apparatus shall be installed by the professional maintenance personnel under the instruction of
the safety introduction,
2. The weight capacity of the floor to support the apparatus and the battery pack shall be considered
before installation.
3. Consult the specification list on page 20 for the specifications of wire and air switch.
Operation Safety
1. Leakage current. Put to earth connection before connecting to the power supply.
5. Dont block or insert in the intake or other apertures with any things. Keep spacing intervals around the
UPS in installation in favor of the air circulation and heat rejection. Avoid of the direct sunlight.
6. Keep a clean working environment and avoid environments of humidity, flammable gas, liquid, or corrosive
materials.
1Electrical Specification......................................................................................................................P7
2Technical Performance and Feature...................................................................................................P9
3, UPS Framework and Appearance.......................................................................................................P10
4, Workings of UPS................................................................................................................................P13
5, Hardware Components and Functions.................................................................................................P16
6, Details of Link of Power Line, Data Line ...........................................................................................P17
7, Communication Interface and
Monitoring...............................................................................................................................................P19
Frequency of standard
50Hz/60Hz
mains supply input
Input
Synchronizing
frequency range of 50/60 Hz 4Hz
mains supply
Inbuilt input
isolation none
transformer
45.67Amp (Max)
input electric current
130% overload, minimum input voltage )
voltage 380Vac / 220 Vac (3 4 4W)
power factor 0.8
Voltage
2%
stability
output Full-load
voltage <2% (R Load)
precision
Output voltage 200/208/220/230/240(At 200V and 208V, default 10%
adjustable de-rating)
Current peak 3:1
coefficient
Unbalance load 100%(unbalance load available)
frequency (46~54)Hz / (56~64)Hz
This mode is that when the UPS operation is abnormal while the bypass input is normal, the
main lines rectifier SCR cuts and the bypass inputs through STS to load
supply. The flow chart is as follows
BYPASS FOR MAINTAINCE
This mode is that when fault is occurred to UPS, the mains supply through maintenance
switch for load, which enables the maintenance personnel carrying out repair and maintenance
under the condition of not cutting the load supply. The flow chart is as follows
4. 4 ECO Mode
This mode is only used when the mains supply input and bypass input are both normal to increase the
overall efficiency. Under this mode, the rectifier, booster and inverter are all in work but the inverter does
not output. The flow chart is as follows
BYPASS FOR MAINTAINCE
7, Communication Interface and Monitoring
3W3 IX series have a multitude of communication interfaces including the external interfaces like RS232
RS485, Intelligent Slot, and AS400, among which the intelligent slot can be installed with WebPower card
(optional) and USB+RS232 card. These interfaces may help the user to monitor the UPS state with computer.
7.1 Standard RS232 interface, with an effective transmission distance of 15m, can be used with the graphic
WebPower monitoring software of Reros .
7.2 Standard RS485 interface, with an effective transmission distance of 1.2 km, can be used with WinPower
for remote or integral control of the UPS .
7.3 AS400 interface: use this interface on UPS to monitor the power supply
7.4 Intelligent Slot, together with WebPower card, enables you carry out the remote control and management
of UPS through Internet.
7.5 USB+RS232 card: an extension monitoring interface, through which the graphic Winpower software can
monitor the UPS.
Note: RS232 And RS485 use the same channel, that is, the two cannot be used in the same time; RS232 or
RS485 does not share the same channel with intelligent slot.
Chapter Two Installation
(Single and Parallel)
B a user s manual
Altitude(M) 1000 1500 2000 2500 3000 3500 4000 4500 5000
Load 100% 95% 91% 86% 82% 78% 74% 70% 67%
Coefficient
6. keep the good ventilation for the installation of UPS. The space between the rear board of the
apparatus and the obstacle shall be at least 50 cm, and the space between the side boards and the
obstacles shall be at least 10 cm.
3, Examination of Power Distribution Environment
1. the following standard of wire layout is advised
Rated input fire wire Input zero line output fire output zero line Battery line Ground wire
model
power width width wire width width width width
20KVA/16 10AWG/6mm
3W3 IX 10AWG/6mm2 8AWG/10mm2 2 8AWG/10mm2 8AWG/10mm2 8AWG/10mm2
20KVA KW
3. examination of i/o three-phase fire wire, zero line and ground line
3.1 confirmation of input three-phase fire wire, zero line and ground line
1) Generally, the ground line shall be led from the ground line block of distribution box, so the
resistance between ground line and the block of distribution box can be checked with the
universal meter, and the resistance value shall approach to 0 ohm.
2) Zero line shall be led from the zero line block of distribution box.If the user dont made N and G short,
then the resistance value between N and G can be tested with the universal meter, and the value
fluctuates from 10 odd to 100 odd; or the voltage of three-phase line and zero line. The value of voltage
is about 220V, and the voltage of N and G generally shall be below 2 V.
