1. Scale of Investments:
iii. Cost of plant & machinery as said above includes cost of erection/installation of plant &
machinery, electrical accessories, cost of generator set inside the plant.
iv. Cost of plant & machinery as said above does not include:
Second hand plant & machinery/equipment/Pollution control equipment purchase
from any place in India
Cost of Land and Site Development
1
INCENTIVES SCHEMES OF WBIDC
Approach Roads
Building,
Water supply, sanitation, drainage and sewerage.
Railway Siding
Consultancy Fees
Infrastructure Cost for drawing power connection upto plant from the feeder of any
electricity distribution company.
Any item other then that not specifically indicated in the scheme.
2. Classification of Area
3. Industrial Promotion Incentive(IPA) will not be granted to QVC Steel & OPPL
because they fall under Scale 1, where as IPA is allowable only under Scale 2, 3 and
4
4. Additional Incentive is also not allowable as they are allowable for other industries
in which it does not belong.
2
INCENTIVES SCHEMES OF WBIDC
(5) Commencement of
commercial production
certificate
Employment M.D. WBIDC After V Documents re: contribution
Generation commencemen to ESI/EPF
Subsidy t of (2) Details of workers
commercial (3) Certificate from
production RPFC/Director, ESI per
Annexure A to Form V re:
contributions
Refund of M.D. WBIDC After VI Schedule of Lands, Map of
Stamp Duty commencemen Land/Building purchased,
& t of Evidence of payment of
Registration commercial Stamp duty & Registration
Fee production Fees