3) The standard voltage between fire line is 380V, and the actual voltage is determined by the userpower
distribution. The phase order can be affirmed with the phase-order meter.
4) If the input three-phase fire line, zero line and ground line have been checked and examined,
please signal with corresponding marks.
3.2 confirmation of battery polarity and voltage
1) The polarity of battery can be judged with the universal meter. After the confirmation, make
marks for the positive and negative polar.
2) The voltage of battery can also be judged with the universal meter. Generally, the voltage of a
new 32-cell battery is between 410 and 420V. If the value checked to be too high or too low,
please find out the reason.
3) Judge the N line according to the voltage of battery. The line that the voltage between it and
other two lines is just half of the total voltage is the N line.
4) Check the number of battery, the width of battery line, and the connection.
5) Use the universal meter to check whether there is a short between the positive and the negative, N, and
the ground. If the battery is installed in two or more battery box, please notice the connection between
boxes.
4, line sewing, installing
1 Select the following connection modes according to the user s demand
(two-supply input, one supply input, single mode or parallel mode)
2. installation steps
2.1 Open the front door, and demount the terminal block cover board
1.1 UPS input wiring connection: confirm that the air switches of mains supply input, bypass supply input are
OFF in the distribution box, and then connect the two groups of wires marked with A B C N G with
the UPS mains supply input end and bypass input end correspondingly, then tighten the screws.
1.2 UPS output wiring connection: confirm that the distributions switches are OFF in the distribution box, and
then connect wires marked with A B C N G with the UPS correspondingly
1.3 Battery unit wiring connection: put the DC switch into OFF position, then connect the positive pole marked
+of the battery unit with the +terminal in the UPS terminal block, and the negative pole marked
- of the battery unit with the - terminal, and N pole with N mark of the battery unit with N terminal,
then tighten the screws.
2.2 After the confirmation of the right connections, fix all the wires with binding wire on the binding wire frame.
5. Startup debugging
2 confirmation before the startup
2.1 Put the battery air switch to the ON position, use the universal meter to re-affirm the battery polarity. Put the
air switch to the OFF position if there is no fault.
2.2 Use the phase-order meter to confirm the phase of input electricity (if any fault is occurred, please find out the
reason such as the lead wire fault, or mark mistake), then check the wire voltage (A-BA-CB-C), and phase
voltage (A-NB-NC-N) with universal meter(the wire voltage is about 380V, and the phase voltage is about
220V). If any fault is occurred, please find out the reason at once.
2.3 N, G voltage is generally below 2V (if N and G are of short circuit, then it shall be 0V, the resistance value
approaches to 0 ohm). If any abnormity is found, please figure out the reason.
2.4 If the above steps are correct, conduct the startup debugging.
3 start and close the apparatus in DC condition
3.1 Push the battery air switch to ON position, then touch the ENTER on panel.At this time, the back lighting
lightens, fan rotates, and words like UPS Self-examination, please wait are displayed on the panel. If abnormity
is found, please figure out the reason immediately (whether the battery is connected, or the DC startup has been set
or not).
3.2 When the self examination is finished, choose Start on the panel and press the ENTER key for the choosing
of starting the machine with DC. Then words like DC starting, please wait. shall be displayed on the panel and
then the UPS enters into the battery mode for working. (Notice: DC startup shall be executed within 40 seconds after
the LCD self examination. If no action is conducted within 40 seconds, UPS will cut off power automatically.)When
the UPS enters into invert battery mode, the signal lamp of battery and inverter on the panel will lighten and the
buzzer will sing every 4 seconds.
3.3 Check whether the parameters on the panel are correct. Use the universal meter for the examination and
register the parameters like UPSs input voltage and frequency.
3.4 If the UPS works well under the battery mode, select turn off the machine on the panel and make sure, then
the UPS doesn't input, but the back light still lightens.
2. The back light of panel will go out about 1 minute after the turn-off of the battery, and the fan stops rotating.
When the fan stops rotating totally, push the air switch of battery to OFF position.
4 AC start and turnoff
4.1 Push the mains supply input air switch and bypass air switch to ON position, then the panel of UPS lightens,
and the fan rotates. Words like UPS IN SELF EXAMINATION, PLEASE WAIT will be displayed on
the panel.
4.2 Enter the startup menu three minutes later, press ESC to escape the menu and check the parameters under
bypass, and enter the SET for the setting of corresponding parameter according to the actual demand. When
the setting is finished, press ENTER and ESC to escape. Choose Start up on the panel and the LCD will
show Starting up, please wait . Several minutes later it will enter into the mains supply invert mode and
the panel displays right supply, no battery linked.
4.3 After the inversion, please check whether the input and output voltage of UPS is normal. Then push the
battery air switch to ON position, and the UPS does not alarm any more. Check the battery parameter on the
panel and you can see that the battery state shall be in charge and the charging current is determined by
the battery saturation. If there is anything wrong, please check the battery and the UPS state. Use the
universal meter to check the charging voltage (13.5V for each cell). If the value is not in the range, please
check on the panel whether the charging voltage setting is correct.
4.4 Check whether the parameters on the panel are correct, and use the universal meter to test and register the
output voltage, frequency, and charging voltage.
4.5 Shift between mains line mode and battery mode. UPS works normal under the mains supply mode, then
turn off the mains input switch, UPS turns to battery mode. Turn the mains supply input air switch of the
UPS ON, UPS turns back to mains supply inversion mode. Operate the shift for three times. After the shift
test, UPS keeps working in the mains supply inversion mode.
4.6 After the normal operation under no-load mains supply/ battery mode shift, carry out the loading test. (If
theres no condition for carrying out such a test, do not conduct this operation) Load on the UPS, and check
whether the parameters on the panel are correct. Use the universal meter to test the output voltage and
frequency of UPS.If the values are normal and the apparatus operates well will normal load 15 minutes later
everything is ok and register down the corresponding data
4.7 Turn off the machine in Mains supply mode. Execute the turnoff order on the panel, when enters into the
bypass and then turn off the mains supply switch. At this time, the back light of the panel still lights, and fan
rotates. One minute later, the back light goes out and fans stops rotating. Cut off the power supply switch when
the fan stops rotating totally.
4. 8 Start the UPS again to the mains supply inversion mode after the cutting off power.
4.9 Carry out basic training for the user, including how to start the UPS, turn off the machine, inquire
information on the panel, deal with the basic faults, maintain the battery, how to call for repair when faults
occurred.
4.10 Fill the registering list one by one according to the startup debugging. And ask the user to sign for
affirmation.
4.11 Put back the cover board of the terminal block on the UPS, lock the front door and clean up the spot.
Note: explanation about the setting of AS400 card in the maintenance setting: the AS400 card of CATLE EX
series UPS can be reset according to users need. When in setting, PORT refers to the relayer 1-4 of AS 400,
which shall not be changed, the function number stands for the programmable contents can be chosen with the
corresponding function number. The number in the parenthese is the function number.
AS400 Contract
[1] UPS ON V 1.5
6, 1 Input connection wire : push the UPSs input line air switch and bypass input air switch to ON
position(the total input air switch OFF), and use the universal meter to test the resistance value
between A-A B-B and C-C of line input and bypass input on the UPS terminal block. If the value
is below 1 ohm, it means that the connection is correct. After the confirmation, push back the air
switches to OFF. (Notice: the main line input or bypass line input shall come from the same source in
the parallel system)
62 Push the single input air switch of each UPS ON in the parallel system, use the universal meter to
test whether the resistance value between A-AB-Band C-C of line input and bypass input on the
UPS terminal block approaches 0 ohm. If it is, it stands for that the connection is right. After the
confirmation, push the air switches OFF.
6. 3 If the UPS is with input transformer or output transformer, the above-mention 2 steps are not
applicable. Push the line input air switch of UPS in the distribution box ON, bypass line input air
switch ON ( the line input and bypass input air switch on the UPS OFF), and use the universal meter to
test the voltage between A-AB-BC-C of line input and bypass input on the terminal block. If the
value tested is over 0.5%, please check for reasons.
7 , Push the UPSs line input air switch, bypass line input air switch, and battery air switch ON in the
parallel system, when the UPS enters into the bypass mode, use the universal meter to test the output
voltage of corresponding L line and make sure the voltage difference is within 2V.
8 , Push back the UPS input air switch, and choose any one of the parallel system to start the machine, the
whole system enters into the Line inv mode. Check the LCD panel of each UPS if normal in the system
and register down the corresponding data.
9 , After the registration of all parameters, choose any one of parallel system to turn off the machine in the
parallel mode and press ENTER, UPS will turn off and enter into the bypass mode if the bypass supply is
normal; if the bypass supply is abnormal, then it will enter into the STANDBY mode. Push the line input
and bypass line input air switches OFF, one minute later, the LCD panel and the fan stop working. Push
the battery air switch OFF, the UPS cuts off power totally.
10,After the test of start and turnoff, push the battery air switch, line input air switch, and bypass line air
switch to ON positive in succession. When the machine enters into the bypass mode, choose START on
the panel and the parallel system will come to work and enter into the line invert mode.
Chapter Three Repair and Maintenance
1.definition of fault code The fault code is displayed through a decimal number. Please consult the
fault code list for judgment.
2. fault code and its comment
Number Fault Table Comment Explanation
1 cBusSoftTimeOut BUS soft time out Maximum time for Bus soft is 60S
2 cBusOver
BUS Over voltage Higher than 430V and then accumulate to
Fault 200V
3 cBusUnder BUS Under lower than 260 V
S-phase negative
18 cInvSNegPow >1.25KW in 5 period
power fault
T-phase negative
19 cInvTNegPow
power fault
20 cTotalInvNegPow
Total inversion
periods
22 cOverLoadFault Overload fault
75 C. If the
difference
25 cInvRlyStickFault INV Rly stick
under the bypass mode, the voltage
26 cLineSCRFault Line SCR Fault When the voltage difference between Line
SCR input terminal and battery is within
10V in 1/4 line period
CAN
Communication line loss, CAN
34 cCanFault communication line
information back
fault
3,Warning Code
The displaying style of warning code is different from that of fault code. The warning code is divided
into present warning and historical warning.
3. 1 present warning
Transfer the decimal number displayed on the machine to binary, and correspond the
digit to fault.
1 2H
L
1 2
H L
Explanation :the digit bit of Warning code ,from 0 to 15 ,is the low digit ,and written in the form of
WC*L ,and the digit from 16-31 in the form of WC*H.
Code category: 0 stands for system warning
1 stands for Internal warning
3 . 3 Warning Code
1.8.1.1 Draw out the PSDR and remove the duct paper.
1.8.1.2 Dismantle the inductance board and capacitance board
1.8.2.1.2 Draw out the PCB softly, during the drawing removing the wiring on the board
and draw the PCB out of the socket.
1. 8.2.2 Disassembling and assembling of CCB-SIGNAL
1 .8.2.2.1 The disassembling and assembling of CCB-SIGNAL is similar to that of
CCB-POWER, the wiring connection is as follows :
6 . 1.3 Connect the output line of the newly-joined machine with the connecting line of
parallel system. Push the input air switch to ON position. Notice: make sure that the
parallel system is working under the line invert mode before new machines joining in.
If parallel system is working under the bypass mode, this operation is forbidden, and
must be shifted to maintenance bypass mode. When all the machines in the parallel
system enter into the bypass mode, shift the maintenance bypass mode to bypass mode,
and then start the system.
6 . 1.4 Push the battery air switch of newly-joined machine to ON position.
6 . 1.5 Connect the line and bypass input of the newly-joined machine with the corresponding
terminals of the parallel system.
6. 1.6 The newly-joined machine will start automatically and join into the parallel system.
6.2 online escape of parallel system
6.2.1 Make sure that the system load is redundancy mode (if the system is of capacity
extension mode, unload the load to redundancy at first and then conduct the following
actions. )
6.2.2 Enter into the LCD menu of the UPS that is going to escape the system, choose Single
Close and enter into the single unit turnoff mode.
6.2.3 When the machine turns off to waiting mode, turn OFF the UPSs input air switch,
battery air switch, line input air switch and bypass input air switch.
6.2.4 Pack the dismantled wirings with insulation tape.
6.2.5 Remove the parallel line after the total cutoff of power.
6. 3 repair of parallel system
6.3.1 If fault occurred to UPS, it will escape from the parallel system automatically.
Escape the UPS that fails according to the above-mentioned way from the parallel
system, and shift the parallel mode to single mode before repairing. The repair is the
same to that of single unit.
6.3.2 adjustment of corresponding parameter after the repair of parallel system:
6.3.2.1 BUS Voltage Readjustment: under the bypass mode, enter into the
settingmaintenance codebalance adjustment, choose Yes, then UPS starts
into invert mode. Under the invert mode, use the universal meter to test whether
the voltage of positive and negative of BUS is 360 0.5V. If the voltage
difference is higher than the standard, readjust through the selections on the
LCD to the correct range. Notice: if the line voltage is under 250V, the
readjustment of BUS voltage shall be conducted under line supply. If the line
voltage is higher than 250V, the readjustment under battery mode.)
6.3.2.2 Output Voltage Readjustment: check whether the output voltage displayed on
LCD is 220 0.5V. If it is beyond the range, readjust to the correct range in the
item of output voltage readjustment under balance adjustment .
6.3.2.3 Invert voltage readjustment: use the universal meter to test whether the invert
output phase voltage of the single machine is in the range of 220 0.5V. If it is
in the range, then it' s unnecessary for readjustment. If it is beyond the range,
readjust to the correct range in the item of inverter voltage readjustment under
balance adjustment.
6.3.3 After the completion of readjustment of the parameters, escape and turn off the
machine. The machine turns to bypass mode, restart the parallel mode of the machine,
and push the line input air switch and bypass input air switch OFF, then the machine is
cut off power completely.
6.3.4 Join the UPS into the parallel system according to the above-mentioned way.
Note: After the replacement of LCD the parameters must be set again to ensure the parameters are all the same in
the system